| Jan 17, 2025 | 62V90 | CookDistrict 1 | HMA overlay, ADA sidewalk and curb ramp improvements, drainage improvements, APS improvements, HMA surface rem (1.88-Mile) Standard Overlay, Drainage and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. The project also includes - Pavement markings/ striping improvements at 17th Avenue and Salt Creek Trail crossing. - New sidewalk and curb ramps for sidewalks (ADA) improvements on Roosevelt Road and Frontage Road, just W | — | Rejected | K-Five Construction Corporation $2,943,344 · | ||
| Jan 17, 2025 | 62W32 | LakeDistrict 1 | The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. | — | Executed | Martam Construction Incorporated $617,286 · | ||
| Jan 17, 2025 | 62W49 | DuPageDistrict 1 | (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci | — | Executed | K-Five Construction Corporation $1,066,333 · | ||
| Jan 17, 2025 | 62W52 | WillDistrict 1 | Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. | — | Executed | Veritas Steel LLC $28,658,382 · | ||
| Jan 17, 2025 | 62W71 | CookDistrict 1 | (3139.11-Ft) This project is a Standard Overlay and ADA Improvements. Located on Addison Street from IL. Route 171 (Cumberland Avenue) to Forest Preserve Drive within the City of Chicago. | — | Executed | A Lamp Concrete Contractors, Inc. $1,098,089 · | ||
| Jan 17, 2025 | 62X15 | CookDistrict 1 | (4,921-Ft) Designed Overlay, SMART Overlay, Curb Ramps (ADA) and Pedestrian Signals (APS) improvements on 5th Avenue from North River Road to IL 64 (North Avenue). This project is in the Villages of River Grove and Melrose Park in Cook County. | — | Executed | K-Five Construction Corporation $1,483,000 · | ||
| Jan 17, 2025 | 62X24 | CookDistrict 1 | Bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd This improvement consists of bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd. (55th St.) for project length of 546.8 ft (.103 miles) in the City of Chicago in Cook County. | — | Executed | Rausch Infrastructure, LLC $747,244 · | ||
| Jan 17, 2025 | 62X49 | LakeDistrict 1 | A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. | — | Executed | Capital Industrial Services, LLC $893,330 · | ||
| Jan 17, 2025 | 62X51 | VariousDistrict 1 | Restoring existing native landscapes at various roadside locations in D1. | — | Executed | McGinty Bros., Inc. $210,094 · | ||
| Jan 17, 2025 | 62X54 | McHenryDistrict 1 | Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. | — | Executed | Veterans Vac Services LLC $199,014 · | ||
| Jan 17, 2025 | 62X75 | CookDuPageDistrict 1 | Expressway Cleaning (Litter/Debris Removal) on various routes in D1. | — | Executed | Orlando Lawn Service, Inc. $276,000 · | ||
| Jan 17, 2025 | 62X78 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | Orlando Lawn Service, Inc. $227,238 · | ||
| Jan 17, 2025 | 62X80 | VariousDistrict 1 | Mowing the roadsides of expressways This work consists of mowing the roadsides of expressways. The project is located along various expressways at various locations in D1. | — | Executed | MYS, Incorporated $656,550 · | ||
| Jan 17, 2025 | 62X81 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | Thor General Contracting LLC $210,330 · | ||
| Jan 17, 2025 | 64M10 | LeeDistrict 2 | Removal and replacement of an existing box culvert carrying US 30 over a creek located 0.1 mile west of Atkinson Road. | — | Executed | Martin & Company Excavating $746,263 · | ||
| Jan 17, 2025 | 64N06 | Rock IslandDistrict 2 | Smart Resurfacing and ADA improvements on IL 5 from 24th Street to 0.1 mile east of 34th Street in Rock Island. 4,332 ft net length. | — | Executed | Brandt Construction Co. $1,008,970 · | ||
