| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 76T49 | MadisonDistrict 8 | Traffic signal modernization at 3 intersections: IL 203 at Johnson/Fehling Road; IL 3 at Hawthorne Street; IL 111 at Horseshoe Lake Road. | — | Executed | Electrico, Inc. $1,030,879 · | ||
| Jan 17, 2025 | 76T87 | MadisonDistrict 8 | Bridge deck sealing at various locations in Madison County. | — | Executed | All States Painting, Inc. $581,300 · | ||
| Jan 17, 2025 | 78483 | JeffersonDistrict 9 | Reconstruction of the I-57/I-64 interchange and intersection modifications at various locations in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $38,661,329 · | ||
| Jan 17, 2025 | 78884 | FranklinJeffersonDistrict 9 | 9.7 miles of additional lane installation on I-57 from 2.5 miles south of IL 154 to Atchison Creek. Includes replacement of SN 028-0011 and SN 0028-0013. | — | Executed | E. T. Simonds Construction Company $104,503,286 · | ||
| Jan 17, 2025 | 78998 | JacksonDistrict 9 | 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. | — | Executed | Gerstner Electric, Inc. $1,954,250 · | ||
| Jan 17, 2025 | 78A59 | JacksonDistrict 9 | 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $241,275 · | ||
| Jan 17, 2025 | 78A68 | PerryDistrict 9 | 3.3 miles of resurfacing on IL 13 from the Randolph County line to Swanwick-Rice Road. | — | Executed | E. T. Simonds Construction Company $726,553 · | ||
| Jan 17, 2025 | 78A69 | GallatinWhiteDistrict 9 | Patching and resurfacing on IL 141 from the Gallatin County line to the Wabash Memorial Bridge and on Vine Street from IL 141 to Main Street in New Haven. | — | Executed | E. T. Simonds Construction Company $3,231,440 · | ||
| Jan 17, 2025 | 78A75 | VariousDistrict 9 | Cleaning and painting 17 bridges on various routes in various counties of District 9. | — | Executed | Venus Painting Co. $1,830,307 · | ||
| Jan 17, 2025 | 78A83 | AlexanderDistrict 9 | 4.3 miles of resurfacing and safety shoulders on IL 3 from 2.2 miles west of IL 127 (southeast of Olive Branch) to 2 miles south of the IL 127 and IL 3 intersection. | — | Executed | E. T. Simonds Construction Company $2,075,889 · | ||
| Jan 17, 2025 | 78B18 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 and I-64 at various locations in various counties. | — | Executed | The Daltons Inc. $224,685 · | ||
| Jan 17, 2025 | 78B19 | VariousDistrict 9 | Weed spraying for Johnson Grass along I-57 at various locations in various counties. | — | Executed | The Daltons Inc. $175,285 · | ||
| Jan 17, 2025 | 85758 | CarrollDistrict 2 | Replace the existing timber/steel truss bridge with a single-span concrete I-beam bridge to carry Big Cut Road over the BNSF Railroad, 3 miles south of Mt. Carroll. | — | Executed | Sjostrom & Sons, Inc. $3,005,217 · | ||
| Jan 17, 2025 | 85767 | Rock IslandDistrict 2 | Construct PCC multi-use paths and sidewalks, install pedestrian push-button activated flashing beacons, pavement markings and landscaping at various locations in East Moline. | — | Executed | McCarthy Improvement Company $835,827 · | ||
| Jan 17, 2025 | 85770 | StephensonDistrict 2 | Cold-In-Place recycling on Lamm Road from 0.2 mile east of IL 26 to Baileyville Road. | — | Executed | Dunn Company $248,656 · | ||
| Jan 17, 2025 | 85772 | Rock IslandDistrict 2 | HMA resurfacing on 19th Street from 7th Street to 16th Street in Moline. Work includes patching, sidewalks with ADA improvments, curb and gutter, pavment markings and traffic signal improvements. | — | Executed | Valley Construction Co. $1,565,824 · | ||
| Jan 17, 2025 | 87805 | KankakeeDistrict 3 | Reconstruction of Manteno-Deslem Road to provide a 3-lane roadway with bi-directional turn lane from US 45/52 to Spuce Street in Manteno. | — | Executed | Kankakee Valley Construction Company, Inc. $9,569,046 · | ||
| Jan 17, 2025 | 87840 | GrundyDistrict 3 | Construction of a HMA multi-use path and pedestrian bridge with segmental block wall, utility adjustments, and culverts along McEvilly Road in Minooka. | — | Executed | D. Construction, Inc. $1,708,477 · | ||
| Jan 17, 2025 | 87852 | LaSalleDistrict 3 | Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71. | — | Rejected | D. Construction, Inc. $946,209 · | ||
| Jan 17, 2025 | 87873 | KendallDistrict 3 | HMA rsurfacing and reconstruct portions of Hale Street from E. Dearborn St. to Larson Street in Plano. Reconstruciton includes cross slope and crown correction, curb and gutter, ADA ramps and a shared-use path. | — | Executed | Geneva Construction Company $1,060,850 · | ||
| Jan 17, 2025 | 89837 | FultonDistrict 4 | Construction of a single-span plate girder with reinforced deck to carry CH 22 over Big Creek. Work includes channel excavation and HMA resurfacing. | — | Executed | Otto Baum Company, