| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2020 | 76J85 | St. ClairDistrict 8 | ADA improvements on US 50 from 3rd Street to Seven Hills Road in O-Fallon. | — | Executed | Baxmeyer Construction, Inc. $291,886 · | ||
| Jan 17, 2020 | 76K36 | CalhounDistrict 8 | 7.1 miles of overlay resurfacing and ADA improvements on IL 100 from IL 96 to the Pike County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,792,705 · | ||
| Jan 17, 2020 | 76K43 | MadisonDistrict 8 | 2.5 miles of resurfacing on IL 162 from IL 157 to just east of IL 159. | — | Executed | Christ Bros. Asphalt, Inc. $2,299,845 · | ||
| Jan 17, 2020 | 76K65 | RandolphDistrict 8 | Bridge joint repairs and HMA overlay with Bridge repairs on IL 3 at Mary's River, 1.3 miles south of Chester. (SN 079-0011) | — | Executed | E. T. Simonds Construction Company $560,223 · | ||
| Jan 17, 2020 | 76L31 | ClintonDistrict 8 | ADA improvements along IL 161 from Clinton Street to 11th Street in New Baden. | — | Executed | Hank's Excavating & Landscaping, Inc. $151,631 · | ||
| Jan 17, 2020 | 76L91 | MadisonDistrict 8 | ADA improvements and traffic signal replacement on IL 3 from south of 20th Street to Niedringhaus Avenue in Granite City. | — | Executed | Keller Construction, Inc. $324,536 · | ||
| Jan 17, 2020 | 76M71 | RandolphDistrict 8 | 3.5 miles of patching on IL 150 from IL 3 to the Perry County line and on IL 3 from IL 150 to the Jackson County line. | — | Executed | E. T. Simonds Construction Company $791,886 · | ||
| Jan 17, 2020 | 76N08 | ClintonDistrict 8 | Ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. | — | Executed | The Kilian Corporation $2,978,674 · | ||
| Jan 17, 2020 | 76N23 | MadisonSt. ClairDistrict 8 | 2.1 miles of patching along IL 203 from Eagle Park Road to Collinsville Road and along Collinsville Road / 9th Street from Lake Avenue to 0.1 miles east of IL 203. | — | Executed | Keeley & Sons, Inc. $198,952 · | ||
| Jan 17, 2020 | 76N24 | St. ClairDistrict 8 | 2.4 miles of patching on 6th Street from IL 177 to IL 161. | — | Rejected | Hank's Excavating & Landscaping, Inc. $211,447 · | ||
| Jan 17, 2020 | 78504 | UnionDistrict 9 | Replacement of 2 three-span bridges with new three-span integral abutment bridges on I-57 over Big Creek, 3 miles north of the Dongola Interchange. (SN 091-0005 and 091-0006) | — | Executed | E. T. Simonds Construction Company $6,837,598 · | ||
| Jan 17, 2020 | 78506 | WilliamsonDistrict 9 | Replacement of a three-span bridge with a two-span integral abutment bridge carrying IL 148 over Wolf Creek, 1 mile south of the I-57 interchange. (SN 100-0038) | — | Executed | E. T. Simonds Construction Company $2,587,670 · | ||
| Jan 17, 2020 | 78551 | JacksonDistrict 9 | 1.5 miles of patching, surface removal, resurfacing, shoulders, pavement markings and raised reflective pavement markers on Gorham Spur Road from Lake Street to IL 3. | — | Executed | Samron Midwest Contracting, Inc. $537,659 · | ||
| Jan 17, 2020 | 78678 | AlexanderJohnsonDistrict 9 | Cleaning and painting 3 portions of 3 structures, 2 in Alexander County and 1 in Johnson County. (SN 002-0023, 002,0024, 044-0035) | — | Executed | ERA-Valdivia Contractors, Inc. $2,123,396 · | ||
| Jan 17, 2020 | 78738 | VariousDistrict 9 | Bridge deck thin polymer overlays and approach patching on IL 154 in Franklin and Perry Counties, and IL 13 in Williamson County. (SN 028-0068, 028-0071, 028-0072, 100-0068, 100-0071, 073-0035) | — | Executed | Samron Midwest Contracting, Inc. $362,604 · | ||
| Jan 17, 2020 | 78751 | WilliamsonDistrict 9 | Resurfacing ramps, shoulders and gore areas on I-57 northbound ramps at Exit 53. | — | Executed | Samron Midwest Contracting, Inc. $197,218 · | ||
