IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jul 12, 2019 76M75 MonroeDistrict 8 13.4 miles of crack and joint seal on IL 3 from Country Club Lane to the Randolph County line. — Executed Nov 26 New Huff Sealing Corporation $199,952 ·
Jul 12, 2019 76M76 ClintonDistrict 8 3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,049,313 ·
Jul 12, 2019 78489 JohnsonDistrict 9 4.3 miles of resurfacing on IL 146 from the Union County line to just east of IL 37. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,085,070 ·
Jul 12, 2019 78565 JacksonDistrict 9 Resurfacing on Old US 51 between the intersections of US 51 and Old US 51, including the Old US 51 spur. — Executed Nov 26 New E. T. Simonds Construction Company $1,233,412 ·
Jul 12, 2019 78607 PerryDistrict 9 9.5 miles of resurfacing on IL 13/127. — Executed Nov 26 New E. T. Simonds Construction Company $3,715,769 ·
Jul 12, 2019 78608 FranklinWilliamsonDistrict 9 2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $881,036 ·
Jul 12, 2019 78638 PerryDistrict 9 3.6 miles of resurfacing on IL 127 in Perry County. — Executed Nov 26 New E. T. Simonds Construction Company $1,497,557 ·
Jul 12, 2019 78639 WilliamsonDistrict 9 2.1 miles of resurfacing on Herrin Road from Christmas Tree Road to just east of I-57. — Executed Nov 26 New E. T. Simonds Construction Company $835,539 ·
Jul 12, 2019 78652 HardinDistrict 9 Replace box culvert SN 035-70222 carrying IL 34 over a ditch, 4.2 miles north of IL 34/146. — Executed Nov 26 New Sierra Bravo Contractors, LLC $122,210 ·
Jul 12, 2019 78673 JacksonDistrict 9 1.6 miles of resurfacing on US 51 in Jackson County. — Executed Nov 26 New E. T. Simonds Construction Company $1,083,656 ·
Jul 12, 2019 78676 PerryDistrict 9 Replace box culvert SN 073-7005 carrying US 51 over an unnamed stream, 0.26 mile north of IL 154, between DuQuoin and Tamaroa. — Executed Nov 26 New Sierra Bravo Contractors, LLC $119,208 ·
Jul 12, 2019 78691 PerryDistrict 9 1.8 miles of resurfacing on IL 14 from just west of the intersection of IL 14 and Old IL 14 West Connector to just east of the intersection of IL 14 and Old IL 14 East Connector. — Executed Nov 26 New E. T. Simonds Construction Company $568,520 ·
Jul 12, 2019 78692 WilliamsonDistrict 9 0.8 miles of milling and resurfacing on IL 13 from IL 37 to Fair Street in Marion. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,005,135 ·
Jul 12, 2019 78705 JacksonDistrict 9 7.9 miles of resurfacing and ADA improvements on IL 13/127 from Finny Road, north of Murphysboro, to the Perry County line. — Executed Nov 26 New E. T. Simonds Construction Company $3,190,741 ·
Jul 12, 2019 78714 VariousDistrict 9 Surfce preparation and application of bridge deck concrete sealer at various locations in Franklin, Hamilton and White counties. — Executed Nov 26 New All States Painting, Inc. $143,224 ·
Jul 12, 2019 78723 VariousDistrict 9 13.5 miles of resurfacing on IL 142 from IL 14 to the Saline County line and 3.4 miles of resurfacing from 3 miles south of Eldorado to the west city limits. — Executed Nov 26 New E. T. Simonds Construction Company $5,374,052 ·
Jul 12, 2019 78740 WhiteDistrict 9 6.5 miles of resurfacing on I-64 from the northwest White County line to County Road Bridge (1350E). — Executed Nov 26 New Howell Paving, Inc. $4,449,506 ·
