IDOT Jobs

2021 · 952 jobs · — Sign up free
★ My Jobs

952 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 11, 2021 95902 WabashDistrict 7 Resurface 5th Street from Oak St. to North Mulberry St., and resurface Oak St. from College Dr. to Poplar St., and from IL 15 to West 3rd St. in Mt. Carmel. — Executed Nov 26 New Howell Paving, Inc. $965,200 ·
Jun 11, 2021 95903 WayneDistrict 7 Replace the bridge carrying TR 558 over Pond Creek drainage ditch, 3 miles southwest of Golden Gate. — Executed Nov 26 New E. T. Simonds Construction Company $583,078 ·
Jun 11, 2021 97716 St. ClairDistrict 8 HMA pavement, sidewalk construction, curb and gutter and pavement markings along Washington Street from Monroe Street to Jefferson Street in Millstadt. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $553,708 ·
Jun 11, 2021 97717 MonroeDistrict 8 Pavement reconstruction, storm sewers, retaining wall, sidewalks, curb and gutter and pavement markings on Moore St. from south of IL 3 to Columbia Ave., including the reconstruction of the intersection of Moore and Columbia in Waterloo. — Executed Nov 26 New DMS Contracting, Inc. $2,266,806 ·
Jun 11, 2021 97742 St. ClairDistrict 8 Construction of a roundabout at the intersecton of Market Place and Commercial Lane in Fairview Heights. — Executed Nov 26 New DMS Contracting, Inc. $635,199 ·
Jun 11, 2021 97753 MadisonDistrict 8 Resurface Seiler Road from Bivens Rd. to IL 159. — Executed Nov 26 New The Kilian Corporation $696,392 ·
Jun 11, 2021 97754 MadisonDistrict 8 Pavement reconstruction on Wood River Ave. from 3rd Street to south of 1st Street in Alton. — Executed Nov 26 New Stutz Excavating, Inc. $1,117,585 ·
Jun 11, 2021 97755 MadisonDistrict 8 Replace the bridge carrying Troy-Fallon Road over Mill Creek, 0.3 mile north of Lebanon Road. — Executed Nov 26 New Plocher Construction Company, Inc. $1,159,400 ·
Jun 11, 2021 97756 St. ClairDistrict 8 Resurface Seibert Road from Main Street to Johnson Road in Shiloh. — Executed Nov 26 New The Kilian Corporation $466,115 ·
Jun 11, 2021 97757 RandolphDistrict 8 Aggregate bse repair, HMA surface removal and resurfacing, and pavement markings on Liberty Street from Church Street to Jackson Street in Evansville. — Executed Nov 26 New E. T. Simonds Construction Company $86,674 ·
Jun 11, 2021 97759 St. ClairDistrict 8 Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on Collinsville Avenue from Summit Avenue to Martin Luther King Drive in East St. Louis. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $541,732 ·
Jun 11, 2021 99650 JacksonDistrict 9 Pavement removal, construction of 8" PCC pavement, curb and gutter, sidewalks, storm sewer, water main and sewer relocation, and pavement markings on North 7th Street from 0.4 mile south of Industrial Park Road to Bost Lane in Murphysboro. — Executed Nov 26 New Samron Midwest Contracting, Inc. $2,641,236 ·
Jun 11, 2021 99661 SalineDistrict 9 Resurface Johnston City Road from the Williamson County line to Harco Road. — Executed Nov 26 New E. T. Simonds Construction Company $832,254 ·
Jun 11, 2021 99662 GallatinDistrict 9 Resurfacing, aggregate shoulders and pavement markings on Ridgeway/New Haven Road from Jackson/New Hope to Road to Shawneetown/New Haven Road. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $433,770 ·
Jun 11, 2021 99663 SalineDistrict 9 Sidewalk Construction along US 45 from IL 142 to 300' east, along IL 142 from Locust Street to US 45, and pedestrian traffic signal improvements at the intersection of IL 142 and US 45 in Eldorado. — Executed Nov 26 New E. T. Simonds Construction Company $348,961 ·
Jun 11, 2021 99664 FranklinDistrict 9 Resurface South Thompsonville Road from IL 34 to the Williamson County Line. — Executed Nov 26 New E. T. Simonds Construction Company $989,256 ·
Jun 11, 2021 99667 WilliamsonDistrict 9 Resurface Lake Egypt Road from South Market Road to IL 166. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $890,783 ·
Jul 30, 2021 46580 ClarkDistrict 7 Various lengths of pavement marking rehabilitation throughout District 7. — Executed Nov 26 New Varsity Striping & Construction Co. $1,264,304 ·
