Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2020 61F36 CookDistrict 1 Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park. — Executed Nov 26 New R. W. Dunteman Company $10,557,782 ·
Jan 17, 2020 61F74 DuPageDistrict 1 Construction of a shared use path adjacent to Gary Avenue from Great Western Trail (St. charles Road) to Army Trail Road in Carol Stream. — Executed Nov 26 New R. W. Dunteman Company $2,023,958 ·
Jan 17, 2020 61F81 WillDistrict 1 Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone. — Executed Nov 26 New Iroquois Paving Corporation $476,339 ·
Jan 17, 2020 61F86 CookDistrict 1 Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park. — Executed Nov 26 New P. T. Ferro Construction Co. $4,647,786 ·
Jan 17, 2020 61F91 CookDistrict 1 Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood. — Executed Nov 26 New D. Construction, Inc. $464,570 ·
Jan 17, 2020 61F94 WillDistrict 1 Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood. — Executed Nov 26 New P. T. Ferro Construction Co. $2,572,560 ·
Jan 17, 2020 61G08 CookDistrict 1 Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles. — Executed Nov 26 New Capitol Cement Co., Inc. $6,976,099 ·
Jan 17, 2020 61G13 CookDistrict 1 Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons. — Executed Nov 26 New Lindahl Brothers, Inc. $911,086 ·
Jan 17, 2020 61G14 DuPageDistrict 1 Sidewalk construction and the construction of multi-use paths at various locations in the Village of Itasca. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $834,549 ·
Jan 17, 2020 61G21 WillDistrict 1 Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet. — Executed Nov 26 New Herlihy Mid-Continent Company $2,812,985 ·
Jan 17, 2020 62A26 CookDistrict 1 Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation. — Executed Nov 26 New R. W. Dunteman Company $5,247,345 ·
Jan 17, 2020 62G17 CookDistrict 1 3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township. — Executed Nov 26 New J. A. Johnson Paving Company $4,016,610 ·
Jan 17, 2020 62G27 McHenryDistrict 1 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. — Executed Nov 26 New Payne & Dolan, Inc. $1,469,929 ·
Jan 17, 2020 62H96 CookDistrict 1 Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie. — Rejected Nov 26 New Peter Baker & Son Co. $2,297,777 ·
Jan 17, 2020 62J05 LakeDistrict 1 Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan. — Executed Nov 26 New Home Towne Electric, Inc. $269,491 ·
Jan 17, 2020 62J33 CookDistrict 1 Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood. — Executed Nov 26 New D. Construction, Inc. $496,790 ·
Jan 17, 2020 62J42 WillDistrict 1 Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. — Executed Nov 26 New D. Construction, Inc. $559,193 ·
Jan 17, 2020 62J45 CookDistrict 1 0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $643,197 ·
Jan 17, 2020 62J46 DuPageDistrict 1 Designed overlay and pedestrian ramp project begins at the intersection of West Westgate Rd and I-55 South Frontage Rd and proceeds East for 2.44 miles to the West leg of the intersection of I-55 South Frontage Rd and Cass Ave. — Executed Nov 26 New P. T. Ferro Construction Co. $1,082,324 ·
Jan 17, 2020 62J48 CookDistrict 1 Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue. — Executed Nov 26 New Gallagher Asphalt Corporation $197,238 ·
Jan 17, 2020 62J49 KaneDistrict 1 Standard overlay, pedestrian ramps on IL 25/Liberty St from Page Ave to Dwight St in Elgin. — Executed Nov 26 New J. A. Johnson Paving Company $1,937,211 ·
Jan 17, 2020 62J51 CookDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014) — Executed Nov 26 New Capital Industrial Services $1,113,633 ·
Jan 17, 2020 62J52 CookDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $392,220 ·