Jul 12, 2019 78741 JeffersonDistrict 9 Resurfacing on IL 142 from I-64 to the Hamilton County line. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $2,952,794 ·
Jul 12, 2019 78742 MassacPopeDistrict 9 Resurfacing on IL 145 from IL 146 to the Massac County line and from the Pope County line to US 45 near Metropolis. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $3,961,865 ·
Jul 12, 2019 78743 MassacDistrict 9 3.2 miles of resurfacing on US 45 from the Johnson County line to IL 169. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $841,735 ·
Jul 12, 2019 93729 MontgomeryDistrict 6 Sidewalk construction, traffic signal modifications, drainage improvements and lighting at various locations in the City of Litchfield. — Executed Nov 26 New Kinney Contractors, Inc. $1,735,500 ·
Aug 2, 2019 46530 VariousDistrict 2 Removing and replacing reflectors and raised reflective pavement marker castings. — Rejected Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $977,770 ·
Aug 2, 2019 61F18 WillDistrict 1 Construction of a multi-use path from McKinley Woods road to IandM Canal and the construction of a pedestrian bridge over the IandM Canal. Project is located along US Route 6 and Bridge Street, beginning west of McKinley Drive and ending east of the IandM Canal at Bridge Street in the Village of Channahon. — Executed Nov 26 New D. Construction, Inc. $734,856 ·
Aug 2, 2019 61F79 CookDistrict 1 Sidewalk construction on Schoenbeck Road from Willow Road to Camp McDonald Road in the City of Prospect Heights. — Executed Nov 26 New Alliance Contractors, Inc. $377,041 ·
Aug 2, 2019 62C21 CookDistrict 1 Guardrail improvements along US 12/20/45 from 63rd Street to Creek Road. Project includes traffic signal modernization at US 45 and 123rd Street. — Executed Nov 26 New Lyons Electric Company, Inc. $515,400 ·
Aug 2, 2019 62H91 LakeDistrict 1 Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road — Executed Nov 26 New Lion Construction 1, LLC $497,411 ·
Aug 2, 2019 64N87 WhitesideDistrict 2 Cold milling and HMA resurfacing on IL 136 from 0.1 mile west of 4th Street to east of 6th Street in Fulton. — Executed Nov 26 New Civil Constructors, Inc. $183,349 ·
Aug 2, 2019 64N89 WinnebagoDistrict 2 Cold milling and HMA resurfacing on US 20, 0.2 mile east and west of Winnebago Road. — Executed Nov 26 New Rock Road Companies, Inc. $338,444 ·
Aug 2, 2019 66A92 BureauDistrict 3 6.03 miles of 3P milling and resurfacing on IL 40 from the Burlington Northern Santa Fe Railroad south of Buda to the Stark County line. Includes approach work on SN 006-0145, guardrail with shoulder stabilization, aggregate ditch checks, intermittent resurfacing, shoulder stone, pavement marking and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $3,084,437 ·
Aug 2, 2019 66H92 KendallDistrict 3 Installation of flashing red and yellow beacons at each approach to the intersection of US 52 and Grove Road. — Executed Nov 26 New Van-Mack Electric Co. $59,096 ·
Aug 2, 2019 66J58 FordDistrict 3 Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. — Executed Nov 26 New G. M. Sipes Construction, Inc. $131,005 ·
Aug 2, 2019 66K05 FordDistrict 3 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. — Executed Nov 26 New Iroquois Paving Corporation $1,379,136 ·
Aug 2, 2019 66K25 GrundyDistrict 3 0.9 miles of milling and resurfacing on both NB and SB lanes of I-55 at MP 232.6, milling and resurfacing Reed Road interchange ramps, and building two PCC crosssovers. — Executed Nov 26 New D. Construction, Inc. $3,956,040 ·
