| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2026 | 64V14 | VariousDistrict 2 | Bridge washing of 17 structures in various counties. | — | Executed | All States Painting, Inc. $84,725 · | ||
| Feb 27, 2026 | 64V15 | VariousDistrict 2 | Bridge washing of 12 structures in various counties. | — | Executed | Interstate Maintenance, Incorporated $93,400 · | ||
| Feb 27, 2026 | 66N22 | KendallDistrict 3 | Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream located 0.1 miles SW of Fennel Rd in Newark, IL and replace nearby side road culvert, culvert lining, and ditch re-grading. | — | Executed | D. Construction, Inc. $199,416 · | ||
| Feb 27, 2026 | 66P67 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length. | — | Executed | Advanced Asphalt Company $3,606,240 · | ||
| Feb 27, 2026 | 66R39 | KankakeeDistrict 3 | Routing and filling primarily longitudinal but includes transverse as needed from the intersection of IL 17 and IL 1 continuing south on IL 1 to the north city limits of St. Anne, IL. 6.76 gross miles. | — | Executed | Freehill Asphalt, Inc. $39,585 · | ||
| Feb 27, 2026 | 66R41 | FordDistrict 3 | Crack sealing on ILL 47 in Gibson City to 900E Rd, and IL 115 to Baltimore Dr in Paxton. 7.97 gross miles. | — | Executed | Freehill Asphalt, Inc. $57,066 · | ||
| Feb 27, 2026 | 66R92 | BureauDistrict 3 | Cleaning and painting structural steel, pavement striping, and traffic control at SN's 006-0055, 006-0057, and 006-0058 on I-180 in Bureau County. | — | Executed | Venus Painting Co. $1,595,710 · | ||
| Feb 27, 2026 | 66R93 | LivingstonDistrict 3 | Cleaning and painting all structural steel and_non- structural steel components of Structure No. 053-0164 carrying IL Route 170 over Mud Creek approximately 0.95 mi north of IL Route 23 in Livingston County. | — | Executed | ERA-Valdivia Contractors, Inc. $114,382 · | ||
| Feb 27, 2026 | 66R94 | GrundyDistrict 3 | Cleaning and painting all structural steel and non-structure_steel components on Structure No. 032-0092 carrying Carbon Hill Rd. over I-55 approximately 4.8 miles south of Reed Rd in Grundy County. | — | Rejected | Civil Coatings and Construction Inc. $356,186 · | ||
| Feb 27, 2026 | 66R95 | BureauDistrict 3 | cleaning and painting all structural steel and non-structural steel components of Structure No. 006-0135 carrying US-34 over Burlington Northern Railroad approximately 1.1 mi. northeast of ILL 26 in Bureau County. | — | Executed | ERA-Valdivia Contractors, Inc. $389,686 · | ||
| Feb 27, 2026 | 66T02 | IroquoisDistrict 3 | Cleaning and painting all structural steel and_non-structural steel components of Structure No. 038-0198 carrying IL Route 49 over Little Mud Creek approximately 2.6 mi. north of Cissna Park in Iroquois County. | — | Executed | ERA-Valdivia Contractors, Inc. $133,444 · | ||
| Feb 27, 2026 | 66T06 | BureauDistrict 3 | Cleaning and painting all structural steel and non-structural steel of SN's: 006-0156 carrying IL 40 over Hickory Creek, 3.5 mi. north of I-80, and 006-0157 carrying IL 40 over a drainage ditch, 3.0 mi. north of I-80. | — | Executed | ERA-Valdivia Contractors, Inc. $181,661 · | ||
| Feb 27, 2026 | 68474 | PeoriaDistrict 4 | Resurfacing IL 6 from 0.7 mile north of Hoerr's Pond to south of I-74 in Peoria County. 4.2 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $25,863,073 · | ||
| Feb 27, 2026 | 68C43 | McDonoughDistrict 4 | Tree mitigation and prairie restoration at various locations adjacent to the NW quadrant of the Macomb Bypass. | — | Executed | JIMAX Landscape LLC $314,609 · | ||
