Filtered by: County: Coles Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 74806 | ColesDistrict 7 | 9 miles of Class A pavement patching on I-57 from MP 182 to MP 191. | — | Executed | G. M. Sipes Construction, Inc. $293,827 · | ||
| Apr 27, 2018 | 74652 | ColesDistrict 7 | Replacement of SN 015-0013 carrying IL 16 over Little Wabash River 2 miles west of Mattoon. | — | Executed | A. J. Walker Construction Company $699,996 · | ||
| Apr 27, 2018 | 74810 | ColesDistrict 7 | 3.2 miles of patching and detector loops on IL 16 from Lerna Road to 1200E, west of Charleston. | — | Executed | Beniach Construction Co., Inc. $367,353 · | ||
| Apr 27, 2018 | 95829 | ColesDistrict 7 | Reconstruction of Marshall Avenue from 14th Street to 9th Street in the City of Mattoon. | — | Executed | Beniach Construction Co., Inc. $1,264,103 · | ||
| Apr 27, 2018 | 95831 | ColesDistrict 7 | Aggregate shoulders, rumble strips and pavement marking on CH 18 from CH 20 to US 45. | — | Executed | Howell Paving, Inc. $193,471 · | ||
| Jun 15, 2018 | 74840 | ColesEffinghamDistrict 7 | Remove and replace light towers and poles, rewiring light poles and towers, removal and replacement of tower and pole foundations at three locations; 1) NB Green Creek Rest Area; 2) I-57/US 45 interchange; 3) I-57/IL 16 interchange. | — | Executed | Egizii Electric, Inc., A Division of EEI Holding Corporation $514,629 · | ||
| Jan 18, 2019 | 74261 | ColesDistrict 7 | 3.1 miles of pavement patching, HMA milling and resurfacing, rehab of 2 bridges 3 culvert extensions and guardrail on IL 16 from Ashmore to the Edgar County line. | — | Executed | Howell Paving, Inc. $2,177,289 · | ||
| Jan 18, 2019 | 74561 | ColesDistrict 7 | Superstructure replacement on SN 015-0070 carrying 900 N/IL 316 over Riley Creek Branch, 0.8 miles northwest of Loxa. | — | Executed | County Contractors, Inc. $511,648 · | ||
| Jan 18, 2019 | 74868 | ColesDistrict 7 | 7.8 miles of microsurfacing on Old IL 316 from 0.2 mile north of IL 16 to D Street in Charleston. | — | Executed | A. C. Pavement Striping Co. $494,881 · | ||
| Jan 18, 2019 | 74889 | ColesShelbyDistrict 7 | 10.5 miles of bituminous surface treatment at 3 locations in Coles County and 4 locations in Shelby County. | — | Executed | Earl Walker Company, Inc. $418,569 · | ||
| Jul 12, 2019 | 74718 | ColesDistrict 7 | 4.9 miles of resurfacing on IL 130 from Fairgrange Road to the Douglas County line. | — | Executed | Ne-Co Asphalt Co., Inc. $2,351,176 · | ||
| Jul 12, 2019 | 74778 | ColesDistrict 7 | 5.9 miles of patching, resurfacing and guardrail replacement on IL 16 from west of Douglas Drive in Charleston. | — | Executed | Howell Paving, Inc. $9,115,672 · | ||
| Aug 2, 2019 | 95849 | ColesDistrict 7 | Improvements to the bike trail connecting Charleston and Matoon, includes extending the west end from 10th street to the Amtrak Depot and connect the east end to Eastern Illinois University. | — | Rejected | Ne-Co Asphalt Co., Inc. $1,077,941 · | ||
| Jan 17, 2020 | 74260 | ColesMoultrieDistrict 7 | 13.1 miles of patching, milling, resurfacing and guardrail updates on IL 121 from the east city limits of Sullivan to 0.2 miles west of 300E in Mattoon. | — | Executed | Howell Paving, Inc. $5,784,430 · | ||
| Jan 17, 2020 | 74694 | ColesDistrict 7 | 3.9 miles of resurfacing, ADA improvements and traffic signals on IL 16 from west of Douglas Drive in Charleston to east of Madison Street. | — | Executed | Howell Paving, Inc. $8,219,292 · | ||
