19-00039-00-BT
- Let date
- Friday, April 29, 2022
- Contract
- 61H18 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- Trailhead improvements including new sidewalk, landscaping, signing and construction of a restroom building and shelter. Project is located at the south corner of IL 56 at Batavia Road in Warrenville.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Landmark Contractors, Inc. Low bidder | $1,001,551 | ||
| 2 | Copenhaver Construction, Inc. | $1,222,949 | +22.1% | |
| 3 | Martam Construction Incorporated | $1,291,214 | +28.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Landmark Contra… | #2 Copenhaver Cons… | #3 Martam Construc… |
|---|---|---|---|---|---|---|---|---|
| 1 | A2005920 | T-PLAT X ACR BG 2-1/2 | 1 | EACH | $725.00 | $950.00 | $600.00 | |
| 2 | C2C04675 | S-PHYSO OP DM 2-1/2'C | 19 | EACH | $55.00 | $150.00 | $110.00 | |
| 3 | C2C09784 | S-SPIREA BETUL T 2'C | 21 | EACH | $42.50 | $150.00 | $120.00 | |
| 4 | C2000652 | S-ARONIA MELAN A M 2' | 25 | EACH | $45.00 | $150.00 | $480.00 | |
| 5 | C2002324 | S-DIERVILLA LONI 2' | 30 | EACH | $50.00 | $150.00 | $100.00 | |
| 6 | C2015302 | S-J CHIN KLLY CMPT 5G | 21 | EACH | $57.00 | $150.00 | $113.00 | |
| 7 | K0012990 | P PL ORNAMENT T GAL P | 6 | UNIT | $2,000.00 | $1,800.00 | $2,500.00 | |
| 8 | K0026850 | PERENNIAL PLANT CARE | 92 | SQ YD | $10.00 | $20.00 | $20.00 | |
| 9 | K0029634 | WEED CONTR PRE-EM GRN | 10 | POUND | $30.00 | $200.00 | $650.00 | |
| 10 | XX000959 | TRASH RECEPTACLES | 4 | EACH | $2,425.00 | $3,500.00 | $2,200.00 | |
| 11 | XX001683 | INFORMATION KIOSK | 1 | EACH | $34,810.25 | $35,000.00 | $22,000.00 | |
| 12 | XX005845 | MODULAR CONC PAVER SP | 150 | SQ FT | $31.55 | $35.00 | $30.00 | |
| 13 | XX006670 | TRAIL HEAD SIGN COMPL | 2 | EACH | $2,875.00 | $5,000.00 | $3,200.00 | |
| 14 | XX006921 | PRECAST MEDALLIONS | 1 | EACH | $13,620.00 | $11,000.00 | $12,000.00 | |
| 15 | XX009020 | LUM LED TYPE 3 SPL | 1 | EACH | $5,450.00 | $6,200.00 | $6,000.00 | |
| 16 | XX009045 | DRINKING FOUNTAIN | 1 | EACH | $9,807.80 | $16,000.00 | $9,600.00 | |
| 17 | XX009334 | BICYCL REPAIR STATION | 1 | EACH | $3,527.00 | $5,000.00 | $2,500.00 | |
| 18 | XX009525 | RESTROOM BUILDING | 1 | L SUM | $368,900.00 | $460,000.00 | $485,000.00 | |
| 19 | X0100029 | EXPLOR EXCAVATION | 80 | FOOT | $40.00 | $15.00 | $40.00 | |
| 20 | X0320067 | BENCH REMOVAL | 3 | EACH | $285.80 | $200.00 | $300.00 | |
| 21 | X0322917 | PRO SS CONN TO EX MAN | 1 | EACH | $714.50 | $2,200.00 | $1,800.00 | |
| 22 | X0324450 | SEG CONC BLK WALL, SP | 150 | SQ FT | $114.00 | $65.00 | $65.00 | |
