16-00095-00-BT
Bidders 6
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Martam Construction Incorporated Low bidder | $377,363 | ||
| 2 | Schroeder Asphalt Services, Inc. | $379,896 | +0.7% | |
| 3 | K-Five Construction Corporation | $421,005 | +11.6% | |
| 4 | Alliance Contractors, Inc. | $432,642 | +14.6% | |
| 5 | Chicagoland Paving Contractors, Inc. | $445,000 | +17.9% | |
| 6 | Copenhaver Construction, Inc. | $456,892 | +21.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Martam Construc… | #2 Schroeder Aspha… | #3 K-Five Construc… | #4 Alliance Contra… | #5 Chicagoland Pav… | #6 Copenhaver Cons… |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X1400367 | PED SIGNAL POST 10 FT | 2 | EACH | $1,100.00 | $1,200.00 | $1,041.00 | $1,041.00 | $1,125.00 | $979.20 | |
| 2 | X1400378 | PED SIGNAL POST 5 FT | 2 | EACH | $950.00 | $1,000.00 | $898.00 | $898.00 | $955.00 | $979.20 | |
| 3 | X2502014 | SEEDING CL 4A MOD | 0.5 | ACRE | $3,300.00 | $5,400.00 | $3,000.00 | $3,000.00 | $7,950.00 | $7,950.00 | |
| 4 | X2511630 | EROS CONT BLANKET SPL | 4,911 | SQ YD | $1.60 | $1.40 | $1.50 | $1.50 | $1.60 | $3.50 | |
| 5 | X4400501 | COMB C&G REMOV REPL < = 10FT | 42 | FOOT | $95.00 | $70.00 | $125.00 | $125.00 | $70.00 | $65.00 | |
| 6 | X5090810 | PEDESTRIAN RAIL SPL | 76 | FOOT | $285.00 | $240.00 | $265.97 | $265.97 | $290.00 | $265.97 | |
| 7 | X8780012 | CONC FDN TY A 12D | 16 | FOOT | $150.00 | $300.00 | $234.00 | $234.00 | $250.00 | $172.01 | |
| 8 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $5,000.00 | $12,000.00 | $5,920.00 | $4,500.00 | $2,900.00 | $18,000.00 | |
| 9 | Z0030850 | TEMP INFO SIGNING | 103 | SQ FT | $15.00 | $20.00 | $12.00 | $12.00 | $18.50 | $20.00 | |
| 10 | Z0033044 | RE-OPTIMIZE SIG SYS 1 | 1 | EACH | $950.00 | $1,200.00 | $935.00 | $935.00 | $995.00 | $682.50 | |
| 11 | 20100110 | TREE REMOV 6-15 | 1,534 | UNIT | $11.00 | $11.00 | $10.00 | $10.00 | $10.60 | $20.00 | |
| 12 | 20100210 | TREE REMOV OVER 15 | 649 | UNIT | $13.00 | $13.25 | $12.00 | $12.00 | $12.75 | $25.00 | |
| 13 | 20101100 | TREE TRUNK PROTECTION | 29 | EACH | $100.00 | $100.00 | $90.00 | $90.00 | $100.00 | $185.00 | |
| 14 | 20101200 | TREE ROOT PRUNING | 29 | EACH | $130.00 | $132.00 | $120.00 | $120.00 | $130.00 | $65.00 | |
| 15 | 20200100 | EARTH EXCAVATION | 335 | CU YD | $36.00 | $36.00 | $40.00 | $50.00 | $50.00 | $37.00 | |
| 16 | 20201200 | REM & DISP UNS MATL | 805 | CU YD | $40.00 | $38.00 | $54.00 | $50.00 | $20.00 | $37.00 | |
| 17 | 20400800 | FURNISHED EXCAVATION | 520 | CU YD | $22.00 | $23.00 | $51.00 | $20.00 | $35.00 | $10.00 | |
| 18 | 20800150 | TRENCH BACKFILL | 14 | CU YD | $95.00 | $60.00 | $60.00 | $90.00 | $57.25 | $45.00 | |
| 19 | 21101615 | TOPSOIL F & P 4 | 4,911 | SQ YD | $5.50 | $6.25 | $5.10 | $5.10 | $4.80 | $5.00 | |
| 20 | 25000210 | SEEDING CL 2A | 0.75 | ACRE | $3,300.00 | $4,000.00 | $3,000.00 | $3,000.00 | $3,890.00 | $2,950.00 | |
| 21 | 28000250 | TEMP EROS CONTR SEED | 101 | POUND | $6.00 | $5.00 | $5.00 | $5.00 | $5.30 | $9.00 | |
