| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 64P45 | VariousDistrict 2 | Guardrail and fence repairs along State maintained routes in Henry. Lee, Rock Island, Whiteside, and portions of LaSalle Counties. | — | Executed | Northern Contracting, Inc. $429,116 · | ||
| Jan 15, 2021 | 64P46 | VariousDistrict 2 | Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2. | — | Executed | O'Brien Civil Works, Inc. $73,700 · | ||
| Jan 15, 2021 | 64P51 | HenryDistrict 2 | Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0137) carrying IL 82 over the north branch of the Edwards River, located 2 miles South of IL 81. | — | Executed | General Constructors Inc. of the Quad Cities $601,848 · | ||
| Jan 15, 2021 | 64P52 | HenryDistrict 2 | Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0141) carrying US 6 over the BN RR and Township Road 38 (TR 38), located 3 miles East of the Rock Island County line. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $853,036 · | ||
| Jan 15, 2021 | 64P55 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | All States Painting, Inc. $56,441 · | ||
| Jan 15, 2021 | 64P56 | HenryDistrict 2 | Concrete sealer applied to bridge decks at various locations. | — | Executed | All States Painting, Inc. $45,900 · | ||
| Jan 15, 2021 | 64P57 | Rock IslandDistrict 2 | Concrete sealer applied to bridge decks at various locations. | — | Executed | All States Painting, Inc. $89,495 · | ||
| Jan 15, 2021 | 64P67 | LeeDistrict 2 | Cold milling and Hot Mix Asphalt Resurfacing from 0.1 mile west to 0.1 mile East of Franklin Creek located West of Franklin Grove. | — | Executed | Porter Brothers Asphalt & Sealing $57,761 · | ||
| Jan 15, 2021 | 66E45 | GrundyDistrict 3 | The replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co. | — | Executed | P. T. Ferro Construction Co. $2,077,263 · | ||
| Jan 15, 2021 | 66K95 | BureauDistrict 3 | The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. | — | Executed | R & R Landscaping & Irrigation $75,446 · | ||
| Jan 15, 2021 | 66L00 | LaSalleDistrict 3 | Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. | — | Executed | D. Construction, Inc. $1,200,540 · | ||
| Jan 15, 2021 | 66L24 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $145,136 · | ||
| Jan 15, 2021 | 66L25 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $208,017 · | ||
| Jan 15, 2021 | 66L26 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $651,622 · | ||
| Jan 15, 2021 | 66L40 | LivingstonDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a poly This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift). | — | Executed | Kankakee Valley Construction Company, Inc. $427,351 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 68F54 | TazewellDistrict 4 | Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. | — | Executed | Stark Excavating, Inc. $4,871,748 · | ||
| Jan 15, 2021 | 68F63 | MarshallMasonTazewellDistrict 4 | Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. | — | Executed | Interstate Maintenance, Incorporated $239,996 · | ||
| Jan 15, 2021 | 68F97 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County. | — | Executed | JIMAX Landscape LLC $225,732 · | ||
| Jan 15, 2021 | 68F99 | KnoxDistrict 4 | Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. | — | Executed | White Construction LLC $206,222 · | ||
| Jan 15, 2021 | 68G07 | FultonPeoriaWarrenDistrict 4 | Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. | — | Executed | Homer Tree Service, Inc. $146,325 · | ||
