| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2020 | 61F36 | CookDistrict 1 | Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park. | — | Executed | R. W. Dunteman Company $10,557,782 · | ||
| Jan 17, 2020 | 61F74 | DuPageDistrict 1 | Construction of a shared use path adjacent to Gary Avenue from Great Western Trail (St. charles Road) to Army Trail Road in Carol Stream. | — | Executed | R. W. Dunteman Company $2,023,958 · | ||
| Jan 17, 2020 | 61F81 | WillDistrict 1 | Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone. | — | Executed | Iroquois Paving Corporation $476,339 · | ||
| Jan 17, 2020 | 61F86 | CookDistrict 1 | Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park. | — | Executed | P. T. Ferro Construction Co. $4,647,786 · | ||
| Jan 17, 2020 | 61F91 | CookDistrict 1 | Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood. | — | Executed | D. Construction, Inc. $464,570 · | ||
| Jan 17, 2020 | 61F94 | WillDistrict 1 | Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood. | — | Executed | P. T. Ferro Construction Co. $2,572,560 · | ||
| Jan 17, 2020 | 61G08 | CookDistrict 1 | Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles. | — | Executed | Capitol Cement Co., Inc. $6,976,099 · | ||
| Jan 17, 2020 | 61G13 | CookDistrict 1 | Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons. | — | Executed | Lindahl Brothers, Inc. $911,086 · | ||
| Jan 17, 2020 | 61G14 | DuPageDistrict 1 | Sidewalk construction and the construction of multi-use paths at various locations in the Village of Itasca. | — | Executed | A Lamp Concrete Contractors, Inc. $834,549 · | ||
| Jan 17, 2020 | 61G21 | WillDistrict 1 | Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet. | — | Executed | Herlihy Mid-Continent Company $2,812,985 · | ||
| Jan 17, 2020 | 62A26 | CookDistrict 1 | Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation. | — | Executed | R. W. Dunteman Company $5,247,345 · | ||
| Jan 17, 2020 | 62G17 | CookDistrict 1 | 3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township. | — | Executed | J. A. Johnson Paving Company $4,016,610 · | ||
| Jan 17, 2020 | 62G27 | McHenryDistrict 1 | 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. | — | Executed | Payne & Dolan, Inc. $1,469,929 · | ||
| Jan 17, 2020 | 62H96 | CookDistrict 1 | Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie. | — | Rejected | Peter Baker & Son Co. $2,297,777 · | ||
| Jan 17, 2020 | 62J05 | LakeDistrict 1 | Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan. | — | Executed | Home Towne Electric, Inc. $269,491 · | ||
| Jan 17, 2020 | 62J33 | CookDistrict 1 | Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood. | — | Executed | D. Construction, Inc. $496,790 · | ||
| Jan 17, 2020 | 62J42 | WillDistrict 1 | Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. | — | Executed | D. Construction, Inc. $559,193 · | ||
| Jan 17, 2020 | 62J45 | CookDistrict 1 | 0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $643,197 · | ||
| Jan 17, 2020 | 62J46 | DuPageDistrict 1 | Designed overlay and pedestrian ramp project begins at the intersection of West Westgate Rd and I-55 South Frontage Rd and proceeds East for 2.44 miles to the West leg of the intersection of I-55 South Frontage Rd and Cass Ave. | — | Executed | P. T. Ferro Construction Co. $1,082,324 · | ||
| Jan 17, 2020 | 62J48 | CookDistrict 1 | Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue. | — | Executed | Gallagher Asphalt Corporation $197,238 · | ||
| Jan 17, 2020 | 62J49 | KaneDistrict 1 | Standard overlay, pedestrian ramps on IL 25/Liberty St from Page Ave to Dwight St in Elgin. | — | Executed | J. A. Johnson Paving Company $1,937,211 · | ||
| Jan 17, 2020 | 62J51 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014) | — | Executed | Capital Industrial Services $1,113,633 · | ||
