2020-153-BR
- Let date
- Friday, June 11, 2021
- Contract
- 62M41 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- The improvement consists of bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 130th Street over 1-94 and at CSSS and IHB RR in Cook County, IL. Gross and net length is 785 FT (0.15 Miles).
- Classification
- Bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 1 ·
- Project number
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Areatha Construction Co., Inc. Low bidder | $3,345,536 | ||
| 2 | Lorig Construction Company | $3,439,366 | +2.8% | |
| 3 | D. Construction, Inc. | $3,666,246 | +9.6% | |
| 4 | Rausch Infrastructure, LLC | $4,184,378 | +25.1% | |
| 5 | Sumit Construction Co., Inc. | $5,444,939 | +62.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Areatha Constru… | #2 Lorig Construct… | #3 D. Construction… | #4 Rausch Infrastr… | #5 Sumit Construct… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X0322215 | CLEAN BRG SCUP/DWNSPT | 10 | EACH | $396.00 | $250.00 | $500.00 | $1,311.00 | $200.00 | |
| 2 | X0323818 | CLN & PT EXP RE-BAR | 24 | SQ FT | $250.00 | $225.00 | $100.00 | $186.00 | $800.00 | |
| 3 | X0327773 | ACCESS DOOR | 2 | EACH | $3,225.00 | $5,000.00 | $4,300.00 | $10,174.00 | $4,000.00 | |
| 4 | X4402020 | CONC MEDIAN SURF REM | 2,001 | SQ FT | $1.90 | $1.40 | $3.00 | $9.50 | $12.00 | |
| 5 | X6700410 | ENGR FLD OFF A SPL | 12 | CAL MO | $2,000.00 | $750.00 | $5,000.00 | $4,500.00 | $3,000.00 | |
| 6 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $137,000.00 | $225,000.00 | $180,795.00 | $35,000.00 | $300,000.00 | |
| 7 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $48,150.00 | $200,000.00 | $0.0100 | $205,000.00 | $9,500.00 | |
| 8 | X7013820 | TR CONT SURVEIL EXPWY | 180 | CAL DA | $1.00 | $1.00 | $0.0100 | $1.00 | $180.00 | |
| 9 | X7030005 | TEMP PAVT MKING REMOV | 44,512 | SQ FT | $0.1000 | $0.0100 | $0.6000 | $0.0500 | $0.1000 | |
| 10 | X8430100 | REMOV EX CON ATT STR | 612.5 | FOOT | $8.50 | $10.00 | $1.87 | $11.00 | $10.15 | |
| 11 | Z0001700 | APPROACH SL REP (FD) | 58.9 | SQ YD | $881.00 | $900.00 | $600.00 | $1,100.00 | $900.00 | |
| 12 | Z0001899 | JACK & REM EX BEARING | 4 | EACH | $2,200.00 | $150.00 | $5,000.00 | $9,000.00 | $4,500.00 | |
| 13 | Z0005874 | BOND PREF JT SEAL 3 | 323.4 | FOOT | $83.20 | $72.00 | $90.00 | $285.00 | $120.00 | |
| 14 | Z0006012 | BR DK LTX C OLY 2 1/4 | 6,875 | SQ YD | $90.00 | $75.00 | $85.00 | $69.00 | $120.00 | |
| 15 | Z0012130 | BR DECK SCAR 3/4 | 5,497 | SQ YD | $43.00 | $40.00 | $55.00 | $44.00 | $55.00 | |
| 16 | Z0012142 | BR DECK SCAR 2 1/4 | 1,378 | SQ YD | $45.00 | $40.00 | $57.50 | $67.00 | $125.00 | |
| 17 | Z0012754 | STR REP CON DP = < 5 | 868.3 | SQ FT | $135.00 | $200.00 | $120.00 | $146.00 | $130.00 | |
| 18 | Z0012755 | STR REP CON DP OVER 5 | 171.5 | SQ FT | $150.00 | $250.00 | $120.00 | $193.00 | $150.00 | |
| 19 | Z0016001 | DECK SLAB REP (FD-T1) | 0.9 | SQ YD | $2,902.00 | $2,500.00 | $4,000.00 | $10,000.00 | $3,000.00 | |