| Feb 27, 2026 | 68E33 | MarshallDistrict 4 | Bridge replacement of SN 062-0008 with SN 062-0074 carrying IL 29 over Barrville Creek, two miles south of Sparland in Marshall County. | — | Executed | Gillan Construction LLC $1,706,806 · | ||
| Feb 27, 2026 | 68F91 | FultonMcDonoughDistrict 4 | 6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Counties. | — | Executed | Gunther Construction, a div of UCM, Inc. $11,748,219 · | ||
| Feb 27, 2026 | 68J46 | PeoriaDistrict 4 | 0.24 mile intersection improvement, Extended EP US 150 left-turn lane, widening for addition of SB right-turn lane, and change left-turn signal phasing from protected/permissive to protected only at the US 150 and West Willow Knolls Dr. intersection in Peoria County. | — | Executed | Otto Baum Company, Inc. $749,500 · | ||
| Feb 27, 2026 | 68J51 | PeoriaDistrict 4 | 316' bridge preservation project at SN 072-0169 carrying IL 8 (Southport Rd) over UPRR, 0.2 miles east of Reservoir Blvd in Peoria County. | — | Executed | Stark Excavating, Inc. $878,313 · | ||
| Feb 27, 2026 | 68J57 | PeoriaDistrict 4 | 7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S), north of Dunlap; and on IL 90 from the IL Rte 90/IL Rte 91 Junction (E) to IL Rte 40; and on SN 072-0035 carrying IL 90 over Kickapoo Creek Tributary. | — | Executed | Advanced Asphalt Company $5,129,210 · | ||
| Feb 27, 2026 | 68J68 | FultonDistrict 4 | Resurfacing and cold-in-place recycling on Il 78 from Fort St in Farmington to 0.2 mile north of Alder St in Canton; and resurfacing on Old Il 78 from IL 78 from IL 78(N) to IL 78(S) in Norris. Approximately 7.63 miles gross. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $7,447,606 · | ||
| Feb 27, 2026 | 68J96 | MarshallDistrict 4 | 8.765 miles of resurfacing and cold-in-place recycling on IL 17 from IL 89 to west of I-39 in Marshall County. | — | Executed | Advanced Asphalt Company $7,833,037 · | ||
| Feb 27, 2026 | 68K06 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities). | — | Executed | Laser Electric, Inc. $764,783 · | ||
| Feb 27, 2026 | 68K11 | VariousDistrict 4 | Washing of seven bridges in Disrict 4. | — | Executed | All States Painting, Inc. $1,394,676 · | ||
| Feb 27, 2026 | 68K15 | PeoriaDistrict 4 | 6.47 miles of resurfacing on IL 78 from west of US 150 to south of IL 8 in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,624,569 · | ||
| Feb 27, 2026 | 68K16 | PeoriaDistrict 4 | 3.53 miles of milling and resurfacing and all related collateral work along US Route 150 and IL Route 78 from 0.1 mile north of North Junction Illinois Route 78/US Route 150 to 0.1 mile north of Interstate 74 in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,332,964 · | ||
| Feb 27, 2026 | 68K56 | TazewellDistrict 4 | Bridge deck and approach pavement resurfacing, replacement of existing expansion joints, and all related collateral work necessary to complete the project located along IL Rte 9 over Prairie Creek in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $239,981 · | ||
| Feb 27, 2026 | 68K57 | MarshallDistrict 4 | Clearing and disposing the existing silt in and around Structure No. 062-2001, installing stone dumped riprap at both ends of the box culvert, grading to drain at both ends, and all related collateral work necessary to complete the project on Illinois Route 40 (FAP 646) over Mud Run, 1.38 miles south of Illinois Route 17 in Marshall County. | — | Executed | Gillan Construction LLC $21,865 · | ||
