- 7.5 miles of designed overlay and culvert replacement on US 40 / IL 185 from Kaskaskia River Bridge to 0.1 miles east of US 51 and US 51 from US 40 / IL 185 east of Vandalia to 0.2 miles south of Shobonier Road.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $5,518,109 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 3,337 | SQ YD | $9.34 | |
| 2 | X0900064 | MEMBR WTRPR SYS B STR | 70 | SQ YD | $59.80 | |
| 3 | X2501000 | SEEDING CL 2 SPL | 0.5 | ACRE | $8,500.00 | |
| 4 | X4060995 | TEMPORARY RAMP SPL | 399 | SQ YD | $14.42 | |
| 5 | Z0049799 | PROT RESET SURVEY MRK | 34 | EACH | $128.64 | |
| 6 | Z0054402 | ROCK FILL - REPLACE | 52 | CU YD | $95.00 | |
| 7 | Z0055500 | RUMBLE STRIP | 1,150 | SQ FT | $0.0100 | |
| 8 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | |
| 9 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | |
| 10 | 20200100 | EARTH EXCAVATION | 53 | CU YD | $53.65 | |
| 11 | 20201200 | REM & DISP UNS MATL | 54.2 | CU YD | $69.15 | |
| 12 | 20400800 | FURNISHED EXCAVATION | 188 | CU YD | $37.45 | |
| 13 | 20700220 | POROUS GRAN EMBANK | 276.4 | CU YD | $43.90 | |
| 14 | 28100107 | STONE RIPRAP CL A4 | 56 | SQ YD | $49.80 | |
| 15 | 28200200 | FILTER FABRIC | 56 | SQ YD | $6.35 | |
| 16 | 35300300 | PCC BSE CSE 8 | 699 | SQ YD | $77.45 | |
| 17 | 40200800 | AGG SURF CSE B | 110 | TON | $40.50 | |
| 18 | 40600290 | BIT MATLS TACK CT | 92,464 | POUND | $0.9900 | |
| 19 | 40600370 | LONG JOINT SEALANT | 39,063 | FOOT | $2.56 | |
| 20 | 40602970 | HMA BC IL-9.5FG N70 | 13,424 | TON | $98.90 | |
| 21 | 40604052 | HMA SC IL-9.5 C N70 | 15,341 | TON | $97.64 | |
| 22 | 40800050 | INCIDENTAL HMA SURF | 283 | TON | $314.22 | |
| 23 | 42000060 | WELDED WIRE REINF | 162 | SQ YD | $11.15 | |
| 24 | 42000540 | PCC PVT 12 | 105 | SQ YD | $97.65 | |
| 25 | 44000100 | PAVEMENT REM | 105 | SQ YD | $11.15 | |
| 26 | 44000155 | HMA SURF REM 1 1/2 | 120,747 | SQ YD | $2.02 | |
| 27 | 44000159 | HMA SURF REM 2 1/2 | 57 | SQ YD | $61.59 | |
| 28 | 44000164 | HMA SURF REM 3 3/4 | 16,205 | SQ YD | $4.92 | |
| 29 | 44000500 | COMB CURB GUTTER REM | 90 | FOOT | $17.65 | |
| 30 | 44004250 | PAVED SHLD REMOVAL | 342 | SQ YD | $19.80 | |
| 31 | 44201421 | CL C PATCH T4 15 | 128 | SQ YD | $225.86 | |
| 32 | 44201789 | CL D PATCH T2 12 | 3,744 | SQ YD | $191.00 | |
| 33 | 44201794 | CL D PATCH T3 12 | 248 | SQ YD | $191.00 | |
| 34 | 44201796 | CL D PATCH T4 12 | 100 | SQ YD | $191.00 | |
| 35 | 48102100 | AGG WEDGE SHLD TYPE B | 2,343 | TON | $40.50 | |
| 36 | 48300300 | PCC SHOULDERS 8 | 52.4 | SQ YD | $55.00 | |
| 37 | 50100100 | REM EXIST STRUCT | 1 | EACH | $17,690.00 | |
| 38 | 52200020 | TEMP SOIL RETEN SYSTM | 360 | SQ FT | $89.80 | |
| 39 | 54001001 | BOX CUL END SEC C1 | 2 | EACH | $37,890.00 | |
| 40 | 54010806 | PCBC 8X6 | 55 | FOOT | $1,195.00 | |
| 41 | 59100100 | GEOCOMPOSITE WALL DR | 70 | SQ YD | $33.80 | |
