$58.39Avg low bid / SQ YD
$67.50Avg of all bids
—Avg engineer's estimate
131Jobs · 67,942.7 SQ YD
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 15 | 11,630 | $45.04 | $56.19 |
| 2025 | 20 | 21,471 | $73.70 | $79.56 |
| 2024 | 19 | 11,975 | $49.03 | $59.99 |
| 2023 | 8 | 2,480 | $64.44 | $75.14 |
| 2022 | 14 | 3,958 | $52.72 | $65.76 |
| 2021 | 15 | 4,828 | $41.67 | $63.03 |
| 2020 | 14 | 5,136 | $54.52 | $64.16 |
| 2019 | 13 | 2,331 | $90.27 | $82.97 |
| 2018 | 13 | 4,133.7 | $51.65 | $60.47 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 62V90 | CookDistrict 1 | 121 SQ YD | $100.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | 545 SQ YD | $90.00 | D. Construction, Inc. |
| Sep 18, 2026 | 62L58 | CookDistrict 1 | 1,026 SQ YD | $30.00 | Builders Paving, LLC |
| Jul 31, 2026 | 61K67 | KaneDistrict 1 | 1,000 SQ YD | $40.00 | Builders Paving, LLC |
| Jun 12, 2026 | 61M46 | CookDistrict 1 | 150 SQ YD | $100.00 | Builders Paving, LLC |
| Jun 12, 2026 | 80B33 | CookDistrict 1 | 48 SQ YD | $90.00 | D. Construction, Inc. |
| Apr 24, 2026 | 62L85 | CookDistrict 1 | 150 SQ YD | $100.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B39 | CookDistrict 1 | 532 SQ YD | $43.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 61M27 | CookDistrict 1 | 62 SQ YD | $89.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 80B08 | DupageDistrict 1 | 1,103 SQ YD | $30.00 | Builders Paving, LLC |
| Feb 27, 2026 | 61L93 | CookDistrict 1 | 1,950 SQ YD | $26.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 80B19 | CookDistrict 1 | 40 SQ YD | $95.00 | Gallagher Asphalt Corporation |
| Jan 16, 2026 | 61L95 | Kane, Dupage, WillDistrict 1 | 2,190 SQ YD | $45.00 | Geneva Construction Company LLC. |
| Jan 16, 2026 | 61L56 | Kane, DupageDistrict 1 | 2,030 SQ YD | $20.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 64U16 | HenryDistrict 2 | 683 SQ YD | $150.00 | Advanced Asphalt Company |
| Sep 19, 2025 | 70C33 | McleanDistrict 5 | 42 SQ YD | $415.00 | Phoenix Corporation of the Quad Cities |
| Aug 1, 2025 | 62X50 | WillDistrict 1 | 120 SQ YD | $130.00 | Gallagher Asphalt Corporation |
| Jun 13, 2025 | 99753 | GallatinDistrict 9 | 62 SQ YD | $255.00 | Samron Midwest Contracting, Inc. |
| Jun 13, 2025 | 61L62 | CookDistrict 1 | 76 SQ YD | $80.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 61L63 | CookDistrict 1 | 59 SQ YD | $80.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 62X68 | MchenryDistrict 1 | 175 SQ YD | $87.00 | Schroeder Asphalt Services, Inc. |
| Jun 13, 2025 | 62X62 | CookDistrict 1 | 91 SQ YD | $228.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 64U19 | OgleDistrict 2 | 4,723 SQ YD | $90.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 13, 2025 | 62G52 | WillDistrict 1 | 2,900 SQ YD | $28.50 | K-Five Construction Corporation |
| Jun 13, 2025 | 64U22 | OgleDistrict 2 | 4,697 SQ YD | $90.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 13, 2025 | 62X61 | LakeDistrict 1 | 274 SQ YD | $50.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 95940 | ShelbyDistrict 7 | 23 SQ YD | $180.00 | Kinney Contractors, Inc. |
| Apr 25, 2025 | 61K95 | DupageDistrict 1 | 402 SQ YD | $30.00 | R. W. Dunteman Company |
