Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 72007 VariousDistrict 6 Bridge washing on various Illinois and Mississippi River crossings in various counties of District 6. — Executed Nov 25 New Interstate Maintenance, Incorporated $103,300 ·
Jan 17, 2025 72023 SangamonDistrict 6 Bridge painting on SN 084-0052 carrying Old US 36 over the Sangamon River, southwest of Riverton. — Executed Nov 25 New Civil Coatings and Construction Inc. $862,345 ·
Jan 17, 2025 72187 CassDistrict 6 Bridge deck patching and joint repairs on SN 009-0001 carrying US 67/IL 100 over the Illinois River at Beardstown. — Executed Nov 25 New Path Construction Company, Inc. $2,949,140 ·
Jan 17, 2025 72515 SangamonDistrict 6 Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 the Morgan County line to the Macon County line. — Executed Nov 25 New Kinney Contractors, Inc. $1,049,013 ·
Jan 17, 2025 72609 SangamonDistrict 6 Riprap installation at SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. — Executed Nov 25 New Kinney Contractors, Inc. $130,080 ·
Jan 17, 2025 72650 SangamonDistrict 6 Bridge painting on SN 084-0163 and SN 084-0164 carrying I-72 over Long Point Slough, 1.5 miles east of Illiopolis. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $259,209 ·
Jan 17, 2025 72747 PikeDistrict 6 Bridge deck patching and joint repairs on SN 075-0038 carrying IL 96 over Kiser Creek at New Canton. — Executed Nov 25 New County Contractors, Inc. $272,212 ·
Jan 17, 2025 72770 LoganSangamonDistrict 6 Cured-in-place pipe liner at various locations on I-55 and the I-55 Frontage Road in Logan and Sangamon Counties. — Executed Nov 25 New Hoerr Construction, Inc. $561,200 ·
Jan 17, 2025 72878 PikeDistrict 6 6.3 miles of crack and joint seal on I-72 from 0.4 miles east of the US 54/IL 107 interchange to the Scott County line. — Executed Nov 25 New Freehill Asphalt, Inc. $83,522 ·
Jan 17, 2025 72934 AdamsPikeDistrict 6 Patching on I-72, I-172 from 1.5 miles north of the Adams/Pike County line to 1 mile east of IL 96. — Executed Nov 25 New G. M. Sipes Construction, Inc. $396,340 ·
Jan 17, 2025 72D00 MacoupinMontgomeryDistrict 6 14.2 miles of resurfacing on I-55 from 0.8 miles north of IL 16 to the Madison County line. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $15,476,927 ·
Jan 17, 2025 72G59 AdamsDistrict 6 1.6 miles of resurfacing, intersection improvements, new left turn lanes and new HMA shoulders on US 24 from the east corporate limits of Camp Point to 0.1 miles east of IL 94. — Executed Nov 25 New Diamond Construction Company $2,871,284 ·
Jan 17, 2025 72L31 SangamonDistrict 6 1 mile of pavement resurfacing and fog sealing of shoulders on IL 124 from the Andrew Road Junction west of Sherman to Business I-55 in Sherman. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $272,390 ·
Jan 17, 2025 74A59 ShelbyDistrict 7 13.9 miles of patching, milling, resurfacing and aggregate shoulders on IL 128 from IL 16 to the Fayette County line. — Executed Nov 25 New Howell Paving, Inc. $12,408,218 ·
Jan 17, 2025 74C56 MoultrieDistrict 7 Bridge deck overlay and bridge joint replacement/repairs on 5 structures along Cadwell Road in Piatt County. (SN 070-0039, 070-0040, 070-0041, 070-0044, and 070-0045) — Executed Nov 25 New Samron Midwest Contracting, Inc. $3,994,275 ·
Jan 17, 2025 74D22 VariousDistrict 7 Guardrail repair and on-call guardrail repair at various locations. — Executed Nov 25 New COLLINS & HERMANN, INC. $747,567 ·
Jan 17, 2025 74D23 ClarkDistrict 7 10 miles of patching on I-70 from 1 mile west of IL 1 to the Indiana state line. — Executed Nov 25 New Kinney Contractors, Inc. $519,237 ·
Jan 17, 2025 76L46 MadisonDistrict 8 0.8 miles of patching, resurfacing and installing bus pads on IL 140 from 0.15 miles east of IL 111 to Sanders Street in Bethalto. — Executed Nov 25 New Charles E. Mahoney Co. $619,161 ·
