Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 1, 2025 78B73 JohnsonDistrict 9 Patching on IL 37 from Hunter Street to Carter Street in Cypress. — Executed Nov 25 New Samron Midwest Contracting, Inc. $106,695 ·
Aug 1, 2025 87864 DeKalbDistrict 3 Traffic signal modernization at various locations in DeKalb County. — Executed Nov 25 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $624,037 ·
Aug 1, 2025 87904 LaSalleDistrict 3 Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. — Executed Nov 25 New Gensini Excavating, Inc. $340,268 ·
Aug 1, 2025 91653 McLeanDistrict 5 Reconstruction and re-alignment of Hamilton Road from west of Bunn Street to existing Hamilton Road at Commerce Parkway, and reconstruction of Rhodes Lane from Hamilton Road to Morrissey Drive in Bloomington. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $16,110,130 ·
Aug 1, 2025 93833 SangamonDistrict 6 Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $6,690,296 ·
Aug 1, 2025 93840 HancockDistrict 6 Replace the bridge carrying 2350 N over Grove Creek 3.56 miles northwest of Burnside. Includes; HMA approach, Earthen shoulders, riprap, and seeding. — Executed Nov 25 New County Contractors, Inc. $535,985 ·
Aug 1, 2025 95981 CumberlandDistrict 7 HMA overlay with aggregate wedge shoulders on E 400 Road, from the Shelby County line to 2.6 miles east. — Executed Nov 25 New Howell Paving, Inc. $612,883 ·
Aug 1, 2025 97826 MadisonDistrict 8 HMA resurfacing with driveways, and curb and gutter on Keebler Road from Sher Nan Drive to West Main Street in Maryville. — Executed Nov 25 New Stutz Excavating, Inc. $829,420 ·
Aug 1, 2025 97863 St. ClairDistrict 8 Construction of a Multi-Use Trail along LandN Avenue from IL 4 to South Railway Street in Mascoutah. Includes lime modified soils, sidewalks, storm sewers, and seeding. — Executed Nov 25 New Baxmeyer Construction, Inc. $1,251,808 ·
Aug 1, 2025 97867 ClintonDistrict 8 Construct a single-span PPC deck beam bridge to carry CH 20 (Lake Road) over Bond Branch, 1 mile northeast of Carlyle. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $729,988 ·
Aug 1, 2025 99284 WilliamsonDistrict 9 Extend Ritter Road north to Grand Avenue in Herrin. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,069,759 ·
Aug 1, 2025 99760 WilliamsonDistrict 9 Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,142,142 ·
Sep 19, 2025 46668 VariousDistrict 7 Repairing various types of pavement markings at various locations throughout District 7. — Executed Nov 25 New Varsity Striping & Construction Co. $719,860 ·
Sep 19, 2025 61K52 LakeDistrict 1 Construction of an open-spandrel arch bridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. — Executed Nov 25 New Dunnet Bay Construction Company $4,297,627 ·
Sep 19, 2025 61K93 CookDistrict 1 Reconstruction of Tonne road from Lanmeier Road to Clearmont Drive in Elk Grove Village. — Executed Nov 25 New Lima Contractors $12,620,000 ·
Sep 19, 2025 61L21 CookDistrict 1 Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont. — Rejected Nov 25 New H & H Electric Co. $4,177,932 ·
Sep 19, 2025 61L28 KaneDistrict 1 Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. — Executed Nov 25 New Martam Construction Incorporated $11,987,774 ·
Sep 19, 2025 61L35 CookDistrict 1 Construct an HMA Multi-Use Path, sidewalk replacement and traffic signal modifications along Lake Street from Church Street to Gary Avenue in Hanover Park. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,344,596 ·
Sep 19, 2025 61L68 CookDistrict 1 Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood. — Executed Nov 25 New
Sep 19, 2025 61L69 DuPageDistrict 1 Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. — Executed Nov 25 New D. Construction, Inc. $3,634,117 ·
Sep 19, 2025 61L70 CookDistrict 1 Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington. — Executed Nov 25 New Triggi Construction, Inc. $220,672 ·
Sep 19, 2025 61L71 CookDistrict 1 HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge. — Executed Nov 25 New Builders Paving, LLC $2,778,778 ·
Sep 19, 2025 61L72 CookDistrict 1 HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments. — Executed Nov 25 New P. T. Ferro Construction Co. $1,092,187 ·
Sep 19, 2025 61L74 KaneDistrict 1 Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. — Executed Nov 25 New Triggi Construction, Inc. $354,811 ·
Sep 19, 2025 62B64 CookDistrict 1 (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County. — Executed Nov 25 New R. W. Dunteman Company $2,431,246 ·
