| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 29, 2022 | 46591 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified o This work shall consist of removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $130,853 · | ||
| Apr 29, 2022 | 46592 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols with This work shall consist of placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | Precision Pavement Markings Inc. $1,478,750 · | ||
| Apr 29, 2022 | 46931 | FranklinDistrict 9 | Resurfacing the parking lot and drive, pavement widening, asphalt seal coating and pavement marking at the IDNR Region V Headquarters in Benton. | — | Executed | Lake Contracting, Inc. $239,183 · | ||
| Apr 29, 2022 | 61G32 | KaneDistrict 1 | Replace the superstructure and the abutments of the existing bridge carrying Coombs Road over the DMandE Railroad in Elgin Township, Kane County. | — | Executed | Lorig Construction Company $2,279,677 · | ||
| Apr 29, 2022 | 61G89 | DuPageDistrict 1 | Constructon of PCC Sidewalk, curb and gutter replacement, storm sewer, Segmental concrete block wall, traffic signal improvements and pavement markings on Hobson Road from Woodside Drive to Janes Avenue in Woodridge and unincorporated DuPage County in Lisle Township. | — | Executed | Acura Inc. $1,696,019 · | ||
| Apr 29, 2022 | 61H18 | DuPageDistrict 1 | Trailhead improvements including new sidewalk, landscaping, signing and construction of a restroom building and shelter. Project is located at the south corner of IL 56 at Batavia Road in Warrenville. | — | Executed | Landmark Contractors, Inc. $1,001,551 · | ||
| Apr 29, 2022 | 61H38 | CookDistrict 1 | Resurfacing Jackson Boulevard from Madison Street to Des Plaines Avenue in Forest Park. | — | Executed | Lindahl Brothers, Inc. $485,407 · | ||
| Apr 29, 2022 | 61H47 | CookDistrict 1 | Storm sewer construction, ADA sidealks and traffic signal pedestrian upgrates Roadway reconstruction on Central Avenue from 47th Street to Burlington Avenue and storm sewer construction with combined sewer separation on Central Avenue and Elm Street. Work along 47th Street from Central Avenue to Flagg Creek consists of storm sewer construction, ADA sidealks and traffic signal pedestrian upgrates. Project is located in Western Springs. | — | Executed | Berger Excavating Contractors, Inc. $4,645,651 · | ||
| Apr 29, 2022 | 61H57 | CookDistrict 1 | Resurfacing Meacham Road from IL 58 to IL 72 in Schaumburg. | — | Executed | Plote Construction, Inc. $1,865,189 · | ||
| Apr 29, 2022 | 61H60 | KaneDistrict 1 | Pavement reclamation, resurfacing and aggregate should improvements on Anderson Road from IL 64 to IL 38 in Compton Township. | — | Executed | Builders Paving, LLC $985,000 · | ||
| Apr 29, 2022 | 61H63 | LakeDistrict 1 | Resurfacing 27th Street from Galilee Avenue to Emmaus Avenue in Zion. | — | Executed | J. A. Johnson Paving Company $871,468 · | ||
| Apr 29, 2022 | 61H64 | CookDistrict 1 | Resurfacing Lawndale Avenue from Touhy Avenue to Central Park Avenue, Central Park Avenue from Lawndale Avenue to Northeast Parkway, and Northeast Parkway from Central park Avenue to McCormick Boulevard in Lincolnwood. | — | Executed | J. A. Johnson Paving Company $537,537 · | ||
| Apr 29, 2022 | 61H66 | LakeDistrict 1 | Construction of a pedestrian path along Hart road from Field of Dreams to Lake Cook Road, and along Lake Cook Road from Hart Road to the high school entrance, in Barrington. | — | Executed | Lorig Construction Company $695,851 · | ||
| Apr 29, 2022 | 61H67 | CookDistrict 1 | Resurfacing Shields Avenue from Maple Avenue to Custer Avenue in Broofield. | — | Executed | K-Five Construction Corporation $780,544 · | ||
