IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Sep 20, 2019 76M39 CalhounDistrict 8 REPAIR AND MAINTENANCE OF THE ELECTRICAL EQUIPMENT AT THE JOE PAGE BRIDGE IN HARDIN. — Executed Nov 26 New Wissehr Electric, Inc. $58,366 ·
Sep 20, 2019 78631 FranklinDistrict 9 ADDITION OF A NEW LANE IN EACH DIRECTION, INSTALL A MEDIAN BARRIER AND UPGRADE GUARDRAIL ON A 3.2 MILE STRETCH OF I-57 FROM SOUTH OF THE COUNTRY CLUB ROAD OVERPASS TO MILE POST 66. — Executed Nov 26 New E. T. Simonds Construction Company $20,637,943 ·
Sep 20, 2019 78736 JohnsonDistrict 9 4.3 MILES OF PATCHING ON NORTHBOUND I-57 FROM THE UNION COUNTY LINE TO THE WILLIAMSON COUNTY LINE. — Executed Nov 26 New Kinney Contractors, Inc. $95,995 ·
Sep 20, 2019 78737 MassacDistrict 9 13.2 MILES OF CENTERLINE RESURFACING ON EASTBOUND I-24 AT VARIOUS LOCATIONS FROM THE JOHNSON COUNTY LINE TO US 45. — Executed Nov 26 New E. T. Simonds Construction Company $282,286 ·
Sep 20, 2019 78739 UnionDistrict 9 PAVED SHOULDER REMOVAL, PCC SHOULDERS, TIMBER CURB REMOVAL, CURB AND GUTTER, REMOVE AND REPLACE STONE RIP RAP TO REPAIR SLOPES ON US 51 AT SN 091-2002, 0.7 MILES NORTH OF ANNA. — Executed Nov 26 New Sierra Bravo Contractors, LLC $164,656 ·
Sep 20, 2019 85687 WinnebagoDistrict 2 Remove guardrail and components, place HMA shoulders and install guardrail and traffic barrier terminals at various locations in Winnebago County. — Rejected Nov 26 New William Charles Construction Company, LLC $1,012,075 ·
Sep 20, 2019 87695 GrundyDistrict 3 Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. — Rejected Nov 26 New D. Construction, Inc. $11,963,320 ·
Sep 20, 2019 87711 LaSalleDistrict 3 construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. — Executed Nov 26 New Advanced Asphalt Company $1,487,056 ·
Sep 20, 2019 87713 LaSalleDistrict 3 Pavement widening and resurfacing on CH 15 from I-80 to IL 71. — Executed Nov 26 New D. Construction, Inc. $2,346,622 ·
Sep 20, 2019 89749 TazewellDistrict 4 Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $6,378,025 ·
Sep 20, 2019 95860 WayneDistrict 7 Replace the bridge carrying TR 562 over King Creek, located 1.7 miles west of Golden Gate. — Executed Nov 26 New Samron Midwest Contracting, Inc. $229,550 ·
Sep 20, 2019 97692 St. ClairDistrict 8 Reconstruction of Shiloh Station Road from South of Timberline Court to north of Johnson Road in the Village of Shiloh. — Executed Nov 26 New The Kilian Corporation $844,928 ·
Sep 20, 2019 97707 MarionDistrict 8 Resurfacing, sidewalk replacement, curb and gutter on Hickory Street from 16th Street to Nolemen Street and on 16th Street from Hickory Street to Wabash Avenue in the city of Centrailia. — Rejected Nov 26 New Howell Paving, Inc. $686,751 ·
Sep 20, 2019 99630 JacksonDistrict 9 Reconstruction of Oakland Avenue from West Walnut Street to Chautauqua Street in the City of Carbondale. — Executed Nov 26 New E. T. Simonds Construction Company $1,772,157 ·
Sep 20, 2019 99631 WilliamsonDistrict 9 Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. — Executed Nov 26 New E. T. Simonds Construction Company $477,971 ·
Nov 8, 2019 46536 VariousDistrict 5 Replacing reflectors and raised pavement marker castings within the limits shown. — Executed Nov 26 New P & P Construction Co. $771,747 ·
Nov 8, 2019 46902 GrundyDistrict 3 Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. — Executed Nov 26 New D. Construction, Inc. $896,861 ·