| Jan 17, 2025 | 64S59 | Jo DaviessDistrict 2 | 1.13 miles of pavement patching and inlet repair along US 20 in Galena. | — | Executed | G. M. Sipes Construction, Inc. $460,622 · | ||
| Jan 17, 2025 | 64T04 | OgleDistrict 2 | Lighting at I-39 IL 64 interchange. | — | Executed | William Charles Construction Co, LLC $258,017 · | ||
| Jan 17, 2025 | 64T35 | VariousDistrict 2 | Bridge washing of 8 structures over the Rock River in various Counties. | — | Executed | All States Painting, Inc. $68,748 · | ||
| Jan 17, 2025 | 64T39 | VariousDistrict 2 | Bridge washing of 6 structures over the Rock River in various Counties. | — | Executed | Pressure Washing Unlimited Inc. $59,230 · | ||
| Jan 17, 2025 | 64T40 | HenryRock IslandDistrict 2 | Bridge washing of 5 structures over the Rock River in various Counties. | — | Executed | Pressure Washing Unlimited Inc. $54,465 · | ||
| Jan 17, 2025 | 64T75 | VariousDistrict 2 | Restoration of turf right-of-way caused by motorist damage on all State and and Interstate routes within the District. Work Orders include fertilizing, seeding, and installing soil retention blanket on disturbed areas. | — | Executed | O'Brien Civil Works, Inc. $94,200 · | ||
| Jan 17, 2025 | 64T80 | Rock IslandDistrict 2 | Continuously reinforced concrete patching from 0.3 miles north of IL 92 to Whiteside County Line. 7.5 mile net length. | — | Executed | Centennial Contractors of the Quad Cities, Inc. $642,392 · | ||
| Jan 17, 2025 | 64T90 | HenryDistrict 2 | Full bridge cleaning and painting at SN 037-0140, carrying Osco Rd over Mineral Creek, 2 miles east of I-74. | — | Executed | Eagle Painting & Maintenance Company, Inc. $124,250 · | ||
| Jan 17, 2025 | 64T93 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | M & M Concrete, Inc. $49,078 · | ||
| Jan 17, 2025 | 64T94 | Rock IslandDistrict 2 | Concrete sealer applied to bridge decks at various locations in Rock Island County within District 2. | — | Executed | M & M Concrete, Inc. $82,974 · | ||
| Jan 17, 2025 | 64T95 | HenryDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | M & M Concrete, Inc. $39,992 · | ||
| Jan 17, 2025 | 66K94 | IroquoisDistrict 3 | 0.2 mile bridge replacement at Little Beaver Creek. 1.2 miles north of Papineau Road. | — | Executed | Iroquois Paving Corporation $2,649,190 · | ||
| Jan 17, 2025 | 66P33 | BureauDistrict 3 | Deck patching, approach pavement resurfacing, parapet repairs, expansion joint replacement, substructure repairs, and slope wall repairs at SN 006-0056. | — | Executed | D. Construction, Inc. $439,369 · | ||
| Jan 17, 2025 | 66P34 | BureauDistrict 3 | bridge repairs including deck patching, expansion joint replacement, approach slab replacement, pavement and shoulder replacement at SN 006-0101 carrying IL 92 over the branch of Masters Creek 0.7 miles west of Van Orin. | — | Executed | D. Construction, Inc. $466,071 · | ||
| Jan 17, 2025 | 66P36 | LaSalleDistrict 3 | Shoulder replacement, seeding, storm sewers, drainage repairs, bridge repairs including expansion joint replacement, PPC I-beam repairs structural repair of concrete, bridge washing and other related construction work at SN 050-0175 carrying CH 33 over I-39 3.0 miles north of the I-39 and I-80 interchange. | — | Executed | D. Construction, Inc. $425,002 · | ||
| Jan 17, 2025 | 66P60 | KendallDistrict 3 | Approximately 6.1 miles of centerline joint repair, pavement marking improvements and intermediate resurfacing of approximately 22,000 sq yds on IL 126 from 80 ft east of Wing Street to 500 ft west of County Line Road in Kendall County. | — | Executed | Austin Tyler Construction, Inc. $776,365 · | ||
| Jan 17, 2025 | 66P81 | LivingstonDistrict 3 | Cleaning and painting structural steel on SN's 053-0116 and 053-0019. | — | Executed | ERA-Valdivia Contractors, Inc. $658,785 · | ||
