(101,102,103)RS-3
- Let date
- Friday, April 23, 2021
- Contract
- 74939 · job page
- District
- District 7
- County
- Wabash
- Highway
- Limits
- 12.2 miles of surface removal, patching, pipe and culvert replacement, deck patching, joint repair and concrete wearing surface on SN 093-0020 on IL 1 from Greathouse Creek in Mt. Carmel to the Edwards County line.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $7,017,712 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 1,846 | SQ YD | $23.94 | |
| 2 | X0900064 | MEMBR WTRPR SYS B STR | 54.3 | SQ YD | $18.58 | |
| 3 | X1200050 | BOX CULVERT REMOVAL | 52 | FOOT | $187.76 | |
| 4 | X2020110 | GRADING & SHAP SHLDRS | 61 | UNIT | $35.71 | |
| 5 | X2501000 | SEEDING CL 2 SPL | 0.5 | ACRE | $7,900.00 | |
| 6 | X4060995 | TEMPORARY RAMP SPL | 569 | SQ YD | $17.89 | |
| 7 | X4401198 | HMA SURF REM VAR DP | 8,750 | SQ YD | $2.37 | |
| 8 | X4406660 | PART DEP REM T4 6 | 3,750 | SQ YD | $24.04 | |
| 9 | X4421000 | PARTIAL DEPTH PATCH | 1,260 | TON | $158.69 | |
| 10 | X6330900 | VERT ADJ OF GUARDRAIL | 476 | FOOT | $45.00 | |
| 11 | X6350120 | DELINEATOR REMOVAL | 6 | EACH | $113.24 | |
| 12 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $4,050.00 | |
| 13 | X7030005 | TEMP PAVT MKING REMOV | 53,100 | SQ FT | $0.00 | |
| 14 | Z0012110 | BRD FLYASH/SLAG 2 1/4 | 419 | SQ YD | $139.52 | |
| 15 | Z0012130 | BR DECK SCAR 3/4 | 419 | SQ YD | $140.67 | |
| 16 | Z0016001 | DECK SLAB REP (FD-T1) | 2 | SQ YD | $3,059.84 | |
| 17 | Z0016002 | DECK SLAB REP (FD-T2) | 2 | SQ YD | $3,059.84 | |
| 18 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $5,275.00 | |
| 19 | Z0033700 | LONG JOINT SEALANT | 63,660 | FOOT | $2.29 | |
| 20 | Z0046304 | P UNDR FOR STRUCT 4 | 110 | FOOT | $13.83 | |
| 21 | Z0049799 | PROT RESET SURVEY MRK | 7 | EACH | $398.15 | |
| 22 | Z0054505 | ROCK FILL - REPLACE | 58 | TON | $33.08 | |
| 23 | Z0076600 | TRAINEES | 500 | HOUR | $1.00 | |
| 24 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | |
| 25 | 20201200 | REM & DISP UNS MATL | 154 | CU YD | $35.32 | |
| 26 | 20400800 | FURNISHED EXCAVATION | 510 | CU YD | $87.75 | |
| 27 | 20600110 | GRAN EMBANK SPEC | 296 | TON | $30.51 | |
| 28 | 20800150 | TRENCH BACKFILL | 23 | CU YD | $42.17 | |
| 29 | 28100205 | STONE RIPRAP CL A3 | 33 | TON | $38.15 | |
| 30 | 28200200 | FILTER FABRIC | 73 | SQ YD | $1.49 | |
| 31 | 40200800 | AGG SURF CSE B | 476 | TON | $63.67 | |
| 32 | 40600290 | BIT MATLS TACK CT | 128,091 | POUND | $0.9300 | |
| 33 | 40600990 | TEMPORARY RAMP | 883 | SQ YD | $6.96 | |
| 34 | 40602970 | HMA BC IL-9.5FG N70 | 17,603 | TON | $95.06 | |
| 35 | 40603085 | HMA BC IL-19.0 N70 | 1,246 | TON | $133.49 | |
| 36 | 40604052 | HMA SC IL-9.5 C N70 | 20,355 | TON | $93.48 | |
| 37 | 40800050 | INCIDENTAL HMA SURF | 197 | TON | $289.13 | |
| 38 | 44000100 | PAVEMENT REM | 127 | SQ YD | $63.65 | |
| 39 | 44000155 | HMA SURF REM 1 1/2 | 151,070 | SQ YD | $2.25 | |
| 40 | 44000164 | HMA SURF REM 3 3/4 | 15,106 | SQ YD | $4.63 | |