Jul 30, 2021 46584 GrundyKendallDistrict 3 Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. — Executed Nov 26 New Maintenance Coatings Co. $264,008 ·
Jul 30, 2021 46585 VariousDistrict 2 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $711,712 ·
Jul 30, 2021 46911 SangamonDistrict 6 Removal and replacement of a portion of the existing parking lot, the sealing of the remainder of the existing parking lot and the construction of a bus lane and drop off connection at the Dana Thomas House State Historic Site in Springfield. — Executed Nov 26 New Kinney Contractors, Inc. $439,805 ·
Jul 30, 2021 60M12 CookDistrict 1 (2,558-Ft) Designed Overlay, ADA Improvements, includes HMA removal and replacement, Class D patching and PMK installation. Location: FAU 2839 California Ave. from 59th St. to 63rd St. within the City of Chicago in Cook County. — Executed Nov 26 New MAT Construction Leasing, Inc. $347,601 ·
Jul 30, 2021 60X57 LakeDistrict 1 (1,300-Ft) Intersection Improvement, culvert replacement and extension, new traffic signal installation, in the Village of Wauconda, Wauconda and Freemont Townships. — Executed Nov 26 New Peter Baker & Son Co. $1,158,508 ·
Jul 30, 2021 60X74 CookDistrict 1 Removal and replacement of the structure that carries IL 83 over Tinley Creek (1229.52-Ft) This project consists of removal and replacement of the structure that carries IL 83 over Tinley Creek. Also included are intersection improvements, pavement reconstruction, widening, resurfacing, drainage adjustments, and ADA improvements. Located in the Villages of Alsip and Crestwood in Cook County. — Executed Nov 26 New Copenhaver Construction, Inc. $7,156,871 ·
Jul 30, 2021 61G74 WillDistrict 1 Construction of a 10' wide HMA trail that includes pedestrian tunnels, retaining walls, box culverts, storm sewers, sidewalks, curb and gutter, fencing and pavement markings. Project begins at Spring Creek Greenway Trail in Lockport and concludes at the intersection of Cougar Road and 159th Street. — Executed Nov 26 New D. Construction, Inc. $6,860,486 ·
Jul 30, 2021 61H07 CookDistrict 1 Resurfacing Weathersfield Way from Braintree Drive to Salem Drive, includes the construction of an shared use path on the north side and new street lighting, in Schaumburg — Executed Nov 26 New R. W. Dunteman Company $1,488,508 ·
Jul 30, 2021 61H16 CookDistrict 1 Resurfacing and improvements on Summit drive from Wise Road to Schaumburg Road in Schaumburg. — Executed Nov 26 New Plote Construction, Inc. $1,309,098 ·
Jul 30, 2021 62D86 LakeDistrict 1 The length of this improvement is 4711 feet (0.89 miles) the type of work is Bridge Replacement, Reconstruction, and Resurfacing in Lake County. — Executed Nov 26 New Lorig Construction Company $12,031,007 ·
Jul 30, 2021 62G10 KendallWillDistrict 1 (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. — Executed Nov 26 New P. T. Ferro Construction Co. $1,259,611 ·
Jul 30, 2021 62G11 KaneDistrict 1 Intersection reconstruction, new traffic signals, consolidating three drainage structures into two box culvert (1,719 Ft.) The project consists of intersection reconstruction, new traffic signals, consolidating three drainage structures into two box culverts under State Street and IL 72, pedestrian and bicyclist accommodations, lighting improvements, ADA ramps, watermain and sanitary sewer improvements. Location: (IL 72) at State Street / Getzelman Road. — Executed Nov 26 New Pir Tano Construction Company, Inc. $3,881,417 ·
Jul 30, 2021 62J25 DuPageDistrict 1 (636-Ft) Removal of the existing retaining wall and replacement with new soldier piles wall with lagging. Location: West side of IL 59, from Glen Ave to Forest Ave in the City of West Chicago in DuPage County. — Executed Nov 26 New Herlihy Mid-Continent Company $938,401 ·
Jul 30, 2021 62N83 CookDistrict 1 I-80/94 (15,592-Ft), I-57 (2,000-Ft) Patching CRPCC with Class A and Full Depth HMA with Class D); Location: FAI 80: I-80/94 from IL 394 to IL/IN State Line in the Village of Lansing and I-57 at I-80 in the City of Country Club Hills — Executed Nov 26 New Plote Construction, Inc. $2,101,659 ·