| Jan 15, 2021 | 68G08 | VariousDistrict 4 | District-wide weed spraying (off road) in various counties on various routes. | — | Rejected | The Daltons Inc. $111,920 · | ||
| Jan 15, 2021 | 70A65 | McLeanDistrict 5 | 3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile. | — | Executed | Rowe Construction, a div of UCM, Inc. $6,473,808 · | ||
| Jan 15, 2021 | 70D16 | McLeanDistrict 5 | Bridge Deck Overlay at Funk's Grove Rest Area. | — | Executed | Stark Excavating, Inc. $3,668,318 · | ||
| Jan 15, 2021 | 70D96 | DouglasDistrict 5 | Six bridge deck overlays at various locations between Arcola and Hindsboro. | — | Executed | Sangamo Construction Company $1,348,258 · | ||
| Jan 15, 2021 | 70E36 | ChampaignDouglasVermilionDistrict 5 | Salt Containment Structures at Fithian, Leverett, and Tuscola facilities. | — | Executed | Stark Excavating, Inc. $347,926 · | ||
| Jan 15, 2021 | 70F23 | VariousDistrict 5 | 567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 on interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $116,455 · | ||
| Jan 15, 2021 | 72L84 | MontgomeryDistrict 6 | ADA improvements, traffic signal replacements, storm sewer work and sign replacements, storm sewer work and sign replacements on IL 16 and IL 127 in Hillsboro. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $691,607 · | ||
| Jan 15, 2021 | 72L92 | PikeDistrict 6 | 4.4 miles of crack and joint sealing on US 54 from 0.1 miles north of North Monroe Street in Pittsfield to I-72. | — | Executed | Complete Asphalt Service Co. $15,980 · | ||
| Jan 15, 2021 | 72L94 | SangamonDistrict 6 | 0.16 miles of milling and resurfacing on I-55 at the Lake Springfield Bridges, south of Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $951,059 · | ||
| Jan 15, 2021 | 72L96 | LoganDistrict 6 | Bridge deck overlay on SN 054-0104 carrying Lincoln Parkway over ICRR, 0.3 miles southeast of Union in Lincoln. | — | Executed | Freesen, a div of UCM, Inc. $434,690 · | ||
| Jan 15, 2021 | 72M13 | BrownDistrict 6 | Insertion culvert liners on IL 99 and IL 107 from the Pike County line to the Schuyler County line. | — | Executed | CSD Environmental Services, Inc. $98,564 · | ||
| Jan 15, 2021 | 72M38 | AdamsHancockDistrict 6 | Bridge washing and concrete sealing on the Quincy Bayview Bridge and the US US 136 / Mississippi River Bridge at Keokuk, Iowa. (SN 001-0068 and SN 034-0062) | — | Executed | All States Painting, Inc. $58,580 · | ||
| Jan 15, 2021 | 72M41 | CassMenardDistrict 6 | Bridge washing and concrete sealing on the Sangamon River bridges on IL 78 and Athens Blacktop. (SN 009-0510 and SN 065-0019) | — | Executed | All States Painting, Inc. $13,900 · | ||
| Jan 15, 2021 | 72M42 | PikeDistrict 6 | Bridge washing and concrete sealing on various bridges in Pike County and expansion joint replacement on the Valley City Eagle Bridges carrying I-72 over the Illinois River. (SN 069-0525, SN 075-0098, SN 075-0099, SN 075-0122, and SN 075-0123) | — | Executed | White Construction LLC $315,819 · | ||
| Jan 15, 2021 | 72M50 | BrownDistrict 6 | Replacing the concrete wearing surface on SN 005-0004 carrying IL 99 over a drainage ditch, 1.2 miles northwest of the Pike County line. | — | Executed | White Construction LLC $145,423 · | ||
| Jan 15, 2021 | 72M56 | MorganDistrict 6 | Painting portions of two bridges carrying I-72 over Mauvaise Terre Creek, 1.1 miles east of Old US 36 near Jacksonville. (SN 069-0048 and SN 069-0049) | — | Executed | ERA-Valdivia Contractors, Inc. $199,128 · | ||
| Jan 15, 2021 | 72M59 | SangamonDistrict 6 | Longitudinal joint repair on I-72 from just west of Chatham Road to 0.4 miles west of Second Street Overhead. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $161,632 · | ||
