| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 20, 2019 | 76M39 | CalhounDistrict 8 | REPAIR AND MAINTENANCE OF THE ELECTRICAL EQUIPMENT AT THE JOE PAGE BRIDGE IN HARDIN. | — | Executed | Wissehr Electric, Inc. $58,366 · | ||
| Sep 20, 2019 | 78631 | FranklinDistrict 9 | ADDITION OF A NEW LANE IN EACH DIRECTION, INSTALL A MEDIAN BARRIER AND UPGRADE GUARDRAIL ON A 3.2 MILE STRETCH OF I-57 FROM SOUTH OF THE COUNTRY CLUB ROAD OVERPASS TO MILE POST 66. | — | Executed | E. T. Simonds Construction Company $20,637,943 · | ||
| Sep 20, 2019 | 78736 | JohnsonDistrict 9 | 4.3 MILES OF PATCHING ON NORTHBOUND I-57 FROM THE UNION COUNTY LINE TO THE WILLIAMSON COUNTY LINE. | — | Executed | Kinney Contractors, Inc. $95,995 · | ||
| Sep 20, 2019 | 78737 | MassacDistrict 9 | 13.2 MILES OF CENTERLINE RESURFACING ON EASTBOUND I-24 AT VARIOUS LOCATIONS FROM THE JOHNSON COUNTY LINE TO US 45. | — | Executed | E. T. Simonds Construction Company $282,286 · | ||
| Sep 20, 2019 | 78739 | UnionDistrict 9 | PAVED SHOULDER REMOVAL, PCC SHOULDERS, TIMBER CURB REMOVAL, CURB AND GUTTER, REMOVE AND REPLACE STONE RIP RAP TO REPAIR SLOPES ON US 51 AT SN 091-2002, 0.7 MILES NORTH OF ANNA. | — | Executed | Sierra Bravo Contractors, LLC $164,656 · | ||
| Sep 20, 2019 | 85687 | WinnebagoDistrict 2 | Remove guardrail and components, place HMA shoulders and install guardrail and traffic barrier terminals at various locations in Winnebago County. | — | Rejected | William Charles Construction Company, LLC $1,012,075 · | ||
| Sep 20, 2019 | 87695 | GrundyDistrict 3 | Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. | — | Rejected | D. Construction, Inc. $11,963,320 · | ||
| Sep 20, 2019 | 87711 | LaSalleDistrict 3 | construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. | — | Executed | Advanced Asphalt Company $1,487,056 · | ||
| Sep 20, 2019 | 87713 | LaSalleDistrict 3 | Pavement widening and resurfacing on CH 15 from I-80 to IL 71. | — | Executed | D. Construction, Inc. $2,346,622 · | ||
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. | — | Executed | Otto Baum Company, Inc. $6,378,025 · | ||
| Sep 20, 2019 | 95860 | WayneDistrict 7 | Replace the bridge carrying TR 562 over King Creek, located 1.7 miles west of Golden Gate. | — | Executed | Samron Midwest Contracting, Inc. $229,550 · | ||
| Sep 20, 2019 | 97692 | St. ClairDistrict 8 | Reconstruction of Shiloh Station Road from South of Timberline Court to north of Johnson Road in the Village of Shiloh. | — | Executed | The Kilian Corporation $844,928 · | ||
| Sep 20, 2019 | 97707 | MarionDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter on Hickory Street from 16th Street to Nolemen Street and on 16th Street from Hickory Street to Wabash Avenue in the city of Centrailia. | — | Rejected | Howell Paving, Inc. $686,751 · | ||
| Sep 20, 2019 | 99630 | JacksonDistrict 9 | Reconstruction of Oakland Avenue from West Walnut Street to Chautauqua Street in the City of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,772,157 · | ||
| Sep 20, 2019 | 99631 | WilliamsonDistrict 9 | Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. | — | Executed | E. T. Simonds Construction Company $477,971 · | ||
| Nov 8, 2019 | 46536 | VariousDistrict 5 | Replacing reflectors and raised pavement marker castings within the limits shown. | — | Executed | P & P Construction Co. $771,747 · | ||
| Nov 8, 2019 | 46902 | GrundyDistrict 3 | Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. | — | Executed | D. Construction, Inc. $896,861 · | ||