Nov 8, 2019 46906 StephensonDistrict 2 Resurfacing and reconstruction of park roads and parking lots, drainage improvements, ADA sidewalk/ramp upgrades, and all other necessary work. — Executed Nov 26 New Civil Constructors, Inc. $3,919,151 ·
Nov 8, 2019 46909 VermilionDistrict 5 HMA resurfacing; campground, roadway, and parking improvements; parking lot improvements; and other miscellaneous improvements in the park. — Executed Nov 26 New Cross Construction, Inc. $4,168,427 ·
Nov 8, 2019 60R67 CookDistrict 1 Bridge deck overlay, bridge deck joint repairs and traffic signal modification on Grand Avenue over Des Plaines River Road in the Village of River Grove. (SN 016-0855). — Executed Nov 26 New Lorig Construction Company $1,091,070 ·
Nov 8, 2019 61E52 KaneDistrict 1 Reconstruct the intersection of Bliss Road at Illinois Route 47 in the Village of Sugar Grove. — Executed Nov 26 New D. Construction, Inc. $1,549,240 ·
Nov 8, 2019 61F17 CookDistrict 1 Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island. — Executed Nov 26 New D. Construction, Inc. $855,645 ·
Nov 8, 2019 61F63 LakeDistrict 1 Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
Nov 8, 2019 61F97 CookDistrict 1 Sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Str Work consists of sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Street to 102nd Place with an omission from 109th Street to 107th Street, located in the Village of Chicago Ridge. — Executed Nov 26 New Landmark Contractors, Inc. $1,151,034 ·
Nov 8, 2019 61F99 McHenryDistrict 1 Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. — Rejected Nov 26 New Curran Contracting Company $1,294,604 ·
Nov 8, 2019 61G03 CookDistrict 1 Replace the superstructure and repairs to the substructure. Project is located north of Park View Drive in the City of North Lake. — Executed Nov 26 New Alliance Contractors, Inc. $469,103 ·
Nov 8, 2019 61G04 CookDistrict 1 Resurfacing Nerge Road from Mitchell Trail to Devon Avenue and IL 53 from south of Huntington Drive to north of Devon Avenue in the Village of Elk Grove Village. — Executed Nov 26 New K-Five Construction Corporation $1,255,255 ·
Nov 8, 2019 61G07 CookDistrict 1 Sidewalk construction, covered bicycle shelter, bike racks and bike repair stations on Burlington Avenue west of Dubois Avenue (Congress Park Metra Station) and on Forest Avenue north of Burlington Avenue (Brookfield Metra Station) on the Village of Brookfield. — Executed Nov 26 New Landmark Contractors, Inc. $130,549 ·
Nov 8, 2019 62F95 CookDistrict 1 Superstructure replacement, substructure rehabilitation, roadway lighting, underdeck lighting and drainage improvements on I-94 at Montrose Avenue. (SN 016-0852) — Executed Nov 26 New Kenny Construction Company_DO NOT USE $16,233,644 ·
Nov 8, 2019 62G94 CookDistrict 1 Bridge overlay and joint repair on the structure carrying IL 72 westbound over the EJandJ Railroad in the Village of Hoffman Estates. (SN 016-0502) — Executed Nov 26 New Martam Construction Incorporated $387,419 ·
Nov 8, 2019 62H21 CookDistrict 1 6.9 miles of overlay, patching with precast concrete slabs and pedestrian ramp improvements on IL 72 (Higgins Road) from Commonwealth Drive to Glen Lake Road in the Villages of Hoffman Estates, Schaumburg and South Barrington. — Executed Nov 26 New Plote Construction, Inc. $7,881,258 ·
Nov 8, 2019 62J31 CookDistrict 1 Construction of a concrete retaining wall on the west side of I-290 between Van Buren and Jackson; mainline pavement near southbound I-90/94 to westbound I-290 ramp; demolition of existing Jackson Boulevard Bridge at I-90/94. (SN 016-0588). — Executed Nov 26 New Lorig Construction Company $9,989,152 ·
