08-00178-03-BT
- Let date
- Friday, November 8, 2019
- Contract
- 61F17 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $855,645 | ||
| 2 | Copenhaver Construction, Inc. | $1,242,528 | +45.2% | |
| 3 | Foundation Mechanics | $1,246,491 | +45.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Copenhaver Cons… | #3 Foundation Mech… |
|---|---|---|---|---|---|---|---|---|
| 1 | A2002008 | T-AESCUL FLV YSB 2 BB | 2 | EACH | $517.00 | $600.00 | $500.00 | |
| 2 | A2002816 | T-CATALPA SPEC 2 | 4 | EACH | $412.50 | $450.00 | $500.00 | |
| 3 | A2002916 | T-CELTIS OCCID 2 | 4 | EACH | $462.00 | $600.00 | $500.00 | |
| 4 | A2005040 | T-GYMNOC DE JFS 2-1/2 | 2 | EACH | $550.00 | $600.00 | $500.00 | |
| 5 | A2005416 | T-LIRIODEN TUL 2 | 7 | EACH | $473.00 | $500.00 | $500.00 | |
| 6 | A2006313 | T-PRUNUS SERO 1.5 | 4 | EACH | $352.00 | $370.00 | $500.00 | |
| 7 | A2006514 | T-QUERCUS BICOL 1-3/4 | 6 | EACH | $379.50 | $500.00 | $500.00 | |
| 8 | A2006614 | T-QUERCUS IMBR 1-3/4 | 4 | EACH | $438.90 | $500.00 | $500.00 | |
| 9 | A2006714 | T-QUERCUS MACR 1-3/4 | 4 | EACH | $440.00 | $500.00 | $500.00 | |
| 10 | A2006814 | T-QUERCUS MUEH 1-3/4 | 8 | EACH | $451.00 | $500.00 | $500.00 | |
| 11 | A2007848 | T-TILIA AMER LEG 2 | 4 | EACH | $478.50 | $600.00 | $500.00 | |
| 12 | A2008468 | T-ULMUS AMER PRINC 2 | 5 | EACH | $478.50 | $550.00 | $500.00 | |
| 13 | B2000664 | T-AMELAN X GF SF 5' | 6 | EACH | $341.00 | $360.00 | $500.00 | |
| 14 | B2001164 | T-CERCIS CAN CL 5' | 4 | EACH | $407.00 | $350.00 | $500.00 | |
| 15 | B2006316 | T-SYRG RT IS TF 2 | 7 | EACH | $495.00 | $600.00 | $500.00 | |
| 16 | B2010070 | T-CLADRASTIS KY 2 | 3 | EACH | $473.00 | $600.00 | $500.00 | |
| 17 | C2C043G5 | S-LIND BENZOIN 5G | 5 | EACH | $71.50 | $80.00 | $65.00 | |
| 18 | C2C100G5 | S-VIBURN LENTAG CG 5G | 6 | EACH | $66.00 | $80.00 | $65.00 | |
| 19 | C2001136 | S-CEPHALAN OCCID 3' | 11 | EACH | $55.00 | $90.00 | $65.00 | |
| 20 | K1005863 | TREE ROOT PRUNING | 21 | EACH | $55.00 | $40.00 | $50.00 | |
| 21 | XX007399 | MONUMENT TY A FOUNDTN | 12 | EACH | $1,500.00 | $3,100.00 | $4,000.00 | |
| 22 | XX008268 | DECOR GTWY ELEMENT | 1 | EACH | $30,000.00 | $65,000.00 | $90,000.00 | |
| 23 | XX008600 | DEC SIGN AND POST(DB) | 12 | EACH | $990.00 | $2,400.00 | $2,500.00 | |
| 24 | XX009338 | T-NYSSA SYLVAT ASG 2 | 4 | EACH | $495.00 | $580.00 | $500.00 | |
| 25 | XX009339 | T-QUERCUS MACR UPBO 2 | 3 | EACH | $478.50 | $520.00 | $500.00 | |