| Jan 15, 2021 | 74549 | MaconShelbyDistrict 7 | 4.25 miles of designed overlay on US 51 from 0.5 miles north of the Shelby County line to the Christian County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,831,241 · | ||
| Jan 15, 2021 | 74721 | FayetteDistrict 7 | 2.28 miles of standard overlay, tree removal, tree planting and aggregate shoulders on US 40 from the Bond County line to 2.28 miles east of Hurricane Creek. | — | Executed | Howell Paving, Inc. $1,077,874 · | ||
| Jan 15, 2021 | 74757 | MaconDistrict 7 | 3.95 miles of rubblization and overlay including earthwork, sign panels, patching, pavement replacement at overhead structures, rest area ramp overlay, pavement marking, riprap, guardrail, pavement removal, concrete pavement, underdrains, culverts and drainage | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $27,728,894 · | ||
| Jan 15, 2021 | 74906 | ClayDistrict 7 | 4.9 miles of patching, milling, surfacing, ramped nose medians and corrugated median construction on US 45 from US 50 to the Wayne County line. | — | Executed | Howell Paving, Inc. $2,391,452 · | ||
| Jan 15, 2021 | 74949 | EffinghamDistrict 7 | 4.8 miles of cape seal surface treatment on US 40 from 0.3 miles west of Lake Sara Road to Henriette Street in Effingham. | — | Executed | A. C. Pavement Striping Co. $504,469 · | ||
| Jan 15, 2021 | 74A14 | ColesDistrict 7 | 0.2 miles of patching and resurfacing on Lerna Road from north of Samsa Drive to IL 16. | — | Executed | Howell Paving, Inc. $262,318 · | ||
| Jan 15, 2021 | 74A40 | VariousDistrict 7 | Cleaning and painting 5 structures on various routes in District 7. (SN 025-0087, 051-0032, 051-0047, 051-0057, 093-0001) | — | Executed | ERA-Valdivia Contractors, Inc. $654,132 · | ||
| Jan 15, 2021 | 74A41 | ColesDistrict 7 | Cleaning and painting 2 structures on IL 16. (SN 015-0015 and SN 015-0016) | — | Executed | ERA-Valdivia Contractors, Inc. $198,944 · | ||
| Jan 15, 2021 | 76K78 | MadisonDistrict 8 | Bridge deck sealing of the McKinley Bridge (Salisbury Street) over the Mississippi River. (SN 060-6002) | — | Executed | M & M Concrete, Inc. $47,964 · | ||
| Jan 15, 2021 | 76M33 | St. ClairDistrict 8 | Cleaning of the Missouri Avenue Pump Station on I-55/I-64. , Cleaning of the Missouri Avenue Pump Station on I-55/64. | — | Active | Layne Christensen Company $1,018,000 · | ||
| Jan 15, 2021 | 76M48 | MadisonDistrict 8 | 5.1 miles of resurfacing on IL 157 from 0.2 miles north of Horseshoe Lake Road to 0.1 miles north of Chain of Rocks Road. | — | Executed | Christ Bros. Asphalt, Inc. $3,487,865 · | ||
| Jan 15, 2021 | 76M85 | MadisonDistrict 8 | 1.76 miles of resurfacing on IL 140 from IL 160 to the Bond County line. | — | Executed | Christ Bros. Asphalt, Inc. $1,729,690 · | ||
| Jan 15, 2021 | 76N40 | MadisonDistrict 8 | Traffic signal interconnect (CMAQ) on IL 157 from Horseshoe Lake Road to West Main Street in Collinsville. | — | Executed | Electrico, Inc. $242,161 · | ||
| Jan 15, 2021 | 76N69 | ClintonDistrict 8 | Microsurfacing on IL 161 from 0.1 miles west of Slant Road to 0.2 miles west of Broadway in Centralia. | — | Executed | Asphalt Stone Company $984,640 · | ||
| Jan 15, 2021 | 76N86 | MadisonDistrict 8 | Resurfacing of Old Alton Edwardsville Road from 0.3 miles east of Wanda Road to Cahokia Creek Road. | — | Executed | The Kilian Corporation $254,049 · | ||
| Jan 15, 2021 | 76N87 | GreeneDistrict 8 | Bituminous surface treatment on CH 24 (State Road) from IL 267 to South Street in Rockbridge. | — | Executed | DMS Contracting, Inc. $39,131 · | ||