| Nov 8, 2019 | 46906 | StephensonDistrict 2 | Resurfacing and reconstruction of park roads and parking lots, drainage improvements, ADA sidewalk/ramp upgrades, and all other necessary work. | — | Executed | Civil Constructors, Inc. $3,919,151 · | ||
| Nov 8, 2019 | 46909 | VermilionDistrict 5 | HMA resurfacing; campground, roadway, and parking improvements; parking lot improvements; and other miscellaneous improvements in the park. | — | Executed | Cross Construction, Inc. $4,168,427 · | ||
| Nov 8, 2019 | 60R67 | CookDistrict 1 | Bridge deck overlay, bridge deck joint repairs and traffic signal modification on Grand Avenue over Des Plaines River Road in the Village of River Grove. (SN 016-0855). | — | Executed | Lorig Construction Company $1,091,070 · | ||
| Nov 8, 2019 | 61E52 | KaneDistrict 1 | Reconstruct the intersection of Bliss Road at Illinois Route 47 in the Village of Sugar Grove. | — | Executed | D. Construction, Inc. $1,549,240 · | ||
| Nov 8, 2019 | 61F17 | CookDistrict 1 | Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island. | — | Executed | D. Construction, Inc. $855,645 · | ||
| Nov 8, 2019 | 61F63 | LakeDistrict 1 | Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Nov 8, 2019 | 61F97 | CookDistrict 1 | Sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Str Work consists of sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Street to 102nd Place with an omission from 109th Street to 107th Street, located in the Village of Chicago Ridge. | — | Executed | Landmark Contractors, Inc. $1,151,034 · | ||
| Nov 8, 2019 | 61F99 | McHenryDistrict 1 | Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. | — | Rejected | Curran Contracting Company $1,294,604 · | ||
| Nov 8, 2019 | 61G03 | CookDistrict 1 | Replace the superstructure and repairs to the substructure. Project is located north of Park View Drive in the City of North Lake. | — | Executed | Alliance Contractors, Inc. $469,103 · | ||
| Nov 8, 2019 | 61G04 | CookDistrict 1 | Resurfacing Nerge Road from Mitchell Trail to Devon Avenue and IL 53 from south of Huntington Drive to north of Devon Avenue in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,255,255 · | ||
| Nov 8, 2019 | 61G07 | CookDistrict 1 | Sidewalk construction, covered bicycle shelter, bike racks and bike repair stations on Burlington Avenue west of Dubois Avenue (Congress Park Metra Station) and on Forest Avenue north of Burlington Avenue (Brookfield Metra Station) on the Village of Brookfield. | — | Executed | Landmark Contractors, Inc. $130,549 · | ||
| Nov 8, 2019 | 62F95 | CookDistrict 1 | Superstructure replacement, substructure rehabilitation, roadway lighting, underdeck lighting and drainage improvements on I-94 at Montrose Avenue. (SN 016-0852) | — | Executed | Kenny Construction Company_DO NOT USE $16,233,644 · | ||
| Nov 8, 2019 | 62G94 | CookDistrict 1 | Bridge overlay and joint repair on the structure carrying IL 72 westbound over the EJandJ Railroad in the Village of Hoffman Estates. (SN 016-0502) | — | Executed | Martam Construction Incorporated $387,419 · | ||
| Nov 8, 2019 | 62H21 | CookDistrict 1 | 6.9 miles of overlay, patching with precast concrete slabs and pedestrian ramp improvements on IL 72 (Higgins Road) from Commonwealth Drive to Glen Lake Road in the Villages of Hoffman Estates, Schaumburg and South Barrington. | — | Executed | Plote Construction, Inc. $7,881,258 · | ||
| Nov 8, 2019 | 62J31 | CookDistrict 1 | Construction of a concrete retaining wall on the west side of I-290 between Van Buren and Jackson; mainline pavement near southbound I-90/94 to westbound I-290 ramp; demolition of existing Jackson Boulevard Bridge at I-90/94. (SN 016-0588). | — | Executed | Lorig Construction Company $9,989,152 · | ||