Jul 30, 2021 62P20 VariousDistrict 1 The repair and installation of fence along various expressway and arterial highways in various counties throug This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One. — Executed Nov 26 New Fence Masters, Inc. $903,609 ·
Jul 30, 2021 62P21 VariousDistrict 1 High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide. — Rejected Nov 26 New Kujo, Inc. $606,621 ·
Jul 30, 2021 64M00 Rock IslandDistrict 2 1.15 miles / replacement of Westbound scale and pavement patching in both weigh scale stations on I-80 located 1.4 miles south of IL 84. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,072,933 ·
Jul 30, 2021 64M90 WhitesideDistrict 2 Cold milling/HMA resurfacing/patching on IL 84 from US 30 to 0.2 miles North of 10th Ave. N, North of Albany. — Executed Nov 26 New Valley Construction Co. $2,757,015 ·
Jul 30, 2021 64N91 Rock IslandDistrict 2 Cold milling, pavement patching, and HMA resurfacing. From 0.4 mile East of Il 92(N) to US 67 in Milan. — Executed Nov 26 New Valley Construction Co. $1,511,730 ·
Jul 30, 2021 64P53 WhitesideDistrict 2 Expansion joint replacement, deck patching, concrete overlay, parapet wall repairs, and other miscellaneous repairs on SN 098-0099, carrying US 30 over the UP Railroad and Harvey Road. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $663,345 ·
Jul 30, 2021 64P92 WhitesideDistrict 2 Expansion joint replacement, deck patching and concrete overlay, parapet wall repairs, and other miscellaneous repairs on SN 098-0005, carrying US 30 over the UP Railroad, 2.5 miles West of Morrison. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $646,160 ·
Jul 30, 2021 64R18 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in Henry, Rock Island, and Whiteside Counties. — Executed Nov 26 New M & M Concrete, Inc. $41,335 ·
Jul 30, 2021 64R20 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in Carroll, JoDaviess, Lee, and Ogle Counties. — Executed Nov 26 New M & M Concrete, Inc. $27,433 ·
Jul 30, 2021 64R21 VariousDistrict 2 Maintenance of signs along state maintained routes within District 2. — Executed Nov 26 New Western Remac, Inc. $223,398 ·
Jul 30, 2021 66K47 LaSalleDistrict 3 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $1,959,861 ·
Jul 30, 2021 66L21 KendallDistrict 3 Removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail r This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items. — Executed Nov 26 New Riber Construction, Inc. $220,993 ·
Jul 30, 2021 66L81 LivingstonDistrict 3 Centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing This project is located at two locations on FAI 55 (I-55) in Livingston County. Location 1 begins at M.M. 205.0 and ends at M.M. 209.0 (S. of Odell), Location 2 begins at M.M. 212.0 and ends at M.M. 215.3 (N. of Odell). This project consists of centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $557,717 ·
Jul 30, 2021 66L83 IroquoisDistrict 3 Class A pavement patching, pavement striping, and other related construction items This project is located on FAI 57 (I-57) beginning at the Ford County Line and ending at IL Route 116 (Ashkum). This work consists of Class A pavement patching, pavement striping, and other related construction items. — Executed Nov 26 New G. M. Sipes Construction, Inc. $448,168 ·
Jul 30, 2021 66L91 FordIroquoisDistrict 3 The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties. — Executed Nov 26 New Freehill Asphalt, Inc. $62,711 ·
Jul 30, 2021 68799 PeoriaDistrict 4 Removal and replacement of the existing structure carrying IL Route 8 over BNSF Railway (Existing S.N. 072-0049; Proposed S.N. 072-0248) at Edwards on a realigned IL Route 8. The project length is 0.68 mile. — Executed Nov 26 New White Construction LLC $12,957,193 ·