| Jan 17, 2020 | 62J52 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines. | — | Executed | Eagle Painting & Maintenance Company, Inc. $392,220 · | ||
| Jan 17, 2020 | 62J53 | CookDistrict 1 | Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village. | — | Executed | Denler, Inc. $200,433 · | ||
| Jan 17, 2020 | 62J54 | CookDistrict 1 | 4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston. | — | Executed | Builders Paving, LLC $5,648,000 · | ||
| Jan 17, 2020 | 62J57 | CookDistrict 1 | 0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood. | — | Executed | Plote Construction, Inc. $814,877 · | ||
| Jan 17, 2020 | 62J60 | WillDistrict 1 | Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151) | — | Executed | D. Construction, Inc. $822,716 · | ||
| Jan 17, 2020 | 62K07 | VariousDistrict 1 | Expressway mowing North. | — | Rejected | |||
| Jan 17, 2020 | 62K08 | VariousDistrict 1 | Expressway mowing South. | — | Rejected | |||
| Jan 17, 2020 | 62K14 | McHenryDistrict 1 | Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. | — | Executed | Martam Construction Incorporated $1,184,616 · | ||
| Jan 17, 2020 | 62K36 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $288,000 · | ||
| Jan 17, 2020 | 62K37 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $192,000 · | ||
| Jan 17, 2020 | 62K38 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length. | — | Rejected | 10x Contractors LLC $197,600 · | ||
| Jan 17, 2020 | 62K39 | CookLakeDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $211,200 · | ||
| Jan 17, 2020 | 62K40 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90 The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K41 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length. | — | Rejected | 10x Contractors LLC $280,800 · | ||
| Jan 17, 2020 | 62K42 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Da The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $230,400 · | ||
| Jan 17, 2020 | 62K43 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K44 | CookWillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $177,600 · | ||
| Jan 17, 2020 | 62K45 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kend The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length. | — | Rejected | MYS, Incorporated $193,806 · | ||
| Jan 17, 2020 | 62K46 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from L The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length. | — | Rejected | 10x Contractors LLC $195,000 · | ||
| Jan 17, 2020 | 62K47 | CookDuPageDistrict 1 | Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. | — | Rejected | Viridian Enterprises, Inc. $119,250 · | ||
| Jan 17, 2020 | 62K48 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length. | — | Rejected | Western Remac, Inc. $345,600 · | ||
| Jan 17, 2020 | 64L57 | WinnebagoDistrict 2 | Pavement patching and HMA resurfacing on IL 251 Wisconsin State Line to S of Forest Hills Rd in Machesney Park. | — | Executed | Rock Road Companies, Inc. $11,833,358 · | ||
| Jan 17, 2020 | 64L72 | WinnebagoDistrict 2 | HMA resurfacing on I-39 from 0.4 mile N of Baxter Rd to 0.3 mile N of Harrison Ave Interchange, US 20 0.7 mile W of Alpine Rd to I-39, and Baxter Rd from 0.1 mile W to 0.2 mile E of I-39. | — | Executed | William Charles Construction Company, LLC $17,894,998 · | ||
| Jan 17, 2020 | 64M43 | LeeOgleDistrict 2 | Cold milling, patching, and resurfacing from Wilson St in Polo to 0.1 mile N of Liberty Ct in Dixon. | — | Executed | Civil Constructors, Inc. $5,375,394 · | ||
| Jan 17, 2020 | 64M46 | HenryDistrict 2 | 7.94 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles E of the I-74/I-80 interchange to 0.5 miles W of IL 82. | — | Executed | Denler, Inc. $598,283 · | ||
| Jan 17, 2020 | 64N10 | Rock IslandDistrict 2 | Deck patching, expansion joint replacement, concrete overlay and painting structural steel on SN 081-0036 carrying IL 5/IL 92 over the IAIS RR, 0.2 miles NE of IL 84. | — | Executed | Civil Constructors, Inc. $1,822,161 · | ||
