| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 23, 2021 | 93736 | MenardDistrict 6 | Reconstruct and resurface CH 2 from east of IL 97/123 for 1.05 miles. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,166,705 · | ||
| Apr 23, 2021 | 93747 | SangamonDistrict 6 | Remove the structures carrying the Norfolk Southern Railroad over Cook Street and South Grand Avenue, Construction of two railroad structures over Cook Street, construction of two railroad structures over South Grand Avenue, track removal, approach roadways, storm sewer, sanitary sewer, pump stations, curb and gutter, sidewalks, lighting, fencing and pavement markings all in the city of Springfield. | — | Executed | Freesen, a div of UCM, Inc. $23,761,224 · | ||
| Apr 23, 2021 | 93761 | LoganDistrict 6 | Remove and replace guardrail at various locations in Logan County. | — | Executed | COLLINS & HERMANN, INC. $1,064,939 · | ||
| Apr 23, 2021 | 93767 | SchuylerDistrict 6 | Resurfacing approaches to the bridge carrying CH 5 over the Lamoine River Slough, Cape Seal resufacting of CH 5 from County Road 3100E to the Rushville Corporate Limits, and on CH 1 from IL 103 to the Rushville Corporate limits. | — | Executed | A. C. Pavement Striping Co. $1,527,806 · | ||
| Apr 23, 2021 | 93768 | PikeDistrict 6 | Bituminous surface treatment at various locatinos in Pike County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,614,284 · | ||
| Apr 23, 2021 | 93769 | HancockDistrict 6 | Micrtosurfacing CH 24 from IL 96 to CH 29. | — | Executed | A. C. Pavement Striping Co. $207,353 · | ||
| Apr 23, 2021 | 94519 | FayetteDistrict 7 | Complete replacement of an existing bridge with a double barrel box culvert on US 51, 3.25 miles south of Vandalia. (SN 026-0088) | — | Executed | Keller Construction, Inc. $860,860 · | ||
| Apr 23, 2021 | 95822 | EffinghamDistrict 7 | Trailhead parking improvements, sidewalk crossing improvements, pedestrian path signals and lighting, sigage and pavement markings at various loactions in Effingham. | — | Rejected | A & R Mechanical Service, Inc. $863,284 · | ||
| Apr 23, 2021 | 95891 | ClarkDistrict 7 | Guardrail removal and replacement with terminals, box culvert extensions, precast box culverts, pipe culverts and riprap at various locations in Clark County. | — | Executed | Samron Midwest Contracting, Inc. $933,441 · | ||
| Apr 23, 2021 | 95895 | ShelbyDistrict 7 | Replace the bridge carrying TR 112 over Flat Branch Tributary, 4.8 miles southeast of Moweaqua. | — | Executed | Depew and Owen Builders, Inc. $318,888 · | ||
| Apr 23, 2021 | 97487 | MonroeDistrict 8 | Pavement removal, sub and aggregate base, HMA Pavement and shoulders with rumble strips, storm sewer, guardrail and pavement markings on TR 47 (HH Road) from 0.15 mile west of Waterloo City Limits to 0.3 mile west. | — | Executed | Baxmeyer Construction, Inc. $427,178 · | ||
| Apr 23, 2021 | 97719 | MonroeDistrict 8 | Pedestrian path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo. | — | Executed | Baxmeyer Construction, Inc. $247,448 · | ||
| Apr 23, 2021 | 97748 | MonroeDistrict 8 | Resurfacing Hanover Road from D Road to 0.2 mile east of FF Road. | — | Executed | Christ Bros. Asphalt, Inc. $1,018,912 · | ||
| Apr 23, 2021 | 97750 | MadisonDistrict 8 | Resurfacing Serento Road from Main Street to the Madison/Bond County Line. | — | Executed | The Kilian Corporation $539,097 · | ||
| Jun 11, 2021 | 46567 | VariousDistrict 3 | Installing and replacement of raised reflective pavement markers and reflectors This work is located at various locations in Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. Work shall consist of installing and replacement of raised reflective pavement markers and reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,606 · | ||
| Jun 11, 2021 | 46568 | VariousDistrict 3 | Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of ra This work is located on various interstate, multi-lane non-interstate and 2L-2W routes in Bureau, LaSalle, Dekalb, and Kendall Counties. This work shall consist of raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $461,546 · | ||
| Jun 11, 2021 | 46569 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and perplacing them with new raised reflective pavement markers within the limits shown in the plans. | — | Executed | P & P Construction Co. $395,933 · | ||