| Apr 29, 2022 | 61H71 | CookDistrict 1 | Roadway widening and resurfacing, and construction of a multi-use path along Chestnut Avenue from Lehigh Avenue to Waukegan Road in Glenview. | — | Executed | Alliance Contractors, Inc. $5,262,614 · | ||
| Apr 29, 2022 | 62G03 | CookDistrict 1 | Traffic Signal Modernization and ADA Sidewalk Ramps at the intersection of Western Ave@ 139th St located in the Village of Posen, Village of Dixmoor, and the City of Blue Island. | — | Executed | Hecker and Company, Inc. $509,914 · | ||
| Apr 29, 2022 | 62G71 | CookDistrict 1 | (4,569 Ft) Designed Overlay and ADA Improvements located in the City of Chicago in Cook County. Addison Street from Avondale Ave to Sacramento Ave. | — | Executed | MAT Construction Leasing, Inc. $1,320,682 · | ||
| Apr 29, 2022 | 62H26 | CookDistrict 1 | (296-Ft) Removal and replacement of culvert located on Dixie Hwy over ditch (1 Mile N of US 6) located in the City of Harvey, Cook County. | — | Executed | D. Construction, Inc. $1,802,727 · | ||
| Apr 29, 2022 | 62H62 | WillDistrict 1 | Improvements located at the IDOT Birds Bridge Maintenance yard at 22608 S. Frontage Rd, Channahon includes pavement removal, sanitary manhole adjustments, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement markings. | — | Executed | Gallagher Asphalt Corporation $439,851 · | ||
| Apr 29, 2022 | 62L68 | LakeDistrict 1 | (3.42-Mile) Design overlay project on IL Route 137 from Buckley Road to Belvidere Road that includes ADA curb ramp improvements located in City of Waukegan and City of North Chicago in Lake County. | — | Executed | Peter Baker & Son Co. $5,588,006 · | ||
| Apr 29, 2022 | 62M46 | CookDistrict 1 | (2.73-Mile) Designed and Standard Overlay Project on Oakton Street, begins Approx. 150 feet W. of Busse Highway and extends E. for 15,023 feet (2.85 miles ) to Waukegan Rd located in the City of Park Ridge and Village of Niles. | — | Executed | Arrow Road Construction Co. $3,917,529 · | ||
| Apr 29, 2022 | 62M48 | CookDistrict 1 | (4,688-Ft) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2772: Waukegan Road from IL 43 (Oakton St) to IL 21 (Milwaukee Ave) in the Village of Niles. | — | Executed | Plote Construction, Inc. $1,160,466 · | ||
| Apr 29, 2022 | 62M58 | LakeDistrict 1 | (1000-Ft) Bridge joint repairs, bridge deck overlay, guardrail, and asphalt shoulder reconstruction for the structures that carry US 41 over Mill Creek located in the Village of Wadsworth in Lake County. | — | Executed | Lorig Construction Company $1,225,496 · | ||
| Apr 29, 2022 | 62M59 | CookDistrict 1 | (1032-Ft) Channelization and pavement widening to add a right turn lane, traffic signal modernization, bridge deck overlay and joint repair located on IL 53 (Biesterfield Rd.) at the I-290 northbound ramp within Elk Grove Village. | — | Executed | MYS, Incorporated $1,748,339 · | ||
| Apr 29, 2022 | 62N07 | CookDuPageLakeDistrict 1 | This is a drainage improvement on various State maintained routes within the Cities of Elmhurst and Waukegan and the Villages of Glendale Heights, Lemont, and Mount Prospect in Cook, DuPage and Lake Counties. The routes are Kensington Road, IL 137, I-290, IL 64, and McCarthy Road / 123rd Street. | — | Executed | Martam Construction Incorporated $1,608,899 · | ||
| Apr 29, 2022 | 62N20 | WillDistrict 1 | (2612-Ft) Bridge superstructure replacement and bridge widening of the two-lane structure over 1-80 at Wolf Road located in the Village of Mokena, Will County. | — | Executed | P. T. Ferro Construction Co. $4,699,500 · | ||
| Apr 29, 2022 | 62N23 | LakeDistrict 1 | (2535-Ft) Land bridge deck overlay and repairs to the structures at Fish Creek. Scope of work includes abandoning structure, grouting, concrete bridge deck overlays, and shoulder reconstruction located in the Village of Volo. | — | Executed | Lorig Construction Company $2,831,222 · | ||