| Nov 8, 2019 | 62J37 | McHenryDistrict 1 | Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) | — | Executed | Alliance Contractors, Inc. $148,753 · | ||
| Nov 8, 2019 | 62J56 | VariousDistrict 1 | Temporary traffic control setup on various state-maintained expressway and arterial routes throughout District 1 on a work order basis. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,556,000 · | ||
| Nov 8, 2019 | 62J58 | VariousDistrict 1 | Sweeping various expressway and arterial highways throughout District 1. | — | Rejected | |||
| Nov 8, 2019 | 62J76 | CookDistrict 1 | 3.2 miles of tree removal, selective clearing, grubbing, tree pruning, chain link and wood fence removal, sign removal and metal structure removal along Wood Street from south of 159th Street to north of 138th Street within the City of Harvey and Villages of Dixmoor and Riverdale. | — | Executed | D. Construction, Inc. $374,062 · | ||
| Nov 8, 2019 | 62K13 | WillDistrict 1 | Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). | — | Executed | Meade Inc. $482,744 · | ||
| Nov 8, 2019 | 64N92 | Jo DaviessDistrict 2 | PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. | — | Executed | G. M. Sipes Construction, Inc. $357,968 · | ||
| Nov 8, 2019 | 64N93 | OgleDistrict 2 | PAVEMENT PATCHING ON IL 38 FROM PHILL RD TO I-39 EAST OF ROCHELLE. | — | Executed | G. M. Sipes Construction, Inc. $197,462 · | ||
| Nov 8, 2019 | 64N94 | Rock IslandDistrict 2 | PAVEMENT PATCHING ON COUNTY HOME RD FROM 113TH AVE TO 175TH AVE/KNOXVILLE RD S OF COAL VALLEY. | — | Executed | G. M. Sipes Construction, Inc. $587,901 · | ||
| Nov 8, 2019 | 66E50 | DeKalbDistrict 3 | 3P milling and resurfacing on IL 38 from the Ogle County line to John Huber Parkway. Other work includes guardrail with stabilization, shoulder stone, detector loop installation, pavement marking, and raised reflectors. | — | Executed | Rock Road Companies, Inc. $2,665,406 · | ||
| Nov 8, 2019 | 66F60 | FordDistrict 3 | Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. | — | Executed | Tobey's Construction & Cartage, Inc. $432,193 · | ||
| Nov 8, 2019 | 66F70 | IroquoisDistrict 3 | Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. | — | Executed | Iroquois Paving Corporation $1,710,724 · | ||
| Nov 8, 2019 | 66F75 | LaSalleDistrict 3 | Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. | — | Executed | Civil Constructors, Inc. $2,219,448 · | ||
| Nov 8, 2019 | 66J72 | LaSalleDistrict 3 | Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. | — | Executed | D. Construction, Inc. $568,614 · | ||
| Nov 8, 2019 | 66J86 | VariousDistrict 3 | Bridge deck concrete sealing at various bare concrete bridge decks. | — | Executed | All States Painting, Inc. $159,900 · | ||
| Nov 8, 2019 | 66K27 | FordDistrict 3 | Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. | — | Executed | Iroquois Paving Corporation $841,960 · | ||
| Nov 8, 2019 | 66K43 | VariousDistrict 3 | District wide tree removal on state maintained routes as needed. | — | Rejected | Endrizzi Contracting, Inc $127,900 · | ||
| Nov 8, 2019 | 68B62 | WoodfordDistrict 4 | Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 · | ||
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. | — | Executed | ICC Group Inc. $42,221,000 · | ||
| Nov 8, 2019 | 68F17 | VariousDistrict 4 | Inspection, maintenance, and repair of existing lighting and electrical facilities at various locations. | — | Executed | Bodine Electric of Decatur $459,726 · | ||