Jan 17, 2025 76M34 St. ClairDistrict 8 1.5 miles of patching on North Belt West from West Main Street in Belleville to IL 161 in Swansea. — Executed Nov 25 New Kinney Contractors, Inc. $273,361 ·
Jan 17, 2025 76P16 JerseyDistrict 8 Widening and resurfacing of IL 16 at the Otterville Road/Grafton Lane intersection to provide dedicated left turn lanes and improved turning radii. — Executed Nov 25 New Stutz Excavating, Inc. $1,403,493 ·
Jan 17, 2025 76R13 MadisonDistrict 8 Bridge deck sealing on the McKinley Bridge (SN 060-6002) over the Mississippi River. — Executed Nov 25 New M & M Concrete, Inc. $64,938 ·
Jan 17, 2025 76R67 St. ClairDistrict 8 Bridge painting at the Poplar Street Complex (SN 082-0005 and SN 082-0144). — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $1,328,000 ·
Jan 17, 2025 76R78 St. ClairDistrict 8 Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8. — Active Nov 25 New Gerstner Electric, Inc. $3,960,000 ·
Jan 17, 2025 76T43 GreeneDistrict 8 Electrical repairs at the Joe Page Bridge in Hardin. , Electrical repairs on the Joe Page Bridge in Hardin. — Active Nov 25 New
Jan 17, 2025 76T49 MadisonDistrict 8 Traffic signal modernization at 3 intersections: IL 203 at Johnson/Fehling Road; IL 3 at Hawthorne Street; IL 111 at Horseshoe Lake Road. — Executed Nov 25 New Electrico, Inc. $1,030,879 ·
Jan 17, 2025 76T87 MadisonDistrict 8 Bridge deck sealing at various locations in Madison County. — Executed Nov 25 New All States Painting, Inc. $581,300 ·
Jan 17, 2025 78483 JeffersonDistrict 9 Reconstruction of the I-57/I-64 interchange and intersection modifications at various locations in Mt. Vernon. — Executed Nov 25 New E. T. Simonds Construction Company $38,661,329 ·
Jan 17, 2025 78884 FranklinJeffersonDistrict 9 9.7 miles of additional lane installation on I-57 from 2.5 miles south of IL 154 to Atchison Creek. Includes replacement of SN 028-0011 and SN 0028-0013. — Executed Nov 25 New E. T. Simonds Construction Company $104,503,286 ·
Jan 17, 2025 78998 JacksonDistrict 9 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. — Executed Nov 25 New Gerstner Electric, Inc. $1,954,250 ·
Jan 17, 2025 78A59 JacksonDistrict 9 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. — Executed Nov 25 New Samron Midwest Contracting, Inc. $241,275 ·
Jan 17, 2025 78A68 PerryDistrict 9 3.3 miles of resurfacing on IL 13 from the Randolph County line to Swanwick-Rice Road. — Executed Nov 25 New E. T. Simonds Construction Company $726,553 ·
Jan 17, 2025 78A69 GallatinWhiteDistrict 9 Patching and resurfacing on IL 141 from the Gallatin County line to the Wabash Memorial Bridge and on Vine Street from IL 141 to Main Street in New Haven. — Executed Nov 25 New E. T. Simonds Construction Company $3,231,440 ·
Jan 17, 2025 78A75 VariousDistrict 9 Cleaning and painting 17 bridges on various routes in various counties of District 9. — Executed Nov 25 New Venus Painting Co. $1,830,307 ·
Jan 17, 2025 78A83 AlexanderDistrict 9 4.3 miles of resurfacing and safety shoulders on IL 3 from 2.2 miles west of IL 127 (southeast of Olive Branch) to 2 miles south of the IL 127 and IL 3 intersection. — Executed Nov 25 New E. T. Simonds Construction Company $2,075,889 ·
Jan 17, 2025 78B18 VariousDistrict 9 Weed spraying for broadleaf weeds along I-57 and I-64 at various locations in various counties. — Executed Nov 25 New The Daltons Inc. $224,685 ·
Jan 17, 2025 78B19 VariousDistrict 9 Weed spraying for Johnson Grass along I-57 at various locations in various counties. — Executed Nov 25 New The Daltons Inc. $175,285 ·
Jan 17, 2025 85758 CarrollDistrict 2 Replace the existing timber/steel truss bridge with a single-span concrete I-beam bridge to carry Big Cut Road over the BNSF Railroad, 3 miles south of Mt. Carroll. — Executed Nov 25 New Sjostrom & Sons, Inc. $3,005,217 ·
Jan 17, 2025 85767 Rock IslandDistrict 2 Construct PCC multi-use paths and sidewalks, install pedestrian push-button activated flashing beacons, pavement markings and landscaping at various locations in East Moline. — Executed Nov 25 New McCarthy Improvement Company $835,827 ·