| Jun 11, 2021 | 46570 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,481,081 · | ||
| Jun 11, 2021 | 46571 | McHenryDistrict 1 | Removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, an This work shall consist of removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limit shown. | — | Executed | Superior Road Striping, Inc. $282,443 · | ||
| Jun 11, 2021 | 46572 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $635,000 · | ||
| Jun 11, 2021 | 46573 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $507,850 · | ||
| Jun 11, 2021 | 46574 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $423,000 · | ||
| Jun 11, 2021 | 46578 | VariousDistrict 9 | Repairing various widths and various types of pavement markings on a work order basis throughout District 9. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $798,480 · | ||
| Jun 11, 2021 | 46579 | VariousDistrict 5 | Pavement marking repair at various locations in Dewitt, Champaign, Vermilion, and District wide. | — | Executed | Varsity Striping & Construction Co. $923,675 · | ||
| Jun 11, 2021 | 46581 | VariousDistrict 6 | Pavement markings on various routes throughout the western part of District 6. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,212,457 · | ||
| Jun 11, 2021 | 46582 | VariousDistrict 6 | Pavement markings on various routes throughout the eastern part of District 6. | — | Executed | A. C. Pavement Striping Co. $1,473,367 · | ||
| Jun 11, 2021 | 46905 | SangamonDistrict 6 | Removal and reconstruction of the concrete retaining wall and walkway from the tomb to the receiving vault and parking lot repairs at the Lincoln-s Tomb State Historic Site in Springfield. | — | Rejected | White Construction LLC $597,216 · | ||
| Jun 11, 2021 | 46920 | St. ClairDistrict 8 | Site preparation and oil and chip treatment at Peabody River King State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $443,425 · | ||
| Jun 11, 2021 | 46926 | PeoriaDistrict 4 | Removal of the three 36-inch diameter culverts and replacing them witha 54-inch diameter culvert, and other drainage and signage work at Jubilee College State Park in Peoria County. | — | Executed | Stark Excavating, Inc. $272,935 · | ||
| Jun 11, 2021 | 46929 | McDonoughDistrict 4 | The slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and al These proposed improvements consist of the slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and all other necessary work to complete the project within the Argyle Lake State Park in McDonough County. net length 280' (0.053 mi.). | — | Executed | Brandt Construction Co. $531,591 · | ||
| Jun 11, 2021 | 60T15 | McHenryDistrict 1 | Intersection Improvement (channelization, traffic signal installation). Includes left and right turn lanes, re-alignment of Wright Rd, re-alignment of leg of Nish Rd and building demolition. Location: Intersection of IL 176 and Nish Road in unincorporated Nunda Township in McHenry County. | — | Executed | Campanella and Sons, Inc. $2,737,521 · | ||
| Jun 11, 2021 | 61B89 | WillDistrict 1 | Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox. | — | Executed | P. T. Ferro Construction Co. $7,905,136 · | ||
| Jun 11, 2021 | 61G38 | DuPageDistrict 1 | Resurfacing, sidewalk, curb and gutter replacement on Chicago Avenue from IL 83 to Garfield Street and on 3rd. Street from Grant Street to Washington Street in Hinsdale. | — | Executed | Builders Paving, LLC $812,000 · | ||
| Jun 11, 2021 | 61G53 | WillDistrict 1 | Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $2,324,588 · | ||
| Jun 11, 2021 | 61G98 | CookDistrict 1 | Installation of a wireless interconnect system and traffic signal modificatons on 143rd St. from Wolf Rd. to LaGrange Rd. in Orland Park. | — | Executed | Hecker and Company, Inc. $192,511 · | ||
| Jun 11, 2021 | 61H05 | DuPageDistrict 1 | Replace the culverts carrying Brickvale Drive over Willow Creek with precast concrete box culvert, 0.10 mile south of Devon Ave. in Elk Grove Village. | — | Executed | Alliance Contractors, Inc. $1,229,833 · | ||
| Jun 11, 2021 | 61H10 | KaneDistrict 1 | Resuface Sleepy Hollow Road from 0.3 mile south of Crane Dr. to IL 72 in Sleepy Hollow. | — | Executed | Plote Construction, Inc. $363,000 · | ||