| Nov 8, 2019 | 70545 | DouglasDistrict 5 | Bridge replacement, bridge removal/demolition on IL 130 over the Embarras River. | — | Executed | Sangamo Construction Company $5,765,527 · | ||
| Nov 8, 2019 | 70E06 | VermilionDistrict 5 | Six spot locations of bridge painting on I-74. | — | Executed | Venus Painting Co. $1,456,964 · | ||
| Nov 8, 2019 | 70E09 | VermilionDistrict 5 | Weigh in Motion Data Collection System on FAI-74 approximately 1.0 mile west of Oakwood. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $405,354 · | ||
| Nov 8, 2019 | 70E34 | VermilionDistrict 5 | One mile of patching on I-74 (EB and WB) from G-Street to E of US 150/IL 1 in Danville. | — | Executed | G. M. Sipes Construction, Inc. $207,280 · | ||
| Nov 8, 2019 | 70E35 | ChampaignDeWittDistrict 5 | Tree removal and seeding on I-74 Westbound at Farmer City exit and on US 45 at NCL of Thomasboro. | — | Executed | J.H. Moore, Inc. d/b/a Castle Electric, Inc. $46,668 · | ||
| Nov 8, 2019 | 72J45 | HancockDistrict 6 | Replacing the bridge carrying IL96 over Sheridan Creek, 0.9 miles south of Nauvoo (SN 034-0020). | — | Executed | County Contractors, Inc. $1,719,799 · | ||
| Nov 8, 2019 | 72J99 | SchuylerDistrict 6 | Resurfacing, traffic signal upgrades, ADA sidewalk ramps and HMA shoulders at the intersection of US 24 and US 67 on the west side of Rushville. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,495,995 · | ||
| Nov 8, 2019 | 72K07 | SangamonDistrict 6 | Deck replacement on IL 123 over I-55. (SN 084-0171) | — | Executed | Freesen, a div of UCM, Inc. $3,121,789 · | ||
| Nov 8, 2019 | 72K44 | ScottDistrict 6 | Bridge deck patching on main spans, hydroscarification and microsilica overlay on approach spans, minor polymer concrete repairs on joints, reseal silicone joints and install new floor drains on approach spans of the structures carrying IL 100/106 over the Illinois River at Florence. (SN 086-0001) | — | Executed | Freesen, a div of UCM, Inc. $828,566 · | ||
| Nov 8, 2019 | 72L33 | SangamonDistrict 6 | Painting of four bridges on I-55 around Springfield. (SN 084-0099, 084-0088, 084-0100, 084-0020) | — | Executed | ERA-Valdivia Contractors, Inc. $660,945 · | ||
| Nov 8, 2019 | 72L39 | LoganDistrict 6 | Patching and resurfacing on Old IL 121 beginning at IL 136 and continuing south for 6.1 miles. | — | Executed | P. H. Broughton & Sons, Inc. $480,951 · | ||
| Nov 8, 2019 | 72L40 | PikeDistrict 6 | 0.56 miles of HMA surface removal and replacement on County Highway 3 from just south of I-72 to just north of I-72. | — | Executed | K. E. Vas Company $349,729 · | ||
| Nov 8, 2019 | 74321 | ShelbyDistrict 7 | Superstructure replacement for the structure carrying IL 16 over Richland Creek, approximately 2.3 miles west of IL 32. (SN 087-0024) | — | Executed | County Contractors, Inc. $1,068,996 · | ||
| Nov 8, 2019 | 74859 | EffinghamDistrict 7 | One new superstructure and one new bridge deck (SN 025-0080 and SN 025-0081) on US 45 approximately 5 miles and 5.3 miles south of IL 37. | — | Executed | Plocher Construction Company, Inc. $3,212,600 · | ||
| Nov 8, 2019 | 74873 | VariousDistrict 7 | Sealing 53 bridge decks on various routes in Lawrence, Wabash, Wayne and Edwards Counties. | — | Executed | All States Painting, Inc. $53,591 · | ||
| Nov 8, 2019 | 74912 | LawrenceDistrict 7 | Concrete over lay of the bridge deck and bridge deck repairs on SN 051-0053 carrying US Business 50 over the Embarras River, east of Lawrenceville. | — | Executed | Samron Midwest Contracting, Inc. $1,037,945 · | ||
| Nov 8, 2019 | 74926 | EffinghamFayetteDistrict 7 | Cleaning and painting four bridges in Effingham County and three bridges in Fayette County. (SN 025-0051, 025-0052, 025-0064, 025-0030, 026-0091, 026-0074 026-0076) | — | Executed | All States Painting, Inc. $1,094,000 · | ||