| 26 | XX009340 | T-SASSAFRAS ALBIDUM 2 | 3 | EACH | $550.00 | $590.00 | $500.00 | |
| 27 | X0321322 | DROP GATE | 1 | EACH | $2,750.00 | $3,500.00 | $5,000.00 | |
| 28 | X0326899 | SOLAR-POWER FB AS CMP | 1 | EACH | $11,300.00 | $30,000.00 | $30,000.00 | |
| 29 | X0327980 | PAVMT MRKG REM WTR BL | 624 | SQ FT | $4.40 | $3.00 | $4.00 | |
| 30 | X2500322 | SEEDING CL 5A MOD | 1.75 | ACRE | $2,200.00 | $5,000.00 | $2,500.00 | |
| 31 | X2502014 | SEEDING CL 4A MOD | 1.75 | ACRE | $2,420.00 | $5,000.00 | $2,500.00 | |
| 32 | Z0004562 | COMB C C&G REM & REPL | 95 | FOOT | $63.00 | $35.00 | $70.00 | |
| 33 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $17,500.00 | $69,000.00 | $26,250.00 | |
| 34 | Z0022800 | FENCE REMOVAL | 137 | FOOT | $10.00 | $6.00 | $5.00 | |
| 35 | Z0030850 | TEMP INFO SIGNING | 52 | SQ FT | $30.00 | $25.00 | $25.00 | |
| 36 | Z0042300 | PC CONC SIDEWALK CURB | 168 | FOOT | $26.75 | $28.00 | $40.00 | |
| 37 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $3,000.00 | $14,000.00 | $7,000.00 | |
| 38 | 20100110 | TREE REMOV 6-15 | 310 | UNIT | $19.80 | $20.00 | $18.00 | |
| 39 | 20100210 | TREE REMOV OVER 15 | 290 | UNIT | $23.10 | $25.00 | $21.00 | |
| 40 | 20100500 | TREE REMOV ACRES | 1 | ACRE | $8,800.00 | $10,000.00 | $8,000.00 | |
| 41 | 20101000 | TEMPORARY FENCE | 1,260 | FOOT | $5.50 | $2.00 | $5.00 | |
| 42 | 20101300 | TREE PRUN 1-10 | 8 | EACH | $55.00 | $35.00 | $50.00 | |
| 43 | 20101350 | TREE PRUN OVER 10 | 14 | EACH | $82.50 | $40.00 | $75.00 | |
| 44 | 20200100 | EARTH EXCAVATION | 1,889 | CU YD | $69.00 | $33.00 | $10.00 | |
| 45 | 20201200 | REM & DISP UNS MATL | 3,326 | CU YD | $0.0100 | $33.00 | $40.00 | |
| 46 | 20400800 | FURNISHED EXCAVATION | 974 | CU YD | $30.00 | $12.00 | $40.00 | |
| 47 | 20800150 | TRENCH BACKFILL | 15 | CU YD | $100.00 | $60.00 | $75.00 | |
| 48 | 21001000 | GEOTECH FAB F/GR STAB | 5,602 | SQ YD | $3.00 | $2.00 | $3.00 | |
| 49 | 21101625 | TOPSOIL F & P 6 | 9,396 | SQ YD | $2.00 | $6.00 | $7.00 | |
| 50 | 25000115 | SEEDING CL 1B | 0.5 | ACRE | $3,300.00 | $3,000.00 | $3,000.00 | |
| 51 | 25000400 | NITROGEN FERT NUTR | 45 | POUND | $2.20 | $1.00 | $2.00 | |
| 52 | 25000600 | POTASSIUM FERT NUTR | 45 | POUND | $2.20 | $1.00 | $2.00 | |
| 53 | 25100115 | MULCH METHOD 2 | 2 | ACRE | $2,200.00 | $2,500.00 | $1,000.00 | |
| 54 | 25100630 | EROSION CONTR BLANKET | 9,396 | SQ YD | $1.10 | $2.00 | $1.00 | |
| 55 | 25200110 | SODDING SALT TOLERANT | 33 | SQ YD | $33.00 | $20.00 | $30.00 | |