| Jan 17, 2025 | 66P82 | DeKalbDistrict 3 | Cleaning and painting all structural steel of SN's 019-0038 and 019-0040. | — | Executed | ERA-Valdivia Contractors, Inc. $167,056 · | ||
| Jan 17, 2025 | 66P90 | BureauLivingstonDistrict 3 | Bridge deck sealing with the parapets/curbs on various routes at various locations throughout Bureau and Livingston Counties. | — | Executed | M & M Concrete, Inc. $159,932 · | ||
| Jan 17, 2025 | 66P96 | GrundyDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Grundy County. | — | Active | Meade Inc. $341,893 · | ||
| Jan 17, 2025 | 66P97 | VariousDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Bureau, LaSalle, DeKalb, and Kendall Counties. | — | Executed | Laser Electric, Inc. $2,232,605 · | ||
| Jan 17, 2025 | 66P98 | VariousDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Ford, Iroquois, and Livingston Counties. | — | Executed | Leo P. Kelly Electric, Incorporated $384,646 · | ||
| Jan 17, 2025 | 66P99 | KankakeeDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Kankakee County. | — | Active | Outsen Electric, Incorporated $193,820 · | ||
| Jan 17, 2025 | 68H97 | HendersonDistrict 4 | Slope stabilization and culvert extension 1 mile south of 2600N in Henderson County. 895' gross. | — | Executed | J.C. Dillon, Inc. $519,574 · | ||
| Jan 17, 2025 | 68J32 | VariousDistrict 4 | Districtwide tree removal on an on call basis. | — | Executed | JIMAX Landscape LLC $233,844 · | ||
| Jan 17, 2025 | 68J35 | VariousDistrict 4 | Washing of nine bridges in District 4. | — | Executed | M & M Concrete, Inc. $492,999 · | ||
| Jan 17, 2025 | 68J37 | VariousDistrict 4 | Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD) throughout District Four. | — | Executed | Northern Contracting, Inc. $748,731 · | ||
| Jan 17, 2025 | 68J38 | PeoriaDistrict 4 | Landscaping maintenance and installation along I-74 from Ellis St. to Illinois River in Peoria. Net length 7,286 ft. | — | Executed | JIMAX Landscape LLC $307,381 · | ||
| Jan 17, 2025 | 70571 | McLeanDistrict 5 | 0.013 miles of bridge replacement at Intermittent Stream_0.9 miles west of I-55 west of Chenoa. | — | Executed | Stark Excavating, Inc. $2,190,999 · | ||
| Jan 17, 2025 | 70A55 | VermilionDistrict 5 | 5.312 miles of pavement rehab - designed overlay resurfacing and underdrains, ramp repair 0.4 mile east of US 150-IL 1 at Tilton to the Indiana State Line. | — | Executed | Open Road Paving Company LLC $32,255,503 · | ||
| Jan 17, 2025 | 70D78 | ChampaignDistrict 5 | Bridge deck overlay and other repairs to SN 010-0208. | — | Executed | Stark Excavating, Inc. $894,984 · | ||
| Jan 17, 2025 | 70G85 | McLeanDistrict 5 | Dynamic Message Signs at various locations in Bloomington/Normal. | — | Executed | Bodine Electric of Decatur $2,995,164 · | ||
| Jan 17, 2025 | 70H37 | VariousDistrict 5 | 567.5 miles of spraying; approximately 2004 acres on State ROW along US 51 and interstate routes including interchanges in Champaign, DeWitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $188,719 · | ||
| Jan 17, 2025 | 72007 | VariousDistrict 6 | Bridge washing on various Illinois and Mississippi River crossings in various counties of District 6. | — | Executed | Interstate Maintenance, Incorporated $103,300 · | ||
| Jan 17, 2025 | 72023 | SangamonDistrict 6 | Bridge painting on SN 084-0052 carrying Old US 36 over the Sangamon River, southwest of Riverton. | — | Executed | Civil Coatings and Construction Inc. $862,345 · | ||
| Jan 17, 2025 | 72187 | CassDistrict 6 | Bridge deck patching and joint repairs on SN 009-0001 carrying US 67/IL 100 over the Illinois River at Beardstown. | — | Executed | Path Construction Company, Inc. $2,949,140 · | ||
