2021-018-RS&SW
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Arrow Road Construction Co. Low bidder | $3,382,411 | ||
| 2 | R. W. Dunteman Company | $3,993,993 | +18.1% | |
| 3 | Builders Paving, LLC | $4,223,800 | +24.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Arrow Road Cons… | #2 R. W. Dunteman … | #3 Builders Paving… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $3,500.00 | $5,470.00 | $4,000.00 | |
| 2 | X4400501 | COMB C&G REMOV REPL < = 10FT | 836 | FOOT | $40.00 | $54.75 | $55.00 | |
| 3 | X5537800 | SS CLEANED 12 | 3,456 | FOOT | $3.00 | $2.75 | $2.75 | |
| 4 | X6030310 | FR & LIDS ADJUST SPL | 70 | EACH | $725.00 | $725.00 | $940.00 | |
| 5 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $3,500.00 | $3,250.00 | $2,800.00 | |
| 6 | Z0004562 | COMB C C&G REM & REPL | 13,772 | FOOT | $38.50 | $33.99 | $46.00 | |
| 7 | Z0018500 | DRAINAGE STR CLEANED | 144 | EACH | $290.00 | $290.00 | $300.00 | |
| 8 | Z0030850 | TEMP INFO SIGNING | 103 | SQ FT | $18.00 | $18.00 | $12.00 | |
| 9 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,000.00 | $4,000.00 | $6,000.00 | |
| 10 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 11 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 12 | 20200100 | EARTH EXCAVATION | 140 | CU YD | $35.00 | $78.54 | $75.00 | |
| 13 | 21101615 | TOPSOIL F & P 4 | 2,458 | SQ YD | $6.00 | $0.1000 | $0.1000 | |
| 14 | 25200110 | SODDING SALT TOLERANT | 2,458 | SQ YD | $9.00 | $13.00 | $13.00 | |
| 15 | 25200200 | SUPPLE WATERING | 1 | UNIT | $0.0100 | $1.00 | $1.00 | |
| 16 | 31101200 | SUB GRAN MAT B 4 | 23 | SQ YD | $50.00 | $30.81 | $29.00 | |
| 17 | 35501308 | HMA BASE CSE 6 | 111 | SQ YD | $100.00 | $51.74 | $90.00 | |
| 18 | 35501316 | HMA BASE CSE 8 | 417 | SQ YD | $120.00 | $63.41 | $100.00 | |
| 19 | 40600290 | BIT MATLS TACK CT | 35,000 | POUND | $0.0100 | $0.6100 | $0.0100 | |
| 20 | 40600370 | LONG JOINT SEALANT | 53,864 | FOOT | $2.25 | $2.35 | $2.50 | |
| 21 | 40600400 | MIX CR JTS FLANGEWYS | 116 | TON | $560.00 | $354.01 | $580.00 | |
| 22 | 40600982 | HMA SURF REM BUTT JT | 477 | SQ YD | $6.00 | $17.49 | $18.00 | |
| 23 | 40601005 | HMA REPL OVER PATCH | 1,271 | TON | $1.00 | $125.04 | $95.00 | |
| 24 | 40604060 | HMA SC IL-9.5 D N50 | 60 | TON | $275.00 | $181.45 | $185.00 | |
| 25 | 40604172 | P HMA SC IL-9.5 E N70 | 7,574 | TON | $101.00 | $108.96 | $98.00 | |
| 26 | 42001300 | PROTECTIVE COAT | 3,712 | SQ YD | $0.0100 | $1.50 | $1.00 | |
| 27 | 42300200 | PCC DRIVEWAY PAVT 6 | 39 | SQ YD | $0.0100 | $68.00 | $55.00 | |
| 28 | 42300400 | PCC DRIVEWAY PAVT 8 | 435 | SQ YD | $0.0100 | $70.00 | $64.00 | |
| 29 | 42400200 | PC CONC SIDEWALK 5 | 4,190 | SQ FT | $8.00 | $7.50 | $9.10 | |
