| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 46539 | VariousDistrict 1 | Replacing deteriorated various types of overhead sign structures, installing new sign panels, and relocating sign panels, installing new drilled shaft foundations | — | Executed | Aldridge Electric, Inc. $5,343,038 · | ||
| Jan 21, 2022 | 46586 | VariousDistrict 1 | Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in region one | — | Executed | Western Remac, Inc. $3,358,616 · | ||
| Jan 21, 2022 | 61E87 | DuPageDistrict 1 | Pavement widening, resurfacing, storm sewer, curb and gutter, Sidewalks, traffic Signals, lighting and pavment Reconstruct the intersection of 87th Street and Woodrige Avenue in Woodridge. Work consists of Pavement widening, resurfacing, storm sewer, curb and gutter, Sidewalks, traffic Signals, lighting and pavment Markings. | — | Executed | Alliance Contractors, Inc. $4,371,729 · | ||
| Jan 21, 2022 | 61F88 | DuPageDistrict 1 | Sidewalk improvement on IL 53 from Hobson Road to Mulligan Drive in the Village of Woodridge. , Sidewalk removal and replacement, curb and gutter replacement, installation of pedestrian traffic signals and pavement markings on IL 53 from Hobson Road to Mulligan Drive in Woodridge. | — | Executed | Triggi Construction, Inc. $307,164 · | ||
| Jan 21, 2022 | 61G01 | McHenryDistrict 1 | Reconstruct the intersection of Madison Street, South Street, and Lake Avenue into a roundabout in the City of Woodstock. | — | Executed | H. Linden & Sons Sewer and Water, Inc. $2,755,454 · | ||
| Jan 21, 2022 | 61G71 | CookDistrict 1 | Roadway reconstruction and lighting on Proviso Drive from the Union Pacific Rail Yard entrance to Wolf Road in Berkeley. | — | Executed | R. W. Dunteman Company $2,659,791 · | ||
| Jan 21, 2022 | 61G73 | WillDistrict 1 | Pavement reconstruction, HMA and PCC pavement, storm sewer, culverts, curb and gutter, sidewalks, guardrail, traffic signals, lighting and pavement markings on 80th Avenue from Greenway Boulevard to Timber Drive and replacing the bridge carrying 80th Avenue over I-80, in Tinley Park. | — | Executed | D. Construction, Inc. $45,187,001 · | ||
| Jan 21, 2022 | 61H19 | DuPageDistrict 1 | Construction of a bike path along the North Central DuPage Regional Trail, from the Illinois Prairie Path to Forest Preserve Drive, in the Villages of Wayne and Bartlett. | — | Executed | Martam Construction Incorporated $1,145,132 · | ||
| Jan 21, 2022 | 61H24 | CookDistrict 1 | Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn. | — | Executed | R. W. Dunteman Company $16,486,777 · | ||
| Jan 21, 2022 | 61H29 | DuPageDistrict 1 | Geometric improvements and traffic signal modernizations at four intersections along 75th Street at Millbrook Drive, Modoff Road, Olympus Drive and Green Road in Naperville. | — | Executed | Alliance Contractors, Inc. $4,524,977 · | ||
| Jan 21, 2022 | 61H35 | KaneDistrict 1 | Reconfirguration of the ATC East Parking Lot to improve vehical and pedestrian traffic flow and to add additonal parking to lot on Spring Street between the BNSF Metra Line and the BNSF Railroad in Aurora. | — | Executed | Alliance Contractors, Inc. $1,093,662 · | ||
| Jan 21, 2022 | 61H36 | DuPageDistrict 1 | Pavement reconstruction and resurfacing on Garfield Street from Hindsdale Avenue to 55th Street in Hinsdale. | — | Executed | J. Nardulli Concrete, Inc. $2,083,485 · | ||
| Jan 21, 2022 | 61H37 | DuPageDistrict 1 | Resurfacing Foster Avenue from Central Avenue to Spruce Avenue in Wood Dale | — | Executed | Arrow Road Construction Co. $316,707 · | ||
| Jan 21, 2022 | 61H40 | KaneDistrict 1 | Replace the bridge carrying Farnsworth Avenue over Indian Creek in Aurora | — | Executed | D. Construction, Inc. $2,563,926 · | ||
