19-00001-05-PV
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Keller Construction, Inc. Low bidder | $1,917,545 | ||
| 2 | Stutz Excavating, Inc. | $2,134,685 | +11.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Keller Construc… | #2 Stutz Excavatin… |
|---|---|---|---|---|---|---|---|
| 1 | X0327301 | RELOCATE EX MAILBOX | 4 | EACH | $655.00 | $230.00 | |
| 2 | X1400326 | R R FL BEACON A COMP | 2 | EACH | $10,800.00 | $11,880.00 | |
| 3 | X2010505 | CLEARING SPECIAL | 1 | L SUM | $12,575.00 | $13,280.00 | |
| 4 | X2501010 | SEEDING CL 2 MOD | 0.7 | ACRE | $4,445.00 | $12,000.00 | |
| 5 | X5510010 | STORM SEW CONNECTION | 1 | EACH | $1,685.00 | $1,945.00 | |
| 6 | X6300225 | SINGLE END SECTION | 4 | EACH | $52.00 | $60.00 | |
| 7 | X6640102 | FENCE (SPECIAL) | 200 | FOOT | $53.25 | $130.00 | |
| 8 | X6640106 | FENCE REMOVAL SPECIAL | 880 | FOOT | $6.80 | $5.00 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $20,000.00 | $18,920.00 | |
| 10 | X7240502 | RELOCATE SIGN SPL | 2 | EACH | $1,400.00 | $1,540.00 | |
| 11 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | |
| 12 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | |
| 13 | 20101000 | TEMPORARY FENCE | 665 | FOOT | $11.80 | $20.00 | |
| 14 | 20200100 | EARTH EXCAVATION | 3,155 | CU YD | $18.70 | $36.70 | |
| 15 | 20201200 | REM & DISP UNS MATL | 25 | CU YD | $56.10 | $45.00 | |
| 16 | 20800150 | TRENCH BACKFILL | 208 | CU YD | $46.50 | $56.00 | |
| 17 | 25000400 | NITROGEN FERT NUTR | 61 | POUND | $7.05 | $5.00 | |
| 18 | 25000500 | PHOSPHORUS FERT NUTR | 61 | POUND | $7.05 | $5.00 | |
| 19 | 25000600 | POTASSIUM FERT NUTR | 61 | POUND | $7.05 | $5.00 | |
| 20 | 25000700 | AGR GROUND LIMESTONE | 1.4 | TON | $1,415.00 | $550.00 | |
| 21 | 25100115 | MULCH METHOD 2 | 0.3 | ACRE | $9,220.00 | $15,000.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 1,803 | SQ YD | $2.15 | $5.10 | |
| 23 | 25100900 | TURF REINF MAT | 239 | SQ YD | $11.00 | $20.00 | |
| 24 | 28000250 | TEMP EROS CONTR SEED | 280 | POUND | $8.00 | $5.00 | |
| 25 | 28000305 | TEMP DITCH CHECKS | 42 | FOOT | $24.00 | $20.00 | |
| 26 | 28000400 | PERIMETER EROS BAR | 1,503 | FOOT | $3.00 | $5.10 | |
| 27 | 28000500 | INLET & PIPE PROTECT | 12 | EACH | $395.00 | $90.00 | |
| 28 | 28100205 | STONE RIPRAP CL A3 | 61 | TON | $142.00 | $156.00 | |
| 29 | 28200200 | FILTER FABRIC | 129 | SQ YD | $4.25 | $4.70 | |
| 30 | 30200650 | PROCESS MOD SOIL 12 | 3,696 | SQ YD | $5.70 | $9.30 | |
| 31 | 30201700 | PORTLAND CEMENT | 134 | TON | $305.55 | $288.00 | |
| 32 | 31100300 | SUB GRAN MAT A 4 | 4,963 | SQ YD | $12.15 | $14.20 | |
| 33 | 31101000 | SUB GRAN MAT B | 47 | TON | $39.00 | $59.70 | |
| 34 | 35102000 | AGG BASE CSE B 8 | 257 | SQ YD | $12.90 | $17.25 | |
| 35 | 40200500 | AGG SURF CSE A 6 | 527 | SQ YD | $18.20 | $16.85 | |
| 36 | 40201000 | AGGREGATE-TEMP ACCESS | 140 | TON | $64.65 | $55.00 | |
| 37 | 40600275 | BIT MATLS PR CT | 518 | POUND | $0.0100 | $2.15 | |