Aug 2, 2019 68E92 TazewellDistrict 4 Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $316,579 ·
Aug 2, 2019 68E96 PeoriaDistrict 4 1.7 miles of patching and joint repair on IL 40 (Knoxville Avenue) from Timber Lane to Bethany Way in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $276,562 ·
Aug 2, 2019 68F06 VariousDistrict 4 Rout and seal at various locations within the western ha;f of district four. — Executed Nov 26 New Freehill Asphalt, Inc. $523,664 ·
Aug 2, 2019 68F07 VariousDistrict 4 Rout and seal various locations within the eastern half of District 4 — Rejected Nov 26 New Complete Asphalt Service Co. $572,132 ·
Aug 2, 2019 72K06 VariousDistrict 6 On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6. — Executed Nov 26 New COLLINS & HERMANN, INC. $933,264 ·
Aug 2, 2019 72L08 MontgomeryDistrict 6 Pollinator habitat preservation and restoration, installation of a parking lot and path on northbound I-55 Frontage Road, 0.4 miles south of N 16th Avenue. — Executed Nov 26 New Keller Construction, Inc. $172,172 ·
Aug 2, 2019 72L34 ChristianDistrict 6 Patching at two locations on (IL 29, IL48: 1) from Webster Street to Pershing Avenue in Taylorville; 2 just north of Lincoln Trail to 2.1 miles south of Spresser Street in Taylorville. — Executed Nov 26 New Kinney Contractors, Inc. $162,895 ·
Aug 2, 2019 72L35 SangamonDistrict 6 Patching on IL 4 from 0.2 miles north of Greenbriar Drive to south of Prairie Crossing Drive in Springfield. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $805,119 ·
Aug 2, 2019 74894 LawrenceRichlandDistrict 7 Replacing obsolete guardrail and terminals at various locations in Richland and Lawrence Counties. — Executed Nov 26 New Midwest Fence Corporation $970,709 ·
Aug 2, 2019 74918 VariousDistrict 7 Bridge parapet repairs on 3 structures in Clark, Fayette and Macon Counties (SN 012-0007, 026-0019, 058-0111). — Executed Nov 26 New Halverson Construction Co., Inc. $145,001 ·
Aug 2, 2019 78734 SalineDistrict 9 Tree planting for wetland mitigation site and proposed steel plate weir along IL 13 near Lovers Lane, west of Harrisburg. — Executed Nov 26 New Nettle Creek Nursery, Inc. $64,465 ·
Aug 2, 2019 87703 LaSalleDistrict 3 Reconstruct the intersection of CH43 and CH33, located 4.0 miles north of Utica. — Executed Nov 26 New Advanced Asphalt Company $680,493 ·
Aug 2, 2019 91581 VermilionDistrict 5 Construction of a pedestrian trail on abandoned CSX Railroad alignment, from Grays Siding Road to the Vermilion County Fairgrounds. — Executed Nov 26 New Halverson Construction Co., Inc. $3,038,480 ·
Aug 2, 2019 93719 SangamonDistrict 6 Reconstruction of Archer Elevator Road from 2-lane rural to 3-lane urban roadway in Springfield. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,283,746 ·
Aug 2, 2019 93731 HancockDistrict 6 Replace the bridge carrying TR 175 over the La Moine River, located 4.5 miles northeast of Carthage. — Executed Nov 26 New County Contractors, Inc. $999,696 ·
Aug 2, 2019 95849 ColesDistrict 7 Improvements to the bike trail connecting Charleston and Matoon, includes extending the west end from 10th street to the Amtrak Depot and connect the east end to Eastern Illinois University. — Rejected Nov 26 New Ne-Co Asphalt Co., Inc. $1,077,941 ·