| Feb 27, 2026 | 68K58 | HendersonDistrict 4 | Replace expansion joints, patch parapets, fill slopewall voids on SN 036-0009 on Illinois Route 96 over Dugout Creek east of Lomax, Illinois in Henderson County. | — | Executed | Laverdiere Construction, Inc. $393,005 · | ||
| Feb 27, 2026 | 68K59 | McDonoughDistrict 4 | Re-applying bituminous material binder to the existing aggregate slopewalls at Structure Nos. 055-0052 and 055-0053, Illinois Rte 336 over the BNSF Railroad. | — | Executed | Brandt Construction Co. $128,795 · | ||
| Feb 27, 2026 | 68K62 | VariousDistrict 4 | Cleaning and painting structural steel of eleven existing bridges throughout District 4. | — | Executed | Venus Painting Co. $1,975,015 · | ||
| Feb 27, 2026 | 68K91 | VariousDistrict 4 | Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD). | — | Executed | Northern Contracting, Inc. $800,027 · | ||
| Feb 27, 2026 | 70D72 | McLeanDistrict 5 | Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth. | — | Executed | Stark Excavating, Inc. $684,610 · | ||
| Feb 27, 2026 | 70F37 | McLeanDistrict 5 | Bridge deck overlay and other repairs to SN 057-0163, SN 057-0164 over Money Creek, and 057-0162 over I-55. 487.42 gross feet. | — | Executed | Stark Excavating, Inc. $7,331,185 · | ||
| Feb 27, 2026 | 70F77 | McLeanDistrict 5 | Remove and construct bridge decks on two structures SN 057-0154 (SB) and 057-0155 (NB) carrying FAI 55 over US 136 in McLean County. | — | Executed | Stark Excavating, Inc. $6,845,494 · | ||
| Feb 27, 2026 | 70H61 | ChampaignDistrict 5 | Bridge beam replacement and pier repair to S.N. 010-0220 at Salt Fork River 1 milew north of St. Joseph. | — | Executed | Stark Excavating, Inc. $414,045 · | ||
| Feb 27, 2026 | 70H62 | DouglasEdgarDistrict 5 | Bridge deck repairs to S.N. 021-0049 and S.N. 023-0026 carrying FAP 820 (IL-130) and FAP 836 IL-49 in Douglas and Edgar Counties. | — | Executed | Sangamo Construction Company $926,892 · | ||
| Feb 27, 2026 | 70H66 | McLeanDistrict 5 | Bridge deck sealing of 63 structures in McLean County. | — | Executed | M & M Concrete, Inc. $149,515 · | ||
| Feb 27, 2026 | 70H81 | ChampaignDistrict 5 | 2.11 miles of median cable improvements on I-74 from 0.3 miles west of County Rd 2500E to Market St in Ogden. | — | Executed | COLLINS & HERMANN, INC. $501,796 · | ||
| Feb 27, 2026 | 72295 | AdamsDistrict 6 | 2.1 miles of resurfacing, patching, ADA improvements, traffic signal improvements and structure improvements on IL 104 (Broadway Street) from west of 38th Street to east of 63rd Street in Quincy. | — | Executed | Diamond Construction Company $18,201,126 · | ||
| Feb 27, 2026 | 72440 | MacoupinDistrict 6 | 2.6 miles of milling and resurfacing on Old US 66 from Old US 66 to south of West 8th Street and from 0.1 miles south of Werner Road to Old US 66 in Mt. Olive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,683,856 · | ||
| Feb 27, 2026 | 72469 | ChristianDistrict 6 | 8.4 miles of microsurfacing on Mt. Auburn Road from south of Arch Street in Mt. Auburn to south of CH 21 (2100N Road) in Taylorville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $739,077 · | ||
| Feb 27, 2026 | 72540 | VariousDistrict 6 | On-call repair of guardrail, cable guardrail and impact attenuators at various locations throughout District 6 as needed. | — | Executed | COLLINS & HERMANN, INC. $2,066,290 · | ||