| Jan 17, 2020 | 78755 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-24 and I-57 at various locations in various counties in District 9. | — | Executed | The Daltons Inc. $84,896 · | ||
| Jan 17, 2020 | 78756 | VariousDistrict 9 | Weed spraying for Johnson Grass along I-24 and I-57 at various locations in various counties in District 9. | — | Executed | Endrizzi Contracting, Inc $129,821 · | ||
| Jan 17, 2020 | 78757 | JeffersonDistrict 9 | 4 miles of resurfacing, partial depth patching and raised reflective pavement markers on I-64 from the Washington County line (MP 62) to MP 66. | — | Executed | Samron Midwest Contracting, Inc. $434,416 · | ||
| Jan 17, 2020 | 87688 | DeKalbDistrict 3 | Replace the bridge carrying TR11 (McNeal Road) over South Branch Kishwaukee River, located east of County Line Road. | — | Executed | Sjostrom & Sons, Inc. $1,976,413 · | ||
| Jan 17, 2020 | 89708 | PutnamDistrict 4 | Replace the bridge carrying CH16 over Illinois River tributary, includes roadway and channel realignment. Project is located 3.0 miles northeast of Granville. | — | Executed | Stark Excavating, Inc. $2,278,900 · | ||
| Jan 17, 2020 | 89753 | McDonoughDistrict 4 | Replace the bridge carrying CH 9 over Sugar Creek, 2 miles west of Vermont. | — | Executed | County Contractors, Inc. $1,627,348 · | ||
| Jan 17, 2020 | 91571 | VermilionDistrict 5 | Replace the Bridge carrying TR 42A over an unnamed stream 0.50 miles south of Armstrong. | — | Executed | Stark Excavating, Inc. $399,725 · | ||
| Jan 17, 2020 | 91583 | McLeanDistrict 5 | Replace the bridg ecarrying TR94 over Kings Mill Creek located 4.5 miles Northwest of Shirley. | — | Executed | Stark Excavating, Inc. $798,771 · | ||
| Jan 17, 2020 | 95863 | ClayDistrict 7 | Replace the bridge carrying Sailor Springs Road over the Little Wabash River, 0.5 miles east of Louisville. | — | Executed | Sangamo Construction Company $5,110,596 · | ||
| Jan 17, 2020 | 95864 | ShelbyDistrict 7 | Sidwalk removal and replacement, lighting and traffic signal modifications on Main Street from Broadway Street to Washington Street in Shelbyville. | — | Executed | Kinney Contractors, Inc. $1,269,880 · | ||
| Jan 17, 2020 | 97688 | MadisonDistrict 8 | Construction of a shared use path adjacent to IL 157 from Center Grove Road to MCT Nature Trail in Edwardsville. | — | Executed | Baxmeyer Construction, Inc. $253,072 · | ||
| Jan 17, 2020 | 97710 | St. ClairDistrict 8 | Construction of a multi-use path on Boul Avenue from west of IL 159 to Morgan Street in Swansea. | — | Executed | Baxmeyer Construction, Inc. $513,935 · | ||
| Mar 6, 2020 | 60M90 | CookDistrict 1 | 0.049 miles of bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying US 14 over IL 58. | — | Executed | Martam Construction Incorporated $474,343 · | ||
| Mar 6, 2020 | 60R66 | CookDistrict 1 | Bridge deck overlay and joint repairs of Chicago Ave over the Des Plaines River. | — | Executed | MYS, Incorporated $573,893 · | ||
| Mar 6, 2020 | 60R72 | CookDistrict 1 | Bridge deck scarification and replacement with latex concrete overlay, resufacing of both approaches and deck repairs on the structure carrying Central Rd over the Des Plaines River in Maine and Northfield Townships. | — | Executed | Martam Construction Incorporated $593,744 · | ||
| Mar 6, 2020 | 60T05 | CookDistrict 1 | 1.5 miles of reconstruction and ADA improvements on Wolf Road from IL 21 (Milwaukee Road) to north of Hintz Road in the Village of Wheeling. | — | Executed | Acura Inc. $12,538,085 · | ||
| Mar 6, 2020 | 61F15 | WillDistrict 1 | Replace the bridge carrying Danne Road over a Branch of Plum Creek, located 0.70 mile east of Klemme Road. | — | Executed | D. Construction, Inc. $1,359,864 · | ||
| Mar 6, 2020 | 61F34 | DuPageDistrict 1 | Construction of a shared used path from Army Trail Road to Conerstone Lakes Park. Project is located in the Village of Wayne. | — | Executed | A Lamp Concrete Contractors, Inc. $874,861 · | ||