| 41 | 44000165 | HMA SURF REM 4 | 6,713 | SQ YD | $5.15 | |
| 42 | 44201789 | CL D PATCH T2 12 | 608 | SQ YD | $192.00 | |
| 43 | 44201794 | CL D PATCH T3 12 | 260 | SQ YD | $192.00 | |
| 44 | 44201796 | CL D PATCH T4 12 | 2,167 | SQ YD | $191.99 | |
| 45 | 48101500 | AGGREGATE SHLDS B 6 | 467 | SQ YD | $48.78 | |
| 46 | 48102100 | AGG WEDGE SHLD TYPE B | 3,926 | TON | $37.31 | |
| 47 | 48203100 | HMA SHOULDERS | 359 | TON | $109.41 | |
| 48 | 50102400 | CONC REM | 11.2 | CU YD | $3,546.50 | |
| 49 | 50105220 | PIPE CULVERT REMOV | 120 | FOOT | $58.87 | |
| 50 | 50200450 | REM/DISP UNS MATL-STR | 54 | CU YD | $36.48 | |
| 51 | 50300255 | CONC SUP-STR | 11.8 | CU YD | $3,646.14 | |
| 52 | 50300260 | BR DECK GROOVING | 414 | SQ YD | $21.48 | |
| 53 | 50300300 | PROTECTIVE COAT | 450 | SQ YD | $7.82 | |
| 54 | 50800205 | REINF BARS, EPOXY CTD | 1,400 | POUND | $4.17 | |
| 55 | 50800515 | BAR SPLICERS | 24 | EACH | $41.75 | |
| 56 | 52000110 | PREF JT STRIP SEAL | 84 | FOOT | $266.58 | |
| 57 | 54001001 | BOX CUL END SEC C1 | 2 | EACH | $11,508.79 | |
| 58 | 54010802 | PCBC 8X2 | 44.4 | FOOT | $823.14 | |
| 59 | 542A0223 | P CUL CL A 1 18 | 38 | FOOT | $226.05 | |
| 60 | 542A0229 | P CUL CL A 1 24 | 82 | FOOT | $153.44 | |
| 61 | 54213663 | PRC FLAR END SEC 18 | 2 | EACH | $2,077.31 | |
| 62 | 54213669 | PRC FLAR END SEC 24 | 2 | EACH | $2,283.64 | |
| 63 | 59100100 | GEOCOMPOSITE WALL DR | 29.6 | SQ YD | $12.55 | |
| 64 | 60100060 | CONC HDWL FOR P DRAIN | 4 | EACH | $252.78 | |
| 65 | 63500105 | DELINEATORS | 6 | EACH | $228.50 | |
| 66 | 66700205 | PERM SURV MKRS T1 | 7 | EACH | $749.83 | |
| 67 | 67000400 | ENGR FIELD OFFICE A | 10 | CAL MO | $2,174.04 | |
| 68 | 67000600 | ENGR FIELD LAB | 10 | CAL MO | $1,806.10 | |
| 69 | 67100100 | MOBILIZATION | 1 | L SUM | $392,290.79 | |
| 70 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $17,170.78 | |
| 71 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $18,261.65 | |
| 72 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $133,359.31 | |
| 73 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $88,766.26 | |
| 74 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $9,862.30 | |
| 75 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $22,925.89 | |
| 76 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $132.00 | |
| 77 | 70300100 | SHORT TERM PAVT MKING | 19,249 | FOOT | $0.9100 | |
| 78 | 70300150 | SHRT TRM PAVT MK REM | 2,139 | SQ FT | $2.73 | |
| 79 | 70300220 | TEMP PVT MK LINE 4 | 159,315 | FOOT | $0.00 | |
| 80 | 70400100 | TEMP CONC BARRIER | 344 | FOOT | $46.45 | |
| 81 | 70400200 | REL TEMP CONC BARRIER | 320 | FOOT | $5.79 | |
| 82 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $5,399.33 | |
| 83 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $325.81 | |
| 84 | 78001110 | PAINT PVT MK LINE 4 | 159,315 | FOOT | $0.1200 | |
| 85 | 78100100 | RAISED REFL PAVT MKR | 839 | EACH | $30.35 | |
| 86 | 78300200 | RAISED REF PVT MK REM | 839 | EACH | $0.00 |