(4)N,RS-10,SR
- Let date
- Friday, January 17, 2025
- Contract
- 72G59 · job page
- District
- District 6
- County
- Adams
- Highway
- Limits
- 1.6 miles of resurfacing, intersection improvements, new left turn lanes and new HMA shoulders on US 24 from the east corporate limits of Camp Point to 0.1 miles east of IL 94.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Diamond Construction Company Low bidder | $2,871,284 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Diamond Constru… |
|---|---|---|---|---|---|---|
| 1 | X0326341 | REATTACH END SECTION | 1 | EACH | $2,500.00 | |
| 2 | X0326899 | SOLAR-POWER FB AS CMP | 1 | EACH | $2,500.00 | |
| 3 | X2020060 | EXC & GR EX SHLD SPL | 122 | UNIT | $650.00 | |
| 4 | X4401198 | HMA SURF REM VAR DP | 887 | SQ YD | $15.00 | |
| 5 | X4404260 | PAVED SHLD REMOVAL SP | 1,112 | SQ YD | $20.00 | |
| 6 | X6050500 | REMOV FR & GR SPL | 1 | EACH | $1,575.00 | |
| 7 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $50,000.00 | |
| 8 | Z0076600 | TRAINEES | 1,500 | HOUR | $0.8000 | |
| 9 | Z0076604 | TRAINEES TPG | 1,500 | HOUR | $15.00 | |
| 10 | 20100210 | TREE REMOV OVER 15 | 44 | UNIT | $150.00 | |
| 11 | 20200100 | EARTH EXCAVATION | 3,523 | CU YD | $22.00 | |
| 12 | 20400800 | FURNISHED EXCAVATION | 10 | CU YD | $157.00 | |
| 13 | 21400100 | GRADING & SHAP DITCH | 11,434 | FOOT | $12.00 | |
| 14 | 25000200 | SEEDING CL 2 | 5.5 | ACRE | $1,350.00 | |
| 15 | 25000400 | NITROGEN FERT NUTR | 463 | POUND | $3.00 | |
| 16 | 25000500 | PHOSPHORUS FERT NUTR | 463 | POUND | $3.00 | |
| 17 | 25000600 | POTASSIUM FERT NUTR | 463 | POUND | $3.00 | |
| 18 | 25000700 | AGR GROUND LIMESTONE | 10.3 | TON | $50.00 | |
| 19 | 25100115 | MULCH METHOD 2 | 5.5 | ACRE | $1,350.00 | |
| 20 | 28000305 | TEMP DITCH CHECKS | 1,200 | FOOT | $10.50 | |
| 21 | 28000400 | PERIMETER EROS BAR | 248 | FOOT | $8.25 | |
| 22 | 28000500 | INLET & PIPE PROTECT | 19 | EACH | $157.00 | |
| 23 | 28100205 | STONE RIPRAP CL A3 | 51 | TON | $142.00 | |
| 24 | 31101600 | SUB GRAN MAT B 8 | 3,128 | SQ YD | $24.00 | |
| 25 | 35101400 | AGG BASE CSE B | 103 | TON | $25.00 | |
| 26 | 35501317 | HMA BASE CSE 8 1/4 | 2,413 | SQ YD | $105.00 | |
| 27 | 35800100 | PREPARATION OF BASE | 50 | SQ YD | $15.00 | |
| 28 | 40200800 | AGG SURF COURSE TY B | 37 | TON | $70.00 | |
| 29 | 40201000 | AGGREGATE-TEMP ACCESS | 20 | TON | $55.00 | |
| 30 | 40600290 | BIT MATLS TACK CT | 17,968 | POUND | $2.25 | |
| 31 | 40600370 | LONG JOINT SEALANT | 10,053 | FOOT | $3.50 | |
| 32 | 40600405 | MATL TRANSFER DEVICE | 1,978 | TON | $5.00 | |
| 33 | 40600982 | HMA SURF REM BUTT JT | 1,296 | SQ YD | $30.00 | |