| Feb 27, 2026 | 72542 | MenardDistrict 6 | Resurfacing on IL 97, 123 from IC and IM Railroad to Antle Street and from south of Lincoln Avenue to 0.1 miles north of North Shore Drive, south of Petersburg. | — | Executed | Truman L. Flatt & Sons Co., Inc. $324,366 · | ||
| Feb 27, 2026 | 72546 | SangamonDistrict 6 | Installation of cure-in-place pipe liners at 12 locations on I-72 in Sangamon County. | — | Executed | J.C. Dillon, Inc. $555,264 · | ||
| Feb 27, 2026 | 72762 | SchuylerDistrict 6 | 11.7 miles of standard overlay, concrete gutter repairs, riprap and culvert rehabilitation (SN 085-2013) on IL 101 from the Hancock County line to 0.2 miles west of Freeman Mine Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,590,001 · | ||
| Feb 27, 2026 | 72989 | SangamonDistrict 6 | 1.9 miles of resurfacing on Dirksen Parkway from Stevenson Drive to south of Wide Track Drive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,597,405 · | ||
| Feb 27, 2026 | 72A82 | VariousDistrict 6 | 18.3 miles of crack and joint sealing on various routes in Adams, Morgan and Pike Counties. | — | Executed | SKC Construction, Inc. $153,087 · | ||
| Feb 27, 2026 | 72C96 | SangamonDistrict 6 | Patching and resurfacing on I-55 from 2.8 miles south of IL 123 in Williamsville to the Logan County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $25,964,194 · | ||
| Feb 27, 2026 | 72J75 | MontgomeryDistrict 6 | 2.9 miles of resurfacing on the I-55 East Frontage Road from 0.3 miles north of North 16th Avenue, north of Litchfield, to south of North 19th Avenue, east of IL 108. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,699,801 · | ||
| Feb 27, 2026 | 74368 | MaconDistrict 7 | Bridge replacement on IL 48 over Mosquito Creek, 1.5 miles northeast of Blue Mound. (SN 058-0029) | — | Executed | Sangamo Construction Company $2,735,104 · | ||
| Feb 27, 2026 | 74653 | ColesDistrict 7 | Replacement of SN 015-0034 carrying CH 31 over the Little Wabash River, 0.8 miles south of Paradise Road. | — | Executed | Sangamo Construction Company $3,082,674 · | ||
| Feb 27, 2026 | 74C49 | ClarkDistrict 7 | Bridge joint replacement, abutment and pier repair, new approaches, bridge deck scarification with overlay and slopewall repairs on I-70 at North Cleone Road (Martinsville interchange). (SN 012-0029) | — | Executed | Sangamo Construction Company $1,826,162 · | ||
| Feb 27, 2026 | 74D47 | EffinghamFayetteDistrict 7 | Bridge deck sealing on 98 bridge decks throughout Effingham and Fayette Counties. | — | Executed | All States Painting, Inc. $154,439 · | ||
| Feb 27, 2026 | 74D53 | LawrenceDistrict 7 | 5.5 miles of patching, milling and resurfacing on Old US 50 from US 50 Business to IL 33. | — | Executed | Ambraw Asphalt Materials, Inc. $3,649,451 · | ||
| Feb 27, 2026 | 74D64 | EffinghamFayetteDistrict 7 | 64.5 miles of weed spray control on I-57 and I-70 in Effingham and Fayette Counties. | — | Executed | The Daltons Inc. $84,942 · | ||
| Feb 27, 2026 | 74E30 | VariousDistrict 7 | Guardrail repairs of existing damage from motorists at locations shown on the plans and damage yet to be realized on an on-call basis throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $811,102 · | ||
| Feb 27, 2026 | 76A37 | MarionDistrict 8 | Bridge replacement on Old US 51 over Crooked Creek, 0.3 miles north of Central City. (SN 061-0007) | — | Executed | Samron Midwest Contracting, Inc. $4,343,470 · | ||