| Jan 15, 2021 | 76N91 | MadisonDistrict 8 | Patching on US 67 from 10th Street to 6th Street in Alton. | — | Executed | Charles E. Mahoney Co. $101,704 · | ||
| Jan 15, 2021 | 76N96 | RandolphDistrict 8 | Patching on IL 13 / IL 153 from IL 4 to the Perry County line. | — | Executed | E. T. Simonds Construction Company $229,618 · | ||
| Jan 15, 2021 | 76P13 | JerseyMadisonDistrict 8 | Weed spraying along IL 100 from IL 96 to the Piasa Bird Monument and along IL IL 255 from I-270 to US 67. | — | Executed | The Daltons Inc. $39,763 · | ||
| Jan 15, 2021 | 78328 | WhiteDistrict 9 | Replacing the existing single span, closed abutment bridge with a new triple opening, cast-in-place reinforced concrete box culvert on IL 1, 2.75 miles north of Norris City. | — | Executed | E. T. Simonds Construction Company $673,811 · | ||
| Jan 15, 2021 | 78606 | MassacDistrict 9 | Patching, resurfacing and bridge repairs on I-24 from the Johnson County line to the Ohio River Bridge. | — | Executed | E. T. Simonds Construction Company $23,498,738 · | ||
| Jan 15, 2021 | 78785 | PulaskiDistrict 9 | 16 miles of pavement patching, milling, surfacing, shoulder repair and ADA ramp improvements on Old US 51 from 2.1 miles south of the Union County line to IL 37 just north of Cairo. | — | Executed | E. T. Simonds Construction Company $5,002,433 · | ||
| Jan 15, 2021 | 78802 | MassacDistrict 9 | 4.6 miles of patching, HMA and PCC removal, HMA surfacing, median/curb repair, ADA ramps and signal upgrades on US 45 from 10th Street / Ferry Street to just east of Belgrade Road and on IL 145 from US 45 to approximately 900' north of US 45. | — | Executed | E. T. Simonds Construction Company $3,997,326 · | ||
| Jan 15, 2021 | 78805 | HamiltonDistrict 9 | Removal and replacement of a box culvert (SN 033-7024) carrying IL 142 over a ditch, 0.1 miles north of Main Street in Broughton. | — | Executed | Samron Midwest Contracting, Inc. $86,710 · | ||
| Jan 15, 2021 | 78815 | WhiteDistrict 9 | Bridge deck repairs on SN 097-0040 carrying I-64 over Pond Creek, 0.25 miles east of Wayne; SN 097-0042 and 097-0043 carrying I-64 over Tributary to Randolph Ditch, 11.5 miles west of IL 1; and SN 097-0046 and 097-0047 carrying I-64 over Randolph Drainage Ditch, 9.5 miles west of IL 1. | — | Executed | E. T. Simonds Construction Company $858,527 · | ||
| Jan 15, 2021 | 78817 | WilliamsonDistrict 9 | Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City. | — | Executed | K. D. Crain and Sons, Inc. $13,690 · | ||
| Jan 15, 2021 | 78821 | AlexanderDistrict 9 | Bridge deck overlay on SN 002-0032 on IL 3 over Sexton Creek, west of Gale. | — | Executed | E. T. Simonds Construction Company $156,645 · | ||
| Jan 15, 2021 | 85698 | Rock IslandDistrict 2 | Guardrail replacement on various routes in Rock Island County. | — | Executed | Lovewell Fencing, Inc. $1,328,775 · | ||
| Jan 15, 2021 | 85703 | WinnebagoDistrict 2 | Replace the bridge carrying _Seminary Street over Keith Creek, 0.5 mile north of 15th Avenue in Rockford. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,393,880 · | ||
| Jan 15, 2021 | 87744 | LivingstonDistrict 3 | Replace the bridge carrying TR 4B over Ditch Mole Creek, located 2.5 miles northwest of Flanagan. | — | Executed | Riber Construction, Inc. $335,279 · | ||
| Jan 15, 2021 | 87745 | BureauDistrict 3 | Resurfacing CH 19 from Angling Road to US 6. | — | Executed | Advanced Asphalt Company $1,111,251 · | ||
| Jan 15, 2021 | 87755 | LivingstonDistrict 3 | Replace the bridge carrying TR 118 over Mud Creek, 3.5 miles northeast of Cornell. | — | Executed | Riber Construction, Inc. $380,342 · | ||
