| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 11, 2022 | 66L57 | BureauDistrict 3 | Work begins in Ohio, Illinois at the intersection of IL 26 and IL 92 and goes West 9.9 miles including a 3P milling and resurfacing of IL 92, drainage improvements, and guardrail improvements. The project terminates at the junction of US 34 and IL 89 in La Moille, Illinois. | — | Executed | Advanced Asphalt Company $3,472,037 · | ||
| Mar 11, 2022 | 66L74 | LaSalleDistrict 3 | Microsilica overlay, expansion joint replacement and deck repairs on the structures SN 050-0173 and SN 050-0174 carrying I-39 over Tomahawk Creek, 3.5 miles north of I-80 in LaSalle County. | — | Executed | D. Construction, Inc. $1,066,495 · | ||
| Mar 11, 2022 | 66L75 | LivingstonDistrict 3 | Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County. | — | Rejected | Tobey's Construction & Cartage, Inc. $1,906,501 · | ||
| Mar 11, 2022 | 66M20 | LaSalleDistrict 3 | Cleaning and painting all structural steel and other steel components of the structures This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures. | — | Executed | ERA-Valdivia Contractors, Inc. $511,038 · | ||
| Mar 11, 2022 | 66M32 | LaSalleDistrict 3 | Tree and shrub planting from mile marker 88 to mile marker 89 on the North side (WB). | — | Executed | Central Landscaping, LP $72,720 · | ||
| Mar 11, 2022 | 66M36 | VariousDistrict 3 | Weed Spray Districtwide (I-80, I-180, I-39, I-55, and I-57 including all interchanges). | — | Executed | The Daltons Inc. $121,355 · | ||
| Mar 11, 2022 | 68F32 | TazewellDistrict 4 | Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. | — | Executed | Stark Excavating, Inc. $79,890 · | ||
| Mar 11, 2022 | 68F73 | KnoxDistrict 4 | Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg. | — | Executed | Brandt Construction Co. $1,167,000 · | ||
| Mar 11, 2022 | 68F75 | TazewellDistrict 4 | Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. | — | Executed | Stark Excavating, Inc. $357,062 · | ||
| Mar 11, 2022 | 68F77 | PutnamDistrict 4 | Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18. | — | Executed | Advanced Asphalt Company and Pavement Maintenance Services, Inc. JV $1,334,347 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Mar 11, 2022 | 68G29 | HendersonMcDonoughDistrict 4 | Crack and joint sealing on US 34 from PD Creek to West end of Biggsville Bypass and on IL 9 from Hancock CL to W of US 67. | — | Executed | Freehill Asphalt, Inc. $260,027 · | ||
| Mar 11, 2022 | 68G58 | MarshallMasonTazewellDistrict 4 | Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. | — | Executed | Interstate Maintenance, Incorporated $219,300 · | ||
| Mar 11, 2022 | 68G60 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (High tension cable barrier) at various locations in District 4. | — | Executed | Northern Contracting, Inc. $700,397 · | ||
| Mar 11, 2022 | 68G61 | VariousDistrict 4 | Districtwide pavement markings. | — | Executed | Varsity Striping & Construction Co. $235,350 · | ||
| Mar 11, 2022 | 68G68 | TazewellDistrict 4 | Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). | — | Executed | Stark Excavating, Inc. $294,240 · | ||
| Mar 11, 2022 | 68G70 | McDonoughDistrict 4 | This project is 0.26 miles in length. It is located at the structure carrying IL 41 over KJRY Railway and BNSF Railway (SN 055-0008), 2.8 miles South of Bushnell. Work includes bridge repair (structural repairs) and shoulder repair. | — | Executed | County Contractors, Inc. $110,055 · | ||
| Mar 11, 2022 | 70951 | PiattDistrict 5 | 3P Policy Designed Overlay on FAS 1531 (Old IL 47) from ILL 32 to 600E W. of Monticello, Piatt County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,498,994 · | ||