| Jan 17, 2025 | 72515 | SangamonDistrict 6 | Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 the Morgan County line to the Macon County line. | — | Executed | Kinney Contractors, Inc. $1,049,013 · | ||
| Jan 17, 2025 | 72609 | SangamonDistrict 6 | Riprap installation at SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. | — | Executed | Kinney Contractors, Inc. $130,080 · | ||
| Jan 17, 2025 | 72650 | SangamonDistrict 6 | Bridge painting on SN 084-0163 and SN 084-0164 carrying I-72 over Long Point Slough, 1.5 miles east of Illiopolis. | — | Executed | ERA-Valdivia Contractors, Inc. $259,209 · | ||
| Jan 17, 2025 | 72747 | PikeDistrict 6 | Bridge deck patching and joint repairs on SN 075-0038 carrying IL 96 over Kiser Creek at New Canton. | — | Executed | County Contractors, Inc. $272,212 · | ||
| Jan 17, 2025 | 72770 | LoganSangamonDistrict 6 | Cured-in-place pipe liner at various locations on I-55 and the I-55 Frontage Road in Logan and Sangamon Counties. | — | Executed | Hoerr Construction, Inc. $561,200 · | ||
| Jan 17, 2025 | 72878 | PikeDistrict 6 | 6.3 miles of crack and joint seal on I-72 from 0.4 miles east of the US 54/IL 107 interchange to the Scott County line. | — | Executed | Freehill Asphalt, Inc. $83,522 · | ||
| Jan 17, 2025 | 72934 | AdamsPikeDistrict 6 | Patching on I-72, I-172 from 1.5 miles north of the Adams/Pike County line to 1 mile east of IL 96. | — | Executed | G. M. Sipes Construction, Inc. $396,340 · | ||
| Jan 17, 2025 | 72D00 | MacoupinMontgomeryDistrict 6 | 14.2 miles of resurfacing on I-55 from 0.8 miles north of IL 16 to the Madison County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $15,476,927 · | ||
| Jan 17, 2025 | 72G59 | AdamsDistrict 6 | 1.6 miles of resurfacing, intersection improvements, new left turn lanes and new HMA shoulders on US 24 from the east corporate limits of Camp Point to 0.1 miles east of IL 94. | — | Executed | Diamond Construction Company $2,871,284 · | ||
| Jan 17, 2025 | 72L31 | SangamonDistrict 6 | 1 mile of pavement resurfacing and fog sealing of shoulders on IL 124 from the Andrew Road Junction west of Sherman to Business I-55 in Sherman. | — | Executed | P. H. Broughton & Sons, Inc. $272,390 · | ||
| Jan 17, 2025 | 74A59 | ShelbyDistrict 7 | 13.9 miles of patching, milling, resurfacing and aggregate shoulders on IL 128 from IL 16 to the Fayette County line. | — | Executed | Howell Paving, Inc. $12,408,218 · | ||
| Jan 17, 2025 | 74C56 | MoultrieDistrict 7 | Bridge deck overlay and bridge joint replacement/repairs on 5 structures along Cadwell Road in Piatt County. (SN 070-0039, 070-0040, 070-0041, 070-0044, and 070-0045) | — | Executed | Samron Midwest Contracting, Inc. $3,994,275 · | ||
| Jan 17, 2025 | 74D22 | VariousDistrict 7 | Guardrail repair and on-call guardrail repair at various locations. | — | Executed | COLLINS & HERMANN, INC. $747,567 · | ||
| Jan 17, 2025 | 74D23 | ClarkDistrict 7 | 10 miles of patching on I-70 from 1 mile west of IL 1 to the Indiana state line. | — | Executed | Kinney Contractors, Inc. $519,237 · | ||
| Jan 17, 2025 | 76L46 | MadisonDistrict 8 | 0.8 miles of patching, resurfacing and installing bus pads on IL 140 from 0.15 miles east of IL 111 to Sanders Street in Bethalto. | — | Executed | Charles E. Mahoney Co. $619,161 · | ||
| Jan 17, 2025 | 76M34 | St. ClairDistrict 8 | 1.5 miles of patching on North Belt West from West Main Street in Belleville to IL 161 in Swansea. | — | Executed | Kinney Contractors, Inc. $273,361 · | ||
| Jan 17, 2025 | 76P16 | JerseyDistrict 8 | Widening and resurfacing of IL 16 at the Otterville Road/Grafton Lane intersection to provide dedicated left turn lanes and improved turning radii. | — | Executed | Stutz Excavating, Inc. $1,403,493 · | ||