| Nov 8, 2019 | 74927 | ClarkDistrict 7 | Cleaning and painting two bridges: 1) SN 012-0025 carrying US 40 over I-70, 2 miles west of the state line; 2) SN 012-0041 carrying TR-107 over I-70, 0.75 miles west of IL 1. | — | Executed | Venus Painting Co. $461,250 · | ||
| Nov 8, 2019 | 76E13 | St. ClairDistrict 8 | 6.79 miles of interstate resurfacing and bridge repairs on I-255 from IL 15 to Collinsville Road. | — | Executed | The Kilian Corporation & Keeley & Sons, Inc. $67,339,439 · | ||
| Nov 8, 2019 | 76M28 | ClintonDistrict 8 | Tree removal along Old US 50 from Koch Lane to Hilmes Road. | — | Executed | Nettle Creek Nursery, Inc. $64,600 · | ||
| Nov 8, 2019 | 76N33 | VariousDistrict 8 | Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | Endrizzi Contracting, Inc $88,200 · | ||
| Nov 8, 2019 | 78431 | PerryDistrict 9 | 9.6 miles of resurfacing on IL 13 from Swanwick Road to just north of IL 154. | — | Executed | E. T. Simonds Construction Company $3,617,495 · | ||
| Nov 8, 2019 | 78458 | JeffersonDistrict 9 | Replacement of the bridge carrying IL 15 over Elk Horn Creek, approximately 4.4 miles east of the Washington County line. (SN 041-0020) | — | Executed | Samron Midwest Contracting, Inc. $1,228,693 · | ||
| Nov 8, 2019 | 78636 | WilliamsonDistrict 9 | Convert existing intersection of Cambria Road and Herrin Road into a roundabout. Includes HMA surface removal, PCC pavement, HMA surfacing and storm sewers. | — | Executed | E. T. Simonds Construction Company $1,624,828 · | ||
| Nov 8, 2019 | 78675 | HamiltonDistrict 9 | Replacement of the box culvert carrying IL 142 over a drainage ditch, approximately 0.2 miles northwest of Delafield. (SN 033-7031) | — | Executed | E. T. Simonds Construction Company $174,556 · | ||
| Nov 8, 2019 | 78732 | JeffersonWilliamsonDistrict 9 | Inserting culvert liners at three locations: 1) SN 100-7039 on IL 148 approximately 2 miles northwest of I-57 near Neber Road in Williamson County; 2) SN 041-7075 on IL 15 approximately 0.2 miles west of Shepherd Lane in Jefferson County; 3) SN 041-7076 on IL 15 approximately 0.3 miles east of Shepherd Lane in Jefferson County. | — | Executed | Samron Midwest Contracting, Inc. $219,125 · | ||
| Nov 8, 2019 | 78754 | JeffersonDistrict 9 | 4.4 miles of tree removal on IL 37 from just south of the Casey Fork to Campground Road, north of Bonnie. | — | Executed | Homer Tree Service, Inc. $157,128 · | ||
| Nov 8, 2019 | 85688 | BooneDistrict 2 | Replace the bridge carrying Poplar Grove Road over the Kishwaukee River, located at the northeast city limits of Belvidere. | — | Executed | Civil Constructors, Inc. $2,571,122 · | ||
| Nov 8, 2019 | 87548 | IroquoisDistrict 3 | Replace the deck on a three span, non-continuous composite steel wide flange bridge carrying CH 40 over Sugar Creek, located 2.7 miles east of IL 1. | — | Rejected | Rausch Infrastructure, LLC $1,885,543 · | ||
| Nov 8, 2019 | 87706 | LaSalleDistrict 3 | Construction of a shared-use-path and the construction of a pedestrian bridge over I-80, located west of IL 23 from Stevenson Road to Etna Road in the City of Ottawa. | — | Executed | D. Construction, Inc. $1,756,388 · | ||
| Nov 8, 2019 | 89744 | PeoriaDistrict 4 | Replace bridge carrying Smithville Road over Copperas Creek, located 0.6 miles west of Trivoli Road. | — | Executed | Stark Excavating, Inc. $1,238,874 · | ||
| Nov 8, 2019 | 89748 | PeoriaDistrict 4 | Replace bridge carrying Kickapoo Creek Road over an unnamed tributary to Kickapoo Creek, located 0.10 miles north of Adams Street. | — | Active | |||
