16-00069-00-RS
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stutz Excavating, Inc. Low bidder | $702,548 | ||
| 2 | Keller Construction, Inc. | $708,708 | +0.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stutz Excavatin… | #2 Keller Construc… |
|---|---|---|---|---|---|---|---|
| 1 | X2500900 | SEEDING CL 1 SPL | 0.75 | ACRE | $7,375.00 | $5,250.00 | |
| 2 | X6062400 | CONC GUTTER SPL | 414 | FOOT | $40.00 | $34.40 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $8,500.00 | $8,125.00 | |
| 4 | X7030005 | TEMP PAVT MKING REMOV | 4,515 | SQ FT | $0.0100 | $0.0100 | |
| 5 | X7240205 | REMOV SIGN COMPLETE | 18 | EACH | $50.00 | $93.00 | |
| 6 | Z0029604 | HEADWALL REMOVAL | 4 | EACH | $125.00 | $200.00 | |
| 7 | 20200100 | EARTH EXCAVATION | 560 | CU YD | $51.50 | $39.75 | |
| 8 | 20800150 | TRENCH BACKFILL | 9 | CU YD | $44.00 | $78.00 | |
| 9 | 21101615 | TOPSOIL F & P 4 | 1,604 | SQ YD | $17.70 | $8.00 | |
| 10 | 25100635 | HD EROS CONTR BLANKET | 338 | SQ YD | $4.45 | $2.80 | |
| 11 | 28000250 | TEMP EROS CONTR SEED | 150 | POUND | $13.35 | $4.00 | |
| 12 | 28000305 | TEMP DITCH CHECKS | 40 | FOOT | $7.00 | $23.94 | |
| 13 | 31100300 | SUB GRAN MAT A 4 | 799 | SQ YD | $14.00 | $10.73 | |
| 14 | 35101100 | AGG BASE CSE A 12 | 1,342 | SQ YD | $20.50 | $18.90 | |
| 15 | 40201000 | AGGREGATE-TEMP ACCESS | 10 | TON | $35.00 | $55.00 | |
| 16 | 40600290 | BIT MATLS TACK CT | 4,271 | POUND | $1.45 | $1.32 | |
| 17 | 40600400 | MIX CR JTS FLANGEWYS | 1.5 | TON | $2,930.00 | $1,952.00 | |
| 18 | 40600990 | TEMPORARY RAMP | 800 | SQ YD | $11.00 | $0.0100 | |
| 19 | 40604062 | HMA SC IL-9.5 D N70 | 915 | TON | $115.25 | $108.18 | |
| 20 | 40604090 | HMA SC IL-9.5 C N30 | 415 | TON | $125.00 | $105.71 | |
| 21 | 42000900 | HES PCC PVT 8 | 1,242 | SQ YD | $80.00 | $91.16 | |
| 22 | 42400100 | PC CONC SIDEWALK 4 | 6,108 | SQ FT | $5.80 | $5.40 | |
| 23 | 42400400 | PC CONC SIDEWALK 7 | 823 | SQ FT | $12.50 | $14.00 | |
| 24 | 42400800 | DETECTABLE WARNINGS | 121 | SQ FT | $48.00 | $47.00 | |
| 25 | 44000100 | PAVEMENT REM | 903 | SQ YD | $15.00 | $11.25 | |
| 26 | 44000159 | HMA SURF REM 2 1/2 | 9,492 | SQ YD | $3.85 | $5.15 | |
| 27 | 44000400 | GUTTER REM | 412 | FOOT | $6.00 | $6.50 | |
| 28 | 44000600 | SIDEWALK REM | 5,615 | SQ FT | $1.20 | $3.00 | |
| 29 | 44201749 | CL D PATCH T1 9 | 82 | SQ YD | $170.00 | $148.41 | |
| 30 | 44201753 | CL D PATCH T2 9 | 82 | SQ YD | $170.00 | $148.41 | |
| 31 | 44201757 | CL D PATCH T3 9 | 82 | SQ YD | $170.00 | $148.41 | |
| 32 | 44201759 | CL D PATCH T4 9 | 82 | SQ YD | $170.00 | $148.41 | |
| 33 | 44300100 | AREA REF CR CON TREAT | 9,492 | SQ YD | $3.10 | $2.00 | |
| 34 | 50105220 | PIPE CULVERT REMOV | 148 | FOOT | $13.45 | $6.81 | |
| 35 | 542A0217 | P CUL CL A 1 12 | 45 | FOOT | $49.00 | $47.00 | |
| 36 | 542A0220 | P CUL CL A 1 15 | 71 | FOOT | $57.50 | $53.00 | |
| 37 | 542A0223 | P CUL CL A 1 18 | 202 | FOOT | $53.00 | $66.00 | |
| 38 | 54213657 | PRC FLAR END SEC 12 | 2 | EACH | $415.00 | $580.00 | |
| 39 | 54213660 | PRC FLAR END SEC 15 | 4 | EACH | $425.00 | $635.00 | |
| 40 | 54213663 | PRC FLAR END SEC 18 | 5 | EACH | $475.00 | $725.00 | |
| 41 | 54216180 | R C PIPE TEE 12P 12R | 1 | EACH | $700.00 | $1,200.00 | |
| 42 | 54248510 | CONCRETE COLLAR | 0.6 | CU YD | $1,165.00 | $950.00 | |
| 43 | 56109210 | WATER VALVES ADJUST | 2 | EACH | $125.00 | $250.00 | |
| 44 | 60255500 | MAN ADJUST | 1 | EACH | $400.00 | $750.00 | |
| 45 | 67100100 | MOBILIZATION | 1 | L SUM | $45,000.00 | $91,040.18 | |
| 46 | 70300100 | SHORT TERM PAVT MKING | 756 | FOOT | $3.00 | $1.66 | |
| 47 | 70300150 | SHRT TRM PAVT MK REM | 84 | SQ FT | $10.00 | $3.00 | |
| 48 | 70300220 | TEMP PVT MK LINE 4 | 13,544 | FOOT | $0.0100 | $0.0100 | |
| 49 | 72000100 | SIGN PANEL T1 | 104.8 | SQ FT | $36.00 | $34.00 | |
| 50 | 72900200 | METAL POST TY B | 191 | FOOT | $12.60 | $12.00 | |
| 51 | 78000200 | THPL PVT MK LINE 4 | 13,544 | FOOT | $1.30 | $1.25 |