Sep 19, 2025 62F86 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County. — Executed Nov 25 New
Sep 19, 2025 62J29 LakeDistrict 1 Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $586,632 ·
Sep 19, 2025 62K78 KaneDistrict 1 Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char — Executed Nov 25 New Plote Construction, Inc. $4,318,000 ·
Sep 19, 2025 62L15 CookDistrict 1 (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. — Executed Nov 25 New D. Construction, Inc. $2,190,770 ·
Sep 19, 2025 62R22 WillDistrict 1 (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d — Executed Nov 25 New D. Construction, Inc. $93,597,946 ·
Sep 19, 2025 62T23 McHenryDistrict 1 Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $257,146 ·
Sep 19, 2025 62U11 CookWillDistrict 1 Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $1,530,704 ·
Sep 19, 2025 62W62 CookDuPageWillDistrict 1 This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. — Executed Nov 25 New John Burns Construction Company $2,170,856 ·
Sep 19, 2025 62W89 VariousDistrict 1 This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage. — Executed Nov 25 New Meade Inc. $1,997,198 ·
Sep 19, 2025 62X00 LakeDistrict 1 Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $151,131 ·
Sep 19, 2025 62X01 WillDistrict 1 (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. — Executed Nov 25 New Iroquois Paving Corporation $7,332,294 ·
Sep 19, 2025 62X58 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement marki (4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $549,468 ·
Sep 19, 2025 62X84 CookDistrict 1 (2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and — Rejected Nov 25 New K-Five Construction Corporation $4,154,377 ·
Sep 19, 2025 62X87 CookDistrict 1 Asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concre (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton. — Executed Nov 25 New D. Construction, Inc. $682,549 ·
Sep 19, 2025 62Y06 VariousDistrict 1 Removing trees, as well as all incidental and collateral work necessary to complete the project The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties. — Executed Nov 25 New Homer Tree Service, Inc. $1,042,409 ·
Sep 19, 2025 62Y12 CookDistrict 1 (269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North A — Executed Nov 25 New Martam Construction Incorporated $955,094 ·
Sep 19, 2025 62Y13 CookDistrict 1 Staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge (304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County. — Executed Nov 25 New Martam Construction Incorporated $966,309 ·
Sep 19, 2025 62Y32 VariousDistrict 1 New guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardra This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. — Executed Nov 25 New Kujo, Inc. $2,998,621 ·
Sep 19, 2025 64P02 OgleDistrict 2 Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet. — Executed Nov 25 New Stenstrom Excavation & Blacktop, Inc. $1,269,521 ·
Sep 19, 2025 64P76 HenryDistrict 2 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). — Executed Nov 25 New Advanced Asphalt Company $2,339,070 ·
Sep 19, 2025 64U45 StephensonWinnebagoDistrict 2 Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. at Safford Rd. in Stephenson and Winnebago Counties. — Executed Nov 25 New CSD Environmental Services, Inc. $144,477 ·
Sep 19, 2025 64U54 Rock IslandDistrict 2 Tree removal along I-74 from 0.9 miles south of 23rd Ave. in Moline to 0.5 miles south of IL 5 and along IL 5 from west of 16th St. to 0.2 miles west of 38th St. (approximately 2.0 miles total). — Executed Nov 25 New Homer Tree Service, Inc. $297,068 ·
Sep 19, 2025 66295 GrundyDistrict 3 Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. — Executed Nov 25 New D. Construction, Inc. $14,268,635 ·
Sep 19, 2025 66R59 LaSalleDistrict 3 Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. — Executed Nov 25 New D. Construction, Inc. $27,740 ·
Sep 19, 2025 66R60 BureauDistrict 3 Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. — Executed Nov 25 New Martin & Company Excavating $373,944 ·
Sep 19, 2025 66R62 LivingstonDistrict 3 Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $255,575 ·
Sep 19, 2025 66R70 LivingstonDistrict 3 Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $64,451 ·
Sep 19, 2025 68J20 VariousDistrict 4 Culvert lining of various sizes at various locations. — Executed Nov 25 New Hoerr Construction, Inc. $1,852,445 ·
Sep 19, 2025 68J62 PeoriaDistrict 4 Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,699,505 ·