| Mar 11, 2022 | 70988 | McLeanDistrict 5 | 3P Policy Standard Overlay and Culvert Replacement on US 24 from Woodford Co. Line to McLean St. in Gridley, McLean County. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,617,193 · | ||
| Mar 11, 2022 | 70B03 | DouglasDistrict 5 | 8.257 Miles of Smart Resurfacing from ECL of Arthur to US 45 at Arcola. | — | Executed | Howell Paving, Inc. $2,686,894 · | ||
| Mar 11, 2022 | 70C22 | ChampaignDistrict 5 | 4.317 miles of Smart Overlay from 2350E at St. Joseph to Vermilion County line and ADA Improvements in Ogden. | — | Executed | Open Road Paving Company LLC $1,624,867 · | ||
| Mar 11, 2022 | 70E19 | McLeanDistrict 5 | Resurfacing on Old 66 from S of Veterans Parkway to 1.7 Mi SW of Towanda, McLean County. | — | Executed | Rowe Construction, a div of UCM, Inc. $848,139 · | ||
| Mar 11, 2022 | 70F57 | McLeanDistrict 5 | Bridge deck repairs Southbound FAI 55 (I-55) SN 057-0154 over US 136 at McLean. | — | Executed | Stark Excavating, Inc. $453,779 · | ||
| Mar 11, 2022 | 70F58 | ChampaignDouglasDistrict 5 | Class A Pavement patching in East Field Area for a total length of 30.54 Mi. | — | Executed | Beniach Construction Co., Inc. $244,524 · | ||
| Mar 11, 2022 | 70F59 | ChampaignDistrict 5 | 0.488 miles, Class B patching, at I-74 North of Mahomet on ILL 47. | — | Executed | Kinney Contractors, Inc. $151,999 · | ||
| Mar 11, 2022 | 70F60 | ChampaignDistrict 5 | Patching on Market St from Ford Harris Rd to Hensley Rd North of Champaign, Champaign County. , Patching on Market St from Ford Harris Rd to Hensley Rd North of Champaign, Champaign County. | — | Executed | Kinney Contractors, Inc. $228,287 · | ||
| Mar 11, 2022 | 70F67 | DeWittMcLeanDistrict 5 | 1) 5.36 miles on FAI 55 (I-55), Class A special patching from SW of Bloomington to S of Shirley. 2) 0.92 mile on FAU 6406 (US 150), Class B patching from Veteran's PKWY to just S of Woodrig Rd. 3) 0.28 mile on FAP 708 (US 51 BUSN), Class B patching from US 51 to 0.3 mile S of US 51. | — | Executed | Kinney Contractors, Inc. $489,892 · | ||
| Mar 11, 2022 | 70F70 | DeWittDistrict 5 | 0.657 miles, patching, ILL 10 to Chestnut St in Weldon. | — | Executed | Ramirez Diversified Services, LLC $184,915 · | ||
| Mar 11, 2022 | 70F85 | VariousDistrict 5 | 567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 and interstate routes including interchanges in Champaign, Dewitt, Mclean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $127,415 · | ||
| Mar 11, 2022 | 70F86 | VariousDistrict 5 | Districtwide smart work zone technology. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $433,000 · | ||
| Mar 11, 2022 | 72M21 | HancockDistrict 6 | 0.6 miles of resurfacing on IL 96 from south of US 36 to north of the Keokuk Junction Railroad in Hamilton. | — | Executed | W. L. Miller Company $524,376 · | ||
| Mar 11, 2022 | 72M23 | CassDistrict 6 | 8.9 miles of cape and fog seal, bump grinding and patching on IL 78 from the Mason County line, through Chandlerville, to 0.1 miles north of IL 125 in Virginia. | — | Executed | Asphalt Stone Company $1,084,462 · | ||
| Mar 11, 2022 | 72M24 | HancockDistrict 6 | 10.8 miles of cape and fog seal and bump grinding on IL 96 from 0.3 miles south of Warsaw Road to the Adams County line. | — | Executed | A. C. Pavement Striping Co. $1,283,965 · | ||
| Mar 11, 2022 | 72M28 | MacoupinDistrict 6 | Bridge overlay of SN 059-0500 carrying IL 111 over the Otter Creek overflow, approximately 2.2 miles north of IL 108. | — | Executed | Sangamo Construction Company $545,354 · | ||
