$519.33Avg low bid / CAL DA
$528.45Avg of all bids
—Avg engineer's estimate
178Jobs · 3,699 CAL DA
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2020 | 3 | 17 | $1,029.18 | $956.86 |
| 2019 | 175 | 3,682 | $516.97 | $526.80 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Apr 24, 2020 | 70B98 | ChampaignDistrict 5 | 12 CAL DA | $808.00 | Stark Excavating, Inc. |
| Jan 17, 2020 | 61F86 | CookDistrict 1 | 2 CAL DA | $1,500.00 | P. T. Ferro Construction Co. |
| Jan 17, 2020 | 66961 | KankakeeDistrict 3 | 3 CAL DA | $1,600.00 | Kankakee Valley Construction Company, Inc. |
| Nov 8, 2019 | 61G07 | CookDistrict 1 | 1 CAL DA | $600.00 | Landmark Contractors, Inc. |
| Nov 8, 2019 | 87706 | LasalleDistrict 3 | 3 CAL DA | $1,045.00 | D. Construction, Inc. |
| Nov 8, 2019 | 61E52 | KaneDistrict 1 | 5 CAL DA | $1,050.00 | D. Construction, Inc. |
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | 8 CAL DA | $900.00 | ICC Group Inc. |
| Nov 8, 2019 | 62F95 | CookDistrict 1 | 15 CAL DA | $875.00 | Kenny Construction Company_DO NOT USE |
| Nov 8, 2019 | 61F17 | CookDistrict 1 | 5 CAL DA | $1,045.00 | D. Construction, Inc. |
| Nov 8, 2019 | 70545 | DouglasDistrict 5 | 5 CAL DA | $937.65 | Sangamo Construction Company |
| Nov 8, 2019 | 62H21 | CookDistrict 1 | 10 CAL DA | $100.00 | Plote Construction, Inc. |
| Nov 8, 2019 | 61F63 | LakeDistrict 1 | 1 CAL DA | $1,675.00 | Chicagoland Paving Contractors, Inc. |
| Nov 8, 2019 | 72J99 | SchuylerDistrict 6 | 5 CAL DA | $1,060.00 | Illinois Valley Paving, a div of UCM, Inc. |
| Nov 8, 2019 | 62J31 | CookDistrict 1 | 45 CAL DA | $700.00 | Lorig Construction Company |
| Nov 8, 2019 | 61F97 | CookDistrict 1 | 2 CAL DA | $920.00 | Landmark Contractors, Inc. |
| Nov 8, 2019 | 85688 | BooneDistrict 2 | 3 CAL DA | $850.00 | Civil Constructors, Inc. |
| Nov 8, 2019 | 64L16 | OgleDistrict 2 | 22 CAL DA | $825.40 | Stenstrom Excavation & Blacktop, Inc. |
| Nov 8, 2019 | 61G04 | CookDistrict 1 | 20 CAL DA | $680.00 | K-Five Construction Corporation |
| Nov 8, 2019 | 87695 | GrundyDistrict 3 | 10 CAL DA | $990.00 | D. Construction, Inc. |
| Nov 8, 2019 | 60R67 | CookDistrict 1 | 10 CAL DA | $200.00 | Lorig Construction Company |
| Nov 8, 2019 | 66E50 | DekalbDistrict 3 | 3 CAL DA | $900.00 | Rock Road Companies, Inc. |
| Sep 20, 2019 | 61F93 | CookDistrict 1 | 1 CAL DA | $1,100.00 | J. A. Johnson Paving Company |
| Sep 20, 2019 | 87711 | LasalleDistrict 3 | 3 CAL DA | $930.00 | Advanced Asphalt Company |
| Sep 20, 2019 | 62G42 | CookDistrict 1 | 20 CAL DA | $680.00 | R. W. Dunteman Company |
| Sep 20, 2019 | 60K72 | CookDistrict 1 | 456 CAL DA | $0.0100 | D. Construction, Inc. |
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | 6 CAL DA | $1,281.47 | Otto Baum Company, Inc. |
| Sep 20, 2019 | 62J04 | CookDistrict 1 | 10 CAL DA | $700.00 | Arrow Road Construction Co. |
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | 128 CAL DA | $300.00 | Plote Construction, Inc. |