| Jan 17, 2020 | 64N33 | BooneDistrict 2 | Expansion joint replaement, minor deck repairs and painting beam ends on SN 004-0015 carrying Poplar Grove Rd over business route US 20 (James Gang Parkway). | — | Executed | Sjostrom & Sons, Inc. $398,481 · | ||
| Jan 17, 2020 | 64N75 | StephensonDistrict 2 | Deck patching, expansion joint replacement, HMA overlay, and miscellaneous other repairs on SN 089-0051, carrying IL 26 over the Pecatonica River in Freeport. | — | Executed | Civil Constructors, Inc. $861,602 · | ||
| Jan 17, 2020 | 64N95 | VariousDistrict 2 | "On-Call" guardrail and fence repairs along State maintained routes in Boone, Carroll, JoDaviess, Ogle, Stephenson, and Winnebago Counties. | — | Executed | Kujo, Inc. $385,575 · | ||
| Jan 17, 2020 | 64N96 | VariousDistrict 2 | "On-Call" guardrail and fence repairs along State maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties. | — | Executed | Kujo, Inc. $434,434 · | ||
| Jan 17, 2020 | 64N97 | VariousDistrict 2 | Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2. | — | Executed | O'Brien Civil Works, Inc. $89,220 · | ||
| Jan 17, 2020 | 64P01 | Jo DaviessOgleDistrict 2 | Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard. | — | Executed | Civil Constructors, Inc. $205,793 · | ||
| Jan 17, 2020 | 64P08 | Rock IslandDistrict 2 | Cold milling and HMA resurfacing on US 67 from Second Ave to Fifth Ave in Rock Island. | — | Executed | Valley Construction Co. $276,390 · | ||
| Jan 17, 2020 | 66961 | KankakeeDistrict 3 | Removal and replacement of SN 046-0087, Larry Power Rd over I-57. | — | Executed | Kankakee Valley Construction Company, Inc. $3,949,761 · | ||
| Jan 17, 2020 | 66A51 | GrundyDistrict 3 | Milling and resurfacing shoulders and 8.5" of HMA mainline pavement, replacing cable median barrier, and structural repairs with scarification on some. The project will be staged using crossovers. It is located on I-55 from 0.39 miles S of Gardner Rd to 0.83 miles S of Reed Rd interchange. | — | Executed | D. Construction, Inc. $18,872,523 · | ||
| Jan 17, 2020 | 66C59 | LaSalleDistrict 3 | Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds. | — | Executed | D. Construction, Inc. $4,314,254 · | ||
| Jan 17, 2020 | 66E68 | LivingstonDistrict 3 | Removing SN 053-0065 and replacing it with SN 053-0192. The work also includes guardrail removal and replacement, channel excavation, rip rap placement, milling and resurfacing of adjacent pavement, pavement marking, and pavement markers. | — | Executed | Tobey's Construction & Cartage, Inc. $2,828,867 · | ||
| Jan 17, 2020 | 66F08 | BureauPutnamDistrict 3 | Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. | — | Executed | Civil Constructors, Inc. $25,110,125 · | ||
| Jan 17, 2020 | 66H21 | LaSalleDistrict 3 | 1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River. | — | Executed | D. Construction, Inc. $16,388,867 · | ||
| Jan 17, 2020 | 66H52 | DeKalbDistrict 3 | Bridge replacement (Ex:019-0021, Prop:019-0050) over a tributary to the Kishwaukee River and associated approach roadway work. | — | Executed | Sjostrom & Sons, Inc. $1,311,673 · | ||
| Jan 17, 2020 | 66J57 | LaSalleDistrict 3 | Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52. | — | Executed | G. M. Sipes Construction, Inc. $415,883 · | ||
| Jan 17, 2020 | 66K36 | BureauDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126. | — | Executed | ERA-Valdivia Contractors, Inc. $416,773 · | ||
| Jan 17, 2020 | 66K37 | DeKalbDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN's 019-0036 and 019-0037. | — | Executed | ERA-Valdivia Contractors, Inc. $246,571 · | ||
| Jan 17, 2020 | 66K38 | LaSalleDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39. | — | Executed | ERA-Valdivia Contractors, Inc. $351,131 · | ||