| 30 | 42400800 | DETECTABLE WARNINGS | 320 | SQ FT | $32.00 | $35.00 | $35.00 | |
| 31 | 44000156 | HMA SURF REM 1 3/4 | 77,278 | SQ YD | $2.80 | $2.32 | $3.40 | |
| 32 | 44000200 | DRIVE PAVEMENT REM | 1,002 | SQ YD | $0.0100 | $22.00 | $19.00 | |
| 33 | 44000600 | SIDEWALK REM | 4,190 | SQ FT | $4.00 | $2.50 | $5.20 | |
| 34 | 44002210 | HMA RM OV PATCH 2 1/2 | 9,076 | SQ YD | $1.00 | $9.01 | $7.70 | |
| 35 | 44003100 | MEDIAN REMOVAL | 207 | SQ FT | $0.0100 | $22.00 | $21.00 | |
| 36 | 44201773 | CL D PATCH T1 11 | 9 | SQ YD | $100.00 | $250.00 | $240.00 | |
| 37 | 44201777 | CL D PATCH T2 11 | 2,586 | SQ YD | $34.00 | $112.00 | $112.00 | |
| 38 | 44201781 | CL D PATCH T3 11 | 1,559 | SQ YD | $34.00 | $105.00 | $111.00 | |
| 39 | 44201783 | CL D PATCH T4 11 | 4,922 | SQ YD | $34.00 | $95.00 | $110.00 | |
| 40 | 45200100 | JT CR RT PCC PAV/SHLD | 7,000 | FOOT | $2.50 | $0.5900 | $1.80 | |
| 41 | 45200300 | JT OR CRACK FILLING | 1,745 | POUND | $4.25 | $5.82 | $4.30 | |
| 42 | 60252800 | CB RECONST | 14 | EACH | $1,100.00 | $2,000.00 | $1,030.00 | |
| 43 | 60257900 | MAN RECONST | 5 | EACH | $1,850.00 | $2,000.00 | $1,050.00 | |
| 44 | 60266600 | VALVE BOX ADJ | 10 | EACH | $425.00 | $250.00 | $310.00 | |
| 45 | 60300105 | FR & GRATES ADJUST | 90 | EACH | $450.00 | $450.00 | $500.00 | |
| 46 | 60300305 | FR & LIDS ADJUST | 31 | EACH | $490.00 | $400.00 | $480.00 | |
| 47 | 60404800 | FR & GRATES T11 | 31 | EACH | $585.00 | $450.00 | $590.00 | |
| 48 | 60404950 | FR & GRATES T24 | 20 | EACH | $485.00 | $450.00 | $425.00 | |
| 49 | 60406000 | FR & LIDS T1 OL | 9 | EACH | $390.00 | $375.00 | $370.00 | |
| 50 | 60406100 | FR & LIDS T1 CL | 125 | EACH | $390.00 | $375.00 | $370.00 | |
| 51 | 60619200 | CONC MED TSB6.06 | 207 | SQ FT | $0.0100 | $40.00 | $31.00 | |
| 52 | 66900200 | NON SPL WASTE DISPOSL | 140 | CU YD | $130.00 | $84.00 | $115.00 | |
| 53 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,450.00 | $1,350.00 | $1,800.00 | |
| 54 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $5,800.00 | $2,850.00 | $2,950.00 | |
| 55 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $1,200.00 | $900.00 | |
| 56 | 66901006 | REG SUB MON | 12 | CAL DA | $425.00 | $700.00 | $680.00 | |
| 57 | 67100100 | MOBILIZATION | 1 | L SUM | $152,000.00 | $240,221.19 | $250,000.00 | |
| 58 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $450,000.00 | $1,500.00 | $39,512.20 | |
| 59 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $1.00 | $41,000.00 | $100.00 | |
| 60 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $1.00 | $1.00 | $100.00 | |
| 61 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $1,000.00 | $100.00 | |