| Feb 27, 2026 | 76B42 | MarionWashingtonDistrict 8 | Bridge replacement on US 51 over Louse Run Tributary, 2 miles south of Patoka, and the replacement of 3 bridge with culverts on DuBois Blacktop Road over a creek, 3 miles west of DuBois. | — | Executed | C-Hill Civil Contractors, Inc. $3,575,562 · | ||
| Feb 27, 2026 | 76U40 | MarionDistrict 8 | 4 miles of resurfacing on US 51 from Texas Avenue in Sandoval to north of Central City. | — | Executed | Howell Paving, Inc. $4,980,603 · | ||
| Feb 27, 2026 | 76U42 | MadisonDistrict 8 | 7 miles of microsurfacing on I-255 from the St. Clair County line to I-270. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $6,640,925 · | ||
| Feb 27, 2026 | 76U43 | MadisonDistrict 8 | 3.9 miles of resurfacing on IL 255 from 0.1 miles north of Seminary Road to US 67 in Godfrey. | — | Executed | Charles E. Mahoney Co. $7,764,431 · | ||
| Feb 27, 2026 | 76U52 | VariousDistrict 8 | Various pavement patching call-out locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,982,334 · | ||
| Feb 27, 2026 | 76U67 | St. ClairDistrict 8 | 4.4 miles of patching and slurry seal on MLK Drive, Louisiana Boulevard and Lake Drive in East St. Louis. | — | Executed | Christ Bros. Asphalt, Inc. $1,246,663 · | ||
| Feb 27, 2026 | 76U71 | MonroeSt. ClairDistrict 8 | 2.2 miles of chip seal at various locations: Hilltop Road from 0.6 miles north of Hill Castle Road to Gilmore Lake Road; Hill Castle Lane from Hill Castle Road to 0.1 miles north of Hill Castle Road; Doyle Road from IL 3 to 0.1 miles north of IL 3; Old IL 156 from IL 13 to 1.0 miles east of IL 13. | — | Executed | DMS Contracting, Inc. $326,472 · | ||
| Feb 27, 2026 | 76U73 | St. ClairDistrict 8 | Bridge deck overlay and repairs on 5 structures I-64 in East St. Louis. (SN 082-0153, 0154, 0157, 0159 and 0161) | — | Executed | Keeley & Sons, Inc. $1,649,119 · | ||
| Feb 27, 2026 | 76U78 | MadisonDistrict 8 | 2.3 miles of patching on IL 203 from the I-270 westbound ramps to Branding Avenue in Granite City. | — | Executed | G. M. Sipes Construction, Inc. $898,651 · | ||
| Feb 27, 2026 | 76V02 | St. ClairDistrict 8 | 1.7 miles of resurfacing on IL 177 from County Road to Mine Road in Mascoutah. | — | Executed | The Kilian Corporation $835,131 · | ||
| Feb 27, 2026 | 76V04 | JerseyMadisonDistrict 8 | Weed control at various locations in Madison and Jersey Counties. | — | Executed | The Daltons Inc. $414,310 · | ||
| Feb 27, 2026 | 78967 | JacksonDistrict 9 | Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. | — | Executed | E. T. Simonds Construction Company $3,594,116 · | ||
| Feb 27, 2026 | 78A87 | FranklinDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 14 and Central Street in West City. | — | Executed | F. W. Electric, Inc. $543,064 · | ||
| Feb 27, 2026 | 78B00 | JacksonDistrict 9 | Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. | — | Executed | Gerstner Electric, Inc. $2,170,000 · | ||
| Feb 27, 2026 | 78B34 | JeffersonDistrict 9 | Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles east of IL 142, 2) at the Belle Rive interchange, 3) approximately 0.6 miles east of IL 37. (SN 041-0087, 041-0088, 041-0071, 041-0072, 041-0080, and 041-0081) | — | Executed | E. T. Simonds Construction Company $5,793,218 · | ||
| Feb 27, 2026 | 78B37 | WhiteDistrict 9 | Bridge deck overlay and repairs on IL 14 over Fox River Slough, 5 miles east of Crossville. (SN 097-0032) | — | Executed | E. T. Simonds Construction Company $600,818 · | ||
| Feb 27, 2026 | 78B38 | JacksonDistrict 9 | Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). | — | Executed | Samron Midwest Contracting, Inc. $1,494,455 · | ||