| Jan 21, 2022 | 61H41 | KaneDistrict 1 | Resurfacing, Curb and Gutter, Sidewalk replacement and pavement markings on Indian Trail from Farnsworth Avenue to the DuPage County line in Aurora. | — | Executed | Geneva Construction Company $706,127 · | ||
| Jan 21, 2022 | 61H43 | KaneDistrict 1 | Resurfacing Spring Street from McLean Boulevard to La Fox Steet in Sourth Elgin . | — | Executed | Plote Construction, Inc. $1,181,000 · | ||
| Jan 21, 2022 | 61H48 | KaneDistrict 1 | Resurfcing, curb and gutter replacement and sidewalk replacement on East New York Street from Ohio Street to Farnsworth Avenue in Aurora. | — | Executed | J. Nardulli Concrete, Inc. $1,441,342 · | ||
| Jan 21, 2022 | 61H49 | KaneDistrict 1 | Reconstruct the intersection of Orchard Road and US 30 in Montgomery. | — | Executed | D. Construction, Inc. $3,616,283 · | ||
| Jan 21, 2022 | 61H53 | McHenryDistrict 1 | Resurfacing Mason Hill Road from 650' west of Cherry Valley Road to Crystl Lake Road in Bull Valley. | — | Executed | Peter Baker & Son Co. $935,194 · | ||
| Jan 21, 2022 | 61H54 | McHenryDistrict 1 | Resurfacing Ringwood Road from the village limits north of McCullom Lake Road to a point 2,066 feet north of the village limits of Ringwood. | — | Executed | Curran Contracting Company $147,450 · | ||
| Jan 21, 2022 | 62D49 | WillDistrict 1 | Bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert Scope of work consists of bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert. Also included are sheet-pile wingwall installation, concrete curb and gutter. | — | Executed | D. Construction, Inc. $1,310,528 · | ||
| Jan 21, 2022 | 62H06 | LakeDistrict 1 | (2.810-Mile) Standard Overlay and ADA improvements along Grand Ave. from IL-131 to IL-137 (Amstutz Expy.) in the City of Waukegan. | — | Executed | Peter Baker & Son Co. $4,160,958 · | ||
| Jan 21, 2022 | 62H49 | CookDistrict 1 | (0.989-Mile) Bridge new deck, widening, bridge repair scour mitigation and lighting in the City of Countryside and the Villages of Willow Springs, Justice and Hodgkins. | — | Executed | Dunnet Bay Construction Company $21,386,753 · | ||
| Jan 21, 2022 | 62K99 | DuPageDistrict 1 | (1,562-Ft) Intersection improvement and signal installation project including HMA surface removal, pavement widening, pavement resurfacing, and traffic signal installation in the City of West Chicago. | — | Executed | A Lamp Concrete Contractors, Inc. $909,680 · | ||
| Jan 21, 2022 | 62L09 | CookDistrict 1 | Full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft This project consists of full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft (0.77 Miles) in the Village of Palatine, Cook County. | — | Executed | M & J Underground Inc. $207,992 · | ||
| Jan 21, 2022 | 62M54 | CookDistrict 1 | (1,334-Ft) Bridge rehabilitation project on the four bridges that carry I-57 over I-80. The work includes deck overlay with latex concrete, substructure repair and reconstruction and patching of bridge approaches located within the City of Country Club Hills. | — | Executed | D. Construction, Inc. $5,296,504 · | ||
| Jan 21, 2022 | 62M84 | CookDistrict 1 | (7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale. | — | Executed | Gallagher Asphalt Corporation & K-Five Construction Corporation & D. Construction, Inc. $32,635,797 · | ||
| Jan 21, 2022 | 62M92 | LakeDistrict 1 | (1.21-Mile) Roadway lighting improvement, located in Gurnee, Park City and Waukegan, IL on IL 120 from west of O'Plaine Rd. to US 41 {Skokie Hwy). Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations, and site restoration | — | Executed | H & H Electric Co. $2,259,898 · | ||