| Apr 29, 2022 | 62N65 | LakeDistrict 1 | (1.86-Mile) SMART overlay along IL 83 from Winchester Rd to IL 176/Maple St. This project is in the Village of Mundelein in Lake County. | — | Executed | Peter Baker & Son Co. $1,021,974 · | ||
| Apr 29, 2022 | 62N70 | LakeDistrict 1 | Smart overlay resurfacing on IL 173 (Rosecrans Road) Approximately 2000 feet east of 1-94 and extends in an easterly direction approximately 20,062 feet (3.80 miles) to approximately 130 feet west of IL 131 located in the Villages of Wadsworth and Zion. | — | Executed | J. A. Johnson Paving Company $1,798,173 · | ||
| Apr 29, 2022 | 62N75 | CookDistrict 1 | Standard overlay resurfacing on Hicks Road approx. 140 feet S. of Kirchoff Rd. and extends in a northerly direction approx. 2033 feet to approx. 20 feet north of Euclid Avenue located in the Village of Palatine. | — | Executed | J. A. Johnson Paving Company $532,000 · | ||
| Apr 29, 2022 | 62N77 | CookDistrict 1 | (2.41-Mile) Smart Overlay, ADA Improvements; Location: FAU 1332, Oakton St from IL 83 (Elmhurst Rd) to US 12/45 (Lee St/Mannheim Rd), in the City of Des Plaines in Cook County. | — | Executed | Arrow Road Construction Co. $3,382,411 · | ||
| Apr 29, 2022 | 62N87 | WillDistrict 1 | This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County. | — | Executed | Triggi Construction, Inc. $971,423 · | ||
| Apr 29, 2022 | 62N98 | CookDistrict 1 | (2.51-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2845: Western Avenue from US 30/ Lincoln Hwy to Steger Rd in the Villages of Chicago Height, Park Forest. | — | Executed | Iroquois Paving Corporation $2,684,806 · | ||
| Apr 29, 2022 | 62N99 | CookDistrict 1 | (2.4-Mile) Standard overlay and ADA improvements on Grand Ave. from Elm St to East of 77th Ct and 74th Ct to IL 43 located in the Villages of Franklin Park, River Grove, and Elmwood Park in Cook County. | — | Executed | K-Five Construction Corporation $3,113,352 · | ||
| Apr 29, 2022 | 62P10 | CookDistrict 1 | (1320-Ft.) Bridge deck replacement to the structure carrying 175th Street Over 1-57. Scope of work includes bridge deck replacement, substructure repairs, steel repairs and steel cleaning and painting located in the City of Country Club Hills. | — | Executed | P. T. Ferro Construction Co. $3,123,305 · | ||
| Apr 29, 2022 | 62P17 | CookDistrict 1 | Designed overlay resurfacing with ADA improvements on River Oaks Drive, beginning at Price Ave. and continuing in the southeasterly direction for approx. 3,500 ft., ending at State Line Rd located in the City of Calumet City. | — | Executed | D. Construction, Inc. $878,988 · | ||
| Apr 29, 2022 | 62P30 | CookDistrict 1 | (1.04-Mile) Designed Overlay on Lehigh Avenue from Oakton St. to Lehigh Ave. The project is located within the Villages of Morton Grove and Niles. | — | Executed | Builders Paving, LLC $868,000 · | ||
| Apr 29, 2022 | 62P32 | CookDistrict 1 | (2.056-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching , HMA resurfacing, curb ramps improvements, PMK. FAU 1332: Oakton St, from Waukegan Rd to Long Ave in the Villages of Niles, Morton Grove and Skokie. | — | Executed | Builders Paving, LLC $3,626,380 · | ||
| Apr 29, 2022 | 62P35 | WillDistrict 1 | This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk. | — | Executed | Triggi Construction, Inc. $998,023 · | ||
| Apr 29, 2022 | 62P45 | CookDistrict 1 | (3.05-Mile) Water main replacement, intersection reconstruction, roadway reconstruction of Wood St / Ashland Ave from north of Thornton Rd to 138th St, bridge rehabilitation, sidewalk, shared-use path roadway lighting, and aesthetic landscaping located in the City of Harvey, Villages of Dixmoor and Riverdale. | — | Executed | Judlau Contracting, Inc. $41,677,110 · | ||