Jan 17, 2020 62J53 CookDistrict 1 Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village. — Executed Nov 26 New Denler, Inc. $200,433 ·
Jan 17, 2020 62J54 CookDistrict 1 4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston. — Executed Nov 26 New Builders Paving, LLC $5,648,000 ·
Jan 17, 2020 62J57 CookDistrict 1 0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood. — Executed Nov 26 New Plote Construction, Inc. $814,877 ·
Jan 17, 2020 62J60 WillDistrict 1 Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151) — Executed Nov 26 New D. Construction, Inc. $822,716 ·
Jan 17, 2020 62K07 VariousDistrict 1 Expressway mowing North. — Rejected Nov 26 New
Jan 17, 2020 62K08 VariousDistrict 1 Expressway mowing South. — Rejected Nov 26 New
Jan 17, 2020 62K14 McHenryDistrict 1 Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. — Executed Nov 26 New Martam Construction Incorporated $1,184,616 ·
Jan 17, 2020 62K36 CookDuPageDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $288,000 ·
Jan 17, 2020 62K37 CookDuPageDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $192,000 ·
Jan 17, 2020 62K38 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length. — Rejected Nov 26 New 10x Contractors LLC $197,600 ·
Jan 17, 2020 62K39 CookLakeDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $211,200 ·
Jan 17, 2020 62K40 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90 The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length. — Rejected Nov 26 New 10x Contractors LLC $214,500 ·
Jan 17, 2020 62K41 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length. — Rejected Nov 26 New 10x Contractors LLC $280,800 ·
Jan 17, 2020 62K42 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Da The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $230,400 ·
Jan 17, 2020 62K43 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length. — Rejected Nov 26 New 10x Contractors LLC $214,500 ·
Jan 17, 2020 62K44 CookWillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $177,600 ·
Jan 17, 2020 62K45 WillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kend The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length. — Rejected Nov 26 New MYS, Incorporated $193,806 ·
Jan 17, 2020 62K46 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from L The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length. — Rejected Nov 26 New 10x Contractors LLC $195,000 ·
Jan 17, 2020 62K47 CookDuPageDistrict 1 Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. — Rejected Nov 26 New Viridian Enterprises, Inc. $119,250 ·
Jan 17, 2020 62K48 WillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length. — Rejected Nov 26 New Western Remac, Inc. $345,600 ·
Jan 17, 2020 64L57 WinnebagoDistrict 2 Pavement patching and HMA resurfacing on IL 251 Wisconsin State Line to S of Forest Hills Rd in Machesney Park. — Executed Nov 26 New Rock Road Companies, Inc. $11,833,358 ·
Jan 17, 2020 64L72 WinnebagoDistrict 2 HMA resurfacing on I-39 from 0.4 mile N of Baxter Rd to 0.3 mile N of Harrison Ave Interchange, US 20 0.7 mile W of Alpine Rd to I-39, and Baxter Rd from 0.1 mile W to 0.2 mile E of I-39. — Executed Nov 26 New William Charles Construction Company, LLC $17,894,998 ·
Jan 17, 2020 64M43 LeeOgleDistrict 2 Cold milling, patching, and resurfacing from Wilson St in Polo to 0.1 mile N of Liberty Ct in Dixon. — Executed Nov 26 New Civil Constructors, Inc. $5,375,394 ·
Jan 17, 2020 64M46 HenryDistrict 2 7.94 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles E of the I-74/I-80 interchange to 0.5 miles W of IL 82. — Executed Nov 26 New Denler, Inc. $598,283 ·