| Jan 21, 2022 | 62N28 | WillDistrict 1 | (1,000-Ft) Culvert replacement located on US 52 (Cedar Road) over Ditch N of Forked Creek (2 .9 Ml S of Hoff Roda) in the unincorporated Wilton Township. | — | Executed | P. T. Ferro Construction Co. $455,194 · | ||
| Jan 21, 2022 | 62N35 | CookDistrict 1 | Intersection improvement and traffic signal modernization project on US Route 6/Illinois Route 83 (Torrence Avenue), approximately 2,640 feet north of the I- 80/94 (Kingery Expressway) overpass and extends in a north for 1,007 lineal feet within the Village of Lansing and City of Calumet City. | — | Executed | Gallagher Asphalt Corporation $969,778 · | ||
| Jan 21, 2022 | 62N44 | McHenryDistrict 1 | (3.00-Mile) SMART overlay and ADA improvements on Virginia St/Northwest Hwy from Crystal Lake Av to Pingree Rd. located in the City of Crystal Lake. | — | Executed | Curran Contracting Company $3,474,967 · | ||
| Jan 21, 2022 | 62N56 | McHenryDistrict 1 | (1.79-Mile) SMART overlay along IL 31 from S of McCullom Lake Road to Johnsburg Road located in the City of McHenry and the Village of Johnsburg. | — | Executed | Peter Baker & Son Co. $1,824,329 · | ||
| Jan 21, 2022 | 62N59 | KaneDistrict 1 | Roadway resurfacing, patching, aggregate shoulders, and centerline rumble strips (7.05-Mile) SMART Overlay project consists of roadway resurfacing, patching, aggregate shoulders, and centerline rumble strips. The project is along IL 47 from Big Timber Rd to Plato Rd in the Villages of Hampshire, Huntley, and Pingree Grove. | — | Executed | Builders Paving, LLC $3,208,000 · | ||
| Jan 21, 2022 | 62N71 | CookDistrict 1 | (1,569-Ft) Designed Overlay and ADA improvements along Addison Street from Halsted Street to US 41 (Lake Shore Dr.) in the City of Chicago. | — | Executed | Bigane Paving Company $733,790 · | ||
| Jan 21, 2022 | 62P16 | CookDistrict 1 | (3.007 Mile) Design Overlay and ADA ramp improvements from Brainard Avenue to 159th Street. Work also includes sidewalk and curb and gutter removal and replacement, detectable warnings. structure adjustments and pavement markings located in the city of Calumet City and the Village of Burnham. | — | Executed | D. Construction, Inc. $2,853,271 · | ||
| Jan 21, 2022 | 62P18 | CookDistrict 1 | Designed Overlay project on IL 43 (Harlem Ave.) at 26th Street and continues northerly direction for (4.49 mile) to south of IL 64 North Ave located in the City of Berwyn and the Villages of Forest Park, North Riverside, Oak Park, River Forest, and Riverside. | — | Executed | Arrow Road Construction Co. $5,762,151 · | ||
| Jan 21, 2022 | 62P23 | CookDistrict 1 | (378.5-Ft) Cleaning and painting designated steel surfaces of bridge structure carrying Ashland Ave over Calumet Sag Channel in the City of Blue Island and Village of Calumet Park. Calumet Township, SN 016-0 294. | — | Executed | Eagle Painting & Maintenance Company, Inc. $978,012 · | ||
| Jan 21, 2022 | 62P28 | VariousDistrict 1 | This project is located on various routes at 12 weigh stations through District One within Cook, Dupage, Lake, McHenry and Will Counties. The scope of work includes weigh station scale pit cleaning and various vegetation maintenance work. | — | Executed | MYS, Incorporated $297,187 · | ||
| Jan 21, 2022 | 62P29 | CookDistrict 1 | (813-Ft) Bridge Preservation Project including partial bridge deck patching, approach slab scarification and overlay, expansion joints replacement, substructure repairs and underpass lighting replacement located on the bridge carrying 127th St over I-57 in the City of Calumet Park. | — | Executed | D. Construction, Inc. $922,791 · | ||