Nov 8, 2019 62J37 McHenryDistrict 1 Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) — Executed Nov 26 New Alliance Contractors, Inc. $148,753 ·
Nov 8, 2019 62J56 VariousDistrict 1 Temporary traffic control setup on various state-maintained expressway and arterial routes throughout District 1 on a work order basis. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $2,556,000 ·
Nov 8, 2019 62J58 VariousDistrict 1 Sweeping various expressway and arterial highways throughout District 1. — Rejected Nov 26 New
Nov 8, 2019 62J76 CookDistrict 1 3.2 miles of tree removal, selective clearing, grubbing, tree pruning, chain link and wood fence removal, sign removal and metal structure removal along Wood Street from south of 159th Street to north of 138th Street within the City of Harvey and Villages of Dixmoor and Riverdale. — Executed Nov 26 New D. Construction, Inc. $374,062 ·
Nov 8, 2019 62K13 WillDistrict 1 Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). — Executed Nov 26 New Meade Inc. $482,744 ·
Nov 8, 2019 64N92 Jo DaviessDistrict 2 PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. — Executed Nov 26 New G. M. Sipes Construction, Inc. $357,968 ·
Nov 8, 2019 64N93 OgleDistrict 2 PAVEMENT PATCHING ON IL 38 FROM PHILL RD TO I-39 EAST OF ROCHELLE. — Executed Nov 26 New G. M. Sipes Construction, Inc. $197,462 ·
Nov 8, 2019 64N94 Rock IslandDistrict 2 PAVEMENT PATCHING ON COUNTY HOME RD FROM 113TH AVE TO 175TH AVE/KNOXVILLE RD S OF COAL VALLEY. — Executed Nov 26 New G. M. Sipes Construction, Inc. $587,901 ·
Nov 8, 2019 66E50 DeKalbDistrict 3 3P milling and resurfacing on IL 38 from the Ogle County line to John Huber Parkway. Other work includes guardrail with stabilization, shoulder stone, detector loop installation, pavement marking, and raised reflectors. — Executed Nov 26 New Rock Road Companies, Inc. $2,665,406 ·
Nov 8, 2019 66F60 FordDistrict 3 Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,193 ·
Nov 8, 2019 66F70 IroquoisDistrict 3 Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,710,724 ·
Nov 8, 2019 66F75 LaSalleDistrict 3 Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. — Executed Nov 26 New Civil Constructors, Inc. $2,219,448 ·
Nov 8, 2019 66J72 LaSalleDistrict 3 Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. — Executed Nov 26 New D. Construction, Inc. $568,614 ·
Nov 8, 2019 66J86 VariousDistrict 3 Bridge deck concrete sealing at various bare concrete bridge decks. — Executed Nov 26 New All States Painting, Inc. $159,900 ·
Nov 8, 2019 66K27 FordDistrict 3 Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. — Executed Nov 26 New Iroquois Paving Corporation $841,960 ·
Nov 8, 2019 66K43 VariousDistrict 3 District wide tree removal on state maintained routes as needed. — Rejected Nov 26 New Endrizzi Contracting, Inc $127,900 ·
Nov 8, 2019 68B62 WoodfordDistrict 4 Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 ·
Nov 8, 2019 68C89 TazewellDistrict 4 Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. — Executed Nov 26 New ICC Group Inc. $42,221,000 ·
Nov 8, 2019 68F17 VariousDistrict 4 Inspection, maintenance, and repair of existing lighting and electrical facilities at various locations. — Executed Nov 26 New Bodine Electric of Decatur $459,726 ·
Nov 8, 2019 70545 DouglasDistrict 5 Bridge replacement, bridge removal/demolition on IL 130 over the Embarras River. — Executed Nov 26 New Sangamo Construction Company $5,765,527 ·