| 38 | 40600290 | BIT MATLS TACK CT | 104 | POUND | $2.56 | $8.00 | |
| 39 | 40603085 | HMA BC IL-19.0 N70 | 33 | TON | $135.87 | $215.00 | |
| 40 | 40604052 | HMA SC IL-9.5 C N70 | 20 | TON | $196.00 | $300.00 | |
| 41 | 40800050 | INCIDENTAL HMA SURF | 40 | TON | $319.15 | $425.00 | |
| 42 | 42000301 | PCC PVT 8 JOINTED | 2,958 | SQ YD | $83.65 | $97.00 | |
| 43 | 42300200 | PCC DRIVEWAY PAVT 6 | 83 | SQ YD | $176.50 | $145.00 | |
| 44 | 42300400 | PCC DRIVEWAY PAVT 8 | 30 | SQ YD | $195.50 | $155.00 | |
| 45 | 42400100 | PC CONC SIDEWALK 4 | 9,987 | SQ FT | $6.88 | $11.80 | |
| 46 | 42400800 | DETECTABLE WARNINGS | 40 | SQ FT | $52.00 | $25.00 | |
| 47 | 44000100 | PAVEMENT REM | 337 | SQ YD | $11.70 | $7.60 | |
| 48 | 44000200 | DRIVE PAVEMENT REM | 271 | SQ YD | $27.10 | $7.60 | |
| 49 | 44000400 | GUTTER REM | 106 | FOOT | $13.65 | $8.25 | |
| 50 | 44000500 | COMB CURB GUTTER REM | 22 | FOOT | $61.20 | $25.00 | |
| 51 | 44000600 | SIDEWALK REM | 41 | SQ FT | $17.65 | $10.00 | |
| 52 | 48101498 | AGGREGATE SHLDS B 4 | 40 | SQ YD | $36.85 | $16.50 | |
| 53 | 50105220 | PIPE CULVERT REMOV | 282 | FOOT | $40.00 | $13.80 | |
| 54 | 52200700 | PRECAST MOD RET WALL | 6,941 | SQ FT | $109.80 | $110.00 | |
| 55 | 542D0220 | P CUL CL D 1 15 | 48 | FOOT | $87.80 | $73.55 | |
| 56 | 550A0050 | STORM SEW CL A 1 12 | 206 | FOOT | $108.00 | $87.50 | |
| 57 | 550A0070 | STORM SEW CL A 1 15 | 684 | FOOT | $71.25 | $80.60 | |
| 58 | 55100700 | STORM SEWER REM 15 | 122 | FOOT | $28.10 | $19.60 | |
| 59 | 60108104 | PIPE UNDERDR T 1 4 | 683 | FOOT | $29.45 | $30.00 | |
| 60 | 60236200 | INLETS TA T8G | 1 | EACH | $4,287.00 | $1,450.00 | |
| 61 | 60237470 | INLETS TA T24F&G | 4 | EACH | $4,215.00 | $1,505.00 | |
| 62 | 60240328 | INLETS TB T24F&G | 7 | EACH | $4,580.00 | $1,920.00 | |
| 63 | 60605000 | COMB CC&G TY B-6.24 | 2,070 | FOOT | $28.15 | $41.00 | |
| 64 | 63000001 | SPBGR TY A 6FT POSTS | 463 | FOOT | $69.61 | $41.00 | |
| 65 | 66400105 | CH LK FENCE 4 | 545 | FOOT | $50.42 | $80.00 | |
| 66 | 67000500 | ENGR FIELD OFFICE B | 6 | CAL MO | $3,300.00 | $1,800.00 | |
| 67 | 67100100 | MOBILIZATION | 1 | L SUM | $115,000.00 | $151,000.00 | |
| 68 | 72000100 | SIGN PANEL T1 | 55 | SQ FT | $49.50 | $54.50 | |
| 69 | 72800100 | TELES STL SIN SUPPORT | 41 | FOOT | $27.75 | $30.50 | |
| 70 | 72900100 | METAL POST TY A | 125 | FOOT | $25.00 | $27.50 | |
| 71 | 78001100 | PT PVT MK LTRS & SYMB | 6 | SQ FT | $24.00 | $26.40 | |
| 72 | 78001110 | PAINT PVT MK LINE 4 | 255 | FOOT | $3.90 | $4.30 | |
| 73 | 78001150 | PAINT PVT MK LINE 12 | 30 | FOOT | $12.00 | $13.20 | |
| 74 | 78009004 | MOD URETH PM LINE 4 | 2,228 | FOOT | $1.30 | $1.45 | |
| 75 | 78009024 | MOD URETH PM LINE 24 | 70 | FOOT | $15.50 | $17.05 | |
| 76 | 78100100 | RAISED REFL PAVT MKR | 13 | EACH | $230.00 | $218.00 | |
| 77 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $12.00 | $14.00 |