| Jan 21, 2022 | 62P56 | CookWillDistrict 1 | Cleaning and painting of steel bridge structures at 5 locations This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $444,000 · | ||
| Jan 21, 2022 | 62P57 | CookDistrict 1 | Cleaning and painting existing steel structures at 7 locations. Bridge structures are located along 1-290 (Einsenhower Expressway) from 25th Avenue to Circle Avenue in the Villages of Broadview, Bellwood, Maywood and and Forest Park. | — | Executed | Eagle Painting & Maintenance Company, Inc. $258,100 · | ||
| Jan 21, 2022 | 62P85 | CookDistrict 1 | Pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irvi Improvement consists of pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irving Park Road) in the City of Chicago in Cook County. SN 016-0115, SN 016-0116. | — | Executed | MYS, Incorporated $277,847 · | ||
| Jan 21, 2022 | 62P86 | WillDistrict 1 | Cleaning(sweeping} various arterial highways in District One throughout Will County The improvement consists of cleaning(sweeping} various arterial highways in District One throughout Will County. | — | Executed | Elgin Sweeping Services, Inc. $860,098 · | ||
| Jan 21, 2022 | 62P87 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Cook County The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County. | — | Executed | Elgin Sweeping Services, Inc. $2,656,557 · | ||
| Jan 21, 2022 | 62P88 | DuPageDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout DuPage County The improvement consists of cleaning(sweeping) various arterial highways in District One throughout DuPage County. | — | Executed | Elgin Sweeping Services, Inc. $1,314,896 · | ||
| Jan 21, 2022 | 62P89 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Cook County The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County. | — | Executed | Elgin Sweeping Services, Inc. $2,242,234 · | ||
| Jan 21, 2022 | 62P90 | CookDistrict 1 | (1.13-Mile) Drainage improvements, culvert replacement, culvert removal, and ditch cleaning in Cook County. | — | Executed | K-Five Construction Corporation $444,444 · | ||
| Jan 21, 2022 | 62R14 | VariousDistrict 1 | The repair and installation of guardrail along various expressway and arterial highways in various counties th This improvement consists of the repair and installation of guardrail along various expressway and arterial highways in various counties throughout District One. | — | Executed | Kujo, Inc. $2,434,521 · | ||
| Jan 21, 2022 | 62R15 | VariousDistrict 1 | Impact attenuators and sand barrels on various expressways throughout District One in various counties The improvement consists of impact attenuators and sand barrels on various expressways throughout District One in various counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,648,000 · | ||
| Jan 21, 2022 | 64880 | Jo DaviessDistrict 2 | Reconstruction of US 20 from Gear Street to Main Street in Galena. | — | Executed | Fischer Excavating, Inc. and Sjostrom & Sons, Inc. and Civil Constructors d/b/a Helm Civil $31,525,994 · | ||
| Jan 21, 2022 | 64J63 | StephensonDistrict 2 | Removal and replacement of two (2) concrete box culverts carrying IL 75 over drainage ditches: SN 089-1047 located 0.2 mile East of Tower Road, and SN 089- 1048 located 0.4 mile East of Tower Road. | — | Executed | Martin & Company Excavating $1,044,240 · | ||
| Jan 21, 2022 | 64N03 | StephensonDistrict 2 | Removal and replacement of concrete bridge deck on the structure (SN 089-0043) carrying IL 26 over Cedar Creek North of Cedarville. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,696,103 · | ||
| Jan 21, 2022 | 64N48 | BooneDistrict 2 | Replace existing ESN 004-1022 box culvert with a double, cast-in-place double 10'x5' box culvert (PSN 004-1030) including a patch. The roadway template will accommodate a future reconstruction of the IL 173 at IL 76 intersection. | — | Executed | Sjostrom & Sons, Inc. $1,035,672 · | ||