| Mar 6, 2020 | 74969 | ColesDistrict 7 | Expansion joint replacement on SN 015-0001 and 015-0002 and PCC base course on the bridges carrying I-57 over US 45 south of Mattoon. | — | Executed | Kinney Contractors, Inc. $523,169 · | ||
| Mar 6, 2020 | 95871 | ColesDistrict 7 | Construct 8" PCC pavement on Marshall Avenue from 17th Street to 14th Street in Mattoon. | — | Executed | Kinney Contractors, Inc. $1,090,053 · | ||
| Apr 24, 2020 | 74575 | ColesDistrict 7 | 2.2 miles of patching, milling, resurfacing, ADA sidewalk upgrades and curb and gutter replacement on IL 121 from 0.2 miles west of 300E to 20th Street in Mattoon. | — | Executed | Ne-Co Asphalt Co., Inc. $2,634,284 · | ||
| Apr 24, 2020 | 74928 | ColesDistrict 7 | Bridge deck patching, approach pavement patching and new bridge joints at 4 structures on IL 16 west of Charleston. SN 015-0015 and 015-0016 carrying IL 16 over Eastern Illinois RR; SN 015-0017 and 015-0018 carrying IL 16 over Riley Creek. | — | Executed | Sangamo Construction Company $624,208 · | ||
| Apr 24, 2020 | 74934 | ColesDistrict 7 | 9 miles of patching on I-57 from MP 182 to MP 191 and 0.2 miles of patching on Old IL 316 from D Street to A Street in Charleston. | — | Executed | Beniach Construction Co., Inc. $314,571 · | ||
| Jun 12, 2020 | 46913 | ColesDistrict 7 | Slope failure repair with pile retaining wall, roadway realignment, striping parking lots, sign replacements and aggregate resurfacing of camp pads at the IDNR Fox Ridge State Park. | — | Executed | White Construction, Inc. $733,525 · | ||
| Jul 31, 2020 | 95878 | ColesDistrict 7 | Construction of HMA shoulders with rumbnle strips, aggregate shoulds and pavement markings on CH 18 from IL 121 to CH 20. | — | Executed | Howell Paving, Inc. $354,954 · | ||
| Jan 15, 2021 | 74A14 | ColesDistrict 7 | 0.2 miles of patching and resurfacing on Lerna Road from north of Samsa Drive to IL 16. | — | Executed | Howell Paving, Inc. $262,318 · | ||
| Jan 15, 2021 | 74A41 | ColesDistrict 7 | Cleaning and painting 2 structures on IL 16. (SN 015-0015 and SN 015-0016) | — | Executed | ERA-Valdivia Contractors, Inc. $198,944 · | ||
| Jan 15, 2021 | 95884 | ColesDistrict 7 | Replace the bridge carrying CH 27 over Kickapoo Creek, 0.5 mile southeast of Mattoon. | — | Executed | Howell Paving, Inc. $670,296 · | ||
| Jan 15, 2021 | 95885 | ColesDistrict 7 | Resurfacing various routes within Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $231,531 · | ||
| Mar 5, 2021 | 74A32 | ColesDistrict 7 | 1.9 miles of patching on US 45 / IL 121 from IL 16 to Rudy Avenue in Mattoon and on IL 16 from 34th Street to 21st Street in Mattoon. | — | Executed | Beniach Construction Co., Inc. $417,262 · | ||
| Jan 21, 2022 | 74A74 | ColesEffinghamDistrict 7 | Lighting upgrades to LED on I-57 at US 45 and at IL 16 in Mattoon and at the northbound Green Creek Rest Area. | — | Executed | Bodine Electric of Decatur $525,537 · | ||
| Mar 11, 2022 | 74A82 | ColesDistrict 7 | Placing 8.3 miles of aggregate shoulders on US 45 from the Douglas County line to Donnelly Road. | — | Executed | Beniach Construction Co., Inc. $144,480 · | ||
| Mar 11, 2022 | 95909 | ColesDistrict 7 | Resurfacing, sidewalks, curb and gutter, patching, and pavement markings on Dewitt Avenue, from east of 14th Street to Logan Street in Mattoon. | — | Executed | Howell Paving, Inc. $1,320,207 · | ||