Jan 17, 2020 64N10 Rock IslandDistrict 2 Deck patching, expansion joint replacement, concrete overlay and painting structural steel on SN 081-0036 carrying IL 5/IL 92 over the IAIS RR, 0.2 miles NE of IL 84. — Executed Nov 26 New Civil Constructors, Inc. $1,822,161 ·
Jan 17, 2020 64N33 BooneDistrict 2 Expansion joint replaement, minor deck repairs and painting beam ends on SN 004-0015 carrying Poplar Grove Rd over business route US 20 (James Gang Parkway). — Executed Nov 26 New Sjostrom & Sons, Inc. $398,481 ·
Jan 17, 2020 64N75 StephensonDistrict 2 Deck patching, expansion joint replacement, HMA overlay, and miscellaneous other repairs on SN 089-0051, carrying IL 26 over the Pecatonica River in Freeport. — Executed Nov 26 New Civil Constructors, Inc. $861,602 ·
Jan 17, 2020 64N95 VariousDistrict 2 "On-Call" guardrail and fence repairs along State maintained routes in Boone, Carroll, JoDaviess, Ogle, Stephenson, and Winnebago Counties. — Executed Nov 26 New Kujo, Inc. $385,575 ·
Jan 17, 2020 64N96 VariousDistrict 2 "On-Call" guardrail and fence repairs along State maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties. — Executed Nov 26 New Kujo, Inc. $434,434 ·
Jan 17, 2020 64N97 VariousDistrict 2 Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2. — Executed Nov 26 New O'Brien Civil Works, Inc. $89,220 ·
Jan 17, 2020 64P01 Jo DaviessOgleDistrict 2 Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard. — Executed Nov 26 New Civil Constructors, Inc. $205,793 ·
Jan 17, 2020 64P08 Rock IslandDistrict 2 Cold milling and HMA resurfacing on US 67 from Second Ave to Fifth Ave in Rock Island. — Executed Nov 26 New Valley Construction Co. $276,390 ·
Jan 17, 2020 66961 KankakeeDistrict 3 Removal and replacement of SN 046-0087, Larry Power Rd over I-57. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,949,761 ·
Jan 17, 2020 66A51 GrundyDistrict 3 Milling and resurfacing shoulders and 8.5" of HMA mainline pavement, replacing cable median barrier, and structural repairs with scarification on some. The project will be staged using crossovers. It is located on I-55 from 0.39 miles S of Gardner Rd to 0.83 miles S of Reed Rd interchange. — Executed Nov 26 New D. Construction, Inc. $18,872,523 ·
Jan 17, 2020 66C59 LaSalleDistrict 3 Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds. — Executed Nov 26 New D. Construction, Inc. $4,314,254 ·
Jan 17, 2020 66E68 LivingstonDistrict 3 Removing SN 053-0065 and replacing it with SN 053-0192. The work also includes guardrail removal and replacement, channel excavation, rip rap placement, milling and resurfacing of adjacent pavement, pavement marking, and pavement markers. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $2,828,867 ·
Jan 17, 2020 66F08 BureauPutnamDistrict 3 Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. — Executed Nov 26 New Civil Constructors, Inc. $25,110,125 ·
Jan 17, 2020 66H21 LaSalleDistrict 3 1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River. — Executed Nov 26 New D. Construction, Inc. $16,388,867 ·
Jan 17, 2020 66H52 DeKalbDistrict 3 Bridge replacement (Ex:019-0021, Prop:019-0050) over a tributary to the Kishwaukee River and associated approach roadway work. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,311,673 ·
Jan 17, 2020 66J57 LaSalleDistrict 3 Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52. — Executed Nov 26 New G. M. Sipes Construction, Inc. $415,883 ·
Jan 17, 2020 66K36 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $416,773 ·
Jan 17, 2020 66K37 DeKalbDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN's 019-0036 and 019-0037. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $246,571 ·
Jan 17, 2020 66K38 LaSalleDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $351,131 ·