| 56 | 25200200 | SUPPLE WATERING | 94 | UNIT | $1.10 | $0.0100 | $1.00 | |
| 57 | 28000250 | TEMP EROS CONTR SEED | 195 | POUND | $5.50 | $0.0100 | $1.00 | |
| 58 | 28000305 | TEMP DITCH CHECKS | 45 | FOOT | $16.50 | $20.00 | $15.00 | |
| 59 | 28000315 | AGG DITCH CHECKS | 9 | TON | $55.00 | $59.00 | $100.00 | |
| 60 | 28000400 | PERIMETER EROS BAR | 4,300 | FOOT | $3.30 | $2.00 | $3.00 | |
| 61 | 28100103 | STONE RIPRAP CL A2 | 150 | SQ YD | $55.00 | $60.00 | $100.00 | |
| 62 | 28200200 | FILTER FABRIC | 150 | SQ YD | $5.00 | $3.00 | $5.00 | |
| 63 | 30300001 | AGG SUBGRADE IMPROVE | 500 | CU YD | $55.00 | $45.00 | $50.00 | |
| 64 | 31101400 | SUB GRAN MAT B 6 | 190 | SQ YD | $15.00 | $15.00 | $23.50 | |
| 65 | 35101600 | AGG BASE CSE B 4 | 29 | SQ YD | $35.00 | $12.00 | $50.00 | |
| 66 | 35101800 | AGG BASE CSE B 6 | 150 | SQ YD | $20.00 | $15.00 | $50.00 | |
| 67 | 35102000 | AGG BASE CSE B 8 | 4,570 | SQ YD | $13.50 | $13.00 | $17.50 | |
| 68 | 40200900 | AGG SURF CSE B | 4 | CU YD | $100.00 | $100.00 | $50.00 | |
| 69 | 40600275 | BIT MATLS PR CT | 9,605 | POUND | $0.0100 | $0.1000 | $0.6200 | |
| 70 | 40604060 | HMA SC IL-9.5 D N50 | 480 | TON | $110.00 | $192.00 | $120.00 | |
| 71 | 40604062 | HMA SC IL-9.5 D N70 | 19 | TON | $200.00 | $220.00 | $330.00 | |
| 72 | 40800029 | BIT MATLS TACK CT | 117 | POUND | $1.00 | $0.1000 | $5.00 | |
| 73 | 42001300 | PROTECTIVE COAT | 243 | SQ YD | $3.15 | $2.00 | $1.00 | |
| 74 | 42300400 | PCC DRIVEWAY PAVT 8 | 134 | SQ YD | $84.00 | $70.00 | $250.00 | |
| 75 | 42400300 | PC CONC SIDEWALK 6 | 3,250 | SQ FT | $8.40 | $7.00 | $12.00 | |
| 76 | 42400800 | DETECTABLE WARNINGS | 40 | SQ FT | $31.50 | $25.00 | $30.00 | |
| 77 | 44000157 | HMA SURF REM 2 | 170 | SQ YD | $15.00 | $31.00 | $60.00 | |
| 78 | 44000600 | SIDEWALK REM | 577 | SQ FT | $2.50 | $3.00 | $5.00 | |
| 79 | 48101202 | AGGREGATE SHLDS B | 2 | CU YD | $200.00 | $200.00 | $50.00 | |
| 80 | 48203029 | HMA SHOULDERS 8 | 190 | SQ YD | $60.00 | $94.00 | $120.00 | |
| 81 | 542A0217 | P CUL CL A 1 12 | 27 | FOOT | $80.00 | $95.00 | $60.00 | |
| 82 | 542A0220 | P CUL CL A 1 15 | 52 | FOOT | $85.00 | $105.00 | $70.00 | |
| 83 | 542A0223 | P CUL CL A 1 18 | 16 | FOOT | $120.00 | $125.00 | $80.00 | |
| 84 | 54213657 | PRC FLAR END SEC 12 | 2 | EACH | $700.00 | $800.00 | $2,500.00 | |
| 85 | 54213660 | PRC FLAR END SEC 15 | 6 | EACH | $800.00 | $900.00 | $2,500.00 | |
| 86 | 54213663 | PRC FLAR END SEC 18 | 2 | EACH | $1,000.00 | $980.00 | $2,500.00 | |