| Apr 29, 2022 | 62P47 | CookLakeMcHenryDistrict 1 | Designed overlay resurfacing on County-Line Rd., beginning at E. of Haegers Bend Rd. and continuing in the easterly direction for approximately 23483 feet (4.44 miles) to 300 ft west of Hart Rd. located in the Village of Barrington Hills. | — | Executed | Plote Construction, Inc. $2,590,116 · | ||
| Apr 29, 2022 | 62P53 | CookDistrict 1 | (200-Ft) Wingwall replacement and culvert repairs of the culvert carrying Wolf Road over Addition Creek in the City of Northlake, Cook County. | — | Rejected | MYS, Incorporated $306,804 · | ||
| Apr 29, 2022 | 62P82 | CookDuPageDistrict 1 | Cleaning and painting existing steel structures at 4 locations Improvement consists of cleaning and painting existing steel structures at 4 locations. Location 1 is at I-290 at IL 58 (SN 016-0980) in Rolling Meadows and Scahumburg. Location 2 is at 25th Ave at IHB RR (SN 016-1011) in Melrose Park and Franklin Park. Location 3 is at 1-290 and 1-355 (SN 022-0092) in Addison. Location 4 is at I-290 ramp to I-355 (SN022-0094) in Addison. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,176,437 · | ||
| Apr 29, 2022 | 62R39 | VariousDistrict 1 | Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Town This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in Cook, various Counties. | — | Executed | Western Remac, Inc. $765,120 · | ||
| Apr 29, 2022 | 62R44 | WillDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed R (216-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed Road. | — | Executed | Winston's Image LLC $222,264 · | ||
| Apr 29, 2022 | 62R45 | CookDuPageDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to IL 43 (180-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to IL 43 (Harlem Ave). | — | Executed | Winston's Image LLC $186,480 · | ||
| Apr 29, 2022 | 62R46 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties (299.5-Mile) The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Executed | Elgin Sweeping Services, Inc. $1,249,890 · | ||
| Apr 29, 2022 | 62R47 | LakeDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Lake County (422.6-Mile) Improvement consists of cleaning(sweeping) various arterial highways in District One throughout Lake County. | — | Executed | Elgin Sweeping Services, Inc. $1,593,840 · | ||
| Apr 29, 2022 | 64J47 | WhitesideDistrict 2 | 0.5 mile, Bridge repair and bridge painting on US 30 over the Mississippi River one mile West of IL 84. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $987,610 · | ||
| Apr 29, 2022 | 64J65 | Rock IslandDistrict 2 | Landscaping from Mississippi River to 0.9 mi S of Avenue of the Cities in Moline. | — | Executed | McCarthy Improvement Company $2,065,884 · | ||
| Apr 29, 2022 | 64M17 | CarrollDistrict 2 | 0.5 mile, culvert replacement, new shoulders, milled rumble strips, and safety improvements from 0.5 mile East of Grange Road located East of Lanark. | — | Executed | Martin & Company Excavating $648,371 · | ||
| Apr 29, 2022 | 64N37 | Rock IslandDistrict 2 | 1.54 miles cold milling and HMA resurfacing and ADA on IL 192 from 0.3 miles West of 140th St W in Edgington to 123rd St W. | — | Executed | Brandt Construction Co. $1,308,309 · | ||
| Apr 29, 2022 | 64N71 | Rock IslandDistrict 2 | The project includes steel repairs, hanger repairs, and other related items on the structure. | — | Executed | White Construction LLC $1,458,043 · | ||
| Apr 29, 2022 | 64R14 | WinnebagoDistrict 2 | Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 101-0142 and 101-0143 carrying I-39/US 51 over Blackhawk Road. | — | Executed | Martin & Company Excavating $750,819 · | ||
| Apr 29, 2022 | 64R38 | OgleDistrict 2 | Full cleaning and painting of structural steel of SN 071-0040 carrying IL 72 over Rock River and partial cleaning and painting of SN 071-0022 carrying IL 2/72 over Mill Creek. | — | Executed | Three Star Painting, Inc. $1,060,875 · | ||
