- (7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gallagher Asphalt Corporation & K-Five Construction Corporation & D. Construction, Inc. Low bidder | $32,635,797 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gallagher Aspha… |
|---|---|---|---|---|---|---|
| 1 | K0029614 | WEED CONT AQUATIC | 1 | GALLON | $1,900.00 | |
| 2 | K0029629 | WEED CONT BROADLF TRF | 2 | POUND | $644.00 | |
| 3 | X0100018 | TREE REMOV UNDER 6U | 100 | UNIT | $12.00 | |
| 4 | X0320024 | ETHERNET MNG SWITCH | 17 | EACH | $10.00 | |
| 5 | X0322906 | WEEP HOLES CORED | 60 | EACH | $850.00 | |
| 6 | X0325201 | SHOULDER RUM STRIP RM | 71,618 | SQ YD | $7.00 | |
| 7 | X0325222 | WEED CONT BASAL TRTMT | 30 | GALLON | $340.00 | |
| 8 | X0325265 | REMOVE ELEC SERVICE | 17 | EACH | $1,160.00 | |
| 9 | X0325462 | MEDIA CONVERTER | 17 | EACH | $10.00 | |
| 10 | X0326812 | CAT 5 ETHERNET CABLE | 76 | FOOT | $9.00 | |
| 11 | X0327117 | ATMS SYS INTEGRATION | 1 | L SUM | $154,000.00 | |
| 12 | X0327120 | WEED CTRL NTV LSCP EN | 11 | ACRE | $1,000.00 | |
| 13 | X0327303 | REM EX SIGN LT UNT NS | 56 | EACH | $891.00 | |
| 14 | X0327616 | MAINT ITS DURG CONSTR | 6 | CAL MO | $1,560.00 | |
| 15 | X0327649 | SOIL RETENTION SYSTEM | 1,266 | SQ FT | $65.00 | |
| 16 | X0900022 | BRDG DRAIN SYS REPAIR | 206 | FOOT | $295.00 | |
| 17 | X1400106 | WIRELESS VEH DET SYS | 17 | EACH | $7,680.00 | |
| 18 | X1400211 | LT P SPECIAL 30' | 3 | EACH | $4,010.00 | |
| 19 | X1400337 | WRLS IN PVT DETECTOR | 222 | EACH | $1,270.00 | |
| 20 | X1400438 | WRLSS VEH DET SR RPTR | 5 | EACH | $14,800.00 | |
| 21 | X2010200 | TREE LIMB REM OVER 10 | 10 | EACH | $50.00 | |
| 22 | X2010350 | TREE REMOV ACRES SPL | 13 | ACRE | $10,000.00 | |
| 23 | X2020110 | GRADING & SHAP SHLDRS | 403 | UNIT | $38.00 | |
| 24 | X2503110 | MOWING SPL | 12.5 | ACRE | $1,500.00 | |
| 25 | X2503315 | INTERSEED CL 4A MOD | 5.5 | ACRE | $1,688.00 | |
| 26 | X2700027 | PREF PL PM TD L 8 CON | 3,749 | FOOT | $9.11 | |
| 27 | X5537800 | SS CLEANED 12 | 500 | FOOT | $10.00 | |
| 28 | X5537900 | SS CLEANED 15 | 500 | FOOT | $10.00 | |
| 29 | X5870015 | BR DK CONCRETE SEALER | 146,778 | SQ FT | $1.00 | |
| 30 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $3,467,250.00 | |
| 31 | X7013820 | TR CONT SURVEIL EXPWY | 180 | CAL DA | $1.00 | |
| 32 | X7030005 | TEMP PAVT MKING REMOV | 360,232 | SQ FT | $0.3000 | |
| 33 | X8140234 | REPL HH COVER | 1 | EACH | $1,000.00 | |
| 34 | X8570001 | SMART TRAF MONIT SYS | 180 | CAL DA | $1,400.50 | |
| 35 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $50,000.00 | |
| 36 | Z0030850 | TEMP INFO SIGNING | 4,000 | SQ FT | $10.00 | |
| 37 | Z0034105 | MATL TRANSFER DEVICE | 81,461 | TON | $20.00 | |
| 38 | Z0062456 | TEMP PAVEMENT | 71,618 | SQ YD | $15.00 | |
| 39 | Z0064600 | SELECTIVE CLEARING | 11 | ACRE | $14,584.43 | |
| 40 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 41 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 42 | 20100110 | TREE REMOV 6-15 | 350 | UNIT | $17.00 | |
| 43 | 20100210 | TREE REMOV OVER 15 | 150 | UNIT | $23.00 | |
| 44 | 20101300 | TREE PRUN 1-10 | 20 | EACH | $125.00 | |