| Feb 27, 2026 | 78B52 | JeffersonDistrict 9 | Resurfacing on IL 37 from IL 15 to the north Mount Vernon city limits and on IL 37 from the Northfolk and Southern Railroad (SN 041-0039), 3.5 miles south of Dix, to the Marion County line. | — | Executed | E. T. Simonds Construction Company $4,988,975 · | ||
| Feb 27, 2026 | 78B58 | WilliamsonDistrict 9 | 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $744,591 · | ||
| Feb 27, 2026 | 78B83 | FranklinSalineDistrict 9 | Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $338,886 · | ||
| Feb 27, 2026 | 78B91 | JacksonUnionDistrict 9 | Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. | — | Executed | F. W. Electric, Inc. $404,654 · | ||
| Feb 27, 2026 | 80B08 | DuPageDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (1.21-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings located on Busse Rd (Illinois Route FAP 344, IL 83), beginning south of Bryn Mawr Ave and ending at Illinois 19 (Irving Park Rd). in the Village of Bensenville in DuPage County. | — | Executed | Builders Paving, LLC $2,172,384 · | ||
| Feb 27, 2026 | 80B13 | WillDistrict 1 | (1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location: IL 53 (Broadway Street/ Ruby Street) from Teale Woods Trail (South of IL 7) to Bluff Street, within the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $1,424,777 · | ||
| Feb 27, 2026 | 80B15 | DuPageDistrict 1 | (8,333-Ft) Standard Overlay of the existing PCC pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter, concrete medians, pavement widening for flush medians, located along IL Route 38 (Roosevelt Road) from east of Nicoll Way to Edson Avenue in the Villages of Glen Ellyn and Lombard in DuPage County. | — | Executed | R. W. Dunteman Company $4,255,555 · | ||
| Feb 27, 2026 | 80B25 | DuPageDistrict 1 | (2.5-Mile) Standard Overlay, ADA Improvements, New Shoulders: Removing and replacing exist. hot-mix asphalt, (HMA) surface and binder course. Narrow (minor) pavement widening, new HMA shoulders in place of existing aggregate, and median improvement. Spot locations pavement patching and curb removal and replacement. Curb ramps for sidewalks (ADA) improvements, drainage structures adjustment and cleaning. pavement markings, raised reflective pavement markers, pedestrian signals improvements (APS), | — | Executed | R. W. Dunteman Company $3,330,985 · | ||
| Feb 27, 2026 | 80B56 | CookDistrict 1 | Cleaning and painting designated steel surfaces Bridge Painting project consists of cleaning and painting designated steel surfaces. Location 1: IL-21 (FAU 1332A) over US-14 (SN: 016-2572) Location 2: Oakton St. (FAP 374) over Des Plaines River 14 (SN: 016-2601) | — | Executed | Eagle Painting & Maintenance Company, Inc. $401,758 · | ||
| Feb 27, 2026 | 80B75 | LakeDistrict 1 | Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County. | — | Executed | Peter Baker & Son Co. $3,291,674 · | ||
| Feb 27, 2026 | 80B83 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $160,313 · | ||
| Feb 27, 2026 | 80B84 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $211,275 · | ||
| Feb 27, 2026 | 80C91 | VariousDistrict 1 | FULL EXPRESSWAY CLEANING CYCLE and SUPPLEMENTAL SWEEPING includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the specified highway areas. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $5,894,295 · | ||