| Jun 11, 2021 | 61H11 | CookDistrict 1 | Resurface East Fullerton Ave. from North Worlf Rd. to Geneva Ave. in Northlake. | — | Executed | J. A. Johnson Paving Company $652,256 · | ||
| Jun 11, 2021 | 61H13 | CookDistrict 1 | Construction of a multi-use path and traffic signal modifications along Wolf Road from the Bemis Woods Trial to Ogden Avenue in Western Springs. | — | Executed | Martam Construction Incorporated $377,363 · | ||
| Jun 11, 2021 | 62F39 | CookDistrict 1 | Drainage Improvement (reinstating roadside berms, storm sewer, PS 17 improvements), Retaining Wall, Standard Overlay Location: IL 58, from West of US 45 (West Hospital Entrance) to East River Road, in the City of Des Plaines. | — | Executed | Martam Construction Incorporated $2,777,624 · | ||
| Jun 11, 2021 | 62F72 | VariousDistrict 1 | This is a guardrail, guardrail end-section replacement and traffic signal signal modernization project on US 20 from IL 47 to Ontarioville Rd. in City of Elgin and Villages of Bartlett, Hanover Park, Pingree Grove, and Streamwood. | — | Executed | Copenhaver Construction, Inc. $218,052 · | ||
| Jun 11, 2021 | 62F84 | CookDistrict 1 | (1.811-Mile) Pavement widening project on Glenwood Dyer Road from Stony Island Avenue to Torrence Avenue that includes standard overlay, traffic signal modification, and ADA improvement work It is located in the Village of Lynwood and unincorporated Cook County. | — | Executed | K-Five Construction Corporation $4,242,424 · | ||
| Jun 11, 2021 | 62G39 | DuPageDistrict 1 | (990.33-Ft) Removal of existing bridge along 1-55 over Lemont Road and replacement with a 4-span 200'-00" long, 197'-10" out-to-out wide bridge; roadway reconstruction and resurfacing; safety, drainage, lighting, signing, pavement marking and landscaping improvements in the City of Darien. | — | Executed | IHC Construction Companies, L.L.C. $17,018,663 · | ||
| Jun 11, 2021 | 62H03 | WillDistrict 1 | Deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconst (1.02-Mile) Improvement consists of deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconstruct a retaining wall at 1-55 and IL 53 and substructure repair for both the bridges located in the Village of Bolingbrook. | — | Executed | D. Construction, Inc. $17,762,802 · | ||
| Jun 11, 2021 | 62K79 | CookDistrict 1 | Bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traff The improvement consists of bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traffic signal replacement at the bridge located on IL 394 over Glenwood Dyre Road in the Villages of Glenwood and Lynwood, in Cook County. IL. Gross and net length is 1,160 FT (0.22 Miles). | — | Executed | D. Construction, Inc. $1,404,369 · | ||
| Jun 11, 2021 | 62L07 | CookDistrict 1 | Design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St This improvement consists of design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St. and extends in a northerly direction approximately 10,920 feet (2.07 miles) to Approximately 190 feet north of Roosevelt Rd. | — | Executed | K-Five Construction Corporation $1,519,500 · | ||
| Jun 11, 2021 | 62L20 | CookDistrict 1 | This is a Standard Overlay and ADA Pedestrian Ramps project on Avenue L (FAP 29 from 116 feet southeast of Indianapolis Ave and extends northwest toward Avenue L and then north toward 95th Street for a total distance of 0.85 miles. The project is located within Hyde Park Township. | — | Executed | MAT Construction Leasing, Inc. $613,640 · | ||
| Jun 11, 2021 | 62L21 | CookDistrict 1 | The Project includes standard overlay and ADA improvements on Dempster St. from Ridge Ave. to Chicago Ave. The gross and the net length is equal to 2061.4 ft 0.39 mile. The project is located within the City of Evanston. | — | Executed | Chicagoland Paving Contractors, Inc. $440,000 · | ||
| Jun 11, 2021 | 62L63 | CookDistrict 1 | Smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in This improvement consists of smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in an easterly direction approximately 5640 feet (1.068 miles) to Approximately 160 feet east of US 41 (Lake Shore Dr.). Location in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $724,432 · | ||