Nov 8, 2019 70E06 VermilionDistrict 5 Six spot locations of bridge painting on I-74. — Executed Nov 26 New Venus Painting Co. $1,456,964 ·
Nov 8, 2019 70E09 VermilionDistrict 5 Weigh in Motion Data Collection System on FAI-74 approximately 1.0 mile west of Oakwood. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $405,354 ·
Nov 8, 2019 70E34 VermilionDistrict 5 One mile of patching on I-74 (EB and WB) from G-Street to E of US 150/IL 1 in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $207,280 ·
Nov 8, 2019 70E35 ChampaignDeWittDistrict 5 Tree removal and seeding on I-74 Westbound at Farmer City exit and on US 45 at NCL of Thomasboro. — Executed Nov 26 New J.H. Moore, Inc. d/b/a Castle Electric, Inc. $46,668 ·
Nov 8, 2019 72J45 HancockDistrict 6 Replacing the bridge carrying IL96 over Sheridan Creek, 0.9 miles south of Nauvoo (SN 034-0020). — Executed Nov 26 New County Contractors, Inc. $1,719,799 ·
Nov 8, 2019 72J99 SchuylerDistrict 6 Resurfacing, traffic signal upgrades, ADA sidewalk ramps and HMA shoulders at the intersection of US 24 and US 67 on the west side of Rushville. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,495,995 ·
Nov 8, 2019 72K07 SangamonDistrict 6 Deck replacement on IL 123 over I-55. (SN 084-0171) — Executed Nov 26 New Freesen, a div of UCM, Inc. $3,121,789 ·
Nov 8, 2019 72K44 ScottDistrict 6 Bridge deck patching on main spans, hydroscarification and microsilica overlay on approach spans, minor polymer concrete repairs on joints, reseal silicone joints and install new floor drains on approach spans of the structures carrying IL 100/106 over the Illinois River at Florence. (SN 086-0001) — Executed Nov 26 New Freesen, a div of UCM, Inc. $828,566 ·
Nov 8, 2019 72L33 SangamonDistrict 6 Painting of four bridges on I-55 around Springfield. (SN 084-0099, 084-0088, 084-0100, 084-0020) — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $660,945 ·
Nov 8, 2019 72L39 LoganDistrict 6 Patching and resurfacing on Old IL 121 beginning at IL 136 and continuing south for 6.1 miles. — Executed Nov 26 New P. H. Broughton & Sons, Inc. $480,951 ·
Nov 8, 2019 72L40 PikeDistrict 6 0.56 miles of HMA surface removal and replacement on County Highway 3 from just south of I-72 to just north of I-72. — Executed Nov 26 New K. E. Vas Company $349,729 ·
Nov 8, 2019 74321 ShelbyDistrict 7 Superstructure replacement for the structure carrying IL 16 over Richland Creek, approximately 2.3 miles west of IL 32. (SN 087-0024) — Executed Nov 26 New County Contractors, Inc. $1,068,996 ·
Nov 8, 2019 74859 EffinghamDistrict 7 One new superstructure and one new bridge deck (SN 025-0080 and SN 025-0081) on US 45 approximately 5 miles and 5.3 miles south of IL 37. — Executed Nov 26 New Plocher Construction Company, Inc. $3,212,600 ·
Nov 8, 2019 74873 VariousDistrict 7 Sealing 53 bridge decks on various routes in Lawrence, Wabash, Wayne and Edwards Counties. — Executed Nov 26 New All States Painting, Inc. $53,591 ·
Nov 8, 2019 74912 LawrenceDistrict 7 Concrete over lay of the bridge deck and bridge deck repairs on SN 051-0053 carrying US Business 50 over the Embarras River, east of Lawrenceville. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,037,945 ·
Nov 8, 2019 74926 EffinghamFayetteDistrict 7 Cleaning and painting four bridges in Effingham County and three bridges in Fayette County. (SN 025-0051, 025-0052, 025-0064, 025-0030, 026-0091, 026-0074 026-0076) — Executed Nov 26 New All States Painting, Inc. $1,094,000 ·