| 20 | Z0016002 | DECK SLAB REP (FD-T2) | 11.6 | SQ YD | $1,256.00 | $1,500.00 | $1,800.00 | $2,200.00 | $3,000.00 | |
| 21 | Z0018051 | DRAINAGE SCUPPERS ADJ | 10 | EACH | $1,475.00 | $800.00 | $550.00 | $2,000.00 | $1,800.00 | |
| 22 | Z0018500 | DRAINAGE STR CLEANED | 4 | EACH | $1,000.00 | $635.00 | $500.00 | $1,175.00 | $200.00 | |
| 23 | Z0021902 | SILICONE JT SEAL 1/2 | 226 | FOOT | $39.45 | $23.00 | $50.00 | $32.00 | $45.00 | |
| 24 | Z0029603 | HANDRAIL REPAIRS | 1 | L SUM | $4,500.00 | $1,000.00 | $4,000.00 | $3,954.00 | $40,000.00 | |
| 25 | Z0030850 | TEMP INFO SIGNING | 43 | SQ FT | $25.00 | $16.00 | $25.00 | $18.00 | $25.00 | |
| 26 | Z0033028 | MAINT LIGHTING SYS | 12 | CAL MO | $824.00 | $1,275.00 | $948.43 | $1,400.00 | $1,010.00 | |
| 27 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $27,300.00 | $14,000.00 | $5,000.00 | $12,000.00 | $15,000.00 | |
| 28 | Z0062456 | TEMP PAVEMENT | 576 | SQ YD | $46.75 | $47.00 | $58.00 | $89.00 | $120.00 | |
| 29 | Z0073200 | TEMP SHORING & CRIB | 8 | EACH | $5,000.00 | $1,000.00 | $10,000.00 | $8,390.00 | $3,500.00 | |
| 30 | Z0073510 | TEMP TR SIGNAL TIMING | 2 | EACH | $906.00 | $1,000.00 | $1,518.00 | $1,081.00 | $1,000.00 | |
| 31 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 32 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | |
| 33 | 20200100 | EARTH EXCAVATION | 224 | CU YD | $63.65 | $42.00 | $55.00 | $60.00 | $200.00 | |
| 34 | 31101200 | SUB GRAN MAT B 4 | 576 | SQ YD | $13.70 | $12.00 | $8.00 | $30.00 | $8.00 | |
| 35 | 40600290 | BIT MATLS TACK CT | 2,361 | POUND | $1.00 | $0.0100 | $0.0100 | $0.0100 | $1.15 | |
| 36 | 40600985 | PCC SURF REM BUTT JT | 380 | SQ YD | $36.00 | $52.00 | $0.0100 | $59.00 | $7.00 | |
| 37 | 40603200 | P HMA BC IL-4.75 N50 | 296 | TON | $156.00 | $245.00 | $90.00 | $282.00 | $170.00 | |
| 38 | 40604172 | P HMA SC IL-9.5 E N70 | 517 | TON | $123.00 | $190.00 | $95.00 | $218.00 | $140.00 | |
| 39 | 44000100 | PAVEMENT REM | 576 | SQ YD | $20.00 | $12.00 | $15.00 | $109.00 | $120.00 | |
| 40 | 44000500 | COMB CURB GUTTER REM | 668 | FOOT | $8.30 | $12.00 | $8.00 | $24.00 | $6.00 | |
| 41 | 44003100 | MEDIAN REMOVAL | 6,532 | SQ FT | $4.30 | $3.00 | $2.50 | $11.00 | $7.00 | |
| 42 | 44200573 | CL A PATCH T1 12 | 20 | SQ YD | $275.00 | $750.00 | $260.00 | $350.00 | $800.00 | |
| 43 | 44200577 | CL A PATCH T2 12 | 20 | SQ YD | $275.00 | $500.00 | $260.00 | $350.00 | $800.00 | |
| 44 | 44200581 | CL A PATCH T3 12 | 40 | SQ YD | $275.00 | $300.00 | $225.00 | $354.00 | $800.00 | |
| 45 | 44200583 | CL A PATCH T4 12 | 720 | SQ YD | $125.00 | $225.00 | $220.00 | $291.00 | $450.00 | |
| 46 | 45200100 | JT CR RT PCC PAV/SHLD | 1,391 | FOOT | $1.05 | $5.00 | $2.00 | $1.20 | $30.00 | |
| 47 | 45200300 | JT OR CRACK FILLING | 464 | POUND | $9.00 | $15.00 | $5.00 | $10.50 | $12.00 | |
| 48 | 50102400 | CONC REM | 48.3 | CU YD | $1,600.00 | $1,525.00 | $2,500.00 | $2,250.00 | $2,000.00 | |
| 49 | 50157300 | PROTECTIVE SHIELD | 2,728 | SQ YD | $50.00 | $1.00 | $80.00 | $40.00 | $200.00 | |