| Jun 11, 2021 | 62L64 | LakeDistrict 1 | Smart Overlay improvement in the Village of Gurnee, Warren Township (1.91-Mile) Improvement of US 41 (Skokie Hwy) from IL 21 (Riverside Dr) to North of Dorchester Ave consists of Smart Overlay improvement in the Village of Gurnee, Warren Township. | — | Executed | Peter Baker & Son Co. $1,931,808 · | ||
| Jun 11, 2021 | 62L65 | McHenryDistrict 1 | Smart Overlay, Class D patching. This improvement of IL 47 begins 800 ft north of Ware Rd. and proceeds approximately 47350.5 ft (8.96 miles) in a northerly direction to IL Rte. 173 in the Village of Hebron and Township of Greenwood and Hebron. | — | Executed | Peter Baker & Son Co. $2,128,510 · | ||
| Jun 11, 2021 | 62L66 | WillDistrict 1 | This is a 2.93 mile SMART overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on IL 53 (Bolingbrook Dr.) from DuPage County Line to I-55 within the Village of Bolingbrook. | — | Executed | K-Five Construction Corporation $2,220,000 · | ||
| Jun 11, 2021 | 62L80 | CookDistrict 1 | (1.73-Mile) SMART overlay and ADA improvements on US 14 (Peterson Avenue) from US 41 to Ridge Avenue. The project is located in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $2,139,433 · | ||
| Jun 11, 2021 | 62L87 | CookDistrict 1 | (5,213-Feet) SMART overlay and ADA improvements on Wolf Road from IL 38 (Roosevelt Road) to Cermak Road located in the Village of Hillside and Westchester. | — | Executed | Plote Construction, Inc. $719,199 · | ||
| Jun 11, 2021 | 62L91 | CookDistrict 1 | (4.40-Mile) Smart overlay and ADA improvements project on IL 43 (Waukegan Rd.) from Ammer Rd. to Lake-Cook Rd. within the Villages of Glenview, Northfield, Northbrook and Deerfield. There is an omission within the project limits. | — | Executed | Plote Construction, Inc. $3,981,000 · | ||
| Jun 11, 2021 | 62L92 | CookDistrict 1 | (5.89-Mile) SMART Overlay project and it begins on IL 43 (Harlem Ave.) at 111th Street and continues in a northerly direction for 33,426 (6.33 mile) feet to 62nd Street. The project is within the City of Chicago, Villages of Bedford Park, Bridgeview, Burbank, Chicago Ridge, Palos Hills, Summit and Worth. | — | Executed | Gallagher Asphalt Corporation $5,033,078 · | ||
| Jun 11, 2021 | 62M09 | CookDistrict 1 | Crack and joint sealing pavement preservation project. Includes renewal of pavement markings. Location: FAU 1581: 111th Street, from Central Ave to Pulaski Rd in the Village of Oak Lawn and the City of Chicago, in Cook County. | — | Executed | SKC Construction, Inc. $151,360 · | ||
| Jun 11, 2021 | 62M17 | CookDistrict 1 | Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf This project consists of Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf Road) spanning a total length of 8,778 ft (1.66 Miles) in the Village of Mt. Prospect and the City of Des Plaines. | — | Executed | Plote Construction, Inc. $1,551,000 · | ||
| Jun 11, 2021 | 62M41 | CookDistrict 1 | Bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 1 The improvement consists of bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 130th Street over 1-94 and at CSSS and IHB RR in Cook County, IL. Gross and net length is 785 FT (0.15 Miles). | — | Executed | Areatha Construction Co., Inc. $3,345,536 · | ||
| Jun 11, 2021 | 62M69 | DuPageDistrict 1 | Removal of existing single cell box culvert and with proposed triple cell box culvert, ditch regrading and con The improvement consists of removal of existing single cell box culvert and with proposed triple cell box culvert, ditch regrading and constructing a new retaining wall located on ll 83 over Drainage Ditch in DuPage County, IL. | — | Executed | D. Construction, Inc. $3,570,071 · | ||
| Jun 11, 2021 | 62M73 | KaneDistrict 1 | Culvert repairs for the structure earring on IL 38 MiII Creek in the Village of Campton Hills, Kane County, IL The improvement consists of culvert repairs for the structure earring on IL 38 MiII Creek in the Village of Campton Hills, Kane County, IL. Gross length is 388 FT (0.073 Miles), Net length is 37.5 FT (0.007 Miles). | — | Executed | MYS, Incorporated $196,778 · | ||
| Jun 11, 2021 | 62N08 | WillDistrict 1 | Bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the b The improvement consists of bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the bridge located on l-55 over Kankakee River in the City of Wilmington in Will County Gross and net length is 1,067 FT (0.2 Miles). | — | Executed | D. Construction, Inc. $1,390,024 · | ||