| 34 | 40600985 | PCC SURF REM BUTT JT | 150 | SQ YD | $30.00 | |
| 35 | 40600990 | TEMPORARY RAMP | 107 | SQ YD | $10.00 | |
| 36 | 40603080 | HMA BC IL-19.0 N50 | 2,967 | TON | $140.00 | |
| 37 | 40604050 | HMA SC IL-9.5 C N50 | 1,978 | TON | $145.00 | |
| 38 | 40800029 | BIT MATLS TACK CT | 586 | POUND | $2.25 | |
| 39 | 40800050 | INCIDENTAL HMA SURF | 176 | TON | $300.00 | |
| 40 | 44000100 | PAVEMENT REM | 31 | SQ YD | $71.00 | |
| 41 | 44000155 | HMA SURF REM 1 1/2 | 20,572 | SQ YD | $4.00 | |
| 42 | 44000500 | COMB CURB GUTTER REM | 64 | FOOT | $27.00 | |
| 43 | 44003100 | MEDIAN REMOVAL | 208 | SQ FT | $10.50 | |
| 44 | 44004250 | PAVED SHLD REMOVAL | 885 | SQ YD | $23.00 | |
| 45 | 48102100 | AGG WEDGE SHLD TYPE B | 241 | TON | $100.00 | |
| 46 | 48203023 | HMA SHOULDERS 6 1/2 | 7,094 | SQ YD | $55.00 | |
| 47 | 48203100 | HMA SHOULDERS | 638 | TON | $140.00 | |
| 48 | 50104400 | CONC HEADWALL REMOVAL | 1 | EACH | $750.00 | |
| 49 | 50105220 | PIPE CULVERT REMOV | 191 | FOOT | $19.00 | |
| 50 | 50800105 | REINFORCEMENT BARS | 60 | POUND | $10.25 | |
| 51 | 542A0220 | P CUL CL A 1 15 | 40 | FOOT | $120.00 | |
| 52 | 542A0223 | P CUL CL A 1 18 | 45 | FOOT | $135.00 | |
| 53 | 542D0220 | P CUL CL D 1 15 | 120 | FOOT | $120.00 | |
| 54 | 542D0223 | P CUL CL D 1 18 | 12 | FOOT | $135.00 | |
| 55 | 54213660 | PRC FLAR END SEC 15 | 2 | EACH | $2,300.00 | |
| 56 | 54213663 | PRC FLAR END SEC 18 | 2 | EACH | $2,500.00 | |
| 57 | 54248510 | CONCRETE COLLAR | 0.6 | CU YD | $15,000.00 | |
| 58 | 54260315 | TRVRS PIPE GRT CON ES | 6 | FOOT | $237.00 | |
| 59 | 54262715 | METAL FL END SEC 15" | 6 | EACH | $525.00 | |
| 60 | 54262718 | METAL FL END SEC 18" | 2 | EACH | $630.00 | |
| 61 | 60250700 | CB ADJ NEW T4F&G | 1 | EACH | $2,520.00 | |
| 62 | 60603500 | COMB CC&G TB6.06 | 21 | FOOT | $150.00 | |
| 63 | 60610400 | COMB CC&G TM6.24 | 33 | FOOT | $175.00 | |
| 64 | 60618300 | CONC MEDIAN SURF 4 | 140 | SQ FT | $60.00 | |
| 65 | 60920015 | PIPE CULV CLEANED 15 | 24 | FOOT | $82.00 | |
| 66 | 60920018 | PIPE CULV CLEANED 18 | 53 | FOOT | $82.00 | |
| 67 | 60921018 | PIPE CULV CLEANED ERS 18 | 161 | FOOT | $65.00 | |
| 68 | 60921024 | PIPE CULV CLEANED ERS 24 | 54 | FOOT | $89.00 | |
| 69 | 63000001 | SPBGR TY A 6FT POSTS | 175 | FOOT | $37.50 | |
| 70 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $4,950.00 | |
| 71 | 63100169 | TR BAR TRM T1 SPL FLR | 1 | EACH | $5,135.00 | |
| 72 | 63500105 | DELINEATORS | 9 | EACH | $335.00 | |
| 73 | 64200108 | SHOULDER RUM STRIP 8 | 15,571 | FOOT | $0.7500 | |
| 74 | 66600105 | FUR ERECT ROW MARKERS | 19 | EACH | $850.00 | |
