(58,74-66)R
- Let date
- Friday, January 15, 2021
- Contract
- 74757 · job page
- District
- District 7
- County
- Macon
- Highway
- Limits
- 3.95 miles of rubblization and overlay including earthwork, sign panels, patching, pavement replacement at overhead structures, rest area ramp overlay, pavement marking, riprap, guardrail, pavement removal, concrete pavement, underdrains, culverts and drainage
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $27,728,894 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… |
|---|---|---|---|---|---|---|
| 1 | A2005116 | T-JUGLANS NIGRA 2 | 12 | EACH | $735.00 | |
| 2 | A2007116 | T-QUERCUS RUBRA 2 | 13 | EACH | $682.50 | |
| 3 | B2000564 | T-AMELAN CAN SF 5' | 13 | EACH | $624.75 | |
| 4 | X0322278 | RODENT SHIELDS | 172 | EACH | $22.05 | |
| 5 | X0322352 | SEEDING MOBILIZATION | 5 | EACH | $1,050.00 | |
| 6 | X0322936 | REMOV EX FLAR END SEC | 2 | EACH | $997.06 | |
| 7 | X0325279 | CLASS SI CONC (MISC) | 246 | CU YD | $702.73 | |
| 8 | X0326650 | FILL EX RUMBLE STRIP | 21,094 | FOOT | $6.45 | |
| 9 | X0327371 | PLUG EXISTING PIPE | 0.5 | CU YD | $7,064.86 | |
| 10 | X0327488 | TEMP BAR GATE SYS | 4 | EACH | $33,600.00 | |
| 11 | X0327980 | PAVMT MRKG REM WTR BL | 33,915 | SQ FT | $1.68 | |
| 12 | X1200107 | PIPE UNDERDRAIN 6 MOD | 78,954 | FOOT | $5.71 | |
| 13 | X2110100 | TOPSOIL F & P SPL | 2,585 | CU YD | $23.80 | |
| 14 | X4401198 | HMA SURF REM VAR DP | 5,139 | SQ YD | $4.11 | |
| 15 | X5012650 | CONC HDWL REM SPL | 164 | EACH | $122.37 | |
| 16 | X6330103 | R&R TRB TM T1 SPL TAN | 1 | EACH | $3,045.00 | |
| 17 | X6350120 | DELINEATOR REMOVAL | 175 | EACH | $8.40 | |
| 18 | X7010805 | TR C-PROT 701401 SPL | 1 | L SUM | $27,221.25 | |
| 19 | X7040125 | PIN TEMP CONC BARRIER | 780 | EACH | $31.50 | |
| 20 | X7050167 | TEMP TRBT T1 SPL TAN | 1 | EACH | $3,045.00 | |
| 21 | X7050169 | TEMP TRBT T1 SPL FLAR | 4 | EACH | $2,835.00 | |
| 22 | X7270008 | BKWY SIGN SUPPORT COU | 30 | EACH | $309.75 | |
| 23 | X7810400 | TEMP RAIS PAV MK | 601 | EACH | $46.99 | |
| 24 | X7830074 | GRV RCSD PVT MRKG 7 | 100,576 | FOOT | $0.6800 | |
| 25 | X7830076 | GRV RCSD PVT MRKG 9 | 3,004 | FOOT | $1.05 | |
| 26 | X7830084 | GRV RCSD PVT MRKG 19 | 72 | FOOT | $8.26 | |
| 27 | Z0005010 | HMA F PATCH (C M) | 20 | TON | $262.37 | |
| 28 | Z0005600 | BREAKING PAVED DITCH | 985 | FOOT | $10.65 | |
| 29 | Z0008758 | AERIAL SPEED CHK MK | 72 | FOOT | $20.59 | |
| 30 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $15,875.18 | |
| 31 | Z0033700 | LONG JOINT SEALANT | 40,954 | FOOT | $2.60 | |
| 32 | Z0034105 | MATL TRANSFER DEVICE | 73,072 | TON | $2.88 | |
| 33 | Z0049799 | PROT RESET SURVEY MRK | 4 | EACH | $914.28 | |
| 34 | Z0055605 | RUBBLIZING PCC PAVT | 91,536 | SQ YD | $2.24 | |
| 35 | 20100500 | TREE REMOV ACRES | 0.25 | ACRE | $116,681.16 | |