| Jun 11, 2021 | 62N17 | CookDistrict 1 | Cleaning and painting existing steel structures at 3 locations Improvements consists of cleaning and painting existing steel structures at 3 locations. 1st location is located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd location is located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove. | — | Executed | Capital Industrial Services $493,930 · | ||
| Jun 11, 2021 | 62N24 | CookDistrict 1 | Bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County The improvement consists of bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County. IL. Gross length is 4044 FT (0. 77 Miles). Net length is 516 FT (0.10 Miles). | — | Executed | Herlihy Mid-Continent Company $276,951 · | ||
| Jun 11, 2021 | 62N29 | CookDistrict 1 | (1.17-Mile) Noise wall repairs. Location: IL-53, from IL-68 (Dundee Road) to Lake-Cook Road in the Villages of Palatine and Arlington Heights, in Palatine Township in Cook County. | — | Executed | Lorig Construction Company $421,460 · | ||
| Jun 11, 2021 | 62N38 | CookDistrict 1 | Bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL The improvement consists of bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL. Gross length is 5808 FT (1. 10 Miles). | — | Executed | Rausch Infrastructure, LLC $699,680 · | ||
| Jun 11, 2021 | 62N82 | LakeDistrict 1 | (1. 71-Mile) Standard Overlay, Designed Overlay, Patching, and ADA improvements Location: IL 60 (Townline Rd) from East of Des River to Riverwoods Rd, in the Village of Mettawa, in Lake County. | — | Executed | Peter Baker & Son Co. $1,805,903 · | ||
| Jun 11, 2021 | 62N90 | CookMcHenryDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships. | — | Executed | Capital Industrial Services $683,300 · | ||
| Jun 11, 2021 | 62N93 | VariousDistrict 1 | Ecological Restoration of Wetland areas in various locations within District One. | — | Executed | Cardno, Inc. $450,025 · | ||
| Jun 11, 2021 | 64H08 | WinnebagoDistrict 2 | Reconstruction of roadway, modernize traffic signals and improve intersections along US Business Route 20 (West State Street) in Rockford from Day Avenue to Independence Avenue. | — | Executed | William Charles Construction Company, LLC $6,499,530 · | ||
| Jun 11, 2021 | 64L45 | OgleWinnebagoDistrict 2 | Guardrail and Traffic Barrier Terminal Improvement, 0.1 mile North of Luther Drive in Byron to 0.1 mile South of Beltline Road South of Rockford. | — | Executed | COLLINS & HERMANN, INC. $802,543 · | ||
| Jun 11, 2021 | 64M18 | WinnebagoDistrict 2 | Cold milling and hot-mix asphalt resurfacing on US 20 from 0.2 mile West of Falconer Road to Simpson Road. | — | Executed | William Charles Construction Company, LLC $12,388,900 · | ||
| Jun 11, 2021 | 64N38 | WhitesideDistrict 2 | Reconstruction of Westbound IL 2 (E. 4th Street) From 4th Ave to 2nd Ave. in Sterling. | — | Executed | Fischer Excavating, Inc. $1,787,878 · | ||
| Jun 11, 2021 | 64N49 | WinnebagoDistrict 2 | Retaining Wall Repair 0.3 Miles North of Auburn St/Spring Creek Road. | — | Executed | Martam Construction Incorporated $862,466 · | ||
| Jun 11, 2021 | 64N50 | CarrollDistrict 2 | Slope stabilization and culvert repairs along US 52/ IL 64 that is located 0.3 miles East of Dauphin Road at Station 259+15. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $341,342 · | ||
| Jun 11, 2021 | 64P49 | Jo DaviessDistrict 2 | 1.705 miles; Application of a CRF Restorative Seal as a pavement preservation treatment over the IL 84 roadway centerline rumble strip; from 0.8 mile North to 0.9 mile South of Crazy Hollow Road. | — | Executed | Brandt Construction Co. $61,502 · | ||
| Jun 11, 2021 | 64P75 | HenryDistrict 2 | Cleaning and painting structural steel on SN-s 037-0013 and 037-0014 carrying I-74 over Edwards River. | — | Executed | All States Painting, Inc. $159,130 · | ||
| Jun 11, 2021 | 64P86 | WhitesideDistrict 2 | Patching, resurfacing and drainage improvement at the Rock Fall maintenance yard. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $234,765 · | ||
| Jun 11, 2021 | 64P87 | BooneDistrict 2 | Milling and resurfacing the Belvidere Maintenance Yard. | — | Executed | Rock Road Companies, Inc. $123,761 · | ||