| Nov 8, 2019 | 89762 | WarrenDistrict 4 | Full Depth reclamation with emulsified asphalt and cement and surface profiling and 2" HMA from IL 164 to 300th Avenue in Alexis. | — | Executed | Dunn Company $1,289,284 · | ||
| Nov 8, 2019 | 93734 | MasonDistrict 6 | Removal and replacement of guardrail and terminals on various routes within Mason County. | — | Executed | Lovewell Fencing, Inc. $1,008,249 · | ||
| Nov 8, 2019 | 95851 | FayetteDistrict 7 | Replace bridge carrying TR 371 over Hurricane Creek, located 4.5 miles West of Vandalia. | — | Executed | Depew and Owen Builders, Inc. $638,098 · | ||
| Nov 8, 2019 | 97693 | WashingtonDistrict 8 | Replace bridge carrying Jimtown Road over Elkhorn Creek. | — | Executed | Samron Midwest Contracting, Inc. $363,206 · | ||
| Nov 8, 2019 | 97709 | St. ClairDistrict 8 | Installation of traffic signals, widening of radius and sidewalks on Union Hill Road at Longacre Drive in the City of Fairview Heights. | — | Executed | Hank's Excavating & Landscaping, Inc. $254,114 · | ||
| Nov 8, 2019 | 97712 | MadisonDistrict 8 | Resurfacing Broadway Street from Helvetia Drive to Iberg Road in the City of Highland. | — | Executed | Stutz Excavating, Inc. $702,548 · | ||
| Nov 8, 2019 | 97714 | MadisonDistrict 8 | Replace bridge carrying Fairmont Avenue over Canteen Canal, located north of Fairway Blvd. in the City of Collinsville. | — | Executed | Keller Construction, Inc. $473,473 · | ||
| Nov 8, 2019 | 97715 | MadisonDistrict 8 | Resurface 6th Street from Madison Avenue to Edwardsville Road, located in the City of Wood River. | — | Executed | Charles E. Mahoney Co. $400,873 · | ||
| Jan 17, 2020 | 46532 | VariousDistrict 7 | Replacement of various lengths of guardrail reflectors and delineation panel replacement on various routes in various counties of District 7. | — | Rejected | Endrizzi Contracting, Inc $179,140 · | ||
| Jan 17, 2020 | 46533 | VariousDistrict 3 | "On-Call" pavement marking with various materials including thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal , hot-spray thermoplastic, grooving for pavement marking, and aerial markings. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,187,470 · | ||
| Jan 17, 2020 | 46534 | VariousDistrict 5 | Pavement marking repair at various locations in DeWitt, McLean, and Piatt Counties. | — | Executed | A. C. Pavement Striping Co. $949,959 · | ||
| Jan 17, 2020 | 46921 | LoganDistrict 6 | New automatic transfer switch and miscellaneous improvements on IL 121 at the Mount Pulaski Pump Station and Illinois Central Railroad. | — | Executed | J. Ranck Electric, Inc. $125,850 · | ||
| Jan 17, 2020 | 60L88 | CookDistrict 1 | Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago. | — | Executed | J. A. Johnson Paving Company $2,124,700 · | ||
| Jan 17, 2020 | 60M68 | CookDistrict 1 | Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811. | — | Executed | Martam Construction Incorporated $2,794,215 · | ||
| Jan 17, 2020 | 60Y74 | CookDistrict 1 | Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve. | — | Executed | Capitol Cement Co., Inc. $1,293,582 · | ||
| Jan 17, 2020 | 61E86 | CookDistrict 1 | Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines. | — | Executed | Berger Excavating Contractors, Inc. $2,524,434 · | ||
| Jan 17, 2020 | 61F32 | KaneDistrict 1 | Reconstruction of Main Street from Van Nortwick Avenue to Water Street and IL 31 from Elm Street to First Street in the City of Batavia. | — | Executed | Acqua Contractors Corp $6,900,000 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.