| 36 | 20200100 | EARTH EXCAVATION | 4,155 | CU YD | $27.31 | |
| 37 | 20400800 | FURNISHED EXCAVATION | 52,135 | CU YD | $30.24 | |
| 38 | 21101505 | TOPSOIL EXC & PLAC | 25,080 | CU YD | $20.99 | |
| 39 | 25000200 | SEEDING CL 2 | 49 | ACRE | $934.50 | |
| 40 | 25000400 | NITROGEN FERT NUTR | 4,410 | POUND | $1.05 | |
| 41 | 25000500 | PHOSPHORUS FERT NUTR | 4,410 | POUND | $1.05 | |
| 42 | 25000600 | POTASSIUM FERT NUTR | 4,410 | POUND | $1.05 | |
| 43 | 25000700 | AGR GROUND LIMESTONE | 98 | TON | $47.25 | |
| 44 | 25100115 | MULCH METHOD 2 | 49 | ACRE | $934.50 | |
| 45 | 25100630 | EROSION CONTR BLANKET | 320 | SQ YD | $2.10 | |
| 46 | 28000250 | TEMP EROS CONTR SEED | 9,800 | POUND | $5.93 | |
| 47 | 28000305 | TEMP DITCH CHECKS | 40 | FOOT | $30.59 | |
| 48 | 28000500 | INLET & PIPE PROTECT | 19 | EACH | $576.30 | |
| 49 | 28100707 | STONE DUMP RIP CL A4 | 5,510 | SQ YD | $59.43 | |
| 50 | 28200200 | FILTER FABRIC | 4,196 | SQ YD | $4.52 | |
| 51 | 30200650 | PROCESS MOD SOIL 12 | 26,183 | SQ YD | $5.41 | |
| 52 | 30201500 | LIME | 659.8 | TON | $134.08 | |
| 53 | 31101900 | SUB GRAN MAT C | 2,066 | TON | $64.51 | |
| 54 | 35101400 | AGG BASE CSE B | 23,359 | TON | $43.83 | |
| 55 | 35501304 | HMA BASE CSE 5 | 13,112 | SQ YD | $28.00 | |
| 56 | 35501332 | HMA BASE CSE 12 | 16,680 | SQ YD | $70.47 | |
| 57 | 40600290 | BIT MATLS TACK CT | 298,102 | POUND | $1.20 | |
| 58 | 40600985 | PCC SURF REM BUTT JT | 108 | SQ YD | $26.21 | |
| 59 | 40603085 | HMA BC IL-19.0 N70 | 19,202 | TON | $91.60 | |
| 60 | 40603090 | HMA BC IL-19.0 N90 | 50,776 | TON | $99.13 | |
| 61 | 40603240 | P HMA BC IL19.0 N90 | 18,494 | TON | $110.75 | |
| 62 | 40604052 | HMA SC IL-9.5 C N70 | 6,019 | TON | $102.77 | |
| 63 | 40604164 | P HMA SC IL-9.5 D N90 | 3,084 | TON | $115.72 | |
| 64 | 40605034 | P SC SMA 12.5 E N80 | 14,318 | TON | $122.17 | |
| 65 | 42000060 | WELDED WIRE REINF | 5,500 | SQ YD | $6.97 | |
| 66 | 42000070 | PVT CON HMA BR APP SL | 145 | SQ YD | $191.51 | |
| 67 | 42000510 | PCC PVT 10 1/2 | 5,500 | SQ YD | $112.13 | |
| 68 | 44000100 | PAVEMENT REM | 14,653 | SQ YD | $22.85 | |
| 69 | 44000157 | HMA SURF REM 2 | 678 | SQ YD | $30.36 | |
| 70 | 44000167 | HMA SURF REM 4 1/2 | 91,536 | SQ YD | $4.11 | |
| 71 | 44000169 | HMA SURF REM 5 | 13,112 | SQ YD | $5.87 | |
| 72 | 44000300 | CURB REM | 440 | FOOT | $10.99 | |
| 73 | 44000500 | COMB CURB GUTTER REM | 1,527 | FOOT | $12.67 | |
| 74 | 44004000 | PAVED DITCH REMOVAL | 22 | FOOT | $63.45 | |
| 75 | 44004250 | PAVED SHLD REMOVAL | 27,861 | SQ YD | $17.85 | |
| 76 | 44200573 | CL A PATCH T1 12 | 110 | SQ YD | $325.50 | |
| 77 | 44200577 | CL A PATCH T2 12 | 310 | SQ YD | $268.80 | |
| 78 | 44200581 | CL A PATCH T3 12 | 170 | SQ YD | $268.80 | |
| 79 | 44200583 | CL A PATCH T4 12 | 170 | SQ YD | $268.80 | |