| 45 | 20101350 | TREE PRUN OVER 10 | 80 | EACH | $150.00 | |
| 46 | 20200100 | EARTH EXCAVATION | 152 | CU YD | $250.00 | |
| 47 | 20201200 | REM & DISP UNS MATL | 152 | CU YD | $250.00 | |
| 48 | 20800150 | TRENCH BACKFILL | 25 | CU YD | $55.00 | |
| 49 | 20900110 | POROUS GRAN BACKFILL | 152 | CU YD | $250.00 | |
| 50 | 21001000 | GEOTECH FAB F/GR STAB | 167 | SQ YD | $10.00 | |
| 51 | 21101615 | TOPSOIL F & P 4 | 61 | SQ YD | $8.00 | |
| 52 | 25000210 | SEEDING CL 2A | 0.2 | ACRE | $2,984.00 | |
| 53 | 25000400 | NITROGEN FERT NUTR | 12 | POUND | $3.00 | |
| 54 | 25000500 | PHOSPHORUS FERT NUTR | 12 | POUND | $3.00 | |
| 55 | 25000600 | POTASSIUM FERT NUTR | 12 | POUND | $3.00 | |
| 56 | 25000750 | MOWING | 200 | ACRE | $300.00 | |
| 57 | 25003115 | INTERSEED CL 1B | 8 | ACRE | $1,592.00 | |
| 58 | 25003210 | INTERSEED CL 2A | 11.4 | ACRE | $1,630.00 | |
| 59 | 25100125 | MULCH METHOD 3 | 9 | ACRE | $1,700.00 | |
| 60 | 31101200 | SUB GRAN MAT B 4 | 144 | SQ YD | $25.00 | |
| 61 | 40600290 | BIT MATLS TACK CT | 408,195 | POUND | $0.0100 | |
| 62 | 40600370 | LONG JOINT SEALANT | 257,776 | FOOT | $2.55 | |
| 63 | 40600400 | MIX CR JTS FLANGEWYS | 4,000 | TON | $0.0100 | |
| 64 | 40600982 | HMA SURF REM BUTT JT | 3,240 | SQ YD | $0.0100 | |
| 65 | 40603085 | HMA BC IL-19.0 N70 | 35,018 | TON | $84.00 | |
| 66 | 40604062 | HMA SC IL-9.5 D N70 | 23,345 | TON | $90.00 | |
| 67 | 40605015 | P HMA BC SMA 12.5 N80 | 48,798 | TON | $86.50 | |
| 68 | 40605036 | P SC SMA 12.5 F N80 | 32,532 | TON | $108.50 | |
| 69 | 44000100 | PAVEMENT REM | 2,812 | SQ YD | $8.00 | |
| 70 | 44000169 | HMA SURF REM 5 | 453,550 | SQ YD | $7.00 | |
| 71 | 44000500 | COMB CURB GUTTER REM | 706 | FOOT | $50.00 | |
| 72 | 44001980 | CONC BARRIER REMOV | 12 | FOOT | $250.00 | |
| 73 | 44200629 | CL A PATCH T1 15 | 3 | SQ YD | $1,000.00 | |
| 74 | 44200630 | CL A PATCH T2 15 | 594 | SQ YD | $600.00 | |
| 75 | 44200631 | CL A PATCH T3 15 | 442 | SQ YD | $600.00 | |
| 76 | 44200632 | CL A PATCH T4 15 | 1,733 | SQ YD | $600.00 | |
| 77 | 44213000 | PATCH REINFORCEMENT | 2,765 | SQ YD | $55.00 | |
| 78 | 44213200 | SAW CUTS | 10,257 | FOOT | $6.50 | |
| 79 | 44213204 | TIE BARS 3/4 | 752 | EACH | $20.00 | |
| 80 | 48102100 | AGG WEDGE SHLD TYPE B | 1,908 | TON | $45.00 | |
| 81 | 550A1240 | STORM SEW CL A 5 12 | 40 | FOOT | $225.00 | |
| 82 | 60208240 | CB TC T24F&G | 4 | EACH | $3,200.00 | |
| 83 | 60211700 | CB TD 4 DIA T1F OL | 2 | EACH | $3,200.00 | |
| 84 | 60238800 | INLETS TA | 2 | EACH | $2,100.00 | |
| 85 | 60250200 | CB ADJUST | 426 | EACH | $950.00 | |
| 86 | 60252800 | CB RECONST | 8 | EACH | $1,375.00 | |
| 87 | 60255410 | CB CLEANED | 4 | EACH | $750.00 | |
| 88 | 60255500 | MAN ADJUST | 6 | EACH | $950.00 | |
| 89 | 60260100 | INLETS ADJUST | 374 | EACH | $950.00 | |
| 90 | 60404910 | FR & GRATES T20 | 37 | EACH | $550.00 | |
| 91 | 60404950 | FR & GRATES T24 | 37 | EACH | $450.00 | |
| 92 | 60406000 | FR & LIDS T1 OL | 75 | EACH | $250.00 | |
| 93 | 60406100 | FR & LIDS T1 CL | 75 | EACH | $250.00 | |
| 94 | 60610400 | COMB CC&G TM6.24 | 706 | FOOT | $55.00 | |