| Apr 25, 2025 | 62J79 | CookDistrict 1 | 1,570 SQ YD | $55.00 | Plote Construction, Inc. |
| Apr 25, 2025 | 62V36 | CookDistrict 1 | 1,300 SQ YD | $35.00 | Iroquois Paving Corporation |
| Apr 25, 2025 | 64U23 | StephensonDistrict 2 | 3,077 SQ YD | $89.40 | Rock Road Companies, Inc. |
| Mar 7, 2025 | 61L23 | CookDistrict 1 | 286 SQ YD | $30.00 | A Lamp Concrete Contractors, Inc. |
| Mar 7, 2025 | 64R02 | LeeDistrict 2 | 62 SQ YD | $130.00 | Martin & Company Excavating |
| Mar 7, 2025 | 64U25 | OgleDistrict 2 | 1,387 SQ YD | $70.00 | Martin & Company Excavating |
| Jan 17, 2025 | 61L00 | MchenryDistrict 1 | 145 SQ YD | $40.00 | Curran Contracting Company |
| Sep 20, 2024 | 66E54 | LivingstonDistrict 3 | 25 SQ YD | $210.00 | Kankakee Valley Construction Company, Inc. |
| Sep 20, 2024 | 62R60 | DupageDistrict 1 | 180 SQ YD | $100.00 | R. W. Dunteman Company |
| Sep 20, 2024 | 61K70 | CookDistrict 1 | 1,256 SQ YD | $35.00 | A Lamp Concrete Contractors, Inc. |
| Jun 14, 2024 | 62L00 | CookDistrict 1 | 264 SQ YD | $86.00 | MAT Construction Leasing, Inc. |
| Jun 14, 2024 | 62R71 | CookDistrict 1 | 1,080 SQ YD | $50.00 | Gallagher Asphalt Corporation |
| Jun 14, 2024 | 62U79 | WillDistrict 1 | 76 SQ YD | $30.00 | Iroquois Paving Corporation |
| Apr 26, 2024 | 60P75 | DupageDistrict 1 | 293 SQ YD | $89.57 | R. W. Dunteman Company |
| Apr 26, 2024 | 62L16 | MchenryDistrict 1 | 3,200 SQ YD | $35.00 | Peter Baker & Son Co. |
| Apr 26, 2024 | 62M25 | Mchenry, LakeDistrict 1 | 2,298 SQ YD | $40.00 | Payne & Dolan, Inc. |
| Apr 26, 2024 | 62R53 | CookDistrict 1 | 1,359 SQ YD | $30.00 | Builders Paving, LLC |
| Apr 26, 2024 | 62T69 | LakeDistrict 1 | 580 SQ YD | $105.00 | Peter Baker & Son Co. |
| Mar 8, 2024 | 62W53 | LakeDistrict 1 | 232 SQ YD | $45.00 | Campanella and Sons, Inc. |
| Mar 8, 2024 | 66M56 | LasalleDistrict 3 | 280 SQ YD | $190.00 | Advanced Asphalt Company |
| Mar 8, 2024 | 62R94 | WillDistrict 1 | 50 SQ YD | $105.00 | P. T. Ferro Construction Co. |
| Mar 8, 2024 | 87833 | DekalbDistrict 3 | 50 SQ YD | $95.00 | Curran Contracting Company |
| Mar 8, 2024 | 61K22 | DupageDistrict 1 | 192 SQ YD | $12.50 | Builders Paving, LLC |
| Mar 8, 2024 | 91619 | McleanDistrict 5 | 55 SQ YD | $210.00 | Stark Excavating, Inc. |
| Jan 19, 2024 | 61J95 | DupageDistrict 1 | 253 SQ YD | $40.00 | Builders Paving, LLC |
| Jan 19, 2024 | 62T87 | CookDistrict 1 | 252 SQ YD | $45.00 | K-Five Construction Corporation |
| Nov 17, 2023 | 61J81 | CookDistrict 1 | 50 SQ YD | $94.94 | Iroquois Paving Corporation |
| Jun 16, 2023 | 62L51 | CookDistrict 1 | 360 SQ YD | $80.15 | MAT Construction Leasing, Inc. |
| Mar 10, 2023 | 62R17 | CookDistrict 1 | 368 SQ YD | $28.00 | Arrow Road Construction Co. |
| Mar 10, 2023 | 61J05 | LakeDistrict 1 | 437 SQ YD | $95.00 | Builders Paving, LLC |
| Jan 20, 2023 | 61J11 | DupageDistrict 1 | 750 SQ YD | $28.00 | K-Five Construction Corporation |
| Jan 20, 2023 | 61J12 | DupageDistrict 1 | 200 SQ YD | $50.00 | A Lamp Concrete Contractors, Inc. |
| Jan 20, 2023 | 62A53 | LakeDistrict 1 | 240 SQ YD | $137.00 | Dunnet Bay Construction Company |
| Jan 20, 2023 | 97785 | MadisonDistrict 8 | 75 SQ YD | $140.00 | Stutz Excavating, Inc. |
| Nov 18, 2022 | 62N51 | WillDistrict 1 | 175 SQ YD | $138.00 | Gallagher Asphalt Corporation |