Aug 2, 2019 95854 EffinghamDistrict 7 Replace the bridge carrying FAX 708 over Muddy Creek, 1 mile west of Winterrowd — Executed Nov 26 New Depew and Owen Builders, Inc. $368,488 ·
Aug 2, 2019 95855 LawrenceDistrict 7 Replace the bridge carrying TR 285 over Big Slough Drainage Ditch, 1 mile southwest of St. Francisville. — Executed Nov 26 New Allendale Gravel Co., Inc. $368,062 ·
Aug 2, 2019 95857 EdwardsDistrict 7 Resurfacing Browns Grayville Road from East 450 North Road to IL 1. — Executed Nov 26 New Howell Paving, Inc. $1,153,828 ·
Aug 2, 2019 95858 ShelbyDistrict 7 Replace the bridge carrying TR 271A over Drake Creek, 4.5 miles east of Strasburg. — Executed Nov 26 New Depew and Owen Builders, Inc. $546,988 ·
Aug 2, 2019 95859 EffinghamDistrict 7 Replace the bridge carrying Tr 34A over Limestone Creek, 3.5 miles west of Edgewood. — Executed Nov 26 New Samron Midwest Contracting, Inc. $177,699 ·
Aug 2, 2019 97689 St. ClairDistrict 8 Reconstruct the intersection of Curtiss-Steinberg Drive at Sauget Business Boulevard in the village of Sauget. — Executed Nov 26 New Keller Construction, Inc. $678,179 ·
Aug 2, 2019 97704 MadisonDistrict 8 Sidewalk replacement, decorative posts and patterned pavement imprinting along Ferguson Avenue betwen Old St. Louis Road and 2nd Street in Wood River. — Executed Nov 26 New RCS Construction, Inc. $456,469 ·
Aug 2, 2019 99617 WhiteDistrict 9 Replace the bridge carrying TR 412A over French Creek, 1 mile north of Calvin. — Executed Nov 26 New Samron Midwest Contracting, Inc. $348,241 ·
Aug 2, 2019 99623 JeffersonDistrict 9 Resurfacing Tolle Lane from Fairfield Road to Miller Lake Lane in Mt. Vernon. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $958,187 ·
Aug 2, 2019 99628 WhiteDistrict 9 replace the bridge carrying CH 18 over Bear Creek Tributary with a 19' X 7' box culvert, located 2 miles southwest of Norris City. — Executed Nov 26 New Sierra Bravo Contractors, LLC $184,218 ·
Sep 20, 2019 46531 VariousDistrict 7 VARIOUS LENGTHS OF PAVEMENT MARKING REHABILITATION THROUGHOUT DISTRICT 7. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $556,835 ·
Sep 20, 2019 46535 VariousDistrict 9 REPAIRING VARIOUS WIDTHS OF THERMOPLASTIC, PREFORMED PLASTIC, AND URETHANE AND POLYUREA PAVEMENT MARKING LINES, LETTERS AND SYMBOLS AND THE REMOVAL OF EXISTING PAVEMENT MARKINGS ON A WORK ORDER BASIS THROUGHOUT DISTRICT 9. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $781,385 ·
Sep 20, 2019 60K72 CookDistrict 1 BRIDGE REHAB AND PAINTING ON WESTERN AVENUE OVER CAL-SAG CHANNEL (SN 016-0777). — Executed Nov 26 New D. Construction, Inc. $10,689,369 ·
Sep 20, 2019 61D65 LakeDistrict 1 Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. — Executed Nov 26 New Plote Construction, Inc. $7,965,000 ·
Sep 20, 2019 61E69 DuPageDistrict 1 Landscaping and sign installation along the Elgin O'Hare Western Access Corridor at Lake Street (US 20), Roselle Road, Plum Grove Road and Rohlwing Road. Project is located in the villages of Roselle, Itasca and Hanover Park. — Rejected Nov 26 New Alliance Contractors, Inc. $1,264,017 ·
Sep 20, 2019 61F25 LakeDistrict 1 Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. — Executed Nov 26 New Berger Excavating Contractors, Inc. $12,469,513 ·
Sep 20, 2019 61F58 McHenryDistrict 1 Reconstruct the intersection of Main Street at Crystal Lake Avenue in the city of Crystal Lake. — Executed Nov 26 New Copenhaver Construction, Inc. $4,028,645 ·