Nov 8, 2019 74927 ClarkDistrict 7 Cleaning and painting two bridges: 1) SN 012-0025 carrying US 40 over I-70, 2 miles west of the state line; 2) SN 012-0041 carrying TR-107 over I-70, 0.75 miles west of IL 1. — Executed Nov 26 New Venus Painting Co. $461,250 ·
Nov 8, 2019 76E13 St. ClairDistrict 8 6.79 miles of interstate resurfacing and bridge repairs on I-255 from IL 15 to Collinsville Road. — Executed Nov 26 New The Kilian Corporation & Keeley & Sons, Inc. $67,339,439 ·
Nov 8, 2019 76M28 ClintonDistrict 8 Tree removal along Old US 50 from Koch Lane to Hilmes Road. — Executed Nov 26 New Nettle Creek Nursery, Inc. $64,600 ·
Nov 8, 2019 76N33 VariousDistrict 8 Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. — Executed Nov 26 New Endrizzi Contracting, Inc $88,200 ·
Nov 8, 2019 78431 PerryDistrict 9 9.6 miles of resurfacing on IL 13 from Swanwick Road to just north of IL 154. — Executed Nov 26 New E. T. Simonds Construction Company $3,617,495 ·
Nov 8, 2019 78458 JeffersonDistrict 9 Replacement of the bridge carrying IL 15 over Elk Horn Creek, approximately 4.4 miles east of the Washington County line. (SN 041-0020) — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,228,693 ·
Nov 8, 2019 78636 WilliamsonDistrict 9 Convert existing intersection of Cambria Road and Herrin Road into a roundabout. Includes HMA surface removal, PCC pavement, HMA surfacing and storm sewers. — Executed Nov 26 New E. T. Simonds Construction Company $1,624,828 ·
Nov 8, 2019 78675 HamiltonDistrict 9 Replacement of the box culvert carrying IL 142 over a drainage ditch, approximately 0.2 miles northwest of Delafield. (SN 033-7031) — Executed Nov 26 New E. T. Simonds Construction Company $174,556 ·
Nov 8, 2019 78732 JeffersonWilliamsonDistrict 9 Inserting culvert liners at three locations: 1) SN 100-7039 on IL 148 approximately 2 miles northwest of I-57 near Neber Road in Williamson County; 2) SN 041-7075 on IL 15 approximately 0.2 miles west of Shepherd Lane in Jefferson County; 3) SN 041-7076 on IL 15 approximately 0.3 miles east of Shepherd Lane in Jefferson County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $219,125 ·
Nov 8, 2019 78754 JeffersonDistrict 9 4.4 miles of tree removal on IL 37 from just south of the Casey Fork to Campground Road, north of Bonnie. — Executed Nov 26 New Homer Tree Service, Inc. $157,128 ·
Nov 8, 2019 85688 BooneDistrict 2 Replace the bridge carrying Poplar Grove Road over the Kishwaukee River, located at the northeast city limits of Belvidere. — Executed Nov 26 New Civil Constructors, Inc. $2,571,122 ·
Nov 8, 2019 87548 IroquoisDistrict 3 Replace the deck on a three span, non-continuous composite steel wide flange bridge carrying CH 40 over Sugar Creek, located 2.7 miles east of IL 1. — Rejected Nov 26 New Rausch Infrastructure, LLC $1,885,543 ·
Nov 8, 2019 87706 LaSalleDistrict 3 Construction of a shared-use-path and the construction of a pedestrian bridge over I-80, located west of IL 23 from Stevenson Road to Etna Road in the City of Ottawa. — Executed Nov 26 New D. Construction, Inc. $1,756,388 ·
Nov 8, 2019 89744 PeoriaDistrict 4 Replace bridge carrying Smithville Road over Copperas Creek, located 0.6 miles west of Trivoli Road. — Executed Nov 26 New Stark Excavating, Inc. $1,238,874 ·
Nov 8, 2019 89748 PeoriaDistrict 4 Replace bridge carrying Kickapoo Creek Road over an unnamed tributary to Kickapoo Creek, located 0.10 miles north of Adams Street. — Active Nov 26 New