| Jan 21, 2022 | 64P16 | Jo DaviessDistrict 2 | Cold-milling, pavement patching, hot-mix asphalt resurfacing, removing and replacing damaged curb and gutter, and removing and replacing damaged inlet lids. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,451,862 · | ||
| Jan 21, 2022 | 64P84 | WinnebagoDistrict 2 | Bridge deck overlay I-39/US 51 over the Kishwaukee River (SN 101-0133 and 101-0134). | — | Executed | Curran Contracting Company $1,285,225 · | ||
| Jan 21, 2022 | 64P88 | OgleDistrict 2 | Bridge deck overlay, deck repairs and joint repairs on structure carrying IL 64 over I-39/US 51 (SN 071-0055). | — | Executed | Martin & Company Excavating $782,871 · | ||
| Jan 21, 2022 | 64R19 | WinnebagoDistrict 2 | Concrete sealer applied to bridge decks at various locations in Winnebago County. | — | Executed | M & M Concrete, Inc. $88,982 · | ||
| Jan 21, 2022 | 64R23 | VariousDistrict 2 | Guardrail and fence repairs along State maintained routes in District 2. | — | Executed | Northern Contracting, Inc. $891,752 · | ||
| Jan 21, 2022 | 64R24 | VariousDistrict 2 | Roadside restoration of Right-Of-Way tuft damage caused by motorists along State maintained routes within District 2. | — | Executed | O'Brien Civil Works, Inc. $69,260 · | ||
| Jan 21, 2022 | 64R31 | Rock IslandDistrict 2 | Bridge expansion joints and steel repairs on SN's 081-0007 and 081-0008 carrying I-74/280 over Shaeffer Creek. | — | Executed | General Constructors Inc. of the Quad Cities $550,210 · | ||
| Jan 21, 2022 | 64R32 | StephensonDistrict 2 | Approach pavement repair and resurfacing on SN 089-0074. | — | Executed | Martin & Company Excavating $127,408 · | ||
| Jan 21, 2022 | 64R36 | CarrollDistrict 2 | Milling and resurfacing of the rest area along US 52/IL 64, 1 mile North of IL 64 East. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $48,229 · | ||
| Jan 21, 2022 | 66932 | IroquoisDistrict 3 | Bridge Replacement (SN 038-0023) at Coon Creek, 5.4 miles South of US 24. | — | Executed | Iroquois Paving Corporation $2,285,001 · | ||
| Jan 21, 2022 | 66E20 | DeKalbDistrict 3 | 3P milling and resurfacing (designed overlay) The project is located on FAP 17 (IL 64) from Clare Rd to 0.4 Ml W of IL 23(S) in Sycamore, for a total of 6.59 miles, the work consists of 3P milling and resurfacing (designed overlay). Other work includes grading and shaping ditches, shoulder stone, culvert work, guardrail work, pavement marking, and raised reflectors. | — | Executed | William Charles Construction Company, LLC $3,764,401 · | ||
| Jan 21, 2022 | 66F74 | KankakeeDistrict 3 | Removal and replacement of four structures carrying I-57 over Grinnell Road and the Norfolk Southern Railway tracks in Kankakee county. The work includes the reconstruction of a section of I-57 affected by the new structures. The length of the project is 0.83 miles. Staging will be accomplished using crossovers. | — | Executed | Kankakee Valley Construction Company, Inc. and Tobey's Construction & Cartage, Inc. JV $23,568,802 · | ||
| Jan 21, 2022 | 66J00 | LaSalleDistrict 3 | Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd. | — | Executed | D. Construction, Inc. $1,835,069 · | ||
| Jan 21, 2022 | 66L98 | LaSalleDistrict 3 | This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line. | — | Executed | D. Construction, Inc. $420,050 · | ||