Jul 30, 2021 68F71 WarrenDistrict 4 Bridge joint replace/repair on Structure No. 094-0016 carrying IL 94/IL 135 over Henderson Creek, approximately 2.0 miles North of Little York in Warren County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $434,766 ·
Jul 30, 2021 68F78 MercerDistrict 4 Bridge joint replace/repair, bridge painting, bridge repair to S.N. 066-0007 carrying Illinois Route 94 over Camp Creek, approximately 5 miles North of Aledo in Mercer County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $429,504 ·
Jul 30, 2021 72M73 VariousDistrict 6 On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,348,040 ·
Jul 30, 2021 72M91 AdamsDistrict 6 Deck and substructure repairs on SN 001-0011 carrying US 24 over BNSF Railroad and Cedar Creek, 1.5 miles north of IL 104. — Executed Nov 26 New Sangamo Construction Company $483,622 ·
Jul 30, 2021 72M99 ScottDistrict 6 Lot improvements at the Riggston Maintenance Yard. — Executed Nov 26 New K. E. Vas Company $87,086 ·
Jul 30, 2021 74915 CrawfordDistrict 7 Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363. — Executed Nov 26 New Sangamo Construction Company $3,028,564 ·
Jul 30, 2021 74A15 MaconDistrict 7 Signal modernization at the intersection of IL 105 and 24th Street in Decatur. — Executed Nov 26 New Laser Electric, Inc. $22,493 ·
Jul 30, 2021 76N17 MadisonDistrict 8 Bridge repair, HMA overlay and joint repair on IL 11 over the Union Pacific Railroad (SN 060-0122) approximately 2 miles north of I-270 and on IL 111 over the Norfolk Southern Railroad and an access road (SN 060-0123) approximately 1.2 miles north of I-270. — Executed Nov 26 New Keeley & Sons, Inc. $1,898,717 ·
Jul 30, 2021 76N59 VariousDistrict 8 Maintain and service all ITS equipment at various locations throughout District 8 and the removal and replacement of a dynamic message board on eastbound I-55/64 at 4th Street. — Executed Nov 26 New Electrico, Inc. $499,729 ·
Jul 30, 2021 76P14 VariousDistrict 8 Guardrail and cable median repair at various locations in District 8. — Executed Nov 26 New Illini Excavation & Reclamation, Inc. $2,746,044 ·
Jul 30, 2021 76P28 MadisonDistrict 8 3.9 miles of resurfacing and design overlay on IL 111 from 0.1 miles south of Horseshoe Lake Road to the St. Clair County line. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $4,645,357 ·
Jul 30, 2021 78550 JeffersonDistrict 9 Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. — Executed Nov 26 New E. T. Simonds Construction Company $16,242,143 ·
Jul 30, 2021 78656 FranklinDistrict 9 9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch. — Executed Nov 26 New E. T. Simonds Construction Company $67,611,531 ·
Jul 30, 2021 78838 JacksonPerryDistrict 9 17.8 miles of pavement patching, HMA surface removal, HMA surfacing, HMA shoulders and ADA sidewalk improvements on US 51 from near Industrial Park Road in Carbondale to Grant Way in Du Quoin. — Executed Nov 26 New E. T. Simonds Construction Company $8,586,162 ·
Jul 30, 2021 78863 JohnsonDistrict 9 3.4 miles of patching, milling, surfacing, median repairs and curb and gutter repairs at 2 locations: 1) US 45 from 0.7 miles northeast of I-24 to 1.07 miles southwest of I-24; 2) Just north of IL 146 to 1.85 miles south of IL 146. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,536,649 ·
Jul 30, 2021 78865 JacksonDistrict 9 6.2 miles of HMA surface removal, resurfacing of the mainline and shoulders and ADA upgrades on IL 149 from IL 13/127 in Murphysboro to US 51 in Desoto. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,641,027 ·
Jul 30, 2021 78872 PulaskiUnionDistrict 9 5 miles of micro-surfacing on Northbound I-57 / US 51 from 1 mile south of Big Creek to Perks Road. — Executed Nov 26 New A. C. Pavement Striping Co. $338,806 ·
Jul 30, 2021 78886 PulaskiDistrict 9 1000- of milling, resurfacing, guardrail removal and replacement and concrete rail removal and replacement on West Cedar Street from east of SN 077-0030 to Front Street in Olmstead. — Executed Nov 26 New Samron Midwest Contracting, Inc. $221,401 ·
Jul 30, 2021 85713 BooneDistrict 2 Replace the bridge carrying TR 120 over Piscasaw Creek, 3.5 miles southeast of Poplar Grove. — Executed Nov 26 New Sjostrom & Sons, Inc. $409,085 ·