Nov 8, 2019 89762 WarrenDistrict 4 Full Depth reclamation with emulsified asphalt and cement and surface profiling and 2" HMA from IL 164 to 300th Avenue in Alexis. — Executed Nov 26 New Dunn Company $1,289,284 ·
Nov 8, 2019 93734 MasonDistrict 6 Removal and replacement of guardrail and terminals on various routes within Mason County. — Executed Nov 26 New Lovewell Fencing, Inc. $1,008,249 ·
Nov 8, 2019 95851 FayetteDistrict 7 Replace bridge carrying TR 371 over Hurricane Creek, located 4.5 miles West of Vandalia. — Executed Nov 26 New Depew and Owen Builders, Inc. $638,098 ·
Nov 8, 2019 97693 WashingtonDistrict 8 Replace bridge carrying Jimtown Road over Elkhorn Creek. — Executed Nov 26 New Samron Midwest Contracting, Inc. $363,206 ·
Nov 8, 2019 97709 St. ClairDistrict 8 Installation of traffic signals, widening of radius and sidewalks on Union Hill Road at Longacre Drive in the City of Fairview Heights. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $254,114 ·
Nov 8, 2019 97712 MadisonDistrict 8 Resurfacing Broadway Street from Helvetia Drive to Iberg Road in the City of Highland. — Executed Nov 26 New Stutz Excavating, Inc. $702,548 ·
Nov 8, 2019 97714 MadisonDistrict 8 Replace bridge carrying Fairmont Avenue over Canteen Canal, located north of Fairway Blvd. in the City of Collinsville. — Executed Nov 26 New Keller Construction, Inc. $473,473 ·
Nov 8, 2019 97715 MadisonDistrict 8 Resurface 6th Street from Madison Avenue to Edwardsville Road, located in the City of Wood River. — Executed Nov 26 New Charles E. Mahoney Co. $400,873 ·
Jan 17, 2020 46532 VariousDistrict 7 Replacement of various lengths of guardrail reflectors and delineation panel replacement on various routes in various counties of District 7. — Rejected Nov 26 New Endrizzi Contracting, Inc $179,140 ·
Jan 17, 2020 46533 VariousDistrict 3 "On-Call" pavement marking with various materials including thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal , hot-spray thermoplastic, grooving for pavement marking, and aerial markings. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,187,470 ·
Jan 17, 2020 46534 VariousDistrict 5 Pavement marking repair at various locations in DeWitt, McLean, and Piatt Counties. — Executed Nov 26 New A. C. Pavement Striping Co. $949,959 ·
Jan 17, 2020 46921 LoganDistrict 6 New automatic transfer switch and miscellaneous improvements on IL 121 at the Mount Pulaski Pump Station and Illinois Central Railroad. — Executed Nov 26 New J. Ranck Electric, Inc. $125,850 ·
Jan 17, 2020 60L88 CookDistrict 1 Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago. — Executed Nov 26 New J. A. Johnson Paving Company $2,124,700 ·
Jan 17, 2020 60M68 CookDistrict 1 Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811. — Executed Nov 26 New Martam Construction Incorporated $2,794,215 ·
Jan 17, 2020 60Y74 CookDistrict 1 Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve. — Executed Nov 26 New Capitol Cement Co., Inc. $1,293,582 ·
Jan 17, 2020 61E86 CookDistrict 1 Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines. — Executed Nov 26 New Berger Excavating Contractors, Inc. $2,524,434 ·
Jan 17, 2020 61F32 KaneDistrict 1 Reconstruction of Main Street from Van Nortwick Avenue to Water Street and IL 31 from Elm Street to First Street in the City of Batavia. — Executed Nov 26 New Acqua Contractors Corp $6,900,000 ·
1,701–1,800 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.