| Mar 6, 2020 | 61F95 | CookDistrict 1 | Pavement marking removal, new pavement markings and the installation of signs on Pratt Avenue from Lawndale Avenue to McCormick Boulevard in the Village of Lincolnwood. | — | Rejected | Marking Specialists Corporation $53,296 · | ||
| Mar 6, 2020 | 61G16 | DuPageDistrict 1 | Reconstruct the intersection of Harger Road at North York Road, and the construction of an underpass to carry the Salt Creek Trail under Harger Road in Oak Brook. | — | Executed | Martam Construction Incorporated $7,365,297 · | ||
| Mar 6, 2020 | 61G17 | KaneDistrict 1 | Resurfacing Bolcum Road from Burlington Road to Fairwy Drive in the Village of Campton Hills. | — | Executed | Geneva Construction Company $704,630 · | ||
| Mar 6, 2020 | 61G18 | DuPageDistrict 1 | Pavement reconstruction and traffic signal modernization on 75th Street from Lyman Avenue to Exner Road/Williams Street, located in the Village of Downers Grove and the City of Darien | — | Executed | R. W. Dunteman Company $4,921,983 · | ||
| Mar 6, 2020 | 61G23 | DuPageDistrict 1 | Resurfacing Manchester Road from County Farm Road to Gables Boulevard in the City of Wheaton. | — | Executed | Plote Construction, Inc. $665,109 · | ||
| Mar 6, 2020 | 61G24 | KaneDistrict 1 | Resurfacing South 7th Avenue from IL 64 to Division Street in St. Charles. | — | Executed | J. A. Johnson Paving Company $910,061 · | ||
| Mar 6, 2020 | 61G25 | DuPageDistrict 1 | Resurfacing President Street from Harrison Avenue to Geneva Road in the City of Wheaton. | — | Executed | Plote Construction, Inc. $677,196 · | ||
| Mar 6, 2020 | 61G27 | DuPageDistrict 1 | Resurfacing Woodward Avenue from 75th Street to the north village limits of Woodridge. | — | Executed | K-Five Construction Corporation $981,870 · | ||
| Mar 6, 2020 | 61G29 | DuPageDistrict 1 | Resurfacing Main Street from St Charles Road to Wilson Avenue in Lombard. | — | Executed | R. W. Dunteman Company $1,307,899 · | ||
| Mar 6, 2020 | 61G30 | CookDistrict 1 | Resurfacing, sidewalk construction, curb and gutter, watermain replacement, roadway lighting and traffic signal modernization on Howard Street from Sacramento Avenue to Cellan Avenue in Evanston. | — | Executed | Acura Inc. $10,088,928 · | ||
| Mar 6, 2020 | 61G31 | LakeDistrict 1 | Roadway reconstruction on Thompson Boulevard from Brandywyn Lane to Buffalo Grove Road, and on Brandywyn Lane from Thompson Blvd. to Aptakisic Road in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $3,224,076 · | ||
| Mar 6, 2020 | 61G34 | KaneDistrict 1 | Pavement reconstruction on Prairie Street from Wilson Street to Pine Street in Batavia. | — | Executed | Pir Tano Construction Company, Inc. $2,962,380 · | ||
| Mar 6, 2020 | 61G37 | DuPageDistrict 1 | Resurfacing 83rd Street from IL 53 to Janes Avenue in the Village of Woodridge. | — | Executed | K-Five Construction Corporation $896,777 · | ||
| Mar 6, 2020 | 62F91 | McHenryDistrict 1 | Overlay Smart, ADA improvements, and milled rumble strips on IL 120 from IL 47 to Martin Rd. | — | Executed | Curran Contracting Company $3,512,337 · | ||
| Mar 6, 2020 | 62G01 | CookDistrict 1 | Turn lane and median repair, ADA improvments and traffic signal modernization at the intersection of IL 50 and 115th Street and traffic signal improvements on IL 50 at 122nd Street within the Village of Alsip. | — | Executed | D. Construction, Inc. $736,313 · | ||
| Mar 6, 2020 | 62G86 | LakeDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying IL 120 (Belvidere Rd) over Greenleaf St and CPRR in Gurnee, Waukegan, and Park City. | — | Executed | Eagle Painting & Maintenance Company, Inc. $498,300 · | ||
