Bid tab 62J99

Let Mar 6, 2020 · District 1 · Lake Sign up free

‹ Mar 2020 results

2019-087-RS&SR

Let date
Friday, March 6, 2020
Contract
62J99 · job page
District
District 1
County
Lake
Highway
Limits
2.6 miles of designed overlay, new shoulders and pedestrian ramp improvements on IL 176 from Crescent Knoll Drive to west of US 41 in the Village of Libertyville.

Bidders 1

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Peter Baker & Son Co. Low bidder $3,498,734

Bid tab: unit prices 63 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Peter Baker & S…
1X0320050 CONSTRUCTN LAYOUT SPL1L SUM $3,625.00
2X5537800 SS CLEANED 12100FOOT $3.00
3X6030310 FR & LIDS ADJUST SPL5EACH $1,200.00
4X7030005 TEMP PAVT MKING REMOV27,213SQ FT $0.0100
5Z0004562 COMB C C&G REM & REPL3,580FOOT $38.00
6Z0018500 DRAINAGE STR CLEANED5EACH $475.00
7Z0030850 TEMP INFO SIGNING51.4SQ FT $20.00
8Z0033700 LONG JOINT SEALANT38,909FOOT $2.33
9Z0048665 RR PROT LIABILITY INS1L SUM $6,250.00
1020200100 EARTH EXCAVATION333CU YD $87.00
1120201200 REM & DISP UNS MATL459CU YD $87.00
1221400100 GRADING & SHAP DITCH6,080FOOT $12.35
1340600290 BIT MATLS TACK CT54,140POUND $1.00
1440600400 MIX CR JTS FLANGEWYS118TON $200.00
1540600982 HMA SURF REM BUTT JT288SQ YD $5.00
1640602985 HMA BC IL-9.5 N708,983TON $78.00
1740605026 P HMA SC SMA 9.5 F N807,861TON $105.00
1842001300 PROTECTIVE COAT343SQ YD $0.0100
1942400200 PC CONC SIDEWALK 56.4SQ FT $65.00
2042400800 DETECTABLE WARNINGS50SQ FT $42.00
2144000100 PAVEMENT REM551SQ YD $17.00
2244000164 HMA SURF REM 3 3/480,207SQ YD $5.95
2344000600 SIDEWALK REM410SQ FT $5.00
2444201789 CL D PATCH T2 12401SQ YD $90.00
2544201794 CL D PATCH T3 12802SQ YD $80.00
2644201796 CL D PATCH T4 12401SQ YD $70.00
2744201851 CL D PATCH T2 17402SQ YD $120.00
2844201855 CL D PATCH T3 17802SQ YD $110.00
2944201857 CL D PATCH T4 17402SQ YD $100.00
3048203029 HMA SHOULDERS 83,561SQ YD $52.60
3160300105 FR & GRATES ADJUST5EACH $650.00
3260300305 FR & LIDS ADJUST5EACH $650.00
3366900200 NON SPL WASTE DISPOSL800CU YD $45.35
3466900530 SOIL DISPOSAL ANALY10EACH $1,200.00
3566901001 REG SUB P-CONST PLAN1LSUM $2,500.00
3666901003 REG SUB F CON REPORT1LSUM $2,200.00
3766901006 REG SUB MON20CAL DA $790.00
3867000400 ENGR FIELD OFFICE A6CAL MO $2,000.00
3967100100 MOBILIZATION1L SUM $242,300.00
4070102620 TR CONT & PROT 7015011L SUM $60,000.00
4170102625 TR CONT & PROT 7016061L SUM $1.00
4270102630 TR CONT & PROT 7016011L SUM $6,000.00
4370102632 TR CONT & PROT 7016021L SUM $1.00
4470102635 TR CONT & PROT 7017011L SUM $1.00
4570102640 TR CONT & PROT 7018011L SUM $4,000.00
4670300100 SHORT TERM PAVT MKING42,181FOOT $0.0100
4770300150 SHRT TRM PAVT MK REM18,497SQ FT $0.0100
4870300210 TEMP PVT MK LTR & SYM437SQ FT $1.00
4970300220 TEMP PVT MK LINE 441,405FOOT $0.2000
5070300240 TEMP PVT MK LINE 66,041FOOT $0.2500
5170300250 TEMP PVT MK LINE 8660FOOT $0.3000
5270300260 TEMP PVT MK LINE 123,953FOOT $0.5000
5370300280 TEMP PVT MK LINE 24702FOOT $1.25
5470300520 PAVT MARK TAPE T3 421,091FOOT $0.0100
5578000100 THPL PVT MK LTR & SYM1,202SQ FT $4.60
5678000200 THPL PVT MK LINE 441,405FOOT $0.5800
5778000400 THPL PVT MK LINE 66,041FOOT $0.9500
5878000500 THPL PVT MK LINE 8660FOOT $1.15
5978000600 THPL PVT MK LINE 123,953FOOT $2.25
6078000650 THPL PVT MK LINE 24702FOOT $4.65
6178100100 RAISED REFL PAVT MKR766EACH $25.00
6278300200 RAISED REF PVT MK REM390EACH $10.00
6388600600 DET LOOP REPL1,930FOOT $17.90