Jan 17, 2025 85770 StephensonDistrict 2 Cold-In-Place recycling on Lamm Road from 0.2 mile east of IL 26 to Baileyville Road. — Executed Nov 25 New Dunn Company $248,656 ·
Jan 17, 2025 85772 Rock IslandDistrict 2 HMA resurfacing on 19th Street from 7th Street to 16th Street in Moline. Work includes patching, sidewalks with ADA improvments, curb and gutter, pavment markings and traffic signal improvements. — Executed Nov 25 New Valley Construction Co. $1,565,824 ·
Jan 17, 2025 87805 KankakeeDistrict 3 Reconstruction of Manteno-Deslem Road to provide a 3-lane roadway with bi-directional turn lane from US 45/52 to Spuce Street in Manteno. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $9,569,046 ·
Jan 17, 2025 87840 GrundyDistrict 3 Construction of a HMA multi-use path and pedestrian bridge with segmental block wall, utility adjustments, and culverts along McEvilly Road in Minooka. — Executed Nov 25 New D. Construction, Inc. $1,708,477 ·
Jan 17, 2025 87852 LaSalleDistrict 3 Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71. — Rejected Nov 25 New D. Construction, Inc. $946,209 ·
Jan 17, 2025 87873 KendallDistrict 3 HMA rsurfacing and reconstruct portions of Hale Street from E. Dearborn St. to Larson Street in Plano. Reconstruciton includes cross slope and crown correction, curb and gutter, ADA ramps and a shared-use path. — Executed Nov 25 New Geneva Construction Company $1,060,850 ·
Jan 17, 2025 89837 FultonDistrict 4 Construction of a single-span plate girder with reinforced deck to carry CH 22 over Big Creek. Work includes channel excavation and HMA resurfacing. — Executed Nov 25 New Otto Baum Company, Inc. $1,169,900 ·
Jan 17, 2025 89854 WoodfordDistrict 4 Reconstruction of CH 13, including construction of a single span PPC deck beam bridge over the West Branch of Panther Creek. Work includes HMA pavement, PCC Pavement, roadway widening, storm sewer and sidewalks. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $4,250,597 ·
Jan 17, 2025 89855 WoodfordDistrict 4 Resurfacing Santa Fe Trail from Lourdes Road to Douglas Street, and ADA Ramp improvements at the Douglas/Progress Street intersection. — Executed Nov 25 New Advanced Asphalt Company $754,206 ·
Jan 17, 2025 89863 TazewellDistrict 4 Resurfacing Parkway Drive from IL 98 to the north city limits of Pekin. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $315,613 ·
Jan 17, 2025 89865 PeoriaDistrict 4 Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe. — Executed Nov 25 New Advanced Asphalt Company $473,305 ·
Jan 17, 2025 93773 SangamonDistrict 6 Construction of a two-span underpass structure to carry the Union Pacific Railroad over North Grand Avenue and construction of a two-span overpass structure to carry North Grand Avenue over the Illinois and Midland, and Norfolk Southern Railroads. This contract includes the reconstruction and re-alignment of North Grand Avenue from 9th Street to 19th Street in Springfield. — Executed Nov 25 New Freesen, a div of UCM, Inc. $99,697,564 ·
Jan 17, 2025 93803 MontgomeryDistrict 6 Intersection realignment and widening at Cofeen Road and Seven Sisters Road. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $512,832 ·
Jan 17, 2025 93824 HancockDistrict 6 Constrution of a three-span, continuous steel beam bridge with concrete deck and approach slabs, HMA Pavement, aggregate shoulders, and guardrails on 4th Street over Spillman Creek in Pontoosuc. — Executed Nov 25 New Laverdiere Construction, Inc. $2,080,125 ·
Jan 17, 2025 93825 ScottDistrict 6 Oil and Chip Resurfacing with aggregate base on Winchester-Glasgow Road. Work includes Aggregate shoulders, pipe culvert replacement and ditch improvements. — Executed Nov 25 New K. E. Vas Company $369,091 ·