| Feb 27, 2026 | 85769 | WinnebagoDistrict 2 | Construction of PCC sidewalk and PCC shared-use path along IL 125 from River Lane to E. River Boulevard in Loves Park. Work includes removal of HMA parking lanes, curb and gutter, ADA improvements, drainage improvements, lighting, traffic signals and other required work. | — | Executed | N-Trak Group LLC $3,986,156 · | ||
| Feb 27, 2026 | 85789 | OgleDistrict 2 | Resurfacing German Church Road from IL 72 to Deer Path Road. | — | Executed | Martin & Company Excavating $830,341 · | ||
| Feb 27, 2026 | 85790 | Rock IslandDistrict 2 | Traffic signal improvement at various intersections in the City of Moline. | — | Executed | Davenport Electric Contract Company $249,275 · | ||
| Feb 27, 2026 | 87886 | BureauDistrict 3 | A-1 Bituminous Surface Treatment on Cleveland Street from IL 89 to the BNSF Railroad in the Village of Ladd. | — | Executed | Universal Asphalt & Excavating, Inc. $137,248 · | ||
| Feb 27, 2026 | 87910 | LaSalleDistrict 3 | HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work. | — | Executed | Advanced Asphalt Company $1,225,765 · | ||
| Feb 27, 2026 | 91660 | McLeanDistrict 5 | Resurfacing, aggregate shoulders and guardrail improvement on CH 7 from IL 165 to IL 9. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,213,052 · | ||
| Feb 27, 2026 | 93842 | LoganDistrict 6 | Sidewalk construction at various locations within the City of Mt. Pulaski. | — | Executed | Earth Worx Solutions LLC $278,650 · | ||
| Feb 27, 2026 | 93845 | HancockDistrict 6 | Construction of a single span PPC deck beam bridge carrying 2980 East Road over Baptist Creek, 4 miles northeast of the town of Fountain Green. Additionally includes aggregate approach roadways, guardrail and other required work. | — | Executed | Laverdiere Construction, Inc. $504,870 · | ||
| Feb 27, 2026 | 93852 | SchuylerDistrict 6 | Reconstruction of West Lafayette Street from Jackson Street to Monroe Street in Rushville. Additionally includes concrete curb and gutter, PCC pavement intersections, sidewalks, lighting, landscaping and other required work. | — | Executed | Laverdiere Construction, Inc. $1,249,952 · | ||
| Feb 27, 2026 | 93853 | PikeDistrict 6 | Full-depth reclamation and resurfacing Cold-in-place recycling and HMA resurfacing of CH 2 and a portion of CH 14 in Pike County. A portion of CH 14 will also consist of full-depth reclamation and resurfacing. Work also includes aggregate shoulders, guardrail, pavement markings and other required work. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,678,290 · | ||
| Feb 27, 2026 | 97872 | St. ClairDistrict 8 | Reconstruction on Frank Scott Parkway East from Green Mount Road to Cross Street. , Pavement widening and reconstruction of Frank Scott Parkway East from Green Mount Road to Cross Street in the Village of Shiloh. | — | Executed | DMS Contracting, Inc. $4,689,431 · | ||
| Feb 27, 2026 | 97882 | MadisonDistrict 8 | HMA resurfacing, curb and gutter replacement, sidewalk replacement, pavement markings, and pedestrian traffic signal improvements on Madison Avenue from 27th St. to 23rd St. in Granite City. | — | Executed | Stutz Excavating, Inc. $2,795,529 · | ||
| Feb 27, 2026 | 97886 | St. ClairDistrict 8 | HMA resurfacing of Old Collinsville Road from Ashland Avenue to US 50 in the City of Fairview Heights. Additional work includes PCC patches, ADA ramps, curb and gutter and other required work. | — | Executed | Keeley & Sons, Inc. $1,199,255 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.