| Mar 6, 2020 | 62G92 | CookDistrict 1 | Removal and replacement of the existing box culvert on Chicago Rd over Thorn Creek Tributary in Chicago Heights. | — | Executed | Dunnet Bay Construction Company $2,208,417 · | ||
| Mar 6, 2020 | 62H40 | VariousDistrict 1 | Drainage improvements at various locations on IL 56, I-55, 79th Street and 131st Street within unincorporated DuPage County, City of Chicago, Village of Justice and Village of Palos Park. | — | Executed | Copenhaver Construction, Inc. $879,187 · | ||
| Mar 6, 2020 | 62H85 | CookDuPageWillDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $584,674 · | ||
| Mar 6, 2020 | 62H86 | VariousDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $686,402 · | ||
| Mar 6, 2020 | 62J20 | KaneDistrict 1 | Resurfacing/Pedestrian ramp (ADA) improvements along 47th St from Finley Rd to Baseline Rd spanning a gross length of 7.005 miles in Sugar Grove. | — | Executed | Curran Contracting Company $5,280,083 · | ||
| Mar 6, 2020 | 62J34 | KaneDistrict 1 | Bridge deck repair, joint repair, and bridge deck overlay to the structure carrying IL 38 over the Fox River in Geneva. | — | Executed | Lorig Construction Company $571,665 · | ||
| Mar 6, 2020 | 62J38 | DuPageDistrict 1 | Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Chicago Ave over IL 83. | — | Executed | P. T. Ferro Construction Co. $172,877 · | ||
| Mar 6, 2020 | 62J44 | CookDistrict 1 | 3.01 miles of designed overlay, pedestrian ramp, and drainage improvements on McCormick Blvd from Dempster St to Devon Ave. | — | Executed | Builders Paving, LLC $4,038,000 · | ||
| Mar 6, 2020 | 62J55 | CookDistrict 1 | 1.826 miles of designed overlay/pedestrian ramp (ADA) improvements along 106th ST from Torrence Ave to US 12/41 (Indianapolis Ave). | — | Executed | Gallagher Asphalt Corporation $2,478,606 · | ||
| Mar 6, 2020 | 62J66 | CookDistrict 1 | 0.5 miles of designed overlay and ADA improvments on Canal Street from Archer Avenue to W 28th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $467,338 · | ||
| Mar 6, 2020 | 62J71 | CookDistrict 1 | 1.62 miles of resurfacing improvements and ADA ramp improvements along US 14 (Northwest Highway) from E of Smith St to S Hicks Rd. | — | Executed | Arrow Road Construction Co. $2,317,789 · | ||
| Mar 6, 2020 | 62J77 | CookDistrict 1 | 1.3 miles of designed overlay on 5th Avenue from IL 64 (North Avenue) to Lake Street in the Villages of Melrose Park and Maywood. | — | Executed | Arrow Road Construction Co. $1,417,367 · | ||
| Mar 6, 2020 | 62J85 | CookDistrict 1 | 2.09 miles of designed overlay from S of IL 171 (Archer Ave) to 107th in Willow Springs. | — | Executed | K-Five Construction Corporation $1,026,000 · | ||
| Mar 6, 2020 | 62J86 | CookDistrict 1 | 0.70 miles of standard overlay and ADA improvements on Palatine Rd - South Frontage Rd, N Verde Ave to Palatine Rd in Arlington Heights. | — | Executed | J. A. Johnson Paving Company $539,293 · | ||
| Mar 6, 2020 | 62J88 | CookDistrict 1 | 4.4 miles of HMA surface removal, patching, resurfacing, ADA sidewalk repairs, HMA shoulders and drainage improvements on Des Plaines River Road from Foster Avenue to IL 171 (1st Avenue) and Lawrence Avenue from East River Road to Ridgewood Avenue within the Villages of Schiller Park, Norridge, Franklin Park and River Grove. | — | Executed | R. W. Dunteman Company $4,948,861 · | ||
| Mar 6, 2020 | 62J97 | CookDistrict 1 | 0.41 miles of designed overlay and pedestrian ramp upgrades on Lincoln Ave approximately 100 ft S of Main St E to approximately 50 ft N of Niles Center Rd. | — | Executed | Arrow Road Construction Co. $511,357 · | ||
| Mar 6, 2020 | 62J99 | LakeDistrict 1 | 2.6 miles of designed overlay, new shoulders and pedestrian ramp improvements on IL 176 from Crescent Knoll Drive to west of US 41 in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $3,498,734 · | ||