| 22 | 28000400 | PERIMETER EROS BAR | 1,761 | FOOT | $3.00 | $4.00 | $2.00 | $3.00 | $2.05 | $3.00 | |
| 23 | 28000510 | INLET FILTERS | 4 | EACH | $300.00 | $130.00 | $180.00 | $250.00 | $160.00 | $70.00 | |
| 24 | 28001100 | TEMP EROS CONTR BLANK | 4,911 | SQ YD | $0.4000 | $2.00 | $0.3500 | $0.3500 | $0.9000 | $1.50 | |
| 25 | 30300001 | AGG SUBGRADE IMPROVE | 25 | CU YD | $54.00 | $60.00 | $62.31 | $25.00 | $40.00 | $39.00 | |
| 26 | 35101800 | AGG BASE CSE B 6 | 2,096 | SQ YD | $6.00 | $8.75 | $13.00 | $6.00 | $10.00 | $9.00 | |
| 27 | 40600275 | BIT MATLS PR CT | 4,706 | POUND | $1.00 | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $0.5000 | |
| 28 | 40604060 | HMA SC IL-9.5 D N50 | 319 | TON | $102.00 | $95.00 | $101.00 | $139.20 | $100.00 | $135.00 | |
| 29 | 40604062 | HMA SC IL-9.5 D N70 | 1 | TON | $2,800.00 | $1,500.00 | $105.00 | $1,113.20 | $500.00 | $1,500.00 | |
| 30 | 42400200 | PC CONC SIDEWALK 5 | 260 | SQ FT | $8.00 | $14.00 | $35.00 | $14.80 | $13.50 | $11.00 | |
| 31 | 42400800 | DETECTABLE WARNINGS | 43 | SQ FT | $35.00 | $80.00 | $50.00 | $25.00 | $73.00 | $30.00 | |
| 32 | 44000600 | SIDEWALK REM | 287 | SQ FT | $3.00 | $10.00 | $15.00 | $3.00 | $2.00 | $3.00 | |
| 33 | 50104400 | CONC HDWL REM | 1 | EACH | $1,200.00 | $600.00 | $500.00 | $500.00 | $560.00 | $1,500.00 | |
| 34 | 542C0217 | P CUL CL C 1 12 | 18 | FOOT | $85.00 | $96.00 | $70.00 | $88.00 | $93.50 | $95.00 | |
| 35 | 54213657 | PRC FLAR END SEC 12 | 1 | EACH | $700.00 | $2,600.00 | $1,200.00 | $2,350.00 | $2,500.00 | $1,200.00 | |
| 36 | 54213669 | PRC FLAR END SEC 24 | 1 | EACH | $1,500.00 | $3,600.00 | $1,895.00 | $3,250.00 | $3,450.00 | $1,600.00 | |
| 37 | 54262712 | METAL FL END SEC 12" | 1 | EACH | $300.00 | $600.00 | $200.00 | $525.00 | $560.00 | $700.00 | |
| 38 | 550A0050 | STORM SEW CL A 1 12 | 78 | FOOT | $88.00 | $105.00 | $85.00 | $95.00 | $101.00 | $90.00 | |
| 39 | 550A0120 | STORM SEW CL A 1 24 | 19 | FOOT | $189.00 | $205.00 | $120.00 | $185.00 | $200.00 | $150.00 | |
| 40 | 55100500 | STORM SEWER REM 12 | 10 | FOOT | $40.00 | $56.00 | $20.00 | $50.00 | $53.00 | $20.00 | |
| 41 | 60207605 | CB TC T8G | 3 | EACH | $2,200.00 | $2,900.00 | $2,400.00 | $2,650.00 | $2,815.00 | $2,600.00 | |
| 42 | 60218400 | MAN TA 4 DIA T1F CL | 1 | EACH | $3,500.00 | $5,200.00 | $2,900.00 | $4,750.00 | $5,050.00 | $3,200.00 | |
| 43 | 60236200 | INLETS TA T8G | 1 | EACH | $1,600.00 | $2,400.00 | $1,400.00 | $2,150.00 | $2,300.00 | $1,200.00 | |
| 44 | 66900200 | NON SPL WASTE DISPOSL | 6 | CU YD | $125.00 | $100.00 | $150.00 | $190.00 | $100.00 | $450.00 | |
| 45 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $2,000.00 | $1,750.00 | $1,850.00 | $1,800.00 | $2,100.00 | $2,000.00 | |
| 46 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $5,000.00 | $2,800.00 | $4,800.00 | $1,800.00 | $3,100.00 | $3,100.00 | |
| 47 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $600.00 | $2,250.00 | $500.00 | $2,200.00 | $750.00 | $1,300.00 | |
| 48 | 66901006 | REG SUB MON | 10 | CAL DA | $500.00 | $1,000.00 | $425.00 | $70.00 | $775.00 | $850.00 | |