| Sep 20, 2019 | 70B53 | ChampaignDistrict 5 | 20 CAL DA | $880.00 | Champaign Asphalt Company, LLC |
| Sep 20, 2019 | 61F25 | LakeDistrict 1 | 10 CAL DA | $800.00 | Berger Excavating Contractors, Inc. |
| Sep 20, 2019 | 76J16 | St. ClairDistrict 8 | 4 CAL DA | $788.00 | Christ Bros. Asphalt, Inc. |
| Sep 20, 2019 | 61F58 | MchenryDistrict 1 | 100 CAL DA | $900.00 | Copenhaver Construction, Inc. |
| Sep 20, 2019 | 78631 | FranklinDistrict 9 | 4 CAL DA | $2,080.00 | E. T. Simonds Construction Company |
| Aug 2, 2019 | 76J86 | MadisonDistrict 8 | 1 CAL DA | $2,200.00 | Keller Construction, Inc. |
| Aug 2, 2019 | 91581 | VermilionDistrict 5 | 14 CAL DA | $1,198.61 | Halverson Construction Co., Inc. |
| Aug 2, 2019 | 93719 | SangamonDistrict 6 | 5 CAL DA | $813.75 | Illinois Valley Paving, a div of UCM, Inc. |
| Aug 2, 2019 | 61F18 | WillDistrict 1 | 1 CAL DA | $935.00 | D. Construction, Inc. |
| Aug 2, 2019 | 62H91 | LakeDistrict 1 | 6 CAL DA | $1,600.00 | Lion Construction 1, LLC |
| Aug 2, 2019 | 66J58 | FordDistrict 3 | 2 CAL DA | $1,200.00 | G. M. Sipes Construction, Inc. |
| Jul 12, 2019 | 62G13 | WillDistrict 1 | 15 CAL DA | $990.00 | D. Construction, Inc. |
| Jul 12, 2019 | 62H95 | LakeDistrict 1 | 5 CAL DA | $750.00 | Arrow Road Construction Co. |
| Jul 12, 2019 | 62G77 | CookDistrict 1 | 15 CAL DA | $1,100.00 | Bigane Paving Company |
| Jul 12, 2019 | 62G29 | MchenryDistrict 1 | 10 CAL DA | $785.00 | Curran Contracting Company |
| Jul 12, 2019 | 62H98 | KaneDistrict 1 | 1 CAL DA | $1,045.00 | D. Construction, Inc. |
| Jul 12, 2019 | 62H54 | CookDistrict 1 | 15 CAL DA | $1,260.00 | Meade Inc. |
| Jul 12, 2019 | 62G59 | DupageDistrict 1 | 15 CAL DA | $680.00 | R. W. Dunteman Company |
| Jul 12, 2019 | 62J02 | CookDistrict 1 | 10 CAL DA | $1,045.00 | D. Construction, Inc. |
| Jul 12, 2019 | 62H56 | CookDistrict 1 | 10 CAL DA | $750.00 | Arrow Road Construction Co. |
| Jul 12, 2019 | 62G69 | CookDistrict 1 | 7 CAL DA | $750.00 | Arrow Road Construction Co. |
| Jul 12, 2019 | 64N55 | WhitesideDistrict 2 | 8 CAL DA | $1,250.00 | Martin & Company Excavating |
| Jul 12, 2019 | 62B78 | CookDistrict 1 | 160 CAL DA | $600.00 | IHC Construction Companies, L.L.C. |
| Jul 12, 2019 | 62H83 | MchenryDistrict 1 | 2 CAL DA | $800.00 | Arrow Road Construction Co. |
| Jul 12, 2019 | 62G70 | CookDistrict 1 | 8 CAL DA | $1,100.00 | Bigane Paving Company |
| Jul 12, 2019 | 93729 | MontgomeryDistrict 6 | 10 CAL DA | $1,300.00 | Kinney Contractors, Inc. |
| Jul 12, 2019 | 62F29 | CookDistrict 1 | 5 CAL DA | $1,000.00 | Lorig Construction Company |
| Jul 12, 2019 | 62H92 | LakeDistrict 1 | 15 CAL DA | $600.00 | Builders Paving, LLC |
| Jul 12, 2019 | 62G76 | CookDistrict 1 | 30 CAL DA | $700.00 | Arrow Road Construction Co. |
| Jun 14, 2019 | 70D18 | EdgarDistrict 5 | 7 CAL DA | $1,154.34 | Kieffer Bros. Construction Co., Inc. |
