Bid tab 62L64

Let Jun 11, 2021 · District 1 · Lake

‹ Jun 2021 results

2020-086-RS

Let date
Friday, June 11, 2021
Contract
62L64 · job page
District
District 1
County
Lake
Highway
Limits
(1.91-Mile) Improvement of US 41 (Skokie Hwy) from IL 21 (Riverside Dr) to North of Dorchester Ave consists of Smart Overlay improvement in the Village of Gurnee, Warren Township.
Classification
Smart Overlay improvement in the Village of Gurnee, Warren Township ·
Project number

Bidders 1

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Peter Baker & Son Co. Low bidder $1,931,808

Bid tab: unit prices 65 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Peter Baker & S…
1X2020110 GRADING & SHAP SHLDRS180UNIT $80.00
2X4400501 COMB C&G REMOV REPL < = 10FT250FOOT $80.00
3X5537800 SS CLEANED 121,700FOOT $4.00
4X6030310 FR & LIDS ADJUST SPL11EACH $990.00
5X7030005 TEMP PAVT MKING REMOV19,675SQ FT $0.0100
6Z0004562 COMB C C&G REM & REPL1,050FOOT $70.00
7Z0018500 DRAINAGE STR CLEANED35EACH $450.00
8Z0018600 DRAINAGE STR RECONST1EACH $1,325.00
9Z0030850 TEMP INFO SIGNING51.4SQ FT $20.00
10Z0033700 LONG JOINT SEALANT22,900FOOT $2.35
11Z0076600 TRAINEES500HOUR $0.8000
12Z0076604 TRAINEES TPG500HOUR $15.00
1321101615 TOPSOIL F & P 41,710SQ YD $4.98
1425200110 SODDING SALT TOLERANT1,710SQ YD $12.00
1525200200 SUPPLE WATERING17UNIT $75.00
1640600290 BIT MATLS TACK CT35,400POUND $0.0100
1740600400 MIX CR JTS FLANGEWYS118TON $250.00
1840600982 HMA SURF REM BUTT JT450SQ YD $3.40
1940604060 HMA SC IL-9.5 D N502.9TON $400.00
2040604062 HMA SC IL-9.5 D N70710TON $81.55
2140605026 P HMA SC SMA 9.5 F N806,998TON $96.50
2242001300 PROTECTIVE COAT435SQ YD $1.00
2344000156 HMA SURF REM 1 3/478,650SQ YD $3.40
2444000200 DRIVE PAVEMENT REM300SQ YD $5.00
2544000600 SIDEWALK REM85SQ FT $5.00
2644003510 MEDIAN REMOVAL (PD)225SQ FT $5.00
2744201827 CL D PATCH T2 15580SQ YD $85.00
2844201831 CL D PATCH T3 15225SQ YD $85.00
2944201833 CL D PATCH T4 15150SQ YD $85.00
3048102100 AGG WEDGE SHLD TYPE B660TON $47.50
3156109210 WATER VALVES ADJUST1EACH $425.00
3260251740 CB ADJ NEW T24F&G4EACH $985.00
3360300305 FR & LIDS ADJUST39EACH $450.00
3460406100 FR & LIDS T1 CL8EACH $415.00
3560618300 CONC MEDIAN SURF 4225SQ FT $12.00
3664200116 SHOULDER RUM STRIP 1617,100FOOT $0.7500
3767000400 ENGR FIELD OFFICE A12CAL MO $1,000.00
3867100100 MOBILIZATION1L SUM $108,500.00
3970100420 TRAF CONT-PROT 7014111EACH $5,815.00
4070102620 TR CONT & PROT 7015011L SUM $1.00
4170102625 TR CONT & PROT 7016061L SUM $179,467.00
4270102630 TR CONT & PROT 7016011L SUM $105,815.00
4370102635 TR CONT & PROT 7017011L SUM $1.00
4470102640 TR CONT & PROT 7018011L SUM $5,815.00
4570107025 CHANGEABLE MESSAGE SN60CAL DA $30.00
4670300100 SHORT TERM PAVT MKING11,200FOOT $0.0100
4770300150 SHRT TRM PAVT MK REM5,600SQ FT $0.0100
4870300210 TEMP PVT MK LTR & SYM546SQ FT $0.0100
4970300220 TEMP PVT MK LINE 445,000FOOT $0.0100
5070300240 TEMP PVT MK LINE 62,650FOOT $0.0100
5170300250 TEMP PVT MK LINE 8380FOOT $0.0100
5270300260 TEMP PVT MK LINE 121,850FOOT $0.0100
5370300280 TEMP PVT MK LINE 24350FOOT $0.0100
5470300520 PAVT MARK TAPE T3 45,600FOOT $0.0100
5578000100 THPL PVT MK LTR & SYM546SQ FT $5.50
5678000200 THPL PVT MK LINE 445,000FOOT $0.5800
5778000400 THPL PVT MK LINE 62,650FOOT $1.05
5878000500 THPL PVT MK LINE 8380FOOT $1.20
5978000600 THPL PVT MK LINE 121,850FOOT $2.05
6078000650 THPL PVT MK LINE 24350FOOT $5.50
6178100100 RAISED REFL PAVT MKR558EACH $25.00
6278300200 RAISED REF PVT MK REM558EACH $12.00
6385000200 MAIN EX TR SIG INSTAL1EACH $2,500.00
6488600600 DET LOOP REPL1,330FOOT $16.85
6589502376 REBUILD EX HANDHOLE1EACH $2,400.00