| 95 | 63000001 | SPBGR TY A 6FT POSTS | 100 | FOOT | $45.13 | |
| 96 | 63301210 | REM RE-E SPBGR TY A | 24 | FOOT | $46.65 | |
| 97 | 63301990 | REM RE-E T B TERM T1 | 2 | EACH | $2,792.12 | |
| 98 | 63500105 | DELINEATORS | 500 | EACH | $53.01 | |
| 99 | 63700180 | CONC BAR 1F 44HT | 12 | FOOT | $900.00 | |
| 100 | 64200116 | SHOULDER RUM STRIP 16 | 322,280 | FOOT | $0.3000 | |
| 101 | 66900200 | NON SPL WASTE DISPOSL | 152 | CU YD | $200.00 | |
| 102 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,350.00 | |
| 103 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,500.00 | |
| 104 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,100.00 | |
| 105 | 66901006 | REG SUB MON | 20 | CAL DA | $940.00 | |
| 106 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $4,500.00 | |
| 107 | 67100100 | MOBILIZATION | 1 | L SUM | $1,958,065.00 | |
| 108 | 70107004 | PAVT MK BLKOUT TAPE 4 | 199,525 | FOOT | $0.5000 | |
| 109 | 70107005 | PAVT MK BLKOUT TAPE 5 | 34,635 | FOOT | $1.80 | |
| 110 | 70107008 | PAVT MK BLKOUT TAPE 8 | 18,200 | FOOT | $3.00 | |
| 111 | 70107012 | PAVT MK BLKOUT TPE 12 | 7,000 | FOOT | $4.50 | |
| 112 | 70107025 | CHANGEABLE MESSAGE SN | 180 | CAL DA | $35.00 | |
| 113 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $75,000.00 | |
| 114 | 70307120 | TEMP PVT MK L4 T4 TAPE | 696,419 | FOOT | $0.4000 | |
| 115 | 70307125 | TEMP PVT MK L5 T4 TAPE | 105,794 | FOOT | $1.38 | |
| 116 | 70307140 | TEMP PVT MK L8 T4 TAPE | 18,200 | FOOT | $2.20 | |
| 117 | 70307160 | TEMP PVT MK L12 T4 TAPE | 7,394 | FOOT | $3.30 | |
| 118 | 72000300 | SIGN PANEL T3 | 5,753 | SQ FT | $26.80 | |
| 119 | 72400330 | REMOV SIGN PANEL T3 | 5,593 | SQ FT | $8.30 | |
| 120 | 73800900 | REM OVH SN STR WLKWAY | 480 | FOOT | $81.30 | |
| 121 | 78000200 | THPL PVT MK LINE 4 | 142,638 | FOOT | $0.8200 | |
| 122 | 78000500 | THPL PVT MK LINE 8 | 23,575 | FOOT | $1.65 | |
| 123 | 78000600 | THPL PVT MK LINE 12 | 5,999 | FOOT | $2.50 | |
| 124 | 78003121 | PREF PL PM TB STAN L5 | 3,749 | FOOT | $3.95 | |
| 125 | 78004354 | PREF PL PM TC INL L4 | 980 | FOOT | $2.75 | |
| 126 | 78004355 | PREF PL PM TD INL L5 | 32,116 | FOOT | $9.05 | |
| 127 | 78004358 | PREF PL PM TC INL L8 | 493 | FOOT | $7.25 | |
| 128 | 78005110 | EPOXY PVT MK LINE 4 | 225,000 | FOOT | $0.4000 | |
| 129 | 78005120 | EPOXY PVT MK LINE 5 | 75,000 | FOOT | $0.8500 | |
| 130 | 78009004 | MOD URETH PM LINE 4 | 11,816 | FOOT | $1.48 | |
| 131 | 78009008 | MOD URETH PM LINE 8 | 562 | FOOT | $2.95 | |
| 132 | 78009012 | MOD URETH PM LINE 12 | 875 | FOOT | $3.80 | |
| 133 | 78011045 | GRV RCSD PVT MRKG 9 | 3,749 | FOOT | $2.50 | |
| 134 | 78100100 | RAISED REFL PAVT MKR | 4,181 | EACH | $36.90 | |
| 135 | 78300200 | RAISED REF PVT MK REM | 4,181 | EACH | $10.50 | |
| 136 | 78300201 | PAVMT MRKG REM GRIND | 1,000 | SQ FT | $1.50 | |
| 137 | 78300202 | PAVMT MRKG REM WTR BL | 8,026 | SQ FT | $1.25 | |
| 138 | 81028200 | UNDRGRD C GALVS 2 | 76 | FOOT | $88.50 | |
| 139 | 83600352 | LP F M 11.5BC 8 5/8X6 | 3 | EACH | $2,100.00 | |
| 140 | 89502378 | REBLD EX HH TO HD HH | 1 | EACH | $4,110.00 |