| Jun 14, 2019 | 61F06 | CookDistrict 1 | 45 CAL DA | $440.00 | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company |
| Jun 14, 2019 | 62H37 | DupageDistrict 1 | 12 CAL DA | $880.00 | Lakes & Rivers Contracting, Inc. |
| Jun 14, 2019 | 62F19 | DupageDistrict 1 | 11 CAL DA | $860.00 | Benchmark Construction Co., Inc. |
| Jun 14, 2019 | 76J82 | JerseyDistrict 8 | 14 CAL DA | $950.00 | RCS Construction, Inc. |
| Jun 14, 2019 | 61F37 | CookDistrict 1 | 100 CAL DA | $8.25 | Alliance Contractors, Inc. |
| Jun 14, 2019 | 62H46 | VariousDistrict 1 | 6 CAL DA | $990.00 | Home Towne Electric, Inc. |
| Jun 14, 2019 | 62G83 | LakeDistrict 1 | 1 CAL DA | $870.00 | Peter Baker & Son Co. |
| Jun 14, 2019 | 85674 | StephensonDistrict 2 | 9 CAL DA | $740.00 | Fischer Excavating, Inc. |
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | 60 CAL DA | $825.00 | Campanella and Sons, Inc. |
| Jun 14, 2019 | 66H03 | DekalbDistrict 3 | 10 CAL DA | $900.00 | Curran Contracting Company |
| Jun 14, 2019 | 62H10 | Lake, MchenryDistrict 1 | 7 CAL DA | $1,500.00 | Kujo, Inc. |
| Jun 14, 2019 | 89715 | FultonDistrict 4 | 3 CAL DA | $1,314.13 | Otto Baum Company, Inc. |
| Jun 14, 2019 | 62C06 | MchenryDistrict 1 | 20 CAL DA | $9.00 | Plote Construction, Inc. |
| Jun 14, 2019 | 66J12 | DekalbDistrict 3 | 9 CAL DA | $750.00 | Curran Contracting Company |
| Jun 14, 2019 | 62H18 | LakeDistrict 1 | 10 CAL DA | $1,700.00 | Meru Corporation |
| Jun 14, 2019 | 97691 | MadisonDistrict 8 | 3 CAL DA | $790.00 | Stutz Excavating, Inc. |
| Jun 14, 2019 | 62C08 | CookDistrict 1 | 1 CAL DA | $990.00 | D. Construction, Inc. |
| Jun 14, 2019 | 66J23 | DekalbDistrict 3 | 14 CAL DA | $300.00 | Builders Paving, LLC |
| Jun 14, 2019 | 62H33 | VariousDistrict 1 | 15 CAL DA | $1,100.00 | Copenhaver Construction, Inc. |
| Jun 14, 2019 | 62D39 | MchenryDistrict 1 | 2 CAL DA | $850.00 | Alliance Contractors, Inc. |
| Apr 26, 2019 | 62H45 | CookDistrict 1 | 40 CAL DA | $10.00 | Plote Construction, Inc. |
| Apr 26, 2019 | 61F26 | DupageDistrict 1 | 9 CAL DA | $750.00 | A Lamp Concrete Contractors, Inc. |
| Apr 26, 2019 | 62G96 | LakeDistrict 1 | 1 CAL DA | $1,110.00 | Plote Construction, Inc. |
| Apr 26, 2019 | 61E74 | KaneDistrict 1 | 51 CAL DA | $939.40 | H & H Electric Co. |
| Apr 26, 2019 | 61F71 | DupageDistrict 1 | 14 CAL DA | $1,100.00 | R. W. Dunteman Company |
| Apr 26, 2019 | 60R52 | WillDistrict 1 | 80 CAL DA | $990.00 | D. Construction, Inc. |
| Apr 26, 2019 | 68B46 | Peoria, TazewellDistrict 4 | 20 CAL DA | $1,200.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Apr 26, 2019 | 62H53 | VariousDistrict 1 | 9 CAL DA | $2,000.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F39 | CookDistrict 1 | 150 CAL DA | $1.00 | J. Nardulli Concrete, Inc. |
| Apr 26, 2019 | 62H12 | CookDistrict 1 | 25 CAL DA | $700.00 | Arrow Road Construction Co. |
| Apr 26, 2019 | 61E94 | CookDistrict 1 | 1 CAL DA | $2,000.00 | Copenhaver Construction, Inc. |