Jul 30, 2021 87754 DeKalbDistrict 3 Resurfacing, sidewalk replacement, curb and gutter, pavement markings and pedestrian signal improvements at three locations on Northern University Campus in the City of DeKalb. — Rejected Nov 26 New Stenstrom Excavation & Blacktop, Inc. $369,273 ·
Jul 30, 2021 87767 DeKalbDistrict 3 Replace the bridge carrying TR 244 over Coon Creek 0.30 mile south of IL 72. — Rejected Nov 26 New Sjostrom & Sons, Inc. $456,936 ·
Jul 30, 2021 87780 FordDistrict 3 Resurfacing and aggregate shoulders on Elliot Road from IL 54 to IL 9. — Executed Nov 26 New Iroquois Paving Corporation $1,626,354 ·
Jul 30, 2021 87781 BureauDistrict 3 Repair the undermining at the abutments and install improved drainage at the bridge carrying Peru Road over Negro Creek, just south of US 6. — Executed Nov 26 New D. Construction, Inc. $198,183 ·
Jul 30, 2021 89784 TazewellDistrict 4 Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 ·
Jul 30, 2021 89786 PeoriaDistrict 4 Construction of sidewalks and ADA ramps on the south side of West Knolls Road from North University Drive to 0.15 mile east of Allen Road in Peoria. — Executed Nov 26 New Illinois Civil Contractors, Inc. $234,082 ·
Jul 30, 2021 89791 KnoxDistrict 4 Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $275,374 ·
Jul 30, 2021 89807 PutnamDistrict 4 Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line. — Executed Nov 26 New Advanced Asphalt Company $753,023 ·
Jul 30, 2021 91606 VermilionDistrict 5 Replace the bridge carrying TR 183 over Unnamed Stream, 1 mile south of Hope. — Executed Nov 26 New Big O Services, LLC $391,390 ·
Jul 30, 2021 93764 HancockDistrict 6 Replace the bridge carrying CH 19 over Panther Creek, 4 miles west of Plymouth. — Executed Nov 26 New County Contractors, Inc. $744,143 ·
Jul 30, 2021 93771 SangamonDistrict 6 Install lighting at the intersection of Mechanicsburg-Illiopolis Road and Mt. Auburn Roiad in Sangamon County. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $28,864 ·
Jul 30, 2021 95904 LawrenceDistrict 7 Resurfacing, HMA shoulders, rumble strips and culvert replacement on FAS 1804 from 1150 North Road to Sun and Sand Road. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $1,263,794 ·
Jul 30, 2021 99601 SalineDistrict 9 Replace the bridge carrying Forest Road over Little Eagle Creek, 8 miles west of IL 1. — Executed Nov 26 New Samron Midwest Contracting, Inc. $497,333 ·
Jul 30, 2021 99612 GallatinDistrict 9 Replace the bridge carrying Eldorado Blacktop Road over North Fork of Saline River, 1.8 miles west of IL 1. — Executed Nov 26 New Samron Midwest Contracting, Inc. $2,973,552 ·
Jul 30, 2021 99668 JeffersonDistrict 9 Resurfacing and aggregate shoulders on East Divide Road from Harmony Lane to Papertown Lane. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,035,795 ·
Sep 17, 2021 46577 VariousDistrict 7 Pavement marking rehabilitation throughout District 7. — Executed Nov 26 New Varsity Striping & Construction Co. $776,874 ·
Sep 17, 2021 61H17 KaneDistrict 1 Reconstruct the existing Illinois Prairie Path from Indian Trial Road to the DuPage County line in Aurora. — Executed Nov 26 New Martam Construction Incorporated $894,048 ·
Sep 17, 2021 61H21 McHenryDistrict 1 Resurfacing Reed Road from the west village limits to Lakewood Road in the Village of Lake in the Hills. — Executed Nov 26 New Plote Construction, Inc. $125,400 ·
Sep 17, 2021 62D79 CookLakeDistrict 1 The project extends from Montrose Ave to Park Blvd. Improvements cover 13.5 miles along 1-94 and 2 miles along US 41. The scope includes fiber optic cable, CCTV and dynamic message signs in order to provide surveillance coverage of the highway. — Executed Nov 26 New Meade Inc. $11,996,355 ·
Sep 17, 2021 62G35 McHenryDistrict 1 (7.74-Mile) Pavement widening and resurfacing to provide left turn lanes at 8 intersections, replacement of 3 culverts, 5 culverts repair, widening 5 culverts to accommodate proposed intersections, guardrails, regrading, shoulder improvements and rumblestrips along IL 176 from Deerpass Rd -Dean St in the City of Marengo. — Executed Nov 26 New William Charles Construction Company, LLC $8,277,010 ·