| 42 | 60608600 | COMB CC&G TM6.06 | 90 | FOOT | $58.15 | |
| 43 | 60624610 | CORRUGATED MED DOW | 510 | SQ FT | $27.80 | |
| 44 | 64200108 | SHOULDER RUM STRIP 8 | 72,852 | FOOT | $0.1700 | |
| 45 | 66700205 | PERM SURV MKRS T1 | 34 | EACH | $268.58 | |
| 46 | 67000400 | ENGR FIELD OFFICE A | 7 | CAL MO | $2,535.07 | |
| 47 | 67000600 | ENGR FIELD LAB | 7 | CAL MO | $2,237.13 | |
| 48 | 67100100 | MOBILIZATION | 1 | L SUM | $409,089.61 | |
| 49 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $17,890.00 | |
| 50 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $18,000.00 | |
| 51 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $77,206.25 | |
| 52 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $46,999.16 | |
| 53 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $1,110.94 | |
| 54 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $11,650.00 | |
| 55 | 70107005 | PAVT MK BLKOUT TAPE 5 | 1,652 | FOOT | $2.85 | |
| 56 | 70107025 | CHANGEABLE MESSAGE SN | 42 | CAL DA | $115.00 | |
| 57 | 70300100 | SHORT TERM PAVT MKING | 12,235 | FOOT | $1.21 | |
| 58 | 70300150 | SHRT TRM PAVT MK REM | 1,955 | SQ FT | $3.21 | |
| 59 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 58.3 | SQ FT | $2.50 | |
| 60 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 92,603 | FOOT | $0.1500 | |
| 61 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 2,016 | FOOT | $0.5000 | |
| 62 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 1,091 | FOOT | $0.2800 | |
| 63 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 238 | FOOT | $5.00 | |
| 64 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 40 | FOOT | $8.00 | |
| 65 | 70400100 | TEMP CONC BARRIER | 450 | FOOT | $29.80 | |
| 66 | 70400200 | REL TEMP CONC BARRIER | 425 | FOOT | $7.65 | |
| 67 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $2,980.00 | |
| 68 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $735.00 | |
| 69 | 78000100 | THPL PVT MK LTR & SYM | 58.3 | SQ FT | $8.50 | |
| 70 | 78000200 | THPL PVT MK LINE 4 | 10,365 | FOOT | $1.50 | |
| 71 | 78000400 | THPL PVT MK LINE 6 | 2,016 | FOOT | $1.50 | |
| 72 | 78000500 | THPL PVT MK LINE 8 | 1,091 | FOOT | $1.55 | |
| 73 | 78000600 | THPL PVT MK LINE 12 | 238 | FOOT | $8.50 | |
| 74 | 78000650 | THPL PVT MK LINE 24 | 40 | FOOT | $12.00 | |
| 75 | 78001110 | PAINT PVT MK LINE 4 | 82,238 | FOOT | $0.1700 | |
| 76 | 78011000 | GRV RCSD PM LTR & SYM | 172 | SQ FT | $2.50 | |
| 77 | 78011025 | GRV RCSD PVT MRKG 5 | 10,365 | FOOT | $1.25 | |
| 78 | 78011035 | GRV RCSD PVT MRKG 7 | 2,016 | FOOT | $1.25 | |
| 79 | 78011045 | GRV RCSD PVT MRKG 9 | 1,091 | FOOT | $1.00 | |
| 80 | 78011065 | GRV RCSD PVT MRKG 13 | 238 | FOOT | $2.50 | |
| 81 | 78011125 | GRV RCSD PVT MRKG 25 | 40 | FOOT | $3.50 | |
| 82 | 78100100 | RAISED REFL PAVT MKR | 609 | EACH | $29.92 | |
| 83 | 78300200 | RAISED REF PVT MK REM | 500 | EACH | $0.0100 |