| Jan 15, 2021 | 89720 | TazewellDistrict 4 | Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. | — | Executed | Illinois Civil Contractors, Inc. $559,587 · | ||
| Jan 15, 2021 | 89759 | McDonoughDistrict 4 | Replace the bridge carrying CH 5 over the North Fork of Lamoine River, 4.3 miles east of IL 110/US 67. | — | Executed | Brandt Construction Co. $725,982 · | ||
| Jan 15, 2021 | 91586 | VermilionDistrict 5 | Pavement removal, construction of PCC pavement, sidewalks, curb and gutter, on CH 36 from South Forest Avenue to US 150. | — | Executed | Feutz Contractors, Inc. $467,341 · | ||
| Jan 15, 2021 | 91596 | ChampaignDistrict 5 | Resurfcing Maplewood Drive from the north city limits of Rantoul to Veteran's Parkway in Rantoul. | — | Executed | Cross Construction, Inc. $1,151,287 · | ||
| Jan 15, 2021 | 93752 | AdamsDistrict 6 | Guardrail replacement on various routes in Adams County. | — | Executed | Clevenger Contractors, Inc. $873,855 · | ||
| Jan 15, 2021 | 93753 | MasonDistrict 6 | Replace the bridge carrying CH 20 over Quiver Creek and roadway reconstruction, located 4.0 miles northeast of Havana. | — | Executed | Stark Excavating, Inc. $4,954,821 · | ||
| Jan 15, 2021 | 93755 | MacoupinDistrict 6 | Construction of a reinforced concrete culvert and the replacement of the superstructure carrying CH 26 over Big Branch Creek, 0.3 miles west of Sawyerville. | — | Executed | RCS Construction, Inc. $1,006,000 · | ||
| Jan 15, 2021 | 95880 | MaconDistrict 7 | Resurfcing CH 24 (Reas Bridge Road from North Brush College Road to north of TR 250. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,027,537 · | ||
| Jan 15, 2021 | 95881 | MaconDistrict 7 | Replace the bridge carrying Strawn Road over Willow Branch, 3.25 miles northeast of Niantic. | — | Executed | County Contractors, Inc. $298,995 · | ||
| Jan 15, 2021 | 95884 | ColesDistrict 7 | Replace the bridge carrying CH 27 over Kickapoo Creek, 0.5 mile southeast of Mattoon. | — | Executed | Howell Paving, Inc. $670,296 · | ||
| Jan 15, 2021 | 95885 | ColesDistrict 7 | Resurfacing various routes within Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $231,531 · | ||
| Jan 15, 2021 | 95886 | LawrenceDistrict 7 | Replace the bridge carrying CH 8 over Raccoon Creek located 8.5 miles south of Bridgeport. | — | Executed | Samron Midwest Contracting, Inc. $538,450 · | ||
| Jan 15, 2021 | 95887 | LawrenceDistrict 7 | Replace the bridge carrying TR 266 over Taylor Ditch, located 2.5 miles southwest of Russellville. | — | Executed | Samron Midwest Contracting, Inc. $366,270 · | ||
| Jan 15, 2021 | 97746 | ClintonDistrict 8 | Replace the bridge carrying CH 3 over Gibbs Creek, 5.0 miles northwest of Shattuc. | — | Executed | Depew and Owen Builders, Inc. $536,588 · | ||
| Jan 15, 2021 | 99656 | SalineDistrict 9 | Resurfacing Liberty Road from Barnett Street to US 45. | — | Executed | E. T. Simonds Construction Company $411,217 · | ||
| Mar 5, 2021 | 46927 | McLeanDistrict 5 | The work includes HMA resurfacing of roadway and parking areas, striping of of parking areas, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, concrete barrier wall construction, and other misc. improvement items at Moraine View State Recreation Area (IDNR) in LeRoy, McLean County. | — | Executed | H. J. Eppel & Co. $2,654,792 · | ||
| Mar 5, 2021 | 61E91 | CookDistrict 1 | Widening US 14 to add southbound, right-turn lane for proposed Metra access road. Project begins at Klingenberg Lane to Metra Station Access Road in Barrington. | — | Executed | Campanella and Sons, Inc. $1,484,365 · | ||