| Mar 11, 2022 | 72M32 | LoganSangamonDistrict 6 | Sealing the decks, parapets and concrete bridge approach pavement on multiple structures on various routes in Logan and Sangamon Counties. | — | Executed | Interstate Maintenance, Incorporated $217,095 · | ||
| Mar 11, 2022 | 72M35 | ChristianDistrict 6 | 4.5 miles of crack and joint sealing on US 51 from 1.4 miles south of Assumption to 2.7 miles north of IL 16. | — | Executed | Freehill Asphalt, Inc. $31,506 · | ||
| Mar 11, 2022 | 72M48 | MorganDistrict 6 | Bridge overlay on I-72 over IL 104 and the BandN Railroad, east of Jacksonville. | — | Executed | County Contractors, Inc. $1,475,863 · | ||
| Mar 11, 2022 | 72M69 | LoganDistrict 6 | 3.9 miles of patching, milling, resurfacing and guardrail updates on IL 121 from south of Pulaski Street in Lincoln to 0.3 miles south of Chestervale Crossing. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,190,212 · | ||
| Mar 11, 2022 | 72M70 | LoganDistrict 6 | 5.9 miles of patching, resurfacing, shoulders, guardrail and entrance improvements on IL 121 from 0.3 miles south of 1200 Street (Chestervale Crossing) to 0.1 miles south of ICRR in Mt. Pulaski. | — | Executed | Truman L. Flatt & Sons Co., Inc. $4,374,377 · | ||
| Mar 11, 2022 | 72N07 | SangamonDistrict 6 | Bridge painting on portions of SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR, 0.4 miles south of Sangamon Avenue in Springfield. | — | Executed | Thomas Industrial Coatings, Inc. $189,794 · | ||
| Mar 11, 2022 | 72N09 | AdamsDistrict 6 | Bridge painting on SN 001-0013 carrying IL 57 over Curtis Creek, 1.6 miles south of US 24 in Quincy. | — | Executed | Civil Coatings and Construction Inc. $163,750 · | ||
| Mar 11, 2022 | 72N17 | SangamonDistrict 6 | Parking lot improvements at the District 6 Sign Shop located at 701 North MacArthur Boulevard in Springfield. | — | Executed | Otto Baum Company, Inc. $842,664 · | ||
| Mar 11, 2022 | 72N20 | MacoupinMontgomeryDistrict 6 | Patching on I-55 from the Madison/Macoupin County line to the Montgomery/ Sangamon County line. | — | Executed | Kinney Contractors, Inc. $455,640 · | ||
| Mar 11, 2022 | 72N21 | LoganDistrict 6 | Patching on I-55 from the Sangamon County line to the McLean County line. | — | Executed | G. M. Sipes Construction, Inc. $621,263 · | ||
| Mar 11, 2022 | 72N24 | AdamsDistrict 6 | Patching on IL 57 from just south of Marblehead to just north of the I-172 interchange. | — | Executed | G. M. Sipes Construction, Inc. $254,950 · | ||
| Mar 11, 2022 | 72N30 | SangamonDistrict 6 | Patching on I-55 Business/9th Street/Peoria Road from South Grand Avenue to Sangamon Avenue in Springfield. | — | Executed | Kinney Contractors, Inc. $175,275 · | ||
| Mar 11, 2022 | 72N35 | SangamonDistrict 6 | Miscellaneous bridge repairs to four bridges on I-72 in eastern Sangamon County. (SN084-0155, 0157, 0158, and 0162) | — | Executed | White Construction LLC $422,908 · | ||
| Mar 11, 2022 | 74360 | ClarkDistrict 7 | Removal and replacement of SN 012-0021 located on US 40, 2 miles west of the City of Marshall. | — | Executed | Sangamo Construction Company $2,373,836 · | ||
| Mar 11, 2022 | 74434 | MoultrieDistrict 7 | Superstructure replacement and new approach pavements on SN 070-0038 located on IL 128, approximately 3.1 miles south of Dalton City. | — | Executed | Stark Excavating, Inc. $814,752 · | ||
| Mar 11, 2022 | 74637 | MaconDistrict 7 | 2.6 miles of resurfacing, median curb repair, ADA upgrades, signal improvements and bridge joint replacement and repairs on Old US 51 Business from IL 121 to I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,810,726 · | ||