| Jun 11, 2021 | 64P94 | WhitesideDistrict 2 | Bridge deck overlay, expansion joint replacement and other bridge repairs on SN 098-0084 and 098-0085 carrying I-88 over the Hennepin Feeder Canal, 1 mile South of Rock Falls. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,444,158 · | ||
| Jun 11, 2021 | 64R03 | WinnebagoDistrict 2 | Pavement patching from 0.1 mile South of Pierce Ave. to Bauer Parkway in Rockford. | — | Executed | Triggi Construction, Inc. $466,055 · | ||
| Jun 11, 2021 | 64R04 | Rock IslandWhitesideDistrict 2 | Pavement patching from 0.7 miles North to 1.2 miles South of Rock Rock Island/Whiteside County line. | — | Executed | G. M. Sipes Construction, Inc. $633,836 · | ||
| Jun 11, 2021 | 64R09 | Rock IslandDistrict 2 | Crack and Joint Sealing 0.8 Mi N to 1 Mi S of IL5/IL92/I 88 Interchange. | — | Executed | Complete Asphalt Service Co. $96,879 · | ||
| Jun 11, 2021 | 66A96 | BureauDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley. | — | Executed | Advanced Asphalt Company $5,946,378 · | ||
| Jun 11, 2021 | 66B93 | DeKalbLaSalleDistrict 3 | This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors. | — | Executed | Curran Contracting Company $2,242,143 · | ||
| Jun 11, 2021 | 66D51 | KendallDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. | — | Executed | D. Construction, Inc. $2,440,250 · | ||
| Jun 11, 2021 | 66D68 | LaSalleDistrict 3 | Milling and resurfacing 3 Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles. | — | Executed | Advanced Asphalt Company $1,122,141 · | ||
| Jun 11, 2021 | 66F88 | KankakeeDistrict 3 | Bridge Replacement (SN 046-0030) at Granary Creek, 1.3 miles East of Essex Rd. and Bridge Replacement (SN 046-0032) at E Branch of Horse Creek, 0.2 mile East of Herscher Road. | — | Executed | P. T. Ferro Construction Co. $2,850,474 · | ||
| Jun 11, 2021 | 66H91 | LaSalleDistrict 3 | Deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, str This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. | — | Executed | D. Construction, Inc. $671,375 · | ||
| Jun 11, 2021 | 66K19 | LaSalleDistrict 3 | This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County. | — | Executed | Curran Contracting Company $742,928 · | ||
| Jun 11, 2021 | 66K40 | IroquoisDistrict 3 | 3P MILLING AND RESURFACING (DESIGNED OVERLAY) EXTENDING 6.41 MILES FROM THE FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN. | — | Executed | Iroquois Paving Corporation $3,355,377 · | ||
| Jun 11, 2021 | 66K46 | LaSalleDistrict 3 | The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps. | — | Executed | Advanced Asphalt Company $3,223,912 · | ||
| Jun 11, 2021 | 66K86 | LivingstonDistrict 3 | 3P Milling and Resurfacing (SMART Overlay) ADA improvement and minor drainage improvement, from IL 116 in Saunemin to US 24 in Forrest. | — | Executed | Kankakee Valley Construction Company, Inc. $2,744,546 · | ||
| Jun 11, 2021 | 66L02 | LaSalleDistrict 3 | Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county. | — | Executed | D. Construction, Inc. $1,081,507 · | ||
| Jun 11, 2021 | 66L31 | KendallDistrict 3 | This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. | — | Executed | D. Construction, Inc. $688,542 · | ||
| Jun 11, 2021 | 66L38 | LaSalleDistrict 3 | This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection. | — | Rejected | Advanced Asphalt Company $1,362,759 · | ||
| Jun 11, 2021 | 66L42 | DeKalbLaSalleDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34. | — | Executed | Curran Contracting Company $3,486,053 · | ||
| Jun 11, 2021 | 66L55 | LaSalleDistrict 3 | Expansion joint replacement, deck patching, parapet patching, structural steel repairs This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs. | — | Executed | D. Construction, Inc. $2,603,832 · | ||
| Jun 11, 2021 | 66L59 | GrundyDistrict 3 | Pavement Patching on IL 47 located 3.5 miles South of Minooka Road (SN 032-0123) and 0.4 miles North of Nelson Road (SN 032-0122) North of Morris. | — | Executed | G. M. Sipes Construction, Inc. $124,463 · | ||
| Jun 11, 2021 | 66L60 | BureauDistrict 3 | Class B pavement patching and pavement striping This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $294,924 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.