| Mar 6, 2020 | 62K01 | CookDistrict 1 | Structure improvements to SN 016-0141 carrying the CTA RR over the Dan Ryan Expressway, approximately 0.5 miles south of 55th Street. | — | Executed | Kiewit Infrastructure Co. $654,013 · | ||
| Mar 6, 2020 | 62K09 | VariousDistrict 1 | Weed spraying at various locations within District One. | — | Rejected | McGinty Bros., Inc. $694,500 · | ||
| Mar 6, 2020 | 62K11 | VariousDistrict 1 | Repair and installation of guardrail along various expressway and arterial highways. | — | Executed | Northern Contracting, Inc. $1,547,667 · | ||
| Mar 6, 2020 | 62K12 | VariousDistrict 1 | Repair and installation of fence along various expressway and arterial highways. | — | Executed | Northern Contracting, Inc. $377,686 · | ||
| Mar 6, 2020 | 62K15 | WillDistrict 1 | 3.2 miles of standard overlay and milled rumble strips on New Avenue from Long Creek to the Cook County line in the City of Lockport. | — | Executed | P. T. Ferro Construction Co. $1,163,112 · | ||
| Mar 6, 2020 | 62K16 | WillDistrict 1 | 1.7 miles of standard overlay, ADA improvments and guardrail replacement on IL 126 from the Kendall County line to Wallin Drive in the Village of Plainfield and unincorporated Plainfield Township. | — | Executed | P. T. Ferro Construction Co. $889,686 · | ||
| Mar 6, 2020 | 62K17 | LakeDistrict 1 | Demolition of one commercial structure and one single-family residence at various locations near US 14 and CN Railroad in the Village of Barrington. | — | Executed | Copenhaver Construction, Inc. $237,435 · | ||
| Mar 6, 2020 | 62K25 | CookDistrict 1 | Cleaning and painting all steel surfaces of the bridge carrying 55th St over I-94 (Dan Ryan Expw) in Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,073,500 · | ||
| Mar 6, 2020 | 62K26 | CookDistrict 1 | Weep hole coring, cleaning drainage structure, reconstructing drainage structure, gutter removal and replacement, debris removal, and selective clearing in the village of McCook and Lyons Township. | — | Executed | MYS, Incorporated $198,148 · | ||
| Mar 6, 2020 | 62K27 | VariousDistrict 1 | Removing and replacing signs along various District One expressways and arterial routes. | — | Executed | Western Remac, Inc. $715,760 · | ||
| Mar 6, 2020 | 62K32 | CookWillDistrict 1 | Concrete bridge deck sealing upon the entire top surface of the bridge deck, top of sidewalks, and the inside and top of parapets on structures at various locations. | — | Executed | M & M Concrete, Inc. $179,824 · | ||
| Mar 6, 2020 | 62K52 | VariousDistrict 1 | Tree removal, tree pruning and stump removal at various locations within District One. | — | Executed | McGinty Bros., Inc. $451,900 · | ||
| Mar 6, 2020 | 62K56 | CookDistrict 1 | Light tower and foundation removal, installation of new light poles, metal foundations, LED luminaires, conduit, cable, excavation and site restoration on US 30 (Lincoln Highway) at IL 43 (Harlem Avenue) in the Village of Frankfort. | — | Executed | John Burns Construction Company $712,222 · | ||
| Mar 6, 2020 | 62K58 | VariousDistrict 1 | Dead tree removal along expressways and arterial routes within District One. | — | Executed | Homer Tree Service, Inc. $722,605 · | ||
| Mar 6, 2020 | 64M29 | LeeDistrict 2 | Miscellaneous intersection and sidewalk improvements at US 52 and Main St in Amboy. | — | Executed | O'Brien Civil Works, Inc. $158,779 · | ||
| Mar 6, 2020 | 64M84 | WhitesideDistrict 2 | Scour mitigation on the upstream end of culvert SN 098-1076 carrying Garden Plain Rd over a tributary to Cattail Creek 0.3 mile NE of Millard Rd. | — | Executed | Curnyn Construction Co. $73,844 · | ||