| 50 | 50300225 | CONC STRUCT | 19.1 | CU YD | $1,752.00 | $825.00 | $1,500.00 | $2,400.00 | $2,800.00 | |
| 51 | 50300255 | CONC SUP-STR | 48.3 | CU YD | $3,163.00 | $1,225.00 | $2,200.00 | $3,000.00 | $2,800.00 | |
| 52 | 50300260 | BR DECK GROOVING | 6,693 | SQ YD | $6.55 | $5.00 | $7.50 | $6.30 | $7.00 | |
| 53 | 50300300 | PROTECTIVE COAT | 7,053 | SQ YD | $1.20 | $0.2500 | $1.00 | $7.25 | $1.00 | |
| 54 | 50800205 | REINF BARS, EPOXY CTD | 7,950 | POUND | $2.00 | $3.40 | $3.00 | $3.40 | $4.00 | |
| 55 | 50800515 | BAR SPLICERS | 44 | EACH | $47.30 | $65.00 | $50.00 | $155.00 | $60.00 | |
| 56 | 52000110 | PREF JT STRIP SEAL | 378 | FOOT | $253.00 | $200.00 | $210.00 | $173.00 | $240.00 | |
| 57 | 52100010 | ELAST BEARING ASSY T1 | 4 | EACH | $3,627.50 | $10,500.00 | $4,500.00 | $2,700.00 | $2,200.00 | |
| 58 | 58700300 | CONCRETE SEALER | 26,606 | SQ FT | $1.35 | $1.35 | $2.00 | $1.20 | $1.00 | |
| 59 | 59000200 | EPOXY CRACK INJECTION | 60 | FOOT | $80.00 | $126.00 | $50.00 | $75.00 | $40.00 | |
| 60 | 59200101 | BRIDGE WASHING N1 | 1 | EACH | $30,944.00 | $31,000.00 | $34,038.40 | $36,000.00 | $70,000.00 | |
| 61 | 59200102 | BRIDGE WASHING N2 | 1 | EACH | $37,855.00 | $40,000.00 | $41,640.50 | $44,000.00 | $70,000.00 | |
| 62 | 60609200 | COMB CC&G TM6.12 | 668 | FOOT | $35.25 | $33.00 | $30.00 | $37.00 | $24.00 | |
| 63 | 60618320 | CONC MEDIAN SURF 6 | 2,001 | SQ FT | $6.80 | $8.50 | $6.50 | $10.00 | $6.00 | |
| 64 | 60619200 | CONC MED TSB6.06 | 6,335 | SQ FT | $11.35 | $14.50 | $12.00 | $17.00 | $9.00 | |
| 65 | 63000001 | SPBGR TY A 6FT POSTS | 450 | FOOT | $40.00 | $30.00 | $32.36 | $34.00 | $28.00 | |
| 66 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $4,750.00 | $1,200.00 | $1,264.23 | $1,350.00 | $2,000.00 | |
| 67 | 63100169 | TR BAR TRM T1 SPL FLR | 2 | EACH | $7,000.00 | $3,375.00 | $3,704.15 | $3,900.00 | $2,200.00 | |
| 68 | 63302720 | REM RE-E T B TERM T6B | 4 | EACH | $9,100.00 | $1,525.00 | $1,667.51 | $1,700.00 | $4,000.00 | |
| 69 | 66900200 | NON SPL WASTE DISPOSL | 192 | CU YD | $93.75 | $55.00 | $90.00 | $134.00 | $80.00 | |
| 70 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,600.00 | $1,350.00 | $1,650.00 | $2,232.00 | $2,000.00 | |
| 71 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,700.00 | $2,500.00 | $2,200.00 | $3,466.00 | $3,000.00 | |
| 72 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $1,500.00 | $2,200.00 | $1,057.00 | $3,000.00 | |
| 73 | 66901006 | REG SUB MON | 1 | CAL DA | $725.00 | $760.00 | $1,045.00 | $799.00 | $1,100.00 | |
| 74 | 67100100 | MOBILIZATION | 1 | L SUM | $200,000.00 | $170,000.00 | $130,000.00 | $250,000.00 | $300,000.00 | |
| 75 | 70103815 | TR CONT SURVEILLANCE | 133 | CAL DA | $150.00 | $150.00 | $0.0100 | $175.00 | $1,500.00 | |
| 76 | 70107005 | PAVT MK BLKOUT TAPE 5 | 1,088 | FOOT | $1.85 | $1.85 | $8.00 | $2.15 | $1.85 | |
| 77 | 70107009 | PAVT MK BLKOUT TAPE 9 | 93 | FOOT | $3.50 | $3.10 | $8.00 | $3.60 | $3.50 | |
| 78 | 70107025 | CHANGEABLE MESSAGE SN | 133 | CAL DA | $30.00 | $28.00 | $50.00 | $32.00 | $30.00 | |