Sep 19, 2025 68K24 PeoriaDistrict 4 Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. — Executed Nov 25 New Laser Electric, Inc. $1,766,478 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Sep 19, 2025 68K26 VariousDistrict 4 Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4. — Executed Nov 25 New Oberlander Electric Co. $1,190,380 ·
Sep 19, 2025 70C33 McLeanDistrict 5 0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $1,043,581 ·
Sep 19, 2025 70D66 VermilionDistrict 5 Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. — Executed Nov 25 New Stark Excavating, Inc. $7,049,795 ·
Sep 19, 2025 70F21 McLeanDistrict 5 3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $23,522,450 ·
Sep 19, 2025 70H51 McLeanDistrict 5 Replacing light towers and poles with aluminum poles and LED lighting on US 51 from I-74 to Filbert Rd. — Executed Nov 25 New Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $869,829 ·
Sep 19, 2025 72286 PikeDistrict 6 Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $5,360,782 ·
Sep 19, 2025 72324 ScottDistrict 6 Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. — Executed Nov 25 New Freesen, a div of UCM, Inc. $544,972 ·
Sep 19, 2025 72416 SangamonDistrict 6 7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road. — Executed Nov 25 New Complete Asphalt Service Co. $247,563 ·
Sep 19, 2025 72974 LoganDistrict 6 Installing helical ground anchors at SN 054-7102 carrying I-55 over a drainage ditch 0.4 miles north of IL 10 near Lincoln. — Executed Nov 25 New Foundation Mechanics $55,250 ·
Sep 19, 2025 72976 CassDistrict 6 Filed tile removal and replacement on IL 125 east of Philadelphia. — Executed Nov 25 New CSD Environmental Services, Inc. $120,678 ·
Sep 19, 2025 72977 LoganDistrict 6 Installation of highway lighting on I-55 at the Elkhart interchange. — Executed Nov 25 New Bodine Electric of Decatur $397,966 ·
Sep 19, 2025 72M33 PikeDistrict 6 Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $2,292,624 ·
Sep 19, 2025 74164 LawrenceDistrict 7 Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50. — Executed Nov 25 New Sangamo Construction Company $21,455,785 ·
Sep 19, 2025 74597 CumberlandDistrict 7 Bridge replacement on I-57 over Eastern Illinois Railroad, 0.3 miles south of the Neoga interchange, and over US 45 at the Neoga interchange. (SN 018-0001, 018-0002, 018-0003, 018-0004) — Executed Nov 25 New William Charles Construction Company, LLC $54,599,804 ·
Sep 19, 2025 74608 EffinghamDistrict 7 0.3 miles of resurfacing and ADA improvements on Dietrich Blacktop from IL 33 to Church Street in Dietrich. — Executed Nov 25 New Howell Paving, Inc. $947,329 ·
Sep 19, 2025 74654 ClayDistrict 7 Bridge superstructure replacement on SN 013-0037 carrying Old US 50 over Raccoon Creek, 2.5 miles west of the US 45 North Junction. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,139,288 ·
Sep 19, 2025 74A04 EffinghamDistrict 7 Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. (SN 025-0003) — Executed Nov 25 New Howell Paving, Inc. $7,201,957 ·
Sep 19, 2025 74D09 WayneDistrict 7 Expansion joint replacement, bridge deck patching, scarification, bridge deck overlay and HMA surface course to tie into the existing pavement on IL 15 over Skillet Fork and Skillet Fork Overflow approximately 0.5 and 0.2 miles southwest of CR 635E near Wayne City. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,024,888 ·
Sep 19, 2025 74D11 ClarkDistrict 7 Bridge deck overlay, bridge joint repair/replacement, bridge deck repairs and striping on I-70 at Crooked Creek, 1.8 miles west of US 40. — Executed Nov 25 New Sangamo Construction Company $1,148,961 ·
Sep 19, 2025 74D31 LawrenceDistrict 7 Tree removal and tree installation along US 50 from 320E to 750E. — Active Nov 25 New Homer Tree Service, Inc. $526,741 ·
Sep 19, 2025 74D57 EffinghamDistrict 7 Installation of a median crossover on I-70 approximately 0.4 miles west of the IL 128 interchange. — Executed Nov 25 New Howell Paving, Inc. $860,301 ·
Sep 19, 2025 76F84 MadisonDistrict 8 Intersection reconstruction on IL 3 at Delmar Avenue and at Pierce Lane, both in Godfrey. — Executed Nov 25 New Stutz Excavating, Inc. $10,524,883 ·
Sep 19, 2025 76R08 ClintonDistrict 8 1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. — Executed Nov 25 New Howell Paving, Inc. $1,023,182 ·