| Apr 26, 2019 | 74419 | ClarkDistrict 7 | 2 CAL DA | $2,000.00 | Ne-Co Asphalt Co., Inc. |
| Apr 26, 2019 | 61F72 | DupageDistrict 1 | 3 CAL DA | $680.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 60T21 | KaneDistrict 1 | 30 CAL DA | $1,000.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F66 | DupageDistrict 1 | 2 CAL DA | $990.00 | Home Towne Electric, Inc. |
| Apr 26, 2019 | 62H73 | CookDistrict 1 | 10 CAL DA | $715.00 | Areatha Construction Co., Inc. |
| Apr 26, 2019 | 62H22 | CookDistrict 1 | 15 CAL DA | $1,045.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F01 | CookDistrict 1 | 1 CAL DA | $680.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 61F73 | DupageDistrict 1 | 100 CAL DA | $80.00 | Rausch Infrastructure, LLC |
| Apr 26, 2019 | 60V17 | DupageDistrict 1 | 10 CAL DA | $728.98 | K-Five Construction Corporation |
| Apr 26, 2019 | 61F68 | WillDistrict 1 | 10 CAL DA | $900.00 | P. T. Ferro Construction Co. |
| Apr 26, 2019 | 66J07 | KankakeeDistrict 3 | 5 CAL DA | $240.00 | Lion Construction 1, LLC |
| Apr 26, 2019 | 62H36 | LakeDistrict 1 | 1 CAL DA | $900.00 | Peter Baker & Son Co. and Plote Construction, Inc JV |
| Apr 26, 2019 | 61F09 | CookDistrict 1 | 45 CAL DA | $810.00 | R. W. Dunteman Company |
| Apr 26, 2019 | 61F75 | LakeDistrict 1 | 5 CAL DA | $1,050.00 | Copenhaver Construction, Inc. |
| Apr 26, 2019 | 61D48 | WillDistrict 1 | 65 CAL DA | $0.0100 | P. T. Ferro Construction Co. |
| Apr 26, 2019 | 61F69 | LakeDistrict 1 | 1 CAL DA | $900.00 | Peter Baker & Son Co. |
| Apr 26, 2019 | 66J09 | IroquoisDistrict 3 | 3 CAL DA | $0.0100 | Iroquois Paving Corporation |
| Apr 26, 2019 | 62H44 | CookDistrict 1 | 23 CAL DA | $700.00 | Arrow Road Construction Co. |
| Apr 26, 2019 | 61F12 | WillDistrict 1 | 5 CAL DA | $970.00 | ICC Group Inc. |
| Apr 26, 2019 | 62G23 | DupageDistrict 1 | 15 CAL DA | $749.41 | K-Five Construction Corporation |
| Apr 26, 2019 | 61D85 | CookDistrict 1 | 7 CAL DA | $2,000.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F70 | DupageDistrict 1 | 15 CAL DA | $1,000.00 | R. W. Dunteman Company |
| Apr 26, 2019 | 60N21 | CookDistrict 1 | 5 CAL DA | $1,500.00 | D. Construction, Inc. |
| Apr 26, 2019 | 66J10 | IroquoisDistrict 3 | 5 CAL DA | $0.0100 | Iroquois Paving Corporation |
| Mar 8, 2019 | 60T49 | CookDistrict 1 | 20 CAL DA | $650.00 | Arrow Road Construction Co. |
| Mar 8, 2019 | 62D38 | LakeDistrict 1 | 30 CAL DA | $1.00 | Martam Construction Incorporated |
| Mar 8, 2019 | 62H41 | CookDistrict 1 | 1 CAL DA | $500.00 | MAT Construction Leasing, Inc. |
| Mar 8, 2019 | 97672 | MadisonDistrict 8 | 2 CAL DA | $997.50 | Keller Construction, Inc. |
| Mar 8, 2019 | 62H43 | CookDistrict 1 | 12 CAL DA | $700.00 | Arrow Road Construction Co. |
| Mar 8, 2019 | 64D70 | WinnebagoDistrict 2 | 15 CAL DA | $1.00 | Curran Contracting Company |