| 62 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $5,900.00 | $1,000.00 | $100.00 | |
| 63 | 70300100 | SHORT TERM PAVT MKING | 33,849 | FOOT | $0.0100 | $0.9600 | $1.10 | |
| 64 | 70300150 | SHRT TRM PAVT MK REM | 11,283 | SQ FT | $0.0100 | $1.32 | $0.0100 | |
| 65 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 1,683 | SQ FT | $0.0100 | $2.50 | $0.0100 | |
| 66 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 37,312 | FOOT | $0.0100 | $0.2500 | $0.0100 | |
| 67 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 5,823 | FOOT | $0.0100 | $0.2500 | $0.0100 | |
| 68 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 2,656 | FOOT | $0.0100 | $0.2500 | $0.0100 | |
| 69 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 898 | FOOT | $0.0100 | $2.50 | $0.0100 | |
| 70 | 70306120 | TEMP PVT MK L4 T3 TAPE | 11,044 | FOOT | $0.0100 | $0.9000 | $1.40 | |
| 71 | 78000100 | THPL PVT MK LTR & SYM | 1,683 | SQ FT | $4.25 | $4.25 | $4.25 | |
| 72 | 78000200 | THPL PVT MK LINE 4 | 37,312 | FOOT | $0.5500 | $0.5500 | $0.5500 | |
| 73 | 78000400 | THPL PVT MK LINE 6 | 5,823 | FOOT | $0.8500 | $0.8500 | $0.8500 | |
| 74 | 78000600 | THPL PVT MK LINE 12 | 2,656 | FOOT | $1.75 | $1.75 | $1.75 | |
| 75 | 78000650 | THPL PVT MK LINE 24 | 898 | FOOT | $4.25 | $4.25 | $4.25 | |
| 76 | 78003137 | PREF PL PM TB LINE 7 | 600 | FOOT | $5.00 | $5.00 | $5.00 | |
| 77 | 78009000 | MOD URETH PM LTR-SYM | 156 | SQ FT | $5.00 | $5.00 | $5.00 | |
| 78 | 78009004 | MOD URETH PM LINE 4 | 18,645 | FOOT | $0.5500 | $0.5500 | $0.5500 | |
| 79 | 78009006 | MOD URETH PM LINE 6 | 2,757 | FOOT | $1.00 | $1.00 | $1.00 | |
| 80 | 78009008 | MOD URETH PM LINE 8 | 158 | FOOT | $1.25 | $1.25 | $1.25 | |
| 81 | 78009012 | MOD URETH PM LINE 12 | 1,863 | FOOT | $2.00 | $2.00 | $2.00 | |
| 82 | 78009024 | MOD URETH PM LINE 24 | 235 | FOOT | $5.00 | $5.00 | $5.00 | |
| 83 | 78011040 | GRV RCSD PVT MRKG 8 | 600 | FOOT | $3.80 | $3.80 | $3.80 | |
| 84 | 78100100 | RAISED REFL PAVT MKR | 1,160 | EACH | $22.00 | $22.00 | $22.00 | |
| 85 | 78300200 | RAISED REF PVT MK REM | 580 | EACH | $5.24 | $21.92 | $19.00 | |
| 86 | 78300202 | PAVMT MRKG REM WTR BL | 10,188 | SQ FT | $0.0100 | $1.00 | $0.0500 | |
| 87 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $1,368.40 | $1,368.40 | $2,600.00 | |
| 88 | 88600600 | DET LOOP REPL | 2,299 | FOOT | $15.30 | $15.30 | $16.00 | |
| 89 | 89500400 | RELOC EX PED PUSH-BUT | 12 | EACH | $330.70 | $330.70 | $300.00 | |
| 90 | 89502376 | REBUILD EX HANDHOLE | 4 | EACH | $1,776.80 | $1,776.80 | $1,500.00 | |
| 91 | 89502378 | REBLD EX HH TO HD HH | 4 | EACH | $1,845.20 | $1,845.20 | $2,000.00 |