| Mar 11, 2022 | 74960 | ShelbyDistrict 7 | 10.5 miles of designed overlay with guardrail improvements and culvert replacement on IL 16 / IL 128 from the Christian County line to Shelby County Airport Road. | — | Executed | Howell Paving, Inc. $8,294,212 · | ||
| Mar 11, 2022 | 74962 | RichlandDistrict 7 | Milling, surfacing, PCC pavement, storm sewer cleaning and replacement of corrugated metal pipe with concrete pipe on IL 130 and IL 250 from south of West North Street to 0.1 miles north of US 50 in Olney. | — | Executed | Ambraw Asphalt Materials, Inc. $1,019,578 · | ||
| Mar 11, 2022 | 74963 | FayetteDistrict 7 | 7.5 miles of designed overlay and culvert replacement on US 40 / IL 185 from Kaskaskia River Bridge to 0.1 miles east of US 51 and US 51 from US 40 / IL 185 east of Vandalia to 0.2 miles south of Shobonier Road. | — | Executed | Howell Paving, Inc. $5,518,109 · | ||
| Mar 11, 2022 | 74964 | MoultrieDistrict 7 | 2.3 miles of standard overlay on IL 32 from 0.4 miles north to 0.1 miles north of Bruce-Findlay Road and from 0.1 miles south of Bruce-Findlay Road to the Shelby County line. | — | Executed | Ne-Co Asphalt Co., Inc. $838,284 · | ||
| Mar 11, 2022 | 74A19 | CumberlandDistrict 7 | Resurfacing, aggregate wedge shoulders, aggregate surface course and patching on IL 130 from Mary Lane in Greenup to the Jasper County line. | — | Executed | Ne-Co Asphalt Co., Inc. $1,179,401 · | ||
| Mar 11, 2022 | 74A22 | MoultrieDistrict 7 | 7.4 miles of patching, HMA surface removal and resurfacing on IL 32 from IL 133 in Lovington to IL 121 west of Sullivan. | — | Executed | Howell Paving, Inc. $2,148,099 · | ||
| Mar 11, 2022 | 74A58 | VariousDistrict 7 | Sealing the bridge decks on 90 structures on various routes in Effingham, Fayette and Macon Counties. | — | Executed | All States Painting, Inc. $123,721 · | ||
| Mar 11, 2022 | 74A82 | ColesDistrict 7 | Placing 8.3 miles of aggregate shoulders on US 45 from the Douglas County line to Donnelly Road. | — | Executed | Beniach Construction Co., Inc. $144,480 · | ||
| Mar 11, 2022 | 76P23 | MadisonDistrict 8 | 1.6 miles of resurfacing on IL 143 from US 40 to the Bond County line. | — | Executed | The Kilian Corporation $590,157 · | ||
| Mar 11, 2022 | 76P50 | BondDistrict 8 | Joint repairs, bridge repairs and bridge deck overlay on IL 127 over Little Beaver Creek, 4.2 miles south of I-70. (SN 003-0049) | — | Executed | The Kilian Corporation $846,983 · | ||
| Mar 11, 2022 | 76P85 | GreeneDistrict 8 | Pavement patching on IL 108 from 0.1 miles west of 11th Street to 1st Street in Carrollton. | — | Executed | Keeley & Sons, Inc. $244,807 · | ||
| Mar 11, 2022 | 76P90 | St. ClairDistrict 8 | Installation of security system at the Missouri Avenue Pump Station along I-55/64. | — | Executed | Electrico, Inc. $44,950 · | ||
| Mar 11, 2022 | 78890 | SalineDistrict 9 | Patching on US 45 from IL 13 to IL 34/145 in Harrisburg. | — | Executed | E. T. Simonds Construction Company $148,544 · | ||
| Mar 11, 2022 | 78891 | JacksonDistrict 9 | Patching on at various locations on US 51 and IL 13 in Jackson County. | — | Executed | E. T. Simonds Construction Company $220,721 · | ||
| Mar 11, 2022 | 78895 | JeffersonWilliamsonDistrict 9 | Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $269,455 · | ||
| Mar 11, 2022 | 78903 | WhiteDistrict 9 | Culvert rehabilitation for a field entrance on IL 1 approximately 1.5 miles south of US 45. | — | Executed | E. T. Simonds Construction Company $133,869 · | ||
| Mar 11, 2022 | 78919 | PerryDistrict 9 | Patching on US 51 from Park Street to Stacy Street in DuQuoin. | — | Executed | E. T. Simonds Construction Company $112,028 · | ||
| Mar 11, 2022 | 78931 | VariousDistrict 9 | Weed spraying for Johnson grass along I-57 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $126,373 · | ||