| 23 | X0325130 | TUBULAR TRAF SGN POST | 2 | EACH | $571.00 | $1,000.00 | $650.00 | |
| 24 | X0325786 | STONE SEATING | 74 | SQ FT | $566.00 | $300.00 | $1,215.00 | |
| 25 | X0325789 | INTERPRET SIGN COMPL | 1 | EACH | $1,786.00 | $3,000.00 | $2,000.00 | |
| 26 | X0325970 | SOIL CONDITION 3 | 357 | SQ YD | $10.00 | $10.00 | $130.00 | |
| 27 | X1700067 | STAMP COL PCC SDWLK 5 | 516 | SQ FT | $73.40 | $25.00 | $78.00 | |
| 28 | X1800024 | DECORATIVE STONE | 295 | SQ FT | $6.00 | $7.00 | $132.00 | |
| 29 | X2020410 | EARTH EXCAVATION SPL | 275 | CU YD | $67.52 | $48.00 | $54.00 | |
| 30 | X2501820 | SEEDING CL 5 MOD | 0.25 | ACRE | $5,100.00 | $7,000.00 | $3,600.00 | |
| 31 | X2502014 | SEEDING CL 4A MOD | 0.25 | ACRE | $5,100.00 | $7,000.00 | $1,800.00 | |
| 32 | X3400004 | RETAINING WALL REMOV | 75 | FOOT | $53.40 | $50.00 | $68.00 | |
| 33 | X4240430 | PC CONC SIDEWALK 5 SP | 1,730 | SQ FT | $16.40 | $16.00 | $12.00 | |
| 34 | X4240450 | PC CONC SIDEWALK 7 SP | 300 | SQ FT | $18.90 | $17.00 | $15.00 | |
| 35 | X4404400 | PAVT REMOVAL SPL | 213 | SQ YD | $20.85 | $20.00 | $16.00 | |
| 36 | X8300001 | LIGHT POLE SPECIAL | 1 | EACH | $2,975.00 | $3,500.00 | $3,800.00 | |
| 37 | X8360120 | LIGHT POLE FDN SPL | 1 | EACH | $1,500.00 | $2,000.00 | $1,800.00 | |
| 38 | Z0003850 | BENCHES | 1 | EACH | $5,656.10 | $8,000.00 | $4,200.00 | |
| 39 | Z0003855 | BICYCLE RACKS | 5 | EACH | $1,263.35 | $750.00 | $600.00 | |
| 40 | Z0012455 | CONC STEP REMOV | 1 | EACH | $428.70 | $2,500.00 | $1,500.00 | |
| 41 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $9,900.00 | $12,000.00 | $8,000.00 | |
| 42 | Z0039700 | PICNIC TABLE | 2 | EACH | $2,819.50 | $2,600.00 | $1,800.00 | |
| 43 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 44 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 45 | 20101000 | TEMPORARY FENCE | 900 | FOOT | $7.00 | $3.00 | $5.00 | |
| 46 | 20101200 | TREE ROOT PRUNING | 3 | EACH | $250.00 | $40.00 | $250.00 | |
| 47 | 20101300 | TREE PRUN 1-10 | 1 | EACH | $100.00 | $70.00 | $180.00 | |
| 48 | 20101700 | SUPPLE WATERING | 40 | UNIT | $0.1000 | $0.0100 | $110.00 | |
| 49 | 20400800 | FURNISHED EXCAVATION | 150 | CU YD | $98.35 | $23.00 | $28.00 | |
| 50 | 20800150 | TRENCH BACKFILL | 35 | CU YD | $75.45 | $47.00 | $88.00 | |
| 51 | 21101615 | TOPSOIL F & P 4 | 3,162 | SQ YD | $0.1000 | $4.00 | $7.00 | |
| 52 | 21101645 | TOPSOIL F & P 12 | 357 | SQ YD | $13.00 | $12.00 | $19.00 | |
| 53 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $9,680.00 | $3,000.00 | $3,500.00 | |
| 54 | 25000400 | NITROGEN FERT NUTR | 50 | POUND | $1.00 | $1.00 | $4.00 | |