| 75 | 66900200 | NON SPL WASTE DISPOSL | 170 | CU YD | $80.00 | |
| 76 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,450.00 | |
| 77 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,300.00 | |
| 78 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,300.00 | |
| 79 | 66901006 | REG SUB MON | 4 | CAL DA | $975.00 | |
| 80 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $2,500.00 | |
| 81 | 67100100 | MOBILIZATION | 1 | L SUM | $145,000.00 | |
| 82 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $1,000.00 | |
| 83 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $20,000.00 | |
| 84 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $35,000.00 | |
| 85 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $28,000.00 | |
| 86 | 70103815 | TR CONT SURVEILLANCE | 20 | CAL DA | $600.00 | |
| 87 | 70300100 | SHORT TERM PAVT MKING | 3,344 | FOOT | $1.00 | |
| 88 | 70300150 | SHRT TRM PAVT MK REM | 1,114 | SQ FT | $3.00 | |
| 89 | 72400205 | REM & REL SIGN PANEL ASMBLY TA | 1 | EACH | $900.00 | |
| 90 | 72400210 | REM & REL SIGN PANEL ASMBLY TB | 6 | EACH | $1,150.00 | |
| 91 | 72400600 | RELOC SIN PAN ASSY TB | 1 | EACH | $1,025.00 | |
| 92 | 72400735 | REM & REL SIGN PANEL T1 | 9 | SQ FT | $12.50 | |
| 93 | 72501000 | TERMINAL MARKER - DA | 2 | EACH | $52.50 | |
| 94 | 72800100 | TELES STL SIN SUPPORT | 234 | FOOT | $37.00 | |
| 95 | 73000100 | WOOD SIN SUPPORT | 18 | FOOT | $84.00 | |
| 96 | 78009000 | MOD URETH PM LTR-SYM | 78 | SQ FT | $4.20 | |
| 97 | 78009005 | MOD URETH PM LINE 5 | 26,765 | FOOT | $1.30 | |
| 98 | 78009006 | MOD URETH PM LINE 6 | 492 | FOOT | $1.45 | |
| 99 | 78009008 | MOD URETH PM LINE 8 | 306 | FOOT | $1.90 | |
| 100 | 78009012 | MOD URETH PM LINE 12 | 301 | FOOT | $2.80 | |
| 101 | 78009024 | MOD URETH PM LINE 24 | 54 | FOOT | $5.70 | |
| 102 | 78100100 | RAISED REFL PAVT MKR | 252 | EACH | $37.00 | |
| 103 | 78200005 | GRDRAIL REF TYPE A | 2 | EACH | $10.50 | |
| 104 | 78300200 | RAISED REF PVT MK REM | 252 | EACH | $5.00 | |
| 105 | 80400100 | ELECT SERV INSTALL | 1 | EACH | $5,300.00 | |
| 106 | 81028750 | UNDRGRD C CNC 2 | 163 | FOOT | $92.50 | |
| 107 | 81603000 | UD 2#8 #8G XLPUSE 3/4 | 511 | FOOT | $12.00 | |
| 108 | 82110007 | LUM LED RDWY G | 2 | EACH | $1,350.00 | |
| 109 | 82500310 | LT CONT PM 240V 60 | 1 | EACH | $6,600.00 | |
| 110 | 83000600 | LT P A 30MH 15DA | 2 | EACH | $6,850.00 | |
| 111 | 83600352 | LP F M 11.5BC 8 5/8X6 | 2 | EACH | $4,130.00 | |
| 112 | 83800650 | BKWY DEV COU SS SCRN | 8 | EACH | $170.00 | |
| 113 | 89502400 | REM EX FB INSTAL COMP | 1 | EACH | $375.00 |