| Jan 21, 2022 | 66M11 | IroquoisDistrict 3 | Cleaning and painting all structural steel and other steel components of the structures This project is located at two structures on I-57, SN 038-0123 carrying I-57 over IL 116 (Ashkum Interchange) and SN 038-0125 carrying TR 89 over I-57, 2.5 mi. south of IL 116 and one structure on US 52, SN 038-0182 carrying US 52 over the Iroquois River near the village of Iroquois. This project consists of cleaning and painting all structural steel and other steel components of the structures. | — | Executed | ERA-Valdivia Contractors, Inc. $549,318 · | ||
| Jan 21, 2022 | 66M12 | FordDistrict 3 | Cleaning and painting all structural steel and other steel components of the structure This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $311,138 · | ||
| Jan 21, 2022 | 66M22 | VariousDistrict 3 | Work consists on performing Bridge Deck Concrete sealing at various bridges decks with bare PCC wearing surfaces in Dekalb, Kendall, Grundy counties, and the Abraham Lincoln Bridge in LaSalle county. | — | Executed | All States Painting, Inc. $197,300 · | ||
| Jan 21, 2022 | 68755 | KnoxDistrict 4 | Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97. | — | Executed | Stark Excavating, Inc. $1,526,949 · | ||
| Jan 21, 2022 | 68D73 | TazewellDistrict 4 | Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 · | ||
| Jan 21, 2022 | 68F11 | TazewellDistrict 4 | This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 · | ||
| Jan 21, 2022 | 68G59 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River. | — | Executed | Central Landscaping, LP $279,293 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Jan 21, 2022 | 68G76 | StarkDistrict 4 | Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County. | — | Executed | CSD Environmental Services, Inc. $54,996 · | ||
| Jan 21, 2022 | 70755 | PiattDistrict 5 | Culvert replacements of SN 074-8052 and SN 074-8054 on FAS 1517 (US 150) at 1.7 and 2.6 miles E of Dewitt Co. Line. Gross Length=Net Length= 0.014 miles 71.5ft. | — | Executed | Cross Construction, Inc. $823,682 · | ||
| Jan 21, 2022 | 70D64 | McLeanDistrict 5 | Bridge deck overlay on I-55 from N of Lexington to Livingston Co. line for a gross length of 9.96 miles. | — | Rejected | Stark Excavating, Inc. $7,171,002 · | ||
| Jan 21, 2022 | 70D89 | VermilionDistrict 5 | Guardrail improvements at 30 Locations on Various Routes in Vermilion County. | — | Executed | Lovewell Fencing, Inc. $409,916 · | ||
| Jan 21, 2022 | 70E48 | ChampaignDistrict 5 | Bridge Deck repairs S.N. 010-0027, 0028, 0029, 0030. | — | Executed | ICC Group Inc. $2,968,000 · | ||
| Jan 21, 2022 | 70E74 | McLeanDistrict 5 | Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County. | — | Executed | ERA-Valdivia Contractors, Inc. $1,899,396 · | ||
| Jan 21, 2022 | 70F40 | ChampaignDouglasDistrict 5 | 9.194 Miles of Smart Resurfacing from Madison Street in Philo to NCL of Villa Grove. | — | Executed | Open Road Paving Company LLC $2,765,317 · | ||
| Jan 21, 2022 | 72A26 | ChristianDistrict 6 | Bridge deck replacement on SN 011-0010 and full bridge replacement of SN 011-0011, both located on IL 29 southeast of Taylorville. | — | Active | Sangamo Construction Company $5,664,814 · | ||
| Jan 21, 2022 | 72F91 | MorganDistrict 6 | 1.4 miles of resurfacing, shoulder work, gutter removal and replacement and pipe culvert removal and replacement on IL 267 from south of Woodson to the Greene County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $4,119,687 · | ||
| Jan 21, 2022 | 72F99 | HancockDistrict 6 | 5 miles of resurfacing, parking lanes, guardrail and ADA improvements on IL 61 from IL 101 in Augusta through Plymouth to the McDonough County line. | — | Executed | W. L. Miller Company $3,146,264 · | ||
| Jan 21, 2022 | 72L55 | MacoupinDistrict 6 | 6.8 miles of cold in-place recycling standard overlay on IL 138 from IL 159 to Sawyerville Hills Road, 0.9 miles east of Wilsonville. | — | Executed | The Kilian Corporation $2,687,989 · | ||
