08-00003-00-PV
- Let date
- Friday, November 5, 2021
- Contract
- 87754 · job page
- District
- District 3
- County
- Dekalb
- Highway
- Limits
- Pavement patching, resurfacing, striping, signing, landscaping, installation of an automated pedestrian signal system and DA improvements at various locations at Northern Illinois University in Dekalb
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stenstrom Excavation & Blacktop, Inc. Low bidder | $369,273 | ||
| 2 | Curran Contracting Company | $389,400 | +5.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stenstrom Excav… | #2 Curran Contract… |
|---|---|---|---|---|---|---|---|
| 1 | XX009474 | JOINT REPAIR SPL | 191 | FOOT | $82.50 | $104.23 | |
| 2 | X6064200 | COMB CC&G TB6.12 SPL | 701 | FOOT | $40.80 | $33.69 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $3,611.00 | $5,000.00 | |
| 4 | X8760200 | ACCESSIBLE PED SIGNAL | 8 | EACH | $1,628.00 | $1,451.12 | |
| 5 | X8950114 | MOD EX CONTR & CAB | 1 | EACH | $2,166.00 | $1,930.80 | |
| 6 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $7,445.00 | $8,500.00 | |
| 7 | Z0073509 | PERM TR SIGNAL TIMING | 1 | EACH | $1,465.00 | $1,305.30 | |
| 8 | 20200100 | EARTH EXCAVATION | 47 | CU YD | $288.00 | $175.00 | |
| 9 | 21101615 | TOPSOIL F & P 4 | 457 | SQ YD | $11.85 | $10.56 | |
| 10 | 25000110 | SEEDING CL 1A | 0.1 | ACRE | $16,927.00 | $15,084.40 | |
| 11 | 25000400 | NITROGEN FERT NUTR | 8.5 | POUND | $5.65 | $5.03 | |
| 12 | 25000500 | PHOSPHORUS FERT NUTR | 8.5 | POUND | $5.65 | $5.03 | |
| 13 | 25000600 | POTASSIUM FERT NUTR | 8.5 | POUND | $5.65 | $5.03 | |
| 14 | 25100635 | HD EROS CONTR BLANKET | 457 | SQ YD | $6.77 | $6.03 | |
| 15 | 28000400 | PERIMETER EROS BAR | 382 | FOOT | $0.0100 | $8.55 | |
| 16 | 28000500 | INLET & PIPE PROTECT | 18 | EACH | $0.0100 | $326.83 | |
| 17 | 40600290 | BIT MATLS TACK CT | 2,750 | POUND | $0.0100 | $0.0100 | |
| 18 | 40602985 | HMA BC IL-9.5 N70 | 2 | TON | $630.00 | $195.00 | |
| 19 | 40604062 | HMA SC IL-9.5 D N70 | 871 | TON | $82.15 | $85.00 | |
| 20 | 42400410 | PC CONC SIDEWALK 8 | 4,875 | SQ FT | $14.14 | $8.70 | |
| 21 | 42400800 | DETECTABLE WARNINGS | 388 | SQ FT | $0.0100 | $27.15 | |
| 22 | 44000159 | HMA SURF REM 2 1/2 | 6,112 | SQ YD | $4.27 | $6.00 | |
| 23 | 44000500 | COMB CURB GUTTER REM | 930 | FOOT | $6.65 | $17.50 | |
| 24 | 44000600 | SIDEWALK REM | 4,928 | SQ FT | $2.42 | $5.00 | |
| 25 | 44201737 | CL D PATCH T1 8 | 7 | SQ YD | $290.00 | $195.00 | |
| 26 | 44201741 | CL D PATCH T2 8 | 9 | SQ YD | $228.00 | $180.00 | |
| 27 | 44201745 | CL D PATCH T3 8 | 23 | SQ YD | $167.00 | $180.00 | |
| 28 | 44201747 | CL D PATCH T4 8 | 27 | SQ YD | $145.00 | $155.00 | |
| 29 | 60255500 | MAN ADJUST | 14 | EACH | $725.00 | $900.00 | |
| 30 | 60260100 | INLETS ADJUST | 17 | EACH | $725.00 | $125.70 | |
| 31 | 60603800 | COMB CC&G TB6.12 | 229 | FOOT | $40.80 | $33.69 | |
| 32 | 67100100 | MOBILIZATION | 1 | L SUM | $11,000.45 | $22,500.00 | |
| 33 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $850.00 | $1,000.00 | |
| 34 | 72000100 | SIGN PANEL T1 | 9 | SQ FT | $34.00 | $30.17 | |
| 35 | 72400100 | REMOV SIN PAN ASSY TA | 1 | EACH | $23.00 | $500.00 | |
| 36 | 72800100 | TELES STL SIN SUPPORT | 13 | FOOT | $23.00 | $20.11 | |
| 37 | 78000100 | THPL PVT MK LTR & SYM | 62 | SQ FT | $5.50 | $4.83 | |
| 38 | 78000400 | THPL PVT MK LINE 6 | 2,379 | FOOT | $1.97 | $1.21 | |
| 39 | 78000600 | THPL PVT MK LINE 12 | 1,938 | FOOT | $2.60 | $2.41 | |
| 40 | 78000650 | THPL PVT MK LINE 24 | 163 | FOOT | $5.42 | $4.83 | |
| 41 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $1,765.00 | $2,578.42 | |
| 42 | 87301215 | ELCBL C SIGNAL 14 2C | 56 | FOOT | $6.65 | $5.91 | |
| 43 | 88102717 | PED SH LED 1F BM CDT | 8 | EACH | $984.00 | $876.91 | |
| 44 | 88600100 | DET LOOP T1 | 34 | FOOT | $109.00 | $96.37 | |
| 45 | 89502300 | REM ELCBL FR CON | 44 | FOOT | $1.40 | $1.25 | |
| 46 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $1,531.00 | $1,363.62 | |
| 47 | 89502376 | REBUILD EX HANDHOLE | 2 | EACH | $2,470.00 | $2,200.31 |