Jan 17, 2025 93827 MenardDistrict 6 Construction of a multi-use trail with trail head parking area between Irwin Bridge Road an Ethell Road. Work includes aggregate base course, shoulders, HMA surface course, pipe culverts, pavment markings, signage, erosion control, bicycle railing and so much more. — Executed Nov 25 New Laverdiere Construction, Inc. $1,454,080 ·
Jan 17, 2025 95968 EdwardsDistrict 7 Replace the bridge carrying West Terminal Street over Butter Creek, east of Red Hill Road in Albion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $425,523 ·
Jan 17, 2025 95970 LawrenceDistrict 7 Replace the bridge carrying Birds Lane over Mad Creek, 1 mile east of Chauncey. — Executed Nov 25 New Samron Midwest Contracting, Inc. $837,511 ·
Jan 17, 2025 97789 MadisonDistrict 8 Sidewalk construction along Pearl Street and a new pedestrian crossing at the Union Pacific and Kansas City Southern Railroads in Godfrey. — Executed Nov 25 New Stutz Excavating, Inc. $116,495 ·
Jan 17, 2025 97843 MadisonDistrict 8 HMA resurfacing on Cougar Drive from Junction Drive tot Illini Drive, and HMA resurfacing and reconstruction on Junction Drive from Cougar to Troy Road in Glen Carbon. — Executed Nov 25 New Keller Construction, Inc. $949,494 ·
Jan 17, 2025 97847 MadisonDistrict 8 Resurfacing Erwin Plegge Boulevard from Bethalto Road to Prairie Steet in Bethalto — Executed Nov 25 New Charles E. Mahoney Co. $670,202 ·
Jan 17, 2025 97849 MadisonDistrict 8 Construct a single span 54" plate girder structure with concrete deck to carry Lee Road over Sugar Creek. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,092,439 ·
Jan 17, 2025 97850 MonroeDistrict 8 Construct a two-span 36" plate girder structure with concrete deck to carry Bluff Road over Carr Creek. — Executed Nov 25 New Keeley & Sons, Inc. $2,792,091 ·
Jan 17, 2025 97853 MadisonDistrict 8 Construct a shared-use path along IL 157 from West Schwarz Street to Enclave Boulevard in Edwardsville. — Executed Nov 25 New Keller Construction, Inc. $531,755 ·
Jan 17, 2025 99687 WilliamsonDistrict 9 Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,026,739 ·
Jan 17, 2025 99712 JeffersonDistrict 9 Resurfacing Old Fairfield Road from Stinson Drive to 0.2 mile west of Campground Lane in Mt. Vernon. — Executed Nov 25 New E. T. Simonds Construction Company $387,947 ·
Jan 17, 2025 99736 WilliamsonDistrict 9 Guardrail Replacemnent, pavment markings and signage at the intersection of of Creal Springs Road and Borton Street in Creal Springs. — Executed Nov 25 New Midwest Fence Corporation $92,499 ·
Mar 7, 2025 46942 JeffersonDistrict 9 Oil and chip, drainage and other improvements to the roads and parking lots near and within Rend Lake State Fish and Wildlife Area. — Executed Nov 25 New Illini Asphalt Corporation $1,020,559 ·
Mar 7, 2025 46946 SalineDistrict 9 Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area. — Executed Nov 25 New Illini Asphalt Corporation $883,314 ·
Mar 7, 2025 61J84 KaneDistrict 1 Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. — Executed Nov 25 New R. W. Dunteman Company $30,162,688 ·
Mar 7, 2025 61K89 CookDistrict 1 Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements. — Executed Nov 25 New D. Construction, Inc. $9,722,683 ·
Mar 7, 2025 61L01 CookDistrict 1 Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest. — Executed Nov 25 New D. Construction, Inc. $341,757 ·
Mar 7, 2025 61L02 WillDistrict 1 Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. — Executed Nov 25 New D. Construction, Inc. $398,891 ·
Mar 7, 2025 61L05 LakeDistrict 1 Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $2,990,057 ·
Mar 7, 2025 61L09 CookDistrict 1 Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake. — Executed Nov 25 New Home Towne Electric, Inc. $674,695 ·
Mar 7, 2025 61L10 DuPageDistrict 1 PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. — Executed Nov 25 New D'Land Construction, LLC $225,598 ·