| 80 | 44201373 | CL C PATCH T1 12 | 570 | SQ YD | $246.75 | |
| 81 | 44201377 | CL C PATCH T2 12 | 1,350 | SQ YD | $224.70 | |
| 82 | 44201381 | CL C PATCH T3 12 | 750 | SQ YD | $223.65 | |
| 83 | 44201383 | CL C PATCH T4 12 | 2,420 | SQ YD | $222.60 | |
| 84 | 44213000 | PATCH REINFORCEMENT | 760 | SQ YD | $68.25 | |
| 85 | 44213200 | SAW CUTS | 2,950 | FOOT | $6.30 | |
| 86 | 44213204 | TIE BARS 3/4 | 310 | EACH | $15.75 | |
| 87 | 48101200 | AGGREGATE SHLDS B | 46 | TON | $141.58 | |
| 88 | 48203029 | HMA SHOULDERS 8 | 1,721 | SQ YD | $94.17 | |
| 89 | 50105220 | PIPE CULVERT REMOV | 376 | FOOT | $27.17 | |
| 90 | 50300225 | CONC STRUCT | 2.1 | CU YD | $3,798.60 | |
| 91 | 50300255 | CONC SUP-STR | 1.5 | CU YD | $7,287.18 | |
| 92 | 50800105 | REINFORCEMENT BARS | 6,960 | POUND | $0.9700 | |
| 93 | 50800205 | REINF BARS, EPOXY CTD | 680 | POUND | $4.94 | |
| 94 | 542A0220 | P CUL CL A 1 15 | 89 | FOOT | $71.95 | |
| 95 | 542A0229 | P CUL CL A 1 24 | 39 | FOOT | $350.66 | |
| 96 | 542A5479 | P CUL CL A 1 EQRS 24 | 1,157 | FOOT | $117.02 | |
| 97 | 54213669 | PRC FLAR END SEC 24 | 3 | EACH | $2,004.43 | |
| 98 | 54214299 | END SEC EQV R-S 24 | 3 | EACH | $1,877.60 | |
| 99 | 54244405 | FL INLT BX MED 542546 | 1 | EACH | $7,407.68 | |
| 100 | 54248510 | CONCRETE COLLAR | 2.3 | CU YD | $8,085.74 | |
| 101 | 54262712 | METAL FL END SEC 12" | 4 | EACH | $691.22 | |
| 102 | 60100070 | SHOULDER REM & REPL | 69,837 | FOOT | $5.84 | |
| 103 | 60100945 | PIPE DRAINS 12 | 368 | FOOT | $55.01 | |
| 104 | 60108100 | PIPE UNDERDRAIN 4 SP | 329 | FOOT | $5.25 | |
| 105 | 60108200 | PIPE UNDERDRAIN 6 SP | 4,263 | FOOT | $7.10 | |
| 106 | 60221000 | MAN TA 5 DIA T1F OL | 3 | EACH | $2,999.95 | |
| 107 | 60221100 | MAN TA 5 DIA T1F CL | 1 | EACH | $2,999.98 | |
| 108 | 60223700 | MAN TA 6 DIA T1F OL | 2 | EACH | $3,877.46 | |
| 109 | 60224445 | MAN TA 7 DIA T1F OL | 1 | EACH | $7,040.07 | |
| 110 | 60236200 | INLETS TA T8G | 4 | EACH | $1,209.12 | |
| 111 | 60500060 | REMOV INLETS | 13 | EACH | $1,256.32 | |
| 112 | 60600605 | CONC CURB TB | 1,221 | FOOT | $48.26 | |
| 113 | 60615400 | PAVED DITCH TA-15 | 10 | FOOT | $152.06 | |
| 114 | 61000050 | CONC THRUST BLOCKS | 4 | EACH | $843.10 | |
| 115 | 61000225 | TY F INLET BOX 610001 | 4 | EACH | $1,934.68 | |
| 116 | 61000335 | TY G INLET BOX 610001 | 4 | EACH | $3,978.80 | |
| 117 | 63000001 | SPBGR TY A 6FT POSTS | 1,225 | FOOT | $32.55 | |
| 118 | 63000003 | SPBGR TY A 9FT POSTS | 2,287.5 | FOOT | $35.70 | |
| 119 | 63100045 | TRAF BAR TERM T2 | 1 | EACH | $1,470.00 | |
| 120 | 63100085 | TRAF BAR TERM T6 | 9 | EACH | $4,042.50 | |
| 121 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $3,360.00 | |
| 122 | 63100169 | TR BAR TRM T1 SPL FLR | 4 | EACH | $3,150.00 | |
| 123 | 63200310 | GUARDRAIL REMOV | 4,240 | FOOT | $5.78 | |
| 124 | 63301210 | REM RE-E SPBGR TY A | 37.5 | FOOT | $29.40 | |