Sep 19, 2025 76T17 St. ClairDistrict 8 Bridge replacement, pavement reconstruction, ADA and APS improvements, new intersection and traffic signal installation, upgrading drainage system and signage upgrades on IL 203 from 0.1 miles north of IL 3 Connector to 0.1 miles south of IL 3 Connector in Madison. — Executed Nov 25 New Keeley & Sons, Inc. $13,758,278 ·
Sep 19, 2025 76U51 VariousDistrict 8 Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways. — Executed Nov 25 New Keeley & Sons, Inc. $1,280,653 ·
Sep 19, 2025 78789 GallatinWhiteDistrict 9 Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection of US 45 and IL 141. — Executed Nov 25 New Sierra Bravo Contractors, LLC $5,191,314 ·
Sep 19, 2025 78793 PulaskiDistrict 9 Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak. — Executed Nov 25 New E. T. Simonds Construction Company $2,356,816 ·
Sep 19, 2025 78B70 JeffersonDistrict 9 1.2 miles of pavement patching on I-64 ramps at Exit 89. — Executed Nov 25 New Samron Midwest Contracting, Inc. $145,862 ·
Sep 19, 2025 85764 WinnebagoDistrict 2 construct a three-span steel plate girder bridge to carry Prairie Hill Road over the Rock River, 1.75 miles southwest of South Beloit. Includes; HMA approach, pavement patching, guardrails, and HMA shoulders. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $6,340,772 ·
Sep 19, 2025 85782 Rock IslandDistrict 2 Sidewalk replacement on 10th Street from 12th Avenue to 16th Avenue, on 10th Street from 16th Avenue to 17th Avenue, and on 16th Avenue from 10th Street to 11th street in Moline. — Executed Nov 25 New Centennial Contractors of the Quad Cities, Inc. $445,774 ·
Sep 19, 2025 87846 KendallDistrict 3 Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. — Executed Nov 25 New D. Construction, Inc. $10,727,441 ·
Sep 19, 2025 87871 LaSalleDistrict 3 Sidewalk construction at various locations in Oglesby. — Executed Nov 25 New D. Construction, Inc. $283,773 ·
Sep 19, 2025 93841 ChristianDistrict 6 Reconstruction of West Main Cross Street from Silver Street to Clay Street in Taylorville. Includes; HMA pavement, PCC driveways, ADA Ram and storm sewer. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $4,986,965 ·
Sep 19, 2025 95980 MoultrieDistrict 7 Remove and replace sidewalks, curb and driveway pavements, and install flashing beacons for pedestrian crossing on IL 121 from Jefferson Street to Church Street in Bethany. — Executed Nov 25 New A & R Mechanical Service, Inc. $280,980 ·
Sep 19, 2025 95983 MoultrieDistrict 7 Construction of three pipe culverts, earth embankment and approaches on Joe Pound Road from 0.4 mile east of 1300 E Road to 0.6 mile east of 1300 E Road. — Executed Nov 25 New Stark Excavating, Inc. $369,000 ·
Sep 19, 2025 95984 WayneDistrict 7 Construct a single-span steel plate girder bridge with concrete deck to carry 250 N Road over Little Pond Creek, 4.5 miles south of Golden Gate. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $813,000 ·
Sep 19, 2025 95988 ClayDistrict 7 Sidewalk construction and sidewalk replacement along Shadwell Street to Floyd Henson Jr. High School in Flora. — Executed Nov 25 New Kieffer Bros. Construction Co., Inc. $215,353 ·
Sep 19, 2025 97833 MadisonDistrict 8 Reconstruction of Summit Avenue with a shared-use path from Notting Hill Court to Dooner Drive in Collinsville. — Executed Nov 25 New Keller Construction, Inc. $2,218,364 ·
Sep 19, 2025 97868 MadisonDistrict 8 Contruction of a new sidewalk and shared-use path from Pontoon Road to Raes Creek Drive in Granite City. — Executed Nov 25 New Kinney Contractors, Inc. $612,809 ·
Sep 19, 2025 97869 MadisonDistrict 8 Resurfacing on Madison Avenue from 14th Street to 3rd Street in Madison. — Executed Nov 25 New Stutz Excavating, Inc. $3,789,307 ·
Sep 19, 2025 97874 MadisonDistrict 8 Reconstruction of C Street from West 7th Street to 1st Street, and the reconstruction of West 7th Street from C Street to D Street within America's Central Post District. — Executed Nov 25 New RCS Construction, Inc. $2,566,151 ·
Sep 19, 2025 99745 MassacDistrict 9 Construct a 12'x 6' precast box culvert to carry Country Club Road over an unnamed creek one mile northwest of Metropolis. Includes PCC pavement and Guardrail. — Executed Nov 25 New Samron Midwest Contracting, Inc. $255,588 ·
Sep 19, 2025 99749 PerryDistrict 9 Intersection reconstruction and replace the bridge carrying Greens Mark Road over Six Mile Creek, one mile west of US 51. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,286,217 ·
Nov 7, 2025 46669 VariousDistrict 6 Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6. — Executed Nov 25 New
801–900 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.