Jan 17, 2020 66K48 LivingstonDistrict 3 Various bridge repairs to SN's 053-0139(SB) and 053-0140(NB) carrying FAI 55 over the west fork of Mazon River 3.0 miles southwest of IL Rte 17. — Executed Nov 26 New D. Construction, Inc. $353,644 ·
Jan 17, 2020 66K74 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $194,041 ·
Jan 17, 2020 66K75 GrundyIroquoisDistrict 3 Weed spraying on various routes in Grundy and Livingston counties. — Executed Nov 26 New Endrizzi Contracting, Inc $27,192 ·
Jan 17, 2020 68C64 FultonDistrict 4 0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City. — Rejected Nov 26 New Gunther Construction, a div of UCM, Inc. $2,986,769 ·
Jan 17, 2020 68D86 WarrenDistrict 4 Rehabilitation to SN 094-0041 carrying US 34 over US 67 and SN 094-0033 carrying US 34 over the BNSF Railroad, Southwest of Monmouth. — Executed Nov 26 New Brandt Construction Co. $1,525,000 ·
Jan 17, 2020 68E34 WoodfordDistrict 4 Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116. — Executed Nov 26 New Advanced Asphalt Company $9,680,201 ·
Jan 17, 2020 68F13 VariousDistrict 4 District-wide weed spraying (off road). — Executed Nov 26 New ALLEN CHASE ENTERPRISES INC. $117,868 ·
Jan 17, 2020 68F14 VariousDistrict 4 Dead tree removal at various locations within District 4. — Executed Nov 26 New Yeagle's Forestry Mulching & Land Management $164,022 ·
Jan 17, 2020 68F18 MarshallMasonDistrict 4 Bridge washing of 3 bridges over the Illinois River. — Executed Nov 26 New M & M Concrete, Inc. $94,950 ·
Jan 17, 2020 70912 McLeanDistrict 5 Interstate resurfacing and ramp repair S of Lexington to Livingston Co Line 9.67 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $14,966,522 ·
Jan 17, 2020 70B92 ChampaignDistrict 5 Bridge deck repairs to SN(s) 010-0031,010-0032,010-0089, and 010-0175. — Executed Nov 26 New Stark Excavating, Inc. $2,399,490 ·
Jan 17, 2020 70E37 ChampaignVermilionDistrict 5 Standard overlay and cold milling at I-57 at I-74 ramps; I-74 at Oakwood ramps; Oakwood Rd S of I-74 interchange; I-74 W of I-57/I-74 interchange. — Executed Nov 26 New Open Road Paving Company LLC $559,464 ·
Jan 17, 2020 70E44 VariousDistrict 5 506.1 miles of spraying, approximately 1405 acres of state right of way along all interstate routes including interchanges in Champaign, Dewitt, Douglas, McLean, Piatt and Vermilion Counties. — Executed Nov 26 New The Daltons Inc. $105,848 ·
Jan 17, 2020 72G01 HancockDistrict 6 4 miles of resurfacing on IL 94 from Powellton Road to 1.1 miles north of CH 29 (Ferris Road). — Executed Nov 26 New W. L. Miller Company $1,942,804 ·
Jan 17, 2020 72G57 LoganDistrict 6 Patching, HMA surface removal to bare concrete, SMA binder and surface courses, HMA shoulders, aggregate shoulders, shoulder rumble strips, guardrail replacement and structure repairs on I-55 from 1.3 miles south of I-55 BUS to 0.6 miles north of IL 10 west of Lincoln and on I-55 BUS from east of Old Route 66 to south of 1056th Avenue south of Lincoln. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $23,541,806 ·
Jan 17, 2020 72G99 MacoupinDistrict 6 0.7 miles of resurfacing on IL 138 from IL 4 to 8th Street in Benld. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $994,785 ·
Jan 17, 2020 72K09 VariousDistrict 6 Bridge washing on various major river bridges over the Illinois River and the Mississippi River in District 6. — Executed Nov 26 New M & M Concrete, Inc. $143,750 ·
Jan 17, 2020 72L25 SangamonDistrict 6 26.4 miles of routing and sealing of longitudinal joints along with transverse cracks in the pavement on I-55, 72, and 72A in Sangamon County. — Executed Nov 26 New Kinney Contractors, Inc. $278,646 ·