| 79 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $1,000.00 | $100.00 | $10,000.00 | $35,000.00 | $10,000.00 | |
| 80 | 70300280 | TEMP PVT MK LINE 24 | 50 | FOOT | $8.00 | $2.00 | $2.00 | $2.35 | $8.00 | |
| 81 | 70300900 | PAVT MARK TAPE T4 L&S | 73 | SQ FT | $3.00 | $3.50 | $2.00 | $4.10 | $3.00 | |
| 82 | 70300904 | PAVT MARK TAPE T4 4 | 41,108 | FOOT | $0.9500 | $0.9000 | $0.5000 | $1.05 | $0.9300 | |
| 83 | 70300906 | PAVT MARK TAPE T4 6 | 350 | FOOT | $2.00 | $1.30 | $3.00 | $1.50 | $2.00 | |
| 84 | 70300908 | PAVT MARK TAPE T4 8 | 1,143 | FOOT | $1.90 | $1.80 | $2.00 | $2.10 | $1.90 | |
| 85 | 70400100 | TEMP CONC BARRIER | 6,250 | FOOT | $2.00 | $23.00 | $20.00 | $19.00 | $35.00 | |
| 86 | 70400200 | REL TEMP CONC BARRIER | 1,613 | FOOT | $1.00 | $3.00 | $10.00 | $6.40 | $14.00 | |
| 87 | 70600255 | IMP ATTN TEMP FRN TL2 | 4 | EACH | $9,500.00 | $6,100.00 | $6,000.00 | $4,935.00 | $4,000.00 | |
| 88 | 70600260 | IMP ATTN TEMP FRN TL3 | 2 | EACH | $12,000.00 | $6,800.00 | $6,000.00 | $5,875.00 | $5,000.00 | |
| 89 | 70600322 | IMP ATTN REL FRN TL2 | 6 | EACH | $2,200.00 | $3,200.00 | $1,500.00 | $1,997.00 | $3,000.00 | |
| 90 | 72501000 | TERMINAL MARKER - DA | 2 | EACH | $50.00 | $42.00 | $45.82 | $48.00 | $20.00 | |
| 91 | 78008200 | POLYUREA PM T1 LTR-SY | 73 | SQ FT | $5.00 | $6.50 | $8.25 | $7.05 | $3.00 | |
| 92 | 78008210 | POLYUREA PM T1 LN 4 | 13,926 | FOOT | $0.5500 | $0.7500 | $1.16 | $1.10 | $0.7500 | |
| 93 | 78008240 | POLYUREA PM T1 LN 8 | 5,997 | FOOT | $1.50 | $1.80 | $2.31 | $2.20 | $1.50 | |
| 94 | 78008250 | POLYUREA PM T1 LN 12 | 1,242 | FOOT | $2.50 | $3.25 | $3.47 | $3.35 | $2.50 | |
| 95 | 78200006 | GRDRAIL REF TYPE B | 10 | EACH | $10.00 | $8.50 | $9.16 | $9.75 | $18.00 | |
| 96 | 78200011 | BARR WALL REF TYPE C | 333 | EACH | $6.00 | $6.00 | $20.00 | $7.05 | $10.00 | |
| 97 | 78300202 | PAVMT MRKG REM WTR BL | 8,356 | SQ FT | $1.05 | $1.00 | $3.03 | $1.15 | $1.05 | |
| 98 | 81100320 | CON AT ST 1 PVC GS | 642 | FOOT | $43.50 | $44.25 | $65.12 | $51.00 | $47.00 | |
| 99 | 81100805 | CON AT ST 3 PVC GALVS | 15 | FOOT | $143.00 | $93.00 | $265.54 | $108.00 | $155.00 | |
| 100 | 81300220 | JUN BX SS AS 6X6X4 | 12 | EACH | $1,150.00 | $785.00 | $1,258.62 | $914.00 | $1,400.00 | |
| 101 | 81300530 | JUN BX SS AS 12X10X6 | 6 | EACH | $1,530.00 | $975.00 | $1,992.21 | $1,141.00 | $1,800.00 | |
| 102 | 81300830 | JUN BX SS AS 18X18X8 | 2 | EACH | $2,010.00 | $1,900.00 | $2,312.09 | $2,224.00 | $2,200.00 | |
| 103 | 81603081 | UD 3#2#4GXLPUSE 1.5 P | 200 | FOOT | $31.50 | $69.00 | $36.63 | $79.00 | $34.00 | |
| 104 | 81702110 | EC C XLP USE 1C 10 | 2,136 | FOOT | $3.10 | $2.25 | $2.86 | $2.50 | $3.40 | |
| 105 | 82110021 | LUM LED UP WM D | 6 | EACH | $2,190.00 | $1,525.00 | $388.50 | $1,788.00 | $2,400.00 | |
| 106 | 82110026 | LUM LED UP SUS D | 6 | EACH | $2,860.00 | $1,900.00 | $7,594.73 | $2,220.00 | $3,100.00 | |
| 107 | 89000100 | TEMP TR SIG INSTALL | 2 | EACH | $45,100.00 | $68,000.00 | $90,218.04 | $80,000.00 | $78,000.00 |