| Apr 29, 2022 | 64R44 | WinnebagoDistrict 2 | Pavement patching on the I-90 southbound off ramp at IL 75. | — | Executed | Alliance Contractors, Inc. $249,382 · | ||
| Apr 29, 2022 | 64R46 | VariousDistrict 2 | Maintain and service all intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public. | — | Executed | Laser Electric, Inc. $154,339 · | ||
| Apr 29, 2022 | 66A79 | BureauDistrict 3 | 3P milling and resurfacing This work is located at FAS 1247 (US 6), approximately 1.0 miles East of Henry County Line to US 34 (S) in Sheffield in Bureau County (+/-5.74 miles). This work consists of 3P milling and resurfacing. | — | Executed | Advanced Asphalt Company $3,588,523 · | ||
| Apr 29, 2022 | 66D60 | IroquoisDistrict 3 | 7.71 miles,Milling and Resurfacing (Designed Overlay) and ADA Work begins 0.15 miles South of South St in Donovan and ends at US 24 in Sheldon. | — | Executed | Iroquois Paving Corporation $4,931,854 · | ||
| Apr 29, 2022 | 66E51 | GrundyDistrict 3 | HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors 0.7 MI OF MCCLINDON RD IN CHANNAHON TO 0.2 MI W OF WILL CO LINE. This work consists of HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors. | — | Executed | D. Construction, Inc. $2,116,332 · | ||
| Apr 29, 2022 | 66F91 | BureauDistrict 3 | The project consists on the removal and replacement of six concrete box culverts on IL 29 (DePue Spur) in Bureau County. The scope of work includes milling and resurfacing the area in between culverts and guardrail upgrades. Traffic control shall be achieved by detour. The project length is 0.6 miles. | — | Executed | Gensini Excavating, Inc. $3,420,890 · | ||
| Apr 29, 2022 | 66J64 | DeKalbDistrict 3 | Milling and resurfacing IL 38 (2 Project consists of milling and resurfacing IL 38 (2.5" to 3.75") from 5th St in city of Dekalb to County Line Rd, Dekalb County. The length of the job is 7.96 miles. Work includes ADA improvements, Traffic signal upgrades and miscellaneous drainage improvements. Local participation from Dekalb is expected for parking lanes and ADA ramps. | — | Executed | Curran Contracting Company $5,740,762 · | ||
| Apr 29, 2022 | 66K35 | BureauDistrict 3 | Spot improvement to remove and replace a box culvert located 0.2 mile South of IL 92 in Ohio IL. | — | Executed | Phoenix Corporation of the Quad Cities $535,704 · | ||
| Apr 29, 2022 | 66K57 | BureauDistrict 3 | Work begin at IL 92/IL 89 intersection just North of Lamoille and end 0.2 mile South of Plank Road in Cherry. The project is a 3P milling and resurfacing of IL 89 including drainage and ADA improvements. | — | Executed | Advanced Asphalt Company $5,628,157 · | ||
| Apr 29, 2022 | 66K73 | BureauDistrict 3 | Bridge Replacements SN 006-0117 and SN 006-0121 under TR 60B 4.8 miles East of Henry County Line; under TR 82C, 1.5 miles north of Sheffield. | — | Executed | D. Construction, Inc. $7,246,218 · | ||
| Apr 29, 2022 | 66L03 | FordDistrict 3 | A SMART overlay with 1 This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements. | — | Executed | Kankakee Valley Construction Company, Inc. $3,153,189 · | ||
| Apr 29, 2022 | 66L50 | DeKalbDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 38 from W. of John Huber Huber Pkwy to 5th St in Dekalb, Dekalb County. The omission area is from 1st St to W of 4th St. Milling and resurfacing at IL23/IL 38 shall be 2.5". The paving work shall be done at night. Some ADA work and traffic signal improvements are proposed. Project length is 2.52 miles. | — | Executed | Curran Contracting Company $3,744,002 · | ||
| Apr 29, 2022 | 66L72 | BureauDistrict 3 | Work begin 0.1 mile East of Lincoln Avenue in Depue and at IL 89 in Spring Valley. The project is a SMART overlay, shoulder widening and rumble strips. | — | Executed | Advanced Asphalt Company $1,899,841 · | ||