| Jan 17, 2020 | 66K48 | LivingstonDistrict 3 | Various bridge repairs to SN's 053-0139(SB) and 053-0140(NB) carrying FAI 55 over the west fork of Mazon River 3.0 miles southwest of IL Rte 17. | — | Executed | D. Construction, Inc. $353,644 · | ||
| Jan 17, 2020 | 66K74 | BureauDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80. | — | Executed | ERA-Valdivia Contractors, Inc. $194,041 · | ||
| Jan 17, 2020 | 66K75 | GrundyIroquoisDistrict 3 | Weed spraying on various routes in Grundy and Livingston counties. | — | Executed | Endrizzi Contracting, Inc $27,192 · | ||
| Jan 17, 2020 | 68C64 | FultonDistrict 4 | 0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City. | — | Rejected | Gunther Construction, a div of UCM, Inc. $2,986,769 · | ||
| Jan 17, 2020 | 68D86 | WarrenDistrict 4 | Rehabilitation to SN 094-0041 carrying US 34 over US 67 and SN 094-0033 carrying US 34 over the BNSF Railroad, Southwest of Monmouth. | — | Executed | Brandt Construction Co. $1,525,000 · | ||
| Jan 17, 2020 | 68E34 | WoodfordDistrict 4 | Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116. | — | Executed | Advanced Asphalt Company $9,680,201 · | ||
| Jan 17, 2020 | 68F13 | VariousDistrict 4 | District-wide weed spraying (off road). | — | Executed | ALLEN CHASE ENTERPRISES INC. $117,868 · | ||
| Jan 17, 2020 | 68F14 | VariousDistrict 4 | Dead tree removal at various locations within District 4. | — | Executed | Yeagle's Forestry Mulching & Land Management $164,022 · | ||
| Jan 17, 2020 | 68F18 | MarshallMasonDistrict 4 | Bridge washing of 3 bridges over the Illinois River. | — | Executed | M & M Concrete, Inc. $94,950 · | ||
| Jan 17, 2020 | 70912 | McLeanDistrict 5 | Interstate resurfacing and ramp repair S of Lexington to Livingston Co Line 9.67 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $14,966,522 · | ||
| Jan 17, 2020 | 70B92 | ChampaignDistrict 5 | Bridge deck repairs to SN(s) 010-0031,010-0032,010-0089, and 010-0175. | — | Executed | Stark Excavating, Inc. $2,399,490 · | ||
| Jan 17, 2020 | 70E37 | ChampaignVermilionDistrict 5 | Standard overlay and cold milling at I-57 at I-74 ramps; I-74 at Oakwood ramps; Oakwood Rd S of I-74 interchange; I-74 W of I-57/I-74 interchange. | — | Executed | Open Road Paving Company LLC $559,464 · | ||
| Jan 17, 2020 | 70E44 | VariousDistrict 5 | 506.1 miles of spraying, approximately 1405 acres of state right of way along all interstate routes including interchanges in Champaign, Dewitt, Douglas, McLean, Piatt and Vermilion Counties. | — | Executed | The Daltons Inc. $105,848 · | ||
| Jan 17, 2020 | 72G01 | HancockDistrict 6 | 4 miles of resurfacing on IL 94 from Powellton Road to 1.1 miles north of CH 29 (Ferris Road). | — | Executed | W. L. Miller Company $1,942,804 · | ||
| Jan 17, 2020 | 72G57 | LoganDistrict 6 | Patching, HMA surface removal to bare concrete, SMA binder and surface courses, HMA shoulders, aggregate shoulders, shoulder rumble strips, guardrail replacement and structure repairs on I-55 from 1.3 miles south of I-55 BUS to 0.6 miles north of IL 10 west of Lincoln and on I-55 BUS from east of Old Route 66 to south of 1056th Avenue south of Lincoln. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $23,541,806 · | ||
| Jan 17, 2020 | 72G99 | MacoupinDistrict 6 | 0.7 miles of resurfacing on IL 138 from IL 4 to 8th Street in Benld. | — | Executed | Hank's Excavating & Landscaping, Inc. $994,785 · | ||
| Jan 17, 2020 | 72K09 | VariousDistrict 6 | Bridge washing on various major river bridges over the Illinois River and the Mississippi River in District 6. | — | Executed | M & M Concrete, Inc. $143,750 · | ||
| Jan 17, 2020 | 72L25 | SangamonDistrict 6 | 26.4 miles of routing and sealing of longitudinal joints along with transverse cracks in the pavement on I-55, 72, and 72A in Sangamon County. | — | Executed | Kinney Contractors, Inc. $278,646 · | ||
