FAP 0335 23 SMART
- Let date
- Friday, June 13, 2025
- Contract
- 62V52 · job page
- District
- District 1
- County
- Mchenry
- Highway
- Limits
- (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Curran Contracting Company Low bidder | $2,389,468 | ||
| 2 | Peter Baker & Son Co. | $2,655,193 | +11.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Curran Contract… | #2 Peter Baker & S… |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $15,000.00 | $2,500.00 | |
| 2 | X1400378 | PED SIGNAL POST 5 FT | 2 | EACH | $1,490.60 | $1,490.60 | |
| 3 | X2020110 | GRADING & SHAP SHLDRS | 162 | UNIT | $60.00 | $160.00 | |
| 4 | X4400501 | CC&G RMVL REPL < = 10 | 75 | FOOT | $71.55 | $95.00 | |
| 5 | X4400503 | CC&G RMVL REPL > 10FT | 385 | FOOT | $68.70 | $95.00 | |
| 6 | X6030310 | FR & LIDS ADJUST SPL | 9 | EACH | $2,500.00 | $1,500.00 | |
| 7 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $4,000.00 | $1,000.00 | |
| 8 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $16.00 | $25.00 | |
| 9 | X8760200 | ACCESSIBLE PED SIGNAL | 4 | EACH | $2,695.35 | $2,695.35 | |
| 10 | X8780012 | CONC FDN TY A 12D | 8 | FOOT | $421.88 | $421.88 | |
| 11 | X8860105 | DET LOOP REPL | 961 | FOOT | $25.80 | $25.80 | |
| 12 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 1 | EACH | $682.50 | $682.50 | |
| 13 | 20200100 | EARTH EXCAVATION | 3,315 | CU YD | $25.00 | $74.00 | |
| 14 | 20201200 | REM & DISP UNS MATL | 325 | CU YD | $30.00 | $80.00 | |
| 15 | 21001000 | GEOTECH FAB F/GR STAB | 975 | SQ YD | $2.13 | $4.50 | |
| 16 | 21101615 | TOPSOIL F & P 4 | 70 | SQ YD | $10.00 | $10.00 | |
| 17 | 25200110 | SODDING SALT TOLERANT | 70 | SQ YD | $60.00 | $60.00 | |
| 18 | 25200200 | SUPPLE WATERING | 0.4 | UNIT | $0.0100 | $1.00 | |
| 19 | 30300001 | AGG SUBGRADE IMPROVE | 325 | CU YD | $65.00 | $130.00 | |
| 20 | 30300112 | AGG SUBGRADE IMPR 12 | 4,872 | SQ YD | $28.00 | $40.00 | |
| 21 | 35501316 | HMA BASE CSE 8 | 12 | SQ YD | $115.00 | $135.60 | |
| 22 | 35600708 | HMA BC WID 8 | 4,872 | SQ YD | $46.00 | $45.50 | |
| 23 | 40600275 | BIT MATLS PR CT | 2,195 | POUND | $1.35 | $0.0100 | |
| 24 | 40600290 | BIT MATLS TACK CT | 26,287 | POUND | $0.0100 | $0.0100 | |
| 25 | 40600370 | LONG JOINT SEALANT | 19,277 | FOOT | $2.80 | $3.80 | |
| 26 | 40600400 | MIX CR JTS FLANGEWYS | 147 | TON | $200.00 | $75.00 | |
| 27 | 40600982 | HMA SURF REM BUTT JT | 364 | SQ YD | $25.00 | $1.00 | |
| 28 | 40603200 | P HMA BC IL-4.75 N50 | 794 | TON | $110.00 | $113.00 | |
| 29 | 40604060 | HMA SC IL-9.5 D N50 | 2 | TON | $400.00 | $250.00 | |
| 30 | 40604062 | HMA SC IL-9.5 D N70 | 4,098 | TON | $87.00 | $87.00 | |
| 31 | 42001300 | PROTECTIVE COAT | 249 | SQ YD | $0.0100 | $3.00 | |
| 32 | 42300400 | PCC DRIVEWAY PAVT 8 | 9 | SQ YD | $184.25 | $300.00 | |
| 33 | 42400200 | PC CONC SIDEWALK 5 | 900 | SQ FT | $16.50 | $15.00 | |
| 34 | 42400800 | DETECTABLE WARNINGS | 74 | SQ FT | $40.00 | $60.00 | |
| 35 | 44000100 | PAVEMENT REM | 4,872 | SQ YD | $32.00 | $22.00 | |
| 36 | 44000155 | HMA SURF REM 1 1/2 | 29,544 | SQ YD | $2.25 | $1.99 | |
| 37 | 44000158 | HMA SURF REM 2 1/4 | 19,347 | SQ YD | $2.60 | $2.99 | |
| 38 | 44000200 | DRIVE PAVEMENT REM | 20 | SQ YD | $24.00 | $105.00 | |
| 39 | 44000600 | SIDEWALK REM | 350 | SQ FT | $4.94 | $5.00 | |
| 40 | 44201823 | CL D PATCH T1 15 | 85 | SQ YD | $300.00 | $85.00 | |
| 41 | 44201827 | CL D PATCH T2 15 | 512 | SQ YD | $200.00 | $85.00 | |
| 42 | 44201831 | CL D PATCH T3 15 | 598 | SQ YD | $150.00 | $85.00 | |
| 43 | 44201833 | CL D PATCH T4 15 | 512 | SQ YD | $120.00 | $85.00 | |