| Mar 11, 2022 | 95913 | ColesDistrict 7 | Resurfacing CH 27 from Country Club Road to Old State Road. | — | Executed | Ne-Co Asphalt Co., Inc. $178,093 · | ||
| Apr 29, 2022 | 74A21 | ColesDistrict 7 | 4.4 miles of resurfacing on IL 49 from the Clark County line to IL 16. | — | Executed | Howell Paving, Inc. $978,300 · | ||
| Apr 29, 2022 | 74A23 | ColesDistrict 7 | 2.3 miles of patching, milling and resurfacing on Dewitt Avenue from Logan Avenue to Lerna Road in Mattoon. | — | Executed | Howell Paving, Inc. $739,240 · | ||
| Apr 29, 2022 | 74A78 | ColesDistrict 7 | 14.5 miles of patching on I-57 from mile post 181 to mile post 195.5. | — | Executed | Beniach Construction Co., Inc. $411,367 · | ||
| Apr 29, 2022 | 74A89 | ColesDistrict 7 | 6.7 miles of patching, milling and resurfacing on IL 130 from 1.8 miles south of IL 16 in Charleston to the Cumberland County line. | — | Executed | Howell Paving, Inc. $1,960,827 · | ||
| Nov 18, 2022 | 74362 | ColesDistrict 7 | Bridge replacement for SN 015-0022 carrying US 45 over Flat Branch, 0.1 miles south of South-Side Drive in Humboldt. | — | Executed | Sangamo Construction Company $2,218,287 · | ||
| Nov 18, 2022 | 74A70 | ColesDistrict 7 | Replacing the approach slabs, bridge wearing surfaces, and joints on SN 015-0009 and 015-0010 This project is located on 1-57 over S Fork Branch 0.5 miles S of Humboldt. The work consists of replacing the approach slabs, bridge wearing surfaces, and joints on SN 015-0009 and 015-0010. | — | Executed | Samron Midwest Contracting, Inc. $1,298,767 · | ||
| Apr 28, 2023 | 74B24 | ColesDistrict 7 | 3.7 miles of crack and joint sealing on I-57 from the Cumberland County line to 0.5 miles west of US 45 at Mattoon. | — | Executed | Complete Asphalt Service Co. $166,685 · | ||
| Jun 16, 2023 | 74812 | ColesDistrict 7 | 2.7 miles of patching and resurfacing on IL 130 from Madison Avenue to 1.8 miles south of IL 16 in Charleston. | — | Executed | Howell Paving, Inc. $2,757,361 · | ||
| Jun 16, 2023 | 74B23 | ColesDistrict 7 | 5 miles of milling, resurfacing and aggregate shoulders on IL 130 from Fairgrange Road, north of Charleston, to 0.1 miles north of Maple Avenue in Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $1,477,664 · | ||
| Mar 8, 2024 | 74903 | ColesDistrict 7 | 9.3 miles of HMA surface removal, binder and surface courses, HMA and aggregate shoulders, longitudinal joint sealant and cured-in-place pipe liner at various locations in Charleston. | — | Executed | Howell Paving, Inc. $4,864,767 · | ||
| Mar 8, 2024 | 74C89 | ColesDistrict 7 | 21.4 miles of weed control on I-57 in various counties of District 7. | — | Executed | The Daltons Inc. $66,177 · | ||
| Mar 8, 2024 | 95946 | ColesDistrict 7 | PCC sidewalks, ADA Ramps, and Curb and Gutter on Western Avenue from 43rd Street to Noyes Court in Mattoon. | — | Executed | Shores Builders, Inc. $163,684 · | ||
| Apr 26, 2024 | 74986 | ColesDistrict 7 | 8 miles of patching, HMA surface removal, HMA resurfacing, aggregate shoulders and guardrail replacement on Lake Paradise Road from IL 16 to the Cumberland County line. | — | Executed | Howell Paving, Inc. $6,034,809 · | ||
| Apr 26, 2024 | 74C41 | ColesDistrict 7 | 3.8 miles of patching, milling and resurfacing on IL 16 from just east of 36th Street in Mattoon to the Moultrie County line. | — | Executed | Ne-Co Asphalt Co., Inc. $1,284,222 · | ||