| Jan 17, 2020 | 72L26 | MorganDistrict 6 | 5.1 miles of pavement patching, 4- overlay (southbound lane) and guardrail removal and replacement on US 67, I-72 BUS from Markham Road (TR 78) to 1.1 miles north of I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,837,219 · | ||
| Jan 17, 2020 | 72L28 | HancockDistrict 6 | 7.2 miles of pavement preservation with Cape Seal of mainline, Fog Seal of shoulders and micro surfacing of medians and intersecting sideroads on IL 110/ 336 from 0.8 miles north of West Point Road to 3.1 miles south of the US 136 overpass in Carthage. | — | Executed | Asphalt Stone Company and Pavement Maintenance Systems JV $1,920,870 · | ||
| Jan 17, 2020 | 72L30 | MacoupinMontgomeryDistrict 6 | 14.3 miles of crack and joint sealing on I-55 from the Madison County line to north of IL 16. | — | Executed | Kinney Contractors, Inc. $167,695 · | ||
| Jan 17, 2020 | 72L41 | MacoupinDistrict 6 | Painting portions of 2 bridges on IL 111 in Macoupin County. (SN 059-0016 and 059-0013). | — | Executed | ERA-Valdivia Contractors, Inc. $292,000 · | ||
| Jan 17, 2020 | 72L42 | VariousDistrict 6 | Painting portions of 5 bridges on various routes in the western part of District 6. (SN 034-0066, 034-0063, 075-0130, 075-0131, 086-0045) | — | Executed | ERA-Valdivia Contractors, Inc. $378,250 · | ||
| Jan 17, 2020 | 72L47 | AdamsDistrict 6 | Replacing expansion joints and performing beam end repairs on SN 001-0054 carrying IL 96 over Mill Creek in Adams County. | — | Executed | County Contractors, Inc. $249,950 · | ||
| Jan 17, 2020 | 72L48 | MenardDistrict 6 | Replacing damaged parapet walls on SN 065-0002 carrying IL 97 over the Sangamon River in Menard County. | — | Executed | Freesen, a div of UCM, Inc. $320,133 · | ||
| Jan 17, 2020 | 72L50 | SangamonDistrict 6 | Patching on I-72 from Wabash Avenue to east of the MacArthur Boulevard interchange. | — | Executed | Kinney Contractors, Inc. $284,610 · | ||
| Jan 17, 2020 | 74260 | ColesMoultrieDistrict 7 | 13.1 miles of patching, milling, resurfacing and guardrail updates on IL 121 from the east city limits of Sullivan to 0.2 miles west of 300E in Mattoon. | — | Executed | Howell Paving, Inc. $5,784,430 · | ||
| Jan 17, 2020 | 74325 | CumberlandDistrict 7 | Superstructure replacement for SN 018-0057 carrying the Montrose Blacktop over Spring Point Creek, 0.5 miles north of the Effingham County line. | — | Executed | Plocher Construction Company, Inc. $1,332,535 · | ||
| Jan 17, 2020 | 74407 | JasperDistrict 7 | 6.3 miles of patching, milling, resurfacing, longitudinal joint sealant and shoulder work on IL 33 from IL 130 to IL 49. | — | Executed | Howell Paving, Inc. $3,438,121 · | ||
| Jan 17, 2020 | 74694 | ColesDistrict 7 | 3.9 miles of resurfacing, ADA improvements and traffic signals on IL 16 from west of Douglas Drive in Charleston to east of Madison Street. | — | Executed | Howell Paving, Inc. $8,219,292 · | ||
| Jan 17, 2020 | 74932 | MaconDistrict 7 | 10 miles of pavement patching and detector loops on US 51 from I-72 to the Dewitt County line. | — | Executed | Kinney Contractors, Inc. $465,234 · | ||
| Jan 17, 2020 | 74933 | MaconDistrict 7 | 2.4 miles of pavement patching on IL 121 from University Avenue in Decatur to Bearsdale Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $159,212 · | ||
| Jan 17, 2020 | 74935 | ClayLawrenceRichlandDistrict 7 | Patching on US 45 from Finch Lane to US 50 and from U.S. 50 to the Wayne County line. Also includes patching along US 50, Xenia Road, west of Flora to Sumner. | — | Executed | Kinney Contractors, Inc. $556,669 · | ||
| Jan 17, 2020 | 74951 | WayneDistrict 7 | 5.7 miles of patching, cape seal and raised reflective pavement markers on IL 242 from south of Section Line Road in Wayne City to north of I-64. | — | Executed | A. C. Pavement Striping Co. $650,397 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.