| Mar 6, 2020 | 64N31 | OgleDistrict 2 | Expansion joint replacement, deck patching, and concrete overlay on SN 071-0040 carrying IL 72 over the Rock River in Byron. | — | Executed | Martin & Company Excavating $945,424 · | ||
| Mar 6, 2020 | 64N56 | WinnebagoDistrict 2 | Cold milling, pavement patching, and HMA resurfacing 0.8 mile W of I-90 to 0.4 mile E of Lyford Rd. | — | Executed | Rock Road Companies, Inc. $895,519 · | ||
| Mar 6, 2020 | 64N57 | WinnebagoDistrict 2 | 2.65 miles routing, cleaning, and sealing the centerline and shoulder joints on IL2 N of Rockford from 0.5 mile N of Elmwood Rd to 0.5 mile N of Latham Rd. | — | Executed | Denler, Inc. $104,920 · | ||
| Mar 6, 2020 | 64P00 | Rock IslandWhitesideDistrict 2 | Painting and cleaning of SN 081-0119 carrying Moline Rd over I-88 located 0.7 mile E of I-80, and SN 098-0056 carrying Sand Rd over I-88 located 2.5 miles NW of Erie. | — | Executed | Civil Coatings and Construction Inc. $697,425 · | ||
| Mar 6, 2020 | 64P07 | BooneDistrict 2 | Cold milling and HMA resurfacing on US 20 BUS from 0.1 mile W to 0.3 mile E of Van Epps Dr in Belvidere. | — | Executed | William Charles Construction Company, LLC $251,659 · | ||
| Mar 6, 2020 | 64P12 | VariousDistrict 2 | Removal of dead trees along state maintained routes. | — | Rejected | Homer Tree Service, Inc. $282,750 · | ||
| Mar 6, 2020 | 66A82 | GrundyDistrict 3 | 3P milling and resurfacing on IL 113 from IL 47 to Mary Ave in Coal City. 6.73 miles. | — | Executed | D. Construction, Inc. $2,696,227 · | ||
| Mar 6, 2020 | 66B76 | FordDistrict 3 | 3.903 miles of milling and resurfacing 3" of HMA from the S edge of Gibson City to the Champaign County Line. Also replacing one cross-road culvert. | — | Executed | Iroquois Paving Corporation $1,695,669 · | ||
| Mar 6, 2020 | 66J48 | LaSalleDistrict 3 | 2.766 miles of milling and resurfacing and ADA improvements from 0.8 miles W of Boyce Memorial Dr to Champlain St in Ottawa. Widen shoulders 1' at west end of the project. | — | Executed | Advanced Asphalt Company $3,711,915 · | ||
| Mar 6, 2020 | 66K29 | LaSallePutnamDistrict 3 | 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. | — | Executed | A. C. Pavement Striping Co. $306,765 · | ||
| Mar 6, 2020 | 66K49 | LivingstonDistrict 3 | Bridge expansion joint seal removal and replacement, removal and replacement of existing bridge approach slabs on SN 053-0047 carrying IL 47 over 5 Mile Creek 0.30 mile N of IL 116. | — | Executed | Tobey's Construction & Cartage, Inc. $532,961 · | ||
| Mar 6, 2020 | 66K80 | LivingstonDistrict 3 | 13.10 miles consisting of 2" SMART cold milling and resurfacing from 0.9 miles S of IL 17 in Dwight to IL 116 in Saunemin. | — | Executed | Kankakee Valley Construction Company, Inc. $3,727,955 · | ||
| Mar 6, 2020 | 66K83 | VariousDistrict 3 | Monitoring traffic backups on the interstate in various counties in region 2 using ITS-Smart Work Zone Technology Traffic Management. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $988,000 · | ||
| Mar 6, 2020 | 68656 | KnoxDistrict 4 | Resurfacing on I-74 from 0.3 miles N of US Rte 34 to 0.4 miles N of Main St in Galesburg. | — | Executed | Gunther Construction, a div of UCM, Inc. $8,250,984 · | ||
| Mar 6, 2020 | 68805 | WoodfordDistrict 4 | Rehabilitation of the superstructure that carries IL Rte 116 over the west branch of Panther Creek in Roanoke. | — | Executed | Stark Excavating, Inc. $976,351 · | ||
| Mar 6, 2020 | 68814 | WarrenDistrict 4 | Resurfacing on IL 116 from TR 154 to the Knox County Line. | — | Executed | Gunther Construction, a div of UCM, Inc. $3,872,911 · | ||
| Mar 6, 2020 | 68A76 | PeoriaDistrict 4 | Resurfacing on IL Rte 91 from the IL Rte 90E junction to S of Parks School Rd in Dunlap. | — | Executed | Advanced Asphalt Company $1,656,535 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.