| Mar 11, 2022 | 78932 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57, I-24 and I-64 at various locations in various counties. | — | Executed | The Daltons Inc. $181,425 · | ||
| Mar 11, 2022 | 85714 | OgleDistrict 2 | Resurfacing Mt. Morris Road from IL 72 to the north city limits of Mt. Morris. | — | Executed | Martin & Company Excavating $662,789 · | ||
| Mar 11, 2022 | 85720 | OgleDistrict 2 | Resurfacing Montague Road from Conger Road to Tower Road | — | Executed | Martin & Company Excavating $353,666 · | ||
| Mar 11, 2022 | 87760 | IroquoisDistrict 3 | Roadway reconstruction, Curb and gutter, storm sewers, landscaping, streetscape, lighting, and pavement markings on North Central Street, from Crescent St. to East 3rd. Street, and on East 2nd Street from the IC Railroad to North Central Street, and on East Front Street from North Central St. to North Main Street in Gilman. | — | Executed | Iroquois Paving Corporation $3,193,594 · | ||
| Mar 11, 2022 | 87773 | LivingstonDistrict 3 | Replace the bridge carrying TR 70 over Mud Creek, 2.5 miles southeast of Manville. | — | Executed | Tobey's Construction & Cartage, Inc. $406,355 · | ||
| Mar 11, 2022 | 87774 | LivingstonDistrict 3 | Replace the bridge carrying TR 244 over Gooseberry Creek, 2.5 miles north of Emington. | — | Executed | Riber Construction, Inc. $388,075 · | ||
| Mar 11, 2022 | 87775 | LivingstonDistrict 3 | Resurfacing Weston Road from 900N Road/McLean County Line to 1650N Road. | — | Executed | Kankakee Valley Construction Company, Inc. $2,085,137 · | ||
| Mar 11, 2022 | 87784 | BureauDistrict 3 | Sidewarlk construction and replacemnt at various locations within Princeton. | — | Executed | Advanced Asphalt Company $363,355 · | ||
| Mar 11, 2022 | 87785 | BureauDistrict 3 | Sidewalk replacement at various locations in DePue. | — | Executed | Advanced Asphalt Company $248,541 · | ||
| Mar 11, 2022 | 90868 | ChampaignDistrict 5 | 4.111 miles of 3" Cold-In-Place Recycling with 1-1/2" Hot-Mix Asphalt Surface overlay from Main Street in Sidney to Block Road. | — | Executed | Open Road Paving Company LLC $1,725,901 · | ||
| Mar 11, 2022 | 91608 | McLeanDistrict 5 | Resurfacing White Oak Road from US 150 to Locust Street. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,195,312 · | ||
| Mar 11, 2022 | 91612 | VermilionDistrict 5 | Resurfacing East Thompson Avenue from east of the CSX Railroad to 9th Street in Hoopeston. | — | Executed | Cross Construction, Inc. $993,593 · | ||
| Mar 11, 2022 | 91615 | ChampaignDistrict 5 | Construction of a 10 foot wide aggregate trail from CR2650 through Ogden to the Vermilion County line. | — | Executed | Stark Excavating, Inc. $942,679 · | ||
| Mar 11, 2022 | 93691 | SangamonDistrict 6 | Reconstruction of Stanford Avenue from 11th Street to Fox Bridge Road including the construction of a pedestrian path, in Springfield. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $7,802,930 · | ||
| Mar 11, 2022 | 93754 | SchuylerDistrict 6 | Guardrail replacement at various locations in Schuyler County. | — | Executed | Clevenger Contractors, Inc. $1,120,325 · | ||
| Mar 11, 2022 | 93777 | SangamonDistrict 6 | Replace the bridge carrying Churchill Road over Jacsonville Branch in Springfield. | — | Executed | County Contractors, Inc. $1,168,384 · | ||
| Mar 11, 2022 | 93779 | BrownDistrict 6 | Pavement removal, curb and gutter, brick pavers, sidewalks, resurfacing, streetscape, lighting, and pavement markings on Capital Avenue from North Street to South Street in Mt. Sterling. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $2,060,970 · | ||