| 125 | 63302000 | REM RE-E T B TERM T2 | 1 | EACH | $1,155.00 | |
| 126 | 63400105 | GUARD POSTS | 90 | EACH | $152.25 | |
| 127 | 63500105 | DELINEATORS | 186 | EACH | $50.40 | |
| 128 | 63800920 | MOD GLAR SCR SYS TEMP | 42,000 | FOOT | $9.45 | |
| 129 | 64200108 | SHOULDER RUM STRIP 8 | 41,158 | FOOT | $0.5400 | |
| 130 | 64200116 | SHOULDER RUM STRIP 16 | 80,762 | FOOT | $0.3300 | |
| 131 | 67000400 | ENGR FIELD OFFICE A | 19 | CAL MO | $2,303.05 | |
| 132 | 67000600 | ENGR FIELD LAB | 19 | CAL MO | $1,853.89 | |
| 133 | 67100100 | MOBILIZATION | 1 | L SUM | $812,037.34 | |
| 134 | 70100410 | TRAF CONT-PROT 701416 | 2 | EACH | $206,903.71 | |
| 135 | 70100420 | TRAF CONT-PROT 701411 | 1 | EACH | $6,562.50 | |
| 136 | 70100700 | TRAF CONT-PROT 701406 | 1 | L SUM | $25,081.09 | |
| 137 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $259,770.00 | |
| 138 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $13,020.00 | |
| 139 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $16,616.25 | |
| 140 | 70103815 | TR CONT SURVEILLANCE | 15 | CAL DA | $964.08 | |
| 141 | 70107005 | PAVT MK BLKOUT TAPE 5 | 2,250 | FOOT | $1.71 | |
| 142 | 70107007 | PAVT MK BLKOUT TAPE 7 | 1,000 | FOOT | $3.07 | |
| 143 | 70107025 | CHANGEABLE MESSAGE SN | 2,392 | CAL DA | $30.98 | |
| 144 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $62,709.76 | |
| 145 | 70300150 | SHRT TRM PAVT MK REM | 1,526 | SQ FT | $2.04 | |
| 146 | 70300220 | TEMP PVT MK LINE 4 | 139,231 | FOOT | $0.1900 | |
| 147 | 70400100 | TEMP CONC BARRIER | 46,400 | FOOT | $19.43 | |
| 148 | 70500100 | TEMP SPBGR TY A | 37.5 | FOOT | $29.40 | |
| 149 | 70500625 | TEMP TR BAR TERM T2 | 1 | EACH | $1,155.00 | |
| 150 | 70500665 | TEMP TR BAR TERM T6 | 4 | EACH | $3,150.00 | |
| 151 | 70600260 | IMP ATTN TEMP FRN TL3 | 4 | EACH | $11,025.00 | |
| 152 | 72000300 | SIGN PANEL T3 | 537 | SQ FT | $40.64 | |
| 153 | 72400330 | REMOV SIGN PANEL T3 | 537 | SQ FT | $8.40 | |
| 154 | 72500100 | OBJECT MARKER T1 | 120 | EACH | $315.00 | |
| 155 | 72501000 | TERMINAL MARKER - DA | 14 | EACH | $31.50 | |
| 156 | 72700100 | STR STL SIN SUP BA | 8,322 | POUND | $5.72 | |
| 157 | 72800100 | TELES STL SIN SUPPORT | 150 | FOOT | $15.23 | |
| 158 | 73400100 | CONC FOUNDATION | 15.9 | CU YD | $1,071.00 | |
| 159 | 73700100 | REM GR MT SIN SUPPORT | 10 | EACH | $110.25 | |
| 160 | 73700200 | REM CONC FDN-GR MT | 10 | EACH | $703.50 | |
| 161 | 78000400 | THPL PVT MK LINE 6 | 86,648 | FOOT | $0.8400 | |
| 162 | 78003130 | PREF PL PM TB LINE 6 | 13,928 | FOOT | $5.25 | |
| 163 | 78003140 | PREF PL PM TB LINE 8 | 3,004 | FOOT | $7.71 | |
| 164 | 78100100 | RAISED REFL PAVT MKR | 1,302 | EACH | $26.26 | |
| 165 | 78200005 | GRDRAIL REF TYPE A | 53 | EACH | $8.40 | |
| 166 | 78300200 | RAISED REF PVT MK REM | 1,302 | EACH | $14.25 |