Jan 17, 2020 72L26 MorganDistrict 6 5.1 miles of pavement patching, 4- overlay (southbound lane) and guardrail removal and replacement on US 67, I-72 BUS from Markham Road (TR 78) to 1.1 miles north of I-72. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $2,837,219 ·
Jan 17, 2020 72L28 HancockDistrict 6 7.2 miles of pavement preservation with Cape Seal of mainline, Fog Seal of shoulders and micro surfacing of medians and intersecting sideroads on IL 110/ 336 from 0.8 miles north of West Point Road to 3.1 miles south of the US 136 overpass in Carthage. — Executed Nov 26 New Asphalt Stone Company and Pavement Maintenance Systems JV $1,920,870 ·
Jan 17, 2020 72L30 MacoupinMontgomeryDistrict 6 14.3 miles of crack and joint sealing on I-55 from the Madison County line to north of IL 16. — Executed Nov 26 New Kinney Contractors, Inc. $167,695 ·
Jan 17, 2020 72L41 MacoupinDistrict 6 Painting portions of 2 bridges on IL 111 in Macoupin County. (SN 059-0016 and 059-0013). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $292,000 ·
Jan 17, 2020 72L42 VariousDistrict 6 Painting portions of 5 bridges on various routes in the western part of District 6. (SN 034-0066, 034-0063, 075-0130, 075-0131, 086-0045) — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $378,250 ·
Jan 17, 2020 72L47 AdamsDistrict 6 Replacing expansion joints and performing beam end repairs on SN 001-0054 carrying IL 96 over Mill Creek in Adams County. — Executed Nov 26 New County Contractors, Inc. $249,950 ·
Jan 17, 2020 72L48 MenardDistrict 6 Replacing damaged parapet walls on SN 065-0002 carrying IL 97 over the Sangamon River in Menard County. — Executed Nov 26 New Freesen, a div of UCM, Inc. $320,133 ·
Jan 17, 2020 72L50 SangamonDistrict 6 Patching on I-72 from Wabash Avenue to east of the MacArthur Boulevard interchange. — Executed Nov 26 New Kinney Contractors, Inc. $284,610 ·
Jan 17, 2020 74260 ColesMoultrieDistrict 7 13.1 miles of patching, milling, resurfacing and guardrail updates on IL 121 from the east city limits of Sullivan to 0.2 miles west of 300E in Mattoon. — Executed Nov 26 New Howell Paving, Inc. $5,784,430 ·
Jan 17, 2020 74325 CumberlandDistrict 7 Superstructure replacement for SN 018-0057 carrying the Montrose Blacktop over Spring Point Creek, 0.5 miles north of the Effingham County line. — Executed Nov 26 New Plocher Construction Company, Inc. $1,332,535 ·
Jan 17, 2020 74407 JasperDistrict 7 6.3 miles of patching, milling, resurfacing, longitudinal joint sealant and shoulder work on IL 33 from IL 130 to IL 49. — Executed Nov 26 New Howell Paving, Inc. $3,438,121 ·
Jan 17, 2020 74694 ColesDistrict 7 3.9 miles of resurfacing, ADA improvements and traffic signals on IL 16 from west of Douglas Drive in Charleston to east of Madison Street. — Executed Nov 26 New Howell Paving, Inc. $8,219,292 ·
Jan 17, 2020 74932 MaconDistrict 7 10 miles of pavement patching and detector loops on US 51 from I-72 to the Dewitt County line. — Executed Nov 26 New Kinney Contractors, Inc. $465,234 ·
Jan 17, 2020 74933 MaconDistrict 7 2.4 miles of pavement patching on IL 121 from University Avenue in Decatur to Bearsdale Road. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $159,212 ·
Jan 17, 2020 74935 ClayLawrenceRichlandDistrict 7 Patching on US 45 from Finch Lane to US 50 and from U.S. 50 to the Wayne County line. Also includes patching along US 50, Xenia Road, west of Flora to Sumner. — Executed Nov 26 New Kinney Contractors, Inc. $556,669 ·
Jan 17, 2020 74951 WayneDistrict 7 5.7 miles of patching, cape seal and raised reflective pavement markers on IL 242 from south of Section Line Road in Wayne City to north of I-64. — Executed Nov 26 New A. C. Pavement Striping Co. $650,397 ·
1,801–1,900 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.