Sep 20, 2019 61F85 DuPageDistrict 1 Streetscape to include sidewalk replacement, curb and gutter replacement, lighting improvements, landscaping, pavement imprinting and resurfacing. Project is located on Prospect Avenue from Ann Street to Burlington Avenue in the Village of Clarendon Hills. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,434,658 ·
Sep 20, 2019 61F93 CookDistrict 1 Resurfacing Broadway Avenue from Division Street to North Avenue in the Village of Melrose Park. — Executed Nov 26 New J. A. Johnson Paving Company $650,700 ·
Sep 20, 2019 61F96 CookDistrict 1 Construction of Poplar Creek Trail from east of the intersection of Shoe Factory Road and the CN Railroad to west of the intersection of IL Route 59. Project is located within the Forest Preserve of Cook County Arthur Janura Forest Preserve in the Village of Hoffman Estates. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
Sep 20, 2019 61F98 McHenryDistrict 1 Sidewalk construction and culvert replacement on Main Street from Winn Road to West of Bilvin Street in the Village of Spring Grove. — Executed Nov 26 New Alliance Contractors, Inc. $443,926 ·
Sep 20, 2019 61G00 LakeDistrict 1 Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,964,385 ·
Sep 20, 2019 62G56 McHenryDistrict 1 OVERLAY, NEW SHOULDERS AND MILLED RUMBLE STRIPS ON IL 31 FROM SHAMROCK LANE TO NORTH OF EDGEWOOD ROAD IN THE CITY OF MCHENRY AND VILLAGE OF PRAIRIE GROVE. — Executed Nov 26 New Peter Baker & Son Co. $988,722 ·
Sep 20, 2019 62H74 CookDistrict 1 PAVEMENT MARKING ROOSEVELT RD TO US 1 2/20 (95TH ST). — Executed Nov 26 New A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,611,663 ·
Sep 20, 2019 62J04 CookDistrict 1 1.9 MILES OF OVERLAY AND PEDESTRIAN RAMP IMPROVEMENTS ON IL 58 FROM BASSWOOD STREET TO I-290 / IL 53 IN THE VILLAGE OF SCHAUMBURG. — Executed Nov 26 New Arrow Road Construction Co. $3,206,907 ·
Sep 20, 2019 62J18 CookDistrict 1 SUBSTRUCTURE BRIDGE REPAIR OF SN 016-1094 CARRYING MILWAUKEE AVENUE OVER THE OHIO FEEDER IN THE CITY OF CHICAGO. — Executed Nov 26 New Areatha Construction Co., Inc. $759,728 ·
Sep 20, 2019 62J19 CookDistrict 1 11.9 MILES OF PAVEMENT MARKING REMOVAL, PAVEMENT MARKING INSTALLATION AND RAISED REFLECTIVE PAVEMENT MARKERS ON I-90/94 (DAN RYAN EXPRESSWAY) FROM ROOSEVELT ROAD TO US 12/20 (95TH STREET) WITHIN THE CITY OF CHICAGO. — Executed Nov 26 New A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,714,768 ·
Sep 20, 2019 62J61 VariousDistrict 1 HIGH TENSION CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS ON VARIOUS EXPRESSWAY MEDIANS THROUGHOUT DISTRICT ONE. — Executed Nov 26 New Northern Contracting, Inc. $342,330 ·
Sep 20, 2019 64L16 OgleDistrict 2 Pedestrian "ADA" ramps a various locations in Oregon and Polo. — Rejected Nov 26 New Stenstrom Excavation & Blacktop, Inc. $1,414,865 ·
Sep 20, 2019 64N78 VariousDistrict 2 WASHING 12 BRIDGES AT VARIOUS LOCATIONS IN DISTRICT 2. — Rejected Nov 26 New All States Painting, Inc. $174,400 ·
Sep 20, 2019 64N79 WinnebagoDistrict 2 WASHING 4 BRIDGES AT VARIOUS LOCATIONS. — Executed Nov 26 New M & M Concrete, Inc. $39,999 ·
Sep 20, 2019 64N81 VariousDistrict 2 WASHING 19 BRIDGES AT VARIOUS LOCATIONS. — Rejected Nov 26 New Interstate Maintenance, Incorporated $159,652 ·
Sep 20, 2019 64N82 VariousDistrict 2 WASHING 6 BRIDGES OVER THE ROCK RIVER AT VARIOUS LOCATIONS. — Executed Nov 26 New All States Painting, Inc. $89,410 ·