| Jan 17, 2025 | 76R13 | MadisonDistrict 8 | Bridge deck sealing on the McKinley Bridge (SN 060-6002) over the Mississippi River. | — | Executed | M & M Concrete, Inc. $64,938 · | ||
| Jan 17, 2025 | 76R67 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex (SN 082-0005 and SN 082-0144). | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,328,000 · | ||
| Jan 17, 2025 | 76T49 | MadisonDistrict 8 | Traffic signal modernization at 3 intersections: IL 203 at Johnson/Fehling Road; IL 3 at Hawthorne Street; IL 111 at Horseshoe Lake Road. | — | Executed | Electrico, Inc. $1,030,879 · | ||
| Jan 17, 2025 | 76T87 | MadisonDistrict 8 | Bridge deck sealing at various locations in Madison County. | — | Executed | All States Painting, Inc. $581,300 · | ||
| Jan 17, 2025 | 78483 | JeffersonDistrict 9 | Reconstruction of the I-57/I-64 interchange and intersection modifications at various locations in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $38,661,329 · | ||
| Jan 17, 2025 | 78884 | FranklinJeffersonDistrict 9 | 9.7 miles of additional lane installation on I-57 from 2.5 miles south of IL 154 to Atchison Creek. Includes replacement of SN 028-0011 and SN 0028-0013. | — | Executed | E. T. Simonds Construction Company $104,503,286 · | ||
| Jan 17, 2025 | 78998 | JacksonDistrict 9 | 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. | — | Executed | Gerstner Electric, Inc. $1,954,250 · | ||
| Jan 17, 2025 | 78A59 | JacksonDistrict 9 | 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $241,275 · | ||
| Jan 17, 2025 | 78A68 | PerryDistrict 9 | 3.3 miles of resurfacing on IL 13 from the Randolph County line to Swanwick-Rice Road. | — | Executed | E. T. Simonds Construction Company $726,553 · | ||
| Jan 17, 2025 | 78A69 | GallatinWhiteDistrict 9 | Patching and resurfacing on IL 141 from the Gallatin County line to the Wabash Memorial Bridge and on Vine Street from IL 141 to Main Street in New Haven. | — | Executed | E. T. Simonds Construction Company $3,231,440 · | ||
| Jan 17, 2025 | 78A75 | VariousDistrict 9 | Cleaning and painting 17 bridges on various routes in various counties of District 9. | — | Executed | Venus Painting Co. $1,830,307 · | ||
| Jan 17, 2025 | 78A83 | AlexanderDistrict 9 | 4.3 miles of resurfacing and safety shoulders on IL 3 from 2.2 miles west of IL 127 (southeast of Olive Branch) to 2 miles south of the IL 127 and IL 3 intersection. | — | Executed | E. T. Simonds Construction Company $2,075,889 · | ||
| Jan 17, 2025 | 78B18 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 and I-64 at various locations in various counties. | — | Executed | The Daltons Inc. $224,685 · | ||
| Jan 17, 2025 | 78B19 | VariousDistrict 9 | Weed spraying for Johnson Grass along I-57 at various locations in various counties. | — | Executed | The Daltons Inc. $175,285 · | ||
| Jan 17, 2025 | 85758 | CarrollDistrict 2 | Replace the existing timber/steel truss bridge with a single-span concrete I-beam bridge to carry Big Cut Road over the BNSF Railroad, 3 miles south of Mt. Carroll. | — | Executed | Sjostrom & Sons, Inc. $3,005,217 · | ||
| Jan 17, 2025 | 85767 | Rock IslandDistrict 2 | Construct PCC multi-use paths and sidewalks, install pedestrian push-button activated flashing beacons, pavement markings and landscaping at various locations in East Moline. | — | Executed | McCarthy Improvement Company $835,827 · | ||
| Jan 17, 2025 | 85770 | StephensonDistrict 2 | Cold-In-Place recycling on Lamm Road from 0.2 mile east of IL 26 to Baileyville Road. | — | Executed | Dunn Company $248,656 · | ||