| Apr 29, 2022 | 66L73 | KankakeeDistrict 3 | Milling resurfacing 1 1/2", pavement marking, update traffic signals and guardrail replacement 0.1 MI E of Lowe Rd E of Kankakee To 0.5 MI E of IL 1 in Sun River Terrace. This work shall consist of milling resurfacing 1 1/2", pavement marking, update traffic signals and guardrail replacement. | — | Executed | Kankakee Valley Construction Company, Inc. $4,199,388 · | ||
| Apr 29, 2022 | 66L90 | LivingstonDistrict 3 | 3P milling and resurfacing (designed overlay) This work is located at FAP 317 (US 24) 0.3 miles East of IL 47 in Forrest to Ford County Line in Livingston County (+/- 8.75 miles). This work consists of 3P milling and resurfacing (designed overlay). | — | Executed | Iroquois Paving Corporation $5,795,600 · | ||
| Apr 29, 2022 | 66M01 | GrundyDistrict 3 | This work is located at the intersections of IL 47 and Pine Bluff Road and at the intersection of IL 47 and Southmor Road South of Morris in Grundy County. This work consists off the removal of existing traffic signal equipment, signal heads, concrete foundations, controller cabinets, UPS and other related traffic signal equipment. | — | Executed | Van-Mack Electric Co. $359,960 · | ||
| Apr 29, 2022 | 66M10 | DeKalbIroquoisDistrict 3 | This project includes traffic signal improvements and railroad interconnect system upgrades at five intersections on US 24/IL 1 from Second St TO Eighth St in Watseka. This project also includes the aforementioned improvements at the intersection of US 30 and Elm St in Waterman. | — | Executed | Outsen Electric, Incorporated $238,185 · | ||
| Apr 29, 2022 | 66M27 | LaSalleDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 LaSalle Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Advanced Asphalt Company $699,074 · | ||
| Apr 29, 2022 | 66M29 | DeKalbDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 Sycamore Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Curran Contracting Company $191,273 · | ||
| Apr 29, 2022 | 66M34 | FordDistrict 3 | Class B pavement patching and other related construction work This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work. | — | Executed | Terrazas, LLC $183,566 · | ||
| Apr 29, 2022 | 66M41 | KendallDistrict 3 | Work begin at US 30/IL 47 intersection and ends 0.3 mile North of Waterpark Way in Yorkville. The project is an interim improvement to address poor pavement condition which include milling 2.25" and replacing in kind. | — | Executed | D. Construction, Inc. $725,559 · | ||
| Apr 29, 2022 | 66M42 | IroquoisDistrict 3 | Class B pavement patching and related construction work This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work. | — | Rejected | Ramirez Diversified Services, LLC $324,616 · | ||
| Apr 29, 2022 | 66M43 | IroquoisDistrict 3 | Class B pavement patching and related construction work This work is located on FAP Route 317 (US 24) beginning at the intersection of US 45/24 (L.M. 0.00) in Gilman and ending at the intersection of US 24 and IL 1 (L.M. 12.34) in Watseka. This work consists of Class B pavement patching and related construction work. | — | Rejected | G. M. Sipes Construction, Inc. $155,429 · | ||
| Apr 29, 2022 | 66M45 | FordDistrict 3 | Class B pavement patching and related construction work This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. | — | Rejected | Iroquois Paving Corporation $391,494 · | ||
| Apr 29, 2022 | 66M46 | LivingstonDistrict 3 | Class A pavement patching and related construction work This work is located on FAI Route 55 (I-55) beginning at the McLean County Line (Mile Marker 187.87) and ending at Wolf-s creek, Structure No. 053-2506 (Mile Marker 206.12). This work consists of Class A pavement patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $590,810 · | ||