Mar 7, 2025 61L12 CookDistrict 1 Resurface Main Street from US 30 to 216th Street in Matteson. — Executed Nov 25 New Gallagher Asphalt Corporation $824,771 ·
Mar 7, 2025 61L13 WillDistrict 1 HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. — Executed Nov 25 New P. T. Ferro Construction Co. $392,397 ·
Mar 7, 2025 61L14 CookDistrict 1 HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings. — Executed Nov 25 New D. Construction, Inc. $927,996 ·
Mar 7, 2025 61L15 CookDistrict 1 Resurface 207th Street from IL 50 to Crawford Avenue in Matteson. — Executed Nov 25 New P. T. Ferro Construction Co. $899,917 ·
Mar 7, 2025 61L16 LakeDistrict 1 Sidewalk improvements at various intersections in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $246,136 ·
Mar 7, 2025 61L17 LakeDistrict 1 Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake — Executed Nov 25 New Peter Baker & Son Co. $388,288 ·
Mar 7, 2025 61L20 CookDistrict 1 Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland. — Executed Nov 25 New D. Construction, Inc. $413,449 ·
Mar 7, 2025 61L23 CookDistrict 1 HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,163,964 ·
Mar 7, 2025 61L25 CookDistrict 1 Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor. — Executed Nov 25 New D. Construction, Inc. $1,920,303 ·
Mar 7, 2025 61L26 KaneDistrict 1 Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. — Rejected Nov 25 New
Mar 7, 2025 61L27 CookDistrict 1 HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage. — Executed Nov 25 New Gallagher Asphalt Corporation $592,913 ·
Mar 7, 2025 62G55 WillDistrict 1 Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. — Executed Nov 25 New Gallagher Asphalt Corporation $1,427,655 ·
Mar 7, 2025 62L58 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County. — Rejected Nov 25 New Builders Paving, LLC $4,247,496 ·
Mar 7, 2025 62N33 DuPageDistrict 1 (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. — Rejected Nov 25 New John Burns Construction Company $25,464,000 ·
Mar 7, 2025 62N91 CookDistrict 1 (3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County. — Executed Nov 25 New Dunnet Bay Construction Company & K-Five Construction Corporation $105,964,527 ·
Mar 7, 2025 62P43 CookDistrict 1 (533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street. — Executed Nov 25 New Lorig Construction Company $13,975,161 ·
Mar 7, 2025 62R58 CookDuPageDistrict 1 This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. — Executed Nov 25 New R. W. Dunteman Company $4,792,444 ·
Mar 7, 2025 62R73 CookDistrict 1 Culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile) — Executed Nov 25 New Martam Construction Incorporated $2,946,729 ·
Mar 7, 2025 62R96 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. — Executed Nov 25 New Peter Baker & Son Co. $1,270,720 ·
Mar 7, 2025 62T31 DuPageDistrict 1 Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. — Executed Nov 25 New D. Construction, Inc. $1,159,146 ·
Mar 7, 2025 62T48 CookDistrict 1 (1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest. — Executed Nov 25 New D. Construction, Inc. $589,859 ·
Mar 7, 2025 62T50 CookDistrict 1 Bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County (292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County. — Executed Nov 25 New D. Construction, Inc. $1,094,671 ·
Mar 7, 2025 62T83 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. — Executed Nov 25 New Peter Baker & Son Co. $622,485 ·
Mar 7, 2025 62U89 WillDistrict 1 The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. — Executed Nov 25 New Scanlon Excavating & Concrete, Inc. $498,400 ·
Mar 7, 2025 62U91 LakeDistrict 1 (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. — Executed Nov 25 New Payne & Dolan, Inc. $2,424,972 ·
Mar 7, 2025 62W55 VariousDistrict 1 Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will. — Executed Nov 25 New Central Sweeping of Illinois, LLC $11,515,816 ·
101–200 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.