| Jan 17, 2025 | 85772 | Rock IslandDistrict 2 | HMA resurfacing on 19th Street from 7th Street to 16th Street in Moline. Work includes patching, sidewalks with ADA improvments, curb and gutter, pavment markings and traffic signal improvements. | — | Executed | Valley Construction Co. $1,565,824 · | ||
| Jan 17, 2025 | 87805 | KankakeeDistrict 3 | Reconstruction of Manteno-Deslem Road to provide a 3-lane roadway with bi-directional turn lane from US 45/52 to Spuce Street in Manteno. | — | Executed | Kankakee Valley Construction Company, Inc. $9,569,046 · | ||
| Jan 17, 2025 | 87840 | GrundyDistrict 3 | Construction of a HMA multi-use path and pedestrian bridge with segmental block wall, utility adjustments, and culverts along McEvilly Road in Minooka. | — | Executed | D. Construction, Inc. $1,708,477 · | ||
| Jan 17, 2025 | 87852 | LaSalleDistrict 3 | Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71. | — | Rejected | D. Construction, Inc. $946,209 · | ||
| Jan 17, 2025 | 87873 | KendallDistrict 3 | HMA rsurfacing and reconstruct portions of Hale Street from E. Dearborn St. to Larson Street in Plano. Reconstruciton includes cross slope and crown correction, curb and gutter, ADA ramps and a shared-use path. | — | Executed | Geneva Construction Company $1,060,850 · | ||
| Jan 17, 2025 | 89837 | FultonDistrict 4 | Construction of a single-span plate girder with reinforced deck to carry CH 22 over Big Creek. Work includes channel excavation and HMA resurfacing. | — | Executed | Otto Baum Company, Inc. $1,169,900 · | ||
| Jan 17, 2025 | 89854 | WoodfordDistrict 4 | Reconstruction of CH 13, including construction of a single span PPC deck beam bridge over the West Branch of Panther Creek. Work includes HMA pavement, PCC Pavement, roadway widening, storm sewer and sidewalks. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,250,597 · | ||
| Jan 17, 2025 | 89855 | WoodfordDistrict 4 | Resurfacing Santa Fe Trail from Lourdes Road to Douglas Street, and ADA Ramp improvements at the Douglas/Progress Street intersection. | — | Executed | Advanced Asphalt Company $754,206 · | ||
| Jan 17, 2025 | 89863 | TazewellDistrict 4 | Resurfacing Parkway Drive from IL 98 to the north city limits of Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $315,613 · | ||
| Jan 17, 2025 | 89865 | PeoriaDistrict 4 | Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe. | — | Executed | Advanced Asphalt Company $473,305 · | ||
| Jan 17, 2025 | 93773 | SangamonDistrict 6 | Construction of a two-span underpass structure to carry the Union Pacific Railroad over North Grand Avenue and construction of a two-span overpass structure to carry North Grand Avenue over the Illinois and Midland, and Norfolk Southern Railroads. This contract includes the reconstruction and re-alignment of North Grand Avenue from 9th Street to 19th Street in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $99,697,564 · | ||
| Jan 17, 2025 | 93803 | MontgomeryDistrict 6 | Intersection realignment and widening at Cofeen Road and Seven Sisters Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $512,832 · | ||
| Jan 17, 2025 | 93824 | HancockDistrict 6 | Constrution of a three-span, continuous steel beam bridge with concrete deck and approach slabs, HMA Pavement, aggregate shoulders, and guardrails on 4th Street over Spillman Creek in Pontoosuc. | — | Executed | Laverdiere Construction, Inc. $2,080,125 · | ||
| Jan 17, 2025 | 93825 | ScottDistrict 6 | Oil and Chip Resurfacing with aggregate base on Winchester-Glasgow Road. Work includes Aggregate shoulders, pipe culvert replacement and ditch improvements. | — | Executed | K. E. Vas Company $369,091 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.