(102,103)RS-3
- Let date
- Friday, July 12, 2019
- Contract
- 78742 · job page
- District
- District 9
- County
- Massac, Pope
- Highway
- Limits
- Resurfacing on IL 145 from IL 146 to the Massac County line and from the Pope County line to US 45 near Metropolis.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Southern Illinois Asphalt Co., Inc. Low bidder | $3,961,865 | ||
| 2 | E. T. Simonds Construction Company | $4,188,178 | +5.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Southern Illino… | #2 E. T. Simonds C… |
|---|---|---|---|---|---|---|---|
| 1 | X4401198 | HMA SURF REM VAR DP | 433 | SQ YD | $11.56 | $4.76 | |
| 2 | X7030005 | TEMP PAVT MKING REMOV | 79,662 | SQ FT | $0.00 | $0.00 | |
| 3 | Z0033700 | LONG JOINT SEALANT | 82,005 | FOOT | $2.27 | $2.39 | |
| 4 | Z0034105 | MATL TRANSFER DEVICE | 29,401 | TON | $1.72 | $2.96 | |
| 5 | 40600290 | BIT MATLS TACK CT | 158,452 | POUND | $0.00 | $0.00 | |
| 6 | 40600637 | LB MM IL-9.5FG N70 | 9,806 | TON | $89.59 | $90.49 | |
| 7 | 40600990 | TEMPORARY RAMP | 136 | SQ YD | $14.75 | $54.62 | |
| 8 | 40603315 | HMA SC "C" N70 | 19,595 | TON | $83.36 | $81.38 | |
| 9 | 44000154 | HMA SURF REM 1 1/4 | 524 | SQ YD | $9.55 | $6.80 | |
| 10 | 44000158 | HMA SURF REM 2 1/4 | 232,743 | SQ YD | $2.39 | $1.81 | |
| 11 | 44200152 | PAVT PATCH T1 13 | 30 | SQ YD | $303.23 | $275.00 | |
| 12 | 44200156 | PAVT PATCH T2 13 | 215 | SQ YD | $222.08 | $215.00 | |
| 13 | 44200160 | PAVT PATCH T3 13 | 150 | SQ YD | $222.24 | $210.00 | |
| 14 | 44200162 | PAVT PATCH T4 13 | 125 | SQ YD | $222.24 | $200.00 | |
| 15 | 44300200 | STRIP REF CR CON TR | 159,342 | FOOT | $0.6400 | $0.5400 | |
| 16 | 48102100 | AGG WEDGE SHLD TYPE B | 1,010 | TON | $36.56 | $37.07 | |
| 17 | 48203100 | HMA SHOULDERS | 127 | TON | $144.46 | $188.97 | |
| 18 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $2,170.00 | $1,800.00 | |
| 19 | 67100100 | MOBILIZATION | 1 | L SUM | $115,981.35 | $412,873.70 | |
| 20 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $12,690.12 | $90,883.43 | |
| 21 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $21,700.00 | $7,987.85 | |
| 22 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $108.50 | $44.20 | |
| 23 | 70300100 | SHORT TERM PAVT MKING | 23,928 | FOOT | $0.5700 | $0.7500 | |
| 24 | 70300150 | SHRT TRM PAVT MK REM | 7,976 | SQ FT | $0.00 | $0.00 | |
| 25 | 70300210 | TEMP PVT MK LTR & SYM | 109.2 | SQ FT | $0.00 | $0.00 | |
| 26 | 70300220 | TEMP PVT MK LINE 4 | 236,611 | FOOT | $0.00 | $0.00 | |
| 27 | 70300260 | TEMP PVT MK LINE 12 | 556 | FOOT | $0.00 | $0.00 | |
| 28 | 70300280 | TEMP PVT MK LINE 24 | 63 | FOOT | $0.00 | $0.00 | |
| 29 | 78000100 | THPL PVT MK LTR & SYM | 109.2 | SQ FT | $4.34 | $4.40 | |
| 30 | 78000200 | THPL PVT MK LINE 4 | 236,611 | FOOT | $0.6300 | $0.6400 | |
| 31 | 78000600 | THPL PVT MK LINE 12 | 556 | FOOT | $1.88 | $1.90 | |
| 32 | 78000650 | THPL PVT MK LINE 24 | 63 | FOOT | $4.07 | $4.13 | |
| 33 | 78100100 | RAISED REFL PAVT MKR | 1,050 | EACH | $30.28 | $28.26 | |
| 34 | 78300200 | RAISED REF PVT MK REM | 1,050 | EACH | $10.80 | $8.92 |