| 44 | 44213200 | SAW CUTS | 12,361 | FOOT | $1.00 | $3.75 | |
| 45 | 48102100 | AGG WEDGE SHLD TYPE B | 274 | TON | $50.00 | $55.00 | |
| 46 | 60257900 | MAN RECONST | 2 | EACH | $3,000.00 | $4,500.00 | |
| 47 | 60406100 | FR & LIDS T1 CL | 2 | EACH | $1,000.00 | $800.00 | |
| 48 | 60920012 | PIPE CULV CLEANED 12 | 150 | FOOT | $18.00 | $18.00 | |
| 49 | 66900200 | NON SPL WASTE DISPOSL | 3,315 | CU YD | $60.00 | $80.00 | |
| 50 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,400.00 | $1,800.00 | |
| 51 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,900.00 | $3,500.00 | |
| 52 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $500.00 | |
| 53 | 66901006 | REG SUB MON | 20 | CAL DA | $700.00 | $725.00 | |
| 54 | 67100100 | MOBILIZATION | 1 | L SUM | $150,000.00 | $268,094.00 | |
| 55 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $125.00 | $100.00 | |
| 56 | 70100455 | TRAF CONT-PROT 701206 | 1 | L SUM | $1.00 | $100.00 | |
| 57 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $125.00 | $100.00 | |
| 58 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $25,000.00 | $100.00 | |
| 59 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $25,000.00 | $118,410.00 | |
| 60 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $1.00 | $100.00 | |
| 61 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $100.00 | |
| 62 | 70300100 | SHORT TERM PAVT MKING | 38,078 | FOOT | $0.0100 | $0.0100 | |
| 63 | 70300150 | SHRT TRM PAVT MK REM | 12,693 | SQ FT | $0.0100 | $0.0100 | |
| 64 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 1,977 | SQ FT | $1.00 | $0.0100 | |
| 65 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 125,745 | FOOT | $0.4000 | $0.0100 | |
| 66 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 9,849 | FOOT | $0.4500 | $0.0100 | |
| 67 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 750 | FOOT | $0.8000 | $0.0100 | |
| 68 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,746 | FOOT | $1.00 | $0.0100 | |
| 69 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 765 | FOOT | $1.25 | $0.0100 | |
| 70 | 70307120 | TEMP PVT MK L4 T4 TAPE | 25,131 | FOOT | $1.00 | $0.0100 | |
| 71 | 78000100 | THPL PVT MK LTR & SYM | 659 | SQ FT | $4.20 | $4.00 | |
| 72 | 78000200 | THPL PVT MK LINE 4 | 41,915 | FOOT | $0.7000 | $0.7900 | |
| 73 | 78000400 | THPL PVT MK LINE 6 | 3,283 | FOOT | $1.05 | $1.22 | |
| 74 | 78000500 | THPL PVT MK LINE 8 | 250 | FOOT | $1.40 | $1.63 | |
| 75 | 78000600 | THPL PVT MK LINE 12 | 582 | FOOT | $2.10 | $2.45 | |
| 76 | 78000650 | THPL PVT MK LINE 24 | 255 | FOOT | $4.20 | $4.90 | |
| 77 | 78100100 | RAISED REFL PAVT MKR | 655 | EACH | $36.00 | $46.90 | |
| 78 | 78300200 | RAISED REF PVT MK REM | 524 | EACH | $13.79 | $19.00 | |
| 79 | 78300202 | PVT MKG REM WTR BLAST | 52,593 | SQ FT | $0.0200 | $0.0500 | |
| 80 | 81028200 | UNDRGRD C GALVS 2 | 72 | FOOT | $41.65 | $41.65 | |
| 81 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $2,000.00 | $2,000.00 | |
| 82 | 87301215 | ELCBL C SIGNAL 14 2C | 418 | FOOT | $1.29 | $1.29 | |
| 83 | 87301900 | ELCBL C EGRDC 6 1C | 33 | FOOT | $2.21 | $2.21 | |
| 84 | 87900200 | DRILL EX HANDHOLE | 3 | EACH | $845.00 | $845.00 | |
| 85 | 89502300 | REM ELCBL FR CON | 434 | FOOT | $0.7300 | $0.7300 | |
| 86 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $630.00 | $630.00 | |
| 87 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $1,297.50 | $1,297.50 | |
| 88 | 89502380 | REMOV EX HANDHOLE | 1 | EACH | $785.00 | $785.00 |