| Jan 21, 2022 | 72L59 | MontgomeryDistrict 6 | Patching and resurfacing on I-55 West Frontage Road from Waggoner Avenue, east of Waggoner, to 0.1 miles south of Macoupin Creek, south of Farmersville. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,694,071 · | ||
| Jan 21, 2022 | 72M18 | MontgomerySangamonDistrict 6 | 5.4 miles of standard overlay on I-55 south of the Sangamon / Montgomery County line to Brush Creek 0.7 miles south of IL 104 and on Brown Street / East Divernon Road east of State Street in Divernon to 0.1 miles east of Sullivan Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $13,900,246 · | ||
| Jan 21, 2022 | 72M19 | AdamsDistrict 6 | 6.5 miles of pavement preservation with cape seal and fog sealing shoulders on IL 110/336 from US 24 to just north of IL 61. | — | Executed | A. C. Pavement Striping Co. $1,853,026 · | ||
| Jan 21, 2022 | 72M20 | HancockDistrict 6 | 8.3 miles of micro-surfacing, cape seal of pavement and fog seal of shoulders on IL 10 from 3 miles east of Carthage to the McDonough County line. | — | Executed | A. C. Pavement Striping Co. $2,484,261 · | ||
| Jan 21, 2022 | 72M27 | PikeDistrict 6 | Bridge deck overlay on IL 96 over Two Mile Creek, 1.6 miles south of US 54, and on IL 96 over Six Mile Creek, 1 mile northwest of Pleasant Hill. (SN 075-0075 and SN 075-0045) | — | Executed | Freesen, a div of UCM, Inc. $502,104 · | ||
| Jan 21, 2022 | 72M36 | SangamonDistrict 6 | 8.9 miles of crack seal on various routes in Sangamon County. | — | Executed | Kinney Contractors, Inc. $73,813 · | ||
| Jan 21, 2022 | 72M65 | ScottDistrict 6 | Bridge joint repair and replacement with a microsilica deck overlay on IL 100 over Wolf Creek, 1 mile south of Norfolk Southern in Bluffs; Microsilica deck overlay on IL 100 over Eagle Run Creek, 1.4 miles south of the Morgan County line. (SN 086-0006 and 086-0046) | — | Executed | Freesen, a div of UCM, Inc. $691,200 · | ||
| Jan 21, 2022 | 72M67 | CassDistrict 6 | Bridge joint repair and replacement with a microsilica deck overlay on IL 100 / US 67 over Indian Creek, 3.9 miles north of the Morgan County line. (SN 009- 012) | — | Executed | County Contractors, Inc. $489,497 · | ||
| Jan 21, 2022 | 72M87 | VariousDistrict 6 | Weed spraying along I-55 and I-72 in various counties. | — | Executed | Endrizzi Contracting, Inc $236,440 · | ||
| Jan 21, 2022 | 72N06 | LoganDistrict 6 | Bridge painting on SN 054-0059 carrying County Highway 2 over I-55, 3.1 miles east of I-155. | — | Executed | Three Star Painting, Inc. $240,000 · | ||
| Jan 21, 2022 | 72N08 | VariousDistrict 6 | Bridge washing on seven Mississippi and Illinois River bridges on various routes in various counties within District 6. (SN 034-0062, 001-0068, 009- 0001, 075-0122, 075-0123, 069-0525, and 086-0001) | — | Executed | All States Painting, Inc. $147,999 · | ||
| Jan 21, 2022 | 72N10 | SangamonDistrict 6 | 3.9 miles of longitudinal joint repair, partial width resurfacing and patching on Wabash Avenue from west of Robbins Road to MacArthur Boulevard and on MacArthur Boulevard from Wabash Avenue to South Grand Avenue. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $518,773 · | ||
| Jan 21, 2022 | 72N18 | SangamonDistrict 6 | Patching on I-55 from the Montgomery County line to Exit 105, north of Sherman. | — | Executed | Kinney Contractors, Inc. $419,500 · | ||
| Jan 21, 2022 | 72N19 | LoganDistrict 6 | Cured-in-place liners on I-55 and I-155 around Lincoln. | — | Executed | Hoerr Construction, Inc. $601,732 · |
1–100 of 924Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.