| Mar 11, 2022 | 95907 | ShelbyDistrict 7 | Replace the bridge carrying CH 41 over Robinson Creek 0.50 miles south of Westervelt. | — | Executed | Depew and Owen Builders, Inc. $939,488 · | ||
| Mar 11, 2022 | 95908 | ShelbyDistrict 7 | Pavement widening, resurfacing, box culverts, pipe culverts, pavement markings, on CH 5 from North 12th Street in Shelbyville to 1600N Road. | — | Executed | Howell Paving, Inc. $2,162,747 · | ||
| Mar 11, 2022 | 95909 | ColesDistrict 7 | Resurfacing, sidewalks, curb and gutter, patching, and pavement markings on Dewitt Avenue, from east of 14th Street to Logan Street in Mattoon. | — | Executed | Howell Paving, Inc. $1,320,207 · | ||
| Mar 11, 2022 | 95910 | EffinghamDistrict 7 | Replace the bridge carrying CH 16 over Bishop Creek, 3.0 miles west of Dieterich. | — | Executed | Howell Paving, Inc. $914,445 · | ||
| Mar 11, 2022 | 95912 | MaconDistrict 7 | Remove and replace two strucures to carry Reas Bridge Road over Lake Decatur. | — | Rejected | ICC Group Inc. $30,042,000 · | ||
| Mar 11, 2022 | 95913 | ColesDistrict 7 | Resurfacing CH 27 from Country Club Road to Old State Road. | — | Executed | Ne-Co Asphalt Co., Inc. $178,093 · | ||
| Mar 11, 2022 | 97752 | St. ClairDistrict 8 | Pavement widening, HMA and PCC pavement, storm sewer, curb and gutter, replace the deck on the structure over the tributary to Richland Creek, pipe culverts, guardrail, pavement markings, and traffic signal improvements on Frank Scott Parkway from west of Old Collinsville Road to west of Green Mount Road. | — | Executed | Baxmeyer Construction, Inc. $7,292,408 · | ||
| Mar 11, 2022 | 97766 | St. ClairDistrict 8 | Reconstruction of Shiloh Station Road from 0.4 mile north of Johnson Road to 0.2 mile north of Johnson Road in Shiloh. | — | Executed | Hank's Excavating & Landscaping, Inc. $413,521 · | ||
| Mar 11, 2022 | 97767 | MonroeDistrict 8 | Construction of a roundabout at Palmer Creek Road and Quarry Road in Columbia. | — | Executed | Baxmeyer Construction, Inc. $1,436,408 · | ||
| Mar 11, 2022 | 99665 | WilliamsonDistrict 9 | Sidewalk construction along IL 13 from State Street to Fair Street in Marion. | — | Executed | Lake Contracting, Inc. $209,037 · | ||
| Mar 11, 2022 | 99670 | UnionDistrict 9 | Replace the structure carrying TR 112 over Mill Creek, 1.75 miles northeast of Mill Creek. | — | Executed | Sierra Bravo Contractors, LLC $284,239 · | ||
| Mar 11, 2022 | 99674 | JacksonDistrict 9 | Resurfacing, HMA shoulders, pavement markings, and raised reflective markers on Elkville Road from IL 127 to Haulage Road. | — | Executed | Samron Midwest Contracting, Inc. $575,575 · | ||
| Apr 29, 2022 | 46587 | VariousDistrict 3 | Removing existing raised reflective pavement markers, installing new raised reflective pavement markers and re This work is located on 1-39 and 1-80 in Various Counties. This work consists of removing existing raised reflective pavement markers, installing new raised reflective pavement markers and removing and replacing raised reflective pavement marker reflectors. | — | Executed | Marking Specialists Corporation $789,990 · | ||
| Apr 29, 2022 | 46588 | VariousDistrict 3 | Raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker This work is located on I-39 and I-80 in Livingston, Ford, Iroquois, and Kankakee Counties. This work consists of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors. | — | Executed | Marking Specialists Corporation $479,809 · | ||
| Apr 29, 2022 | 46590 | VariousDistrict 2 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on the plans. | — | Executed | P & P Construction Co. $847,811 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.