Sep 17, 2021 62H87 CookDistrict 1 Intersection improvements at US 14 and Propect Road to include traffic signal modernization, left turn lanes, railroad interconnect, pedestrian signals, drainage system, and ADA/shared-use path improvements in Des Plaines and Mt. Prospect. — Executed Nov 26 New Berger Excavating Contractors, Inc. $2,974,033 ·
Sep 17, 2021 62J90 LakeDistrict 1 (2.17-Mile) Designed Overlay, ADA Improvements; Location: FAU 3506: Sheridan Rd from St. Johns Ave to Lambert Tree Ave in the City of Highland Park in Lake County. — Executed Nov 26 New Builders Paving, LLC $1,448,000 ·
Sep 17, 2021 62K02 CookDistrict 1 (2,897-Ft) Intersection improvement and traffic signal modernization project located at the intersection of IL 19 (FAU 1321) and Barrington Road in the Village of Hanover Park in Cook County. — Executed Nov 26 New Alliance Contractors, Inc. $2,935,409 ·
Sep 17, 2021 62K30 WillDistrict 1 (13.6-Mile) Pavement Rehabilitation (designed overlay). Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Southbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,952,848 ·
Sep 17, 2021 62K51 WillDistrict 1 (13.6-miles) Pavement rehabilitation (designed overlay) project for Northbound direction. Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Northbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,734,628 ·
Sep 17, 2021 62L67 CookDistrict 1 (5,255-Ft) Standard Overlay with ADA improvements. Location: 47th Street, from Central Ave to IL-50 (Cicero Ave) in the Village of Stickney and the City of Chicago, in Cook County. — Executed Nov 26 New MAT Construction Leasing, Inc. $904,416 ·
Sep 17, 2021 62M76 CookDistrict 1 The improvement is located at the structure carrying Metra commuter rail over 1-90 and CTA at Jefferson Park (SN 016-0515) in the city of Chicago. — Executed Nov 26 New Copenhaver Construction, Inc. $367,420 ·
Sep 17, 2021 62M86 VariousDistrict 1 This contract is for annual maintenance of electrical systems including the Signal Systems, Lighting Systems, Pump Station Systems, Surveilliance System and other Electrical Systems, many subsystems and components, mechanical system and including buildings, structures and grounds located withing District 1. — Rejected Nov 26 New Meade Inc. $39,292,732 ·
Sep 17, 2021 62N95 VariousDistrict 1 89 Traffic Signal Intersections. Installation of traffic signal safety devices to increase visibility of signal indications during inclement weather. Location - 23 intersections in Cook, 4 locations in Lake, 35 locations in Kane, 4 locations in McHenry, 23 locations in Will. — Executed Nov 26 New H & H Electric Co. $929,834 ·
Sep 17, 2021 62P25 CookDistrict 1 (597-Ft.) Cleaning and painting designated steel surfaces of bridge structure carrying Western Ave over Calumet Sag Channel in the City of Blue Island, Worth and Calumet Townships, Cook County. — Executed Nov 26 New Capital Industrial Services $1,533,930 ·
Sep 17, 2021 62P26 McHenryDistrict 1 (16.3-Mile) Pavement surface patching (2-in mill and fill / intermittent resurfacing) improvement. Includes affected PMKs restoration. Location: IL 173 (Maple Ave) from Alden Rd to Lake Co Line in the Villages Alden Hebron and Richmond in McHenry County. — Executed Nov 26 New Payne & Dolan, Inc. $597,319 ·
Sep 17, 2021 62P27 VariousDistrict 1 (15.3-Mile) Replacement of existing signs with new guide signs, removal of walkway, and removal of existing sign lighting Location - Along 1-55 Northbound and Southbound as well as exit ramps between Weber Rd and l-294 (Tri-State Tollway) — Executed Nov 26 New Aldridge Electric, Inc. $1,244,418 ·
Sep 17, 2021 64L75 OgleDistrict 2 Deck replacement and substructure repairs, IL 251 over Soo Line Railroad 0.1 mile South of Il 72. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,189,925 ·
701–800 of 952‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.