| Mar 8, 2019 | 62G64 | DupageDistrict 1 | 2 CAL DA | $850.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 61F40 | WillDistrict 1 | 20 CAL DA | $775.00 | K-Five Construction Corporation & Herlihy Mid-Continent Company |
| Mar 8, 2019 | 62F49 | Cook, WillDistrict 1 | 10 CAL DA | $1,045.00 | D. Construction, Inc. |
| Mar 8, 2019 | 66J11 | IroquoisDistrict 3 | 5 CAL DA | $0.0100 | Iroquois Paving Corporation |
| Mar 8, 2019 | 64J41 | Boone, WinnebagoDistrict 2 | 3 CAL DA | $349.95 | William Charles Construction Company, LLC |
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | 5 CAL DA | $1,296.94 | Illinois Civil Contractors, Inc. |
| Mar 8, 2019 | 62G67 | CookDistrict 1 | 10 CAL DA | $1,100.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 61F41 | CookDistrict 1 | 12 CAL DA | $820.00 | Plote Construction, Inc. |
| Mar 8, 2019 | 62F54 | DupageDistrict 1 | 30 CAL DA | $900.00 | R. W. Dunteman Company |
| Mar 8, 2019 | 76L67 | St. ClairDistrict 8 | 3 CAL DA | $1,000.00 | DMS Contracting, Inc. |
| Mar 8, 2019 | 72H53 | Sangamon, MacoupinDistrict 6 | 6 CAL DA | $997.50 | Truman L. Flatt & Sons Co., Inc. |
| Mar 8, 2019 | 62G21 | CookDistrict 1 | 20 CAL DA | $500.00 | MAT Construction Leasing, Inc. |
| Mar 8, 2019 | 61F57 | KaneDistrict 1 | 250 CAL DA | $0.0100 | Curran Contracting Company |
| Mar 8, 2019 | 62G80 | CookDistrict 1 | 10 CAL DA | $820.00 | Gallagher Asphalt Corporation |
| Mar 8, 2019 | 61F47 | LakeDistrict 1 | 7 CAL DA | $880.00 | A Lamp Concrete Contractors, Inc. |
| Mar 8, 2019 | 62F66 | CookDistrict 1 | 15 CAL DA | $700.00 | Arrow Road Construction Co. |
| Mar 8, 2019 | 78454 | PulaskiDistrict 9 | 2 CAL DA | $1,260.00 | E. T. Simonds Construction Company |
| Mar 8, 2019 | 60P68 | DupageDistrict 1 | 15 CAL DA | $780.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 62G48 | MchenryDistrict 1 | 15 CAL DA | $850.00 | Alliance Contractors, Inc. |
| Mar 8, 2019 | 68E80 | PeoriaDistrict 4 | 3 CAL DA | $1,325.95 | Otto Baum Company, Inc. |
| Mar 8, 2019 | 62G98 | WillDistrict 1 | 30 CAL DA | $1,045.00 | D. Construction, Inc. |
| Mar 8, 2019 | 61F49 | CookDistrict 1 | 30 CAL DA | $1,100.00 | A Lamp Concrete Contractors, Inc. |
| Mar 8, 2019 | 62G47 | CookDistrict 1 | 15 CAL DA | $800.00 | R. W. Dunteman Company |
| Mar 8, 2019 | 60N83 | CookDistrict 1 | 9 CAL DA | $1,300.00 | Lorig Construction Company |
| Mar 8, 2019 | 61F60 | CookDistrict 1 | 1 CAL DA | $900.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 62G90 | LakeDistrict 1 | 20 CAL DA | $250.00 | Alliance Contractors, Inc. |
| Mar 8, 2019 | 85673 | WinnebagoDistrict 2 | 40 CAL DA | $0.0100 | N-Trak Group LLC |
| Mar 8, 2019 | 62H39 | LakeDistrict 1 | 3 CAL DA | $997.50 | Lima Contractors |
| Mar 8, 2019 | 62H32 | KaneDistrict 1 | 10 CAL DA | $920.00 | Curran Contracting Company |
| Mar 8, 2019 | 62G62 | DupageDistrict 1 | 40 CAL DA | $795.00 | R. W. Dunteman Company |
| Jan 18, 2019 | 62G95 | DupageDistrict 1 | 10 CAL DA | $1.00 | Scanlon Excavating & Concrete, Inc. |