| Apr 29, 2022 | 66M49 | IroquoisDistrict 3 | Intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and repl This project is located on F.A.I. Route 57 (I-57) beginning at the Ford County Line and ending approximately 4.5 miles North of US 24 (Gilman). This work consists of intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and replacement. | — | Rejected | Iroquois Paving Corporation $509,531 · | ||
| Apr 29, 2022 | 68A36 | WarrenDistrict 4 | Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $20,211,670 · | ||
| Apr 29, 2022 | 68F44 | MercerDistrict 4 | Resurfacing IL 17 from 1st Street in New Boston to Bryant Rd in Mercer County. Total Length 5.4 miles. | — | Executed | Brandt Construction Co. $3,999,605 · | ||
| Apr 29, 2022 | 68F87 | MarshallWoodfordDistrict 4 | Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. | — | Executed | Advanced Asphalt Company $25,968,870 · | ||
| Apr 29, 2022 | 68G30 | WoodfordDistrict 4 | Cape Seal on Il 116/117 from IL 117(N) to 1-39. | — | Executed | Beniach Construction Co., Inc. $692,608 · | ||
| Apr 29, 2022 | 68G31 | McDonoughDistrict 4 | Cape Seal on US 67/IL 11 O from IL 9 to N of IL 336. | — | Executed | A. C. Pavement Striping Co. $734,321 · | ||
| Apr 29, 2022 | 68G32 | MercerDistrict 4 | Microsurfacing (1-Pass) on IL 17 from E of IL 94(N) in Aledo to 2201h St. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $278,305 · | ||
| Apr 29, 2022 | 68G33 | HendersonWarrenDistrict 4 | Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67. | — | Executed | DMS Contracting, Inc. $656,824 · | ||
| Apr 29, 2022 | 68G34 | PeoriaDistrict 4 | Microsurfacing (1-pass)on IL 116 from IL 78(N) in Farmington to Eden Road. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $553,862 · | ||
| Apr 29, 2022 | 68G50 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $293,000 · | ||
| Apr 29, 2022 | 68G73 | TazewellDistrict 4 | Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. | — | Executed | Bodine Electric of Decatur $248,640 · | ||
| Apr 29, 2022 | 68G74 | VariousDistrict 4 | Traffic signal mast arm replacement at various locations in Peoria, Tazewell, and McDonough Counties. | — | Executed | Oberlander Electric Co. $598,683 · | ||
| Apr 29, 2022 | 68G77 | KnoxWoodfordDistrict 4 | Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. | — | Executed | Laser Electric, Inc. $179,815 · | ||
| Apr 29, 2022 | 68G78 | WoodfordDistrict 4 | Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. | — | Executed | Three Star Painting, Inc. $500,000 · | ||
| Apr 29, 2022 | 68G88 | McDonoughDistrict 4 | Intersection improvement at IL 336/IL 11 0 and E 600th St near Colchester. | — | Executed | Gunther Construction, a div of UCM, Inc. $539,236 · | ||
| Apr 29, 2022 | 70778 | McLeanDistrict 5 | 3P resurfacing (standard overlay) of FAP 701 (ILL 122) from Tazewell Co Line to ILL 9. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,718,559 · | ||
| Apr 29, 2022 | 70994 | McLeanDistrict 5 | 3P Resurfacing Standard overlay from S Main St. in McLean to US 51 in Heyworth. Project length 9.44 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $4,611,308 · | ||
| Apr 29, 2022 | 70A57 | DeWittPiattDistrict 5 | 3P Resurfacing - Designed Overlay of FAP 721 (ILL 10) from ILL 48 at Weldon to I-72. | — | Executed | Open Road Paving Company LLC $8,224,171 · | ||
| Apr 29, 2022 | 70A89 | ChampaignDistrict 5 | Interstate Resurfacing (Designed Overlay) of FAI 57 (I 57) from 2 Mi S of Thomasboro to US 136 at Rantoul. | — | Executed | Open Road Paving Company LLC $11,189,394 · | ||
| Apr 29, 2022 | 70B04 | ChampaignDistrict 5 | 4.799 Miles, 3P Resurfacing - Designed Overlay, Royal Road to E Grand Ave in St Joseph. | — | Executed | Open Road Paving Company LLC $3,225,471 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.