| 87 | 60255500 | MAN ADJUST | 4 | EACH | $750.00 | $600.00 | $1,000.00 | |
| 88 | 66400305 | CH LK FENCE 6 | 100 | FOOT | $49.00 | $60.00 | $50.00 | |
| 89 | 66900200 | NON SPL WASTE DISPOSL | 160 | CU YD | $90.00 | $105.00 | $65.00 | |
| 90 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,485.00 | $2,100.00 | $2,500.00 | |
| 91 | 66901001 | REG SUB P-CONST PLAN | 1 | LSUM | $2,200.00 | $3,600.00 | $5,000.00 | |
| 92 | 66901002 | ON-SITE MON REG SUB | 5 | CAL DA | $1,045.00 | $800.00 | $720.00 | |
| 93 | 66901003 | REG SUB F CON REPORT | 1 | LSUM | $2,200.00 | $900.00 | $5,000.00 | |
| 94 | 67000500 | ENGR FIELD OFFICE B | 8 | CAL MO | $4,000.00 | $1,500.00 | $2,000.00 | |
| 95 | 67100100 | MOBILIZATION | 1 | L SUM | $51,300.00 | $70,332.00 | $74,300.00 | |
| 96 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $17,500.00 | $105,000.00 | $45,000.00 | |
| 97 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $0.0100 | $1.00 | $7,500.00 | |
| 98 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $1.00 | $7,500.00 | |
| 99 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $0.0100 | $10,000.00 | $7,500.00 | |
| 100 | 72000100 | SIGN PANEL T1 | 696 | SQ FT | $22.00 | $22.00 | $18.00 | |
| 101 | 72400100 | REMOV SIN PAN ASSY TA | 2 | EACH | $192.50 | $90.00 | $200.00 | |
| 102 | 72800100 | TELES STL SIN SUPPORT | 94 | FOOT | $18.70 | $28.00 | $20.00 | |
| 103 | 72900100 | METAL POST TY A | 548 | FOOT | $16.50 | $18.00 | $12.00 | |
| 104 | 72900200 | METAL POST TY B | 1,057 | FOOT | $17.60 | $19.00 | $12.00 | |
| 105 | 73100100 | BASE TEL STL SIN SUPP | 8 | EACH | $247.50 | $180.00 | $500.00 | |
| 106 | 78000100 | THPL PVT MK LTR & SYM | 870 | SQ FT | $4.40 | $24.00 | $6.25 | |
| 107 | 78000200 | THPL PVT MK LINE 4 | 10,093 | FOOT | $0.5700 | $1.25 | $0.7800 | |
| 108 | 78000400 | THPL PVT MK LINE 6 | 96 | FOOT | $0.9600 | $2.00 | $1.50 | |
| 109 | 78000600 | THPL PVT MK LINE 12 | 486 | FOOT | $1.93 | $4.00 | $3.10 | |
| 110 | 78000650 | THPL PVT MK LINE 24 | 28 | FOOT | $6.60 | $7.00 | $6.25 | |
| 111 | 78001110 | PAINT PVT MK LINE 4 | 3,992 | FOOT | $0.7000 | $1.00 | $0.7000 | |
| 112 | 78001150 | PAINT PVT MK LINE 12 | 25 | FOOT | $2.11 | $5.00 | $2.10 | |
| 113 | 78009004 | MOD URETH PM LINE 4 | 450 | FOOT | $2.48 | $5.00 | $6.50 | |
| 114 | 78009006 | MOD URETH PM LINE 6 | 169 | FOOT | $3.72 | $8.00 | $9.25 | |
| 115 | 78009012 | MOD URETH PM LINE 12 | 288 | FOOT | $7.43 | $14.00 | $20.00 |