| Sep 23, 2022 | 62P22 | DupageDistrict 1 | 60 SQ YD | $110.00 | Geneva Construction Company |
| Jun 17, 2022 | 62L11 | CookDistrict 1 | 45 SQ YD | $101.00 | J. A. Johnson Paving Company |
| Jun 17, 2022 | 62N50 | WillDistrict 1 | 270 SQ YD | $99.00 | Iroquois Paving Corporation |
| Jun 17, 2022 | 62N72 | CookDistrict 1 | 60 SQ YD | $90.00 | D. Construction, Inc. |
| Jun 17, 2022 | 66B77 | FordDistrict 3 | 80 SQ YD | $206.00 | Kankakee Valley Construction Company, Inc. |
| Apr 29, 2022 | 87750 | DekalbDistrict 3 | 51 SQ YD | $290.00 | William Charles Construction Company, LLC |
| Mar 11, 2022 | 91608 | McleanDistrict 5 | 25 SQ YD | $153.92 | Rowe Construction, a div of UCM, Inc. |
| Mar 11, 2022 | 62G72 | CookDistrict 1 | 576 SQ YD | $31.50 | Arrow Road Construction Co. |
| Mar 11, 2022 | 62L19 | CookDistrict 1 | 538 SQ YD | $9.81 | R. W. Dunteman Company |
| Mar 11, 2022 | 62M45 | Cook, LakeDistrict 1 | 570 SQ YD | $25.00 | Arrow Road Construction Co. |
| Mar 11, 2022 | 70951 | PiattDistrict 5 | 20 SQ YD | $196.16 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 21, 2022 | 62H06 | LakeDistrict 1 | 1,440 SQ YD | $40.00 | Peter Baker & Son Co. |
| Jan 21, 2022 | 62N35 | CookDistrict 1 | 48 SQ YD | $144.00 | Gallagher Asphalt Corporation |
| Nov 5, 2021 | 62N52 | Cook, KaneDistrict 1 | 1,500 SQ YD | $26.00 | Arrow Road Construction Co. |
| Sep 17, 2021 | 62J90 | LakeDistrict 1 | 320 SQ YD | $40.00 | Builders Paving, LLC |
| Jul 30, 2021 | 60M12 | CookDistrict 1 | 83 SQ YD | $74.00 | MAT Construction Leasing, Inc. |
| Jul 30, 2021 | 60X74 | CookDistrict 1 | 144 SQ YD | $69.00 | Copenhaver Construction, Inc. |
| Jul 30, 2021 | 99668 | JeffersonDistrict 9 | 24 SQ YD | $254.83 | Southern Illinois Asphalt Co., Inc. |
| Jun 11, 2021 | 60T15 | MchenryDistrict 1 | 70 SQ YD | $105.00 | Campanella and Sons, Inc. |
| Jun 11, 2021 | 62F39 | CookDistrict 1 | 499 SQ YD | $1.00 | Martam Construction Incorporated |
| Jun 11, 2021 | 62L91 | CookDistrict 1 | 966 SQ YD | $50.00 | Plote Construction, Inc. |
| Apr 23, 2021 | 61H08 | CookDistrict 1 | 200 SQ YD | $110.00 | Arrow Road Construction Co. |
| Apr 23, 2021 | 66L01 | LasalleDistrict 3 | 44 SQ YD | $100.00 | D. Construction, Inc. |
| Mar 5, 2021 | 61G90 | KaneDistrict 1 | 15 SQ YD | $120.00 | D. Construction, Inc. |
| Mar 5, 2021 | 62L93 | CookDistrict 1 | 60 SQ YD | $75.00 | Builders Paving, LLC |
| Mar 5, 2021 | 62M18 | CookDistrict 1 | 523 SQ YD | $22.00 | Arrow Road Construction Co. |
| Jan 15, 2021 | 62L55 | WillDistrict 1 | 275 SQ YD | $20.00 | Iroquois Paving Corporation |
| Jan 15, 2021 | 91752 | VermilionDistrict 5 | 105 SQ YD | $203.00 | Cross Construction, Inc. |
| Sep 18, 2020 | 62L01 | CookDistrict 1 | 249 SQ YD | $23.00 | K-Five Construction Corporation |
| Sep 18, 2020 | 62L13 | LakeDistrict 1 | 40 SQ YD | $22.00 | Arrow Road Construction Co. |
| Jul 31, 2020 | 62M20 | CookDistrict 1 | 184 SQ YD | $70.00 | J. A. Johnson Paving Company |
| Jul 31, 2020 | 62K84 | CookDistrict 1 | 15 SQ YD | $200.00 | Davis Concrete Construction Co. |
| Jun 12, 2020 | 62J62 | WillDistrict 1 | 76 SQ YD | $50.00 | Iroquois Paving Corporation |
| Jun 12, 2020 | 62J92 | LakeDistrict 1 | 750 SQ YD | $65.00 | J. A. Johnson Paving Company |