| Apr 26, 2024 | 74C80 | ColesEffinghamDistrict 7 | Parking lot improvements at the Effingham District Office and the Mattoon Yard. | — | Executed | G. M. Sipes Construction, Inc. $352,266 · | ||
| Jun 14, 2024 | 74C75 | ColesCumberlandDistrict 7 | 31.5 miles of aggregate shoulder reconstruction on US 45 from 0.1 miles north of the Lake Land College entrance to IL 121; on US 40 from the Effingham County line to IL 130 in Greenup; on IL 121 from the Montrose Blacktop to 0.1 miles east of 1500E in Toledo; on the Montrose Blacktop from IL 121 to the Effingham County line. | — | Executed | Phoenix Corporation of the Quad Cities $647,679 · | ||
| Jun 14, 2024 | 74C94 | ColesDistrict 7 | 19.75 miles of patching on I-57 from milepost 182 to milepost 202. | — | Executed | Kinney Contractors, Inc. $816,794 · | ||
| Jun 14, 2024 | 95958 | ColesDistrict 7 | Reconstruction of Douglas Street from Hayes Avenue to Coolidge Avenue in the Ci ty of Charleston. | — | Executed | McCarthy Improvement Company $4,262,900 · | ||
| Jun 14, 2024 | 95960 | ColesDistrict 7 | Resurfacing, with pavement markings and rumble strips on Westfield Road from Lincoln National Memorial to the Coles/Clark County Line. | — | Executed | Ne-Co Asphalt Co., Inc. $2,999,290 · | ||
| Apr 25, 2025 | 74759 | ColesDistrict 7 | Pavement patching, hot-mix asphalt surface removal and resurfacing, ADA improvements and Signal improvements on IL 16 from IL 121 to just east of Swords Drive in Mattoon. | — | Executed | Howell Paving, Inc. $10,508,360 · | ||
| Apr 25, 2025 | 95975 | ColesDistrict 7 | Resurfacing on Madison Avenue from 7th Street to 18th Street in Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $356,482 · | ||
| Jun 13, 2025 | 74564 | ColesDistrict 7 | Complete superstructure and substructure replacement of SN 015-0068 which carries 900N over Riley Creek, 0.3 mile west of Charleston. Includes; guardrail and resurfacing done under a full road closure. | — | Executed | Sangamo Construction Company $2,441,724 · | ||
| Jun 13, 2025 | 74D32 | ColesDistrict 7 | Line existing corrugated metal pipe culverts with polyethylene solid wall or profile wall smooth interior pipe at various locations on IL 16 between Mattoon and Charleston. | — | Executed | CSD Environmental Services, Inc. $473,517 · | ||
| Jun 13, 2025 | 74D45 | ColesDistrict 7 | 7.3 miles of longitudinal joint repair on I-57 from 0.4 miles southwest of US to 1 mile north of IL 16. | — | Executed | Howell Paving, Inc. $1,058,359 · | ||
| Feb 27, 2026 | 74653 | ColesDistrict 7 | Replacement of SN 015-0034 carrying CH 31 over the Little Wabash River, 0.8 miles south of Paradise Road. | — | Executed | Sangamo Construction Company $3,082,674 · | ||
| Jun 12, 2026 | 74D54 | ColesDistrict 7 | 8 miles of resurfacing, aggregate wedge shoulder, HMA shoulders and patching on Old IL 316, 0.2 miles north of IL 16 in Mattoon to D Street in Charleston. | — | Executed | Howell Paving, Inc. $1,860,730 · | ||
| Jul 31, 2026 | 74E43 | ColesDistrict 7 | Bridge deck overlay on SN 015-0032 carrying Old State Road over I-57 east of Mattoon. | — | Executed | Howell Paving, Inc. $61,319 · | ||
| Sep 18, 2026 | 74650 | ColesDistrict 7 | Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004) | — | Executed | Sangamo Construction Company $11,526,296 · |
1–59 of 59
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.