Sep 20, 2019 64N83 Rock IslandDistrict 2 WASHING 2 BRIDGES OVER THE MISSISSIPPI RIVER. — Executed Nov 26 New Interstate Maintenance, Incorporated $229,992 ·
Sep 20, 2019 64N84 VariousDistrict 2 WASHING 3 BRIDGES OVER THE MISSISSIPPI RIVER. — Executed Nov 26 New Interstate Maintenance, Incorporated $129,876 ·
Sep 20, 2019 64N85 VariousDistrict 2 WASHING 5 BRIDGES OVER THE ROCK RIVER. — Executed Nov 26 New All States Painting, Inc. $70,960 ·
Sep 20, 2019 64N86 VariousDistrict 2 WASHING 8 BRIDGES AT VARIOUS LOCATIONS. — Executed Nov 26 New All States Painting, Inc. $85,000 ·
Sep 20, 2019 66K34 IroquoisDistrict 3 DRAINAGE REPAIRS 0.27 MI N OF CR 700 N ROAD. — Executed Nov 26 New Iroquois Paving Corporation $208,524 ·
Sep 20, 2019 68758 KnoxDistrict 4 Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. — Executed Nov 26 New Otto Baum Company, Inc. $2,245,718 ·
Sep 20, 2019 68C57 PeoriaDistrict 4 SUPERSTRUCTURE REPLACEMENT TO SN 072-0073 CARRYING BELL SCHOOL RD OVER I-74 AND RESURFACE IL 78 FROM I-74 N 0.13 MI AND 0.2 MI S. — Executed Nov 26 New Stark Excavating, Inc. $2,937,974 ·
Sep 20, 2019 68C65 KnoxDistrict 4 CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. — Executed Nov 26 New Valley Construction Co. $1,513,546 ·
Sep 20, 2019 68E16 PeoriaTazewellDistrict 4 CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. — Executed Nov 26 New Hoerr Construction, Inc. $769,350 ·
Sep 20, 2019 68E27 TazewellDistrict 4 BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. — Executed Nov 26 New Halverson Construction Co., Inc. $853,648 ·
Sep 20, 2019 68E53 PeoriaTazewellDistrict 4 CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. — Executed Nov 26 New Otto Baum Company, Inc. $537,618 ·
Sep 20, 2019 70B53 ChampaignDistrict 5 1.533 miles of safety improvements on US 150/University Ave. from Wright St. to Cunningham Ave. in Urbana. — Executed Nov 26 New Champaign Asphalt Company, LLC $10,394,213 ·
Sep 20, 2019 72L38 MorganDistrict 6 PATCHING ON IL 267 FROM JUST NORTH OF I-72 TO JUST SOUTH OF I-72. — Executed Nov 26 New Kinney Contractors, Inc. $158,297 ·
Sep 20, 2019 74922 EffinghamDistrict 7 TREE REMOVAL AND SEEDING ALONG I-70 FROM MILE POST 98 TO MILE POST 105 EAST OF EFFINGHAM AND ALONG I-57 FROM THE I-70 / I-57 INTERCHANGE NORTH TO MILE POST 166 NORTHEAST OF EFFINGHAM. — Executed Nov 26 New Lion Construction 1, LLC $183,380 ·
Sep 20, 2019 76J16 St. ClairDistrict 8 8.9 miles of resurfcing and ADA upgrades on IL 13/IL 15 from Roger's Drive in Freeburg to south of the Kaskasia River Bridge on IL 15. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $5,948,690 ·
Sep 20, 2019 76M16 MadisonDistrict 8 DECK WATERPROOFING, JOINT AND BEAM END REPAIRS ON SN 060-0226 CARRYING IL 140 OVER UPRR, 3.1 MILES WEST OF I-55 AND SN 060-0227 CARRYING IL 140 OVER NandWRR, 2.9 MILES WEST OF I-55. — Executed Nov 26 New The Kilian Corporation $512,618 ·
Sep 20, 2019 76M37 MadisonSt. ClairDistrict 8 WELL TREATMENT AT VARIOUS LOCATIONS WITHIN DISTRICT 8. — Executed Nov 26 New Layne Christensen Company $723,853 ·
Sep 20, 2019 76M38 VariousDistrict 8 REPAIR AND MAINTENANCE OF ELECTRICAL EQUIPMENT AT VARIOUS PUMP STATIONS THROUGHOUT DISTRICT 8. — Executed Nov 26 New Wissehr Electric, Inc. $54,758 ·
1,601–1,700 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.