| Apr 24, 2020 | 62J43 | WillDistrict 1 | 270 SQ YD | $50.00 | Austin Tyler Construction, Inc. |
| Mar 6, 2020 | 62J77 | CookDistrict 1 | 210 SQ YD | $95.00 | Arrow Road Construction Co. |
| Mar 6, 2020 | 62J85 | CookDistrict 1 | 376 SQ YD | $38.00 | K-Five Construction Corporation |
| Mar 6, 2020 | 62K15 | WillDistrict 1 | 600 SQ YD | $80.00 | P. T. Ferro Construction Co. |
| Mar 6, 2020 | 62F91 | MchenryDistrict 1 | 1,680 SQ YD | $50.00 | Curran Contracting Company |
| Mar 6, 2020 | 62J66 | CookDistrict 1 | 150 SQ YD | $81.00 | MAT Construction Leasing, Inc. |
| Jan 17, 2020 | 60L88 | CookDistrict 1 | 405 SQ YD | $10.00 | J. A. Johnson Paving Company |
| Jan 17, 2020 | 62J45 | CookDistrict 1 | 131 SQ YD | $69.00 | MAT Construction Leasing, Inc. |
| Nov 8, 2019 | 97712 | MadisonDistrict 8 | 82 SQ YD | $170.00 | Stutz Excavating, Inc. |
| Sep 20, 2019 | 60K72 | CookDistrict 1 | 18 SQ YD | $90.00 | D. Construction, Inc. |
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | 73 SQ YD | $95.00 | Plote Construction, Inc. |
| Sep 20, 2019 | 62G42 | CookDistrict 1 | 137 SQ YD | $74.26 | R. W. Dunteman Company |
| Jul 12, 2019 | 62H92 | LakeDistrict 1 | 604 SQ YD | $87.00 | Builders Paving, LLC |
| Jul 12, 2019 | 62G29 | MchenryDistrict 1 | 100 SQ YD | $82.00 | Curran Contracting Company |
| Jun 14, 2019 | 62G30 | LakeDistrict 1 | 440 SQ YD | $78.00 | Builders Paving, LLC |
| Apr 26, 2019 | 99618 | JeffersonDistrict 9 | 110 SQ YD | $204.94 | Southern Illinois Asphalt Co., Inc. |
| Apr 26, 2019 | 61F26 | DupageDistrict 1 | 100 SQ YD | $55.00 | A Lamp Concrete Contractors, Inc. |
| Apr 26, 2019 | 62H45 | CookDistrict 1 | 343 SQ YD | $94.00 | Plote Construction, Inc. |
| Apr 26, 2019 | 62H75 | MchenryDistrict 1 | 200 SQ YD | $60.00 | Curran Contracting Company |
| Apr 26, 2019 | 62H76 | MchenryDistrict 1 | 100 SQ YD | $80.00 | Curran Contracting Company |
| Mar 8, 2019 | 99614 | JeffersonDistrict 9 | 24 SQ YD | $100.00 | E. T. Simonds Construction Company |
| Nov 9, 2018 | 62F57 | DupageDistrict 1 | 56 SQ YD | $76.20 | R. W. Dunteman Company |
| Sep 21, 2018 | 61E88 | Dupage, KaneDistrict 1 | 19 SQ YD | $100.00 | D. Construction, Inc. |
| Jun 15, 2018 | 68D09 | TazewellDistrict 4 | 37.7 SQ YD | $193.06 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 15, 2018 | 62D12 | CookDistrict 1 | 750 SQ YD | $34.00 | Arrow Road Construction Co. |
| Apr 27, 2018 | 62F63 | CookDistrict 1 | 300 SQ YD | $40.00 | K-Five Construction Corporation |
| Apr 27, 2018 | 62F65 | CookDistrict 1 | 55 SQ YD | $89.90 | Arrow Road Construction Co. |
| Apr 27, 2018 | 60Y26 | CookDistrict 1 | 111 SQ YD | $57.00 | Iroquois Paving Corporation |
| Apr 27, 2018 | 99598 | JeffersonDistrict 9 | 41 SQ YD | $237.47 | Southern Illinois Asphalt Co., Inc. |
| Apr 27, 2018 | 61D92 | DupageDistrict 1 | 130 SQ YD | $22.00 | Arrow Road Construction Co. |
| Apr 27, 2018 | 61E61 | DupageDistrict 1 | 430 SQ YD | $15.00 | J. A. Johnson Paving Company |
| Apr 27, 2018 | 62F26 | LakeDistrict 1 | 1,900 SQ YD | $35.00 | Payne & Dolan, Inc. |
| Mar 9, 2018 | 70A10 | ChampaignDistrict 5 | 160 SQ YD | $250.00 | Open Road Paving Company LLC |
| Mar 9, 2018 | 68339 | Warren, KnoxDistrict 4 | 144 SQ YD | $178.86 | Gunther Construction, a div of UCM, Inc. |