| 49 | 67000400 | ENGR FIELD OFFICE A | 3 | CAL MO | $3,800.00 | $3,000.00 | $3,300.00 | $500.00 | $1,500.00 | $1,500.00 | |
| 50 | 67100100 | MOBILIZATION | 1 | L SUM | $22,000.00 | $12,000.00 | $25,260.00 | $40,000.00 | $113,619.49 | $27,000.00 | |
| 51 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $28,000.00 | $1.00 | $37,767.00 | $66,000.00 | $3,900.00 | $54,969.00 | |
| 52 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $200.00 | |
| 53 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $6,000.00 | $1.00 | $1.00 | $1.00 | $200.00 | |
| 54 | 72000100 | SIGN PANEL T1 | 6 | SQ FT | $30.00 | $40.00 | $20.00 | $20.00 | $42.75 | $60.00 | |
| 55 | 72400100 | REMOV SIN PAN ASSY TA | 4 | EACH | $90.00 | $30.00 | $75.00 | $75.00 | $30.50 | $70.00 | |
| 56 | 72400310 | REMOV SIGN PANEL T1 | 40 | SQ FT | $20.00 | $8.00 | $10.00 | $10.00 | $6.25 | $20.00 | |
| 57 | 72800100 | TELES STL SIN SUPPORT | 15 | FOOT | $20.00 | $30.00 | $15.00 | $15.00 | $24.50 | $20.00 | |
| 58 | 78000400 | THPL PVT MK LINE 6 | 179 | FOOT | $12.00 | $12.00 | $3.20 | $10.00 | $5.50 | $12.00 | |
| 59 | 78000600 | THPL PVT MK LINE 12 | 446 | FOOT | $4.00 | $5.00 | $6.40 | $3.75 | $10.00 | $5.00 | |
| 60 | 78300202 | PAVMT MRKG REM WTR BL | 159 | SQ FT | $20.00 | $20.00 | $15.00 | $15.00 | $20.00 | $18.00 | |
| 61 | 81028200 | UNDRGRD C GALVS 2 | 61 | FOOT | $26.00 | $26.00 | $24.40 | $24.40 | $25.90 | $64.48 | |
| 62 | 81028240 | UNDRGRD C GALVS 4 | 110 | FOOT | $68.00 | $72.00 | $65.00 | $65.00 | $69.00 | $69.25 | |
| 63 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $2,800.00 | $3,000.00 | $2,640.00 | $2,640.00 | $2,800.00 | $1,113.60 | |
| 64 | 87301215 | ELCBL C SIGNAL 14 2C | 217 | FOOT | $1.20 | $1.20 | $1.10 | $1.10 | $1.20 | $5.45 | |
| 65 | 87301225 | ELCBL C SIGNAL 14 3C | 235 | FOOT | $1.50 | $1.60 | $1.40 | $1.40 | $1.50 | $5.15 | |
| 66 | 87301900 | ELCBL C EGRDC 6 1C | 87 | FOOT | $2.20 | $2.20 | $2.00 | $2.00 | $2.15 | $13.57 | |
| 67 | 87900200 | DRILL EX HANDHOLE | 6 | EACH | $360.00 | $400.00 | $347.00 | $347.00 | $370.00 | $615.60 | |
| 68 | 88102717 | PED SH LED 1F BM CDT | 4 | EACH | $580.00 | $615.00 | $563.00 | $563.00 | $600.00 | $366.90 | |
| 69 | 88800100 | PED PUSH-BUTTON | 2 | EACH | $350.00 | $365.00 | $320.00 | $320.00 | $340.00 | $221.85 | |
| 70 | 89500400 | RELOC EX PED PUSH-BUT | 2 | EACH | $550.00 | $575.00 | $512.00 | $512.00 | $545.00 | $69.60 | |
| 71 | 89502200 | MOD EX CONTR | 1 | EACH | $1,300.00 | $1,300.00 | $1,168.00 | $1,168.00 | $1,250.00 | $525.00 | |
| 72 | 89502210 | MOD EX CONTR CAB | 1 | EACH | $2,400.00 | $2,600.00 | $2,278.00 | $2,278.00 | $2,425.00 | $525.00 | |
| 73 | 89502350 | REM & RE ELCBL FR CON | 137 | FOOT | $1.50 | $1.50 | $1.30 | $1.30 | $1.40 | $4.06 | |
| 74 | 89502375 | REMOV EX TS EQUIP | 2 | EACH | $900.00 | $930.00 | $880.00 | $880.00 | $935.00 | $139.20 | |
| 75 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $2,500.00 | $2,600.00 | $2,347.00 | $2,347.00 | $2,500.00 | $2,311.20 | |
| 76 | 89502400 | REM EX FB INSTAL COMP | 2 | EACH | $1,900.00 | $2,000.00 | $1,760.00 | $1,760.00 | $1,875.00 | $1,113.60 |