| 55 | 25000600 | POTASSIUM FERT NUTR | 50 | POUND | $1.00 | $1.00 | $4.00 | |
| 56 | 25100115 | MULCH METHOD 2 | 0.25 | ACRE | $2,000.00 | $2,500.00 | $2,000.00 | |
| 57 | 25100630 | EROSION CONTR BLANKET | 3,162 | SQ YD | $4.00 | $2.00 | $1.10 | |
| 58 | 28000250 | TEMP EROS CONTR SEED | 100 | POUND | $0.1000 | $0.0100 | $2.00 | |
| 59 | 28000400 | PERIMETER EROS BAR | 900 | FOOT | $2.75 | $2.00 | $3.00 | |
| 60 | 28000510 | INLET FILTERS | 8 | EACH | $285.80 | $60.00 | $150.00 | |
| 61 | 40601005 | HMA REPL OVER PATCH | 7.3 | TON | $775.85 | $450.00 | $850.00 | |
| 62 | 42400200 | PC CONC SIDEWALK 5 | 5,025 | SQ FT | $12.45 | $13.00 | $9.00 | |
| 63 | 42400400 | PC CONC SIDEWALK 7 | 770 | SQ FT | $13.75 | $14.00 | $12.00 | |
| 64 | 42400800 | DETECTABLE WARNINGS | 100 | SQ FT | $35.75 | $50.00 | $45.00 | |
| 65 | 44000300 | CURB REM | 276 | FOOT | $12.95 | $10.00 | $9.00 | |
| 66 | 44000500 | COMB CURB GUTTER REM | 48 | FOOT | $12.95 | $10.00 | $12.00 | |
| 67 | 44000600 | SIDEWALK REM | 3,212 | SQ FT | $1.70 | $3.00 | $2.00 | |
| 68 | 44002208 | HMA RM OV PATCH 2 | 65 | SQ YD | $85.82 | $60.00 | $90.00 | |
| 69 | 44201692 | CL D PATCH T2 4 | 7.3 | SQ YD | $377.45 | $210.00 | $565.00 | |
| 70 | 44201696 | CL D PATCH T4 4 | 59 | SQ YD | $141.25 | $160.00 | $225.00 | |
| 71 | 50901760 | PIPE HANDRAIL | 120 | FOOT | $443.40 | $500.00 | $480.00 | |
| 72 | 550A0040 | STORM SEW CL A 1 10 | 75 | FOOT | $120.85 | $120.00 | $156.00 | |
| 73 | 56200200 | WATER SERV LINE 3/4 | 25 | FOOT | $321.75 | $85.00 | $85.00 | |
| 74 | 60100925 | PIPE DRAINS 8 | 52 | FOOT | $107.00 | $115.00 | $120.00 | |
| 75 | 60207605 | CB TC T8G | 3 | EACH | $2,353.50 | $3,200.00 | $2,600.00 | |
| 76 | 60250200 | CB ADJUST | 2 | EACH | $362.35 | $800.00 | $700.00 | |
| 77 | 60255700 | MAN ADJ NEW T1F OL | 1 | EACH | $726.90 | $950.00 | $950.00 | |
| 78 | 60500050 | REMOV CATCH BAS | 1 | EACH | $699.50 | $600.00 | $500.00 | |
| 79 | 60600605 | CONC CURB TB | 94 | FOOT | $50.20 | $35.00 | $45.00 | |
| 80 | 60603800 | COMB CC&G TB6.12 | 48 | FOOT | $44.75 | $38.00 | $49.00 | |
| 81 | 67100100 | MOBILIZATION | 1 | L SUM | $50,570.00 | $98,000.00 | $72,000.00 | |
| 82 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $4,200.00 | $119,000.00 | $46,000.00 | |
| 83 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $1,500.00 | $1.00 | |
| 84 | 72000100 | SIGN PANEL T1 | 4 | SQ FT | $75.00 | $80.00 | $60.00 | |
| 85 | 78300202 | PAVMT MRKG REM WTR BL | 200 | SQ FT | $10.00 | $10.00 | $5.00 | |
| 86 | 81028170 | UNDRGRD C GALVS 1 | 41 | FOOT | $15.15 | $19.00 | $18.00 | |
| 87 | 81702441 | EC C XLP 2-12C 1-12CG | 41 | FOOT | $24.50 | $30.00 | $30.00 |