| Mar 5, 2021 | 61G22 | CookDistrict 1 | Replace the bridge carrying Brookfield Avenue over Salt Creek in Brookfield. | — | Executed | Lorig Construction Company $3,471,604 · | ||
| Mar 5, 2021 | 61G40 | LakeDistrict 1 | Reconstruction on North Krueger Road from Gilmer Road to IL 22 in Long Grove. | — | Executed | Peter Baker & Son Co. $1,045,471 · | ||
| Mar 5, 2021 | 61G57 | CookDistrict 1 | Construction of a multi-use path on the west side of US 12, from Central Road to Elk Boulevard in Des Plaines. | — | Executed | A Lamp Concrete Contractors, Inc. $2,386,230 · | ||
| Mar 5, 2021 | 61G60 | McHenryDistrict 1 | Construction of bicycle facilities, pavement reconstruction, traffic signal improvements, roadway lighting, streetscape items, construction of a roundabout, and pavement markings. Improvement begins on Harrison Street at the McHenry County Conservation District Prairie Trail and extends north to Park Street, westerly to Riverview Drive, south to Main Street, then north to the existing multi-use path at IL 31 in Algonquin. | — | Executed | Martam Construction Incorporated $6,342,937 · | ||
| Mar 5, 2021 | 61G81 | CookDistrict 1 | Pavement reconstruction, storm sewer, sidewalks and pavment markings on 123rd Street from 76th Avenue to Harlem Avenue in Palos Heights. | — | Executed | Lindahl Brothers, Inc. $1,470,766 · | ||
| Mar 5, 2021 | 61G90 | KaneDistrict 1 | Pavement widening, markings and signing to acommodate on-street bicycle lanes on various routes within Aurora. | — | Executed | D. Construction, Inc. $284,012 · | ||
| Mar 5, 2021 | 61G92 | CookDistrict 1 | Full Depth reconstruction on Acacia Drive, beginning at the south intersection with Wolf Road and ending at the north intersection with Wolf Road, in the Village of Indian Head Park | — | Executed | Lindahl Brothers, Inc. $1,464,512 · | ||
| Mar 5, 2021 | 61G93 | McHenryDistrict 1 | Construction of a bike path from east of Illinois Route 31 into the park, in the Village of Cary. | — | Executed | Campanella and Sons, Inc. $800,037 · | ||
| Mar 5, 2021 | 62C52 | CookDistrict 1 | (3.57-Mile) Resurfacing project consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA improvements and pavement marking on Dixie HWy. | — | Executed | Iroquois Paving Corporation $3,189,418 · | ||
| Mar 5, 2021 | 62D14 | CookDistrict 1 | (4.8-Mile) of SMART overlay, milled rumble strips and ADA improvements on Palatine Road from IL 62 (Algonquin Road) to east of Roselle Road in the Villages of Barrington Hills, Hoffman Estates, Inverness, Palatine and South Barrington. | — | Executed | Builders Paving, LLC $1,698,000 · | ||
| Mar 5, 2021 | 62H51 | CookDistrict 1 | Bridge rehab, ADA improvements and shared-use path on Cermak Road in the Villages of Broadview and Westchester (SN 016-0631, 016-0632, 016-0633). | — | Executed | Herlihy Mid-Continent Company $9,477,993 · | ||
| Mar 5, 2021 | 62J27 | CookDistrict 1 | (2,589.74-Ft) Culvert removal and replacement, drainage improvements, roadway removal and replacement, earth excavation. landscaping, and erosion control at Farmers Creek over and at unnamed ditch. Located in the City of Des Plaines and Village of Niles in Cook County. | — | Executed | Lorig Construction Company $1,925,500 · | ||
| Mar 5, 2021 | 62K88 | CookDistrict 1 | This is an ADA Improvement project located along various State maintained routes within the Village of Oak Park and City of Park Ridge in Cook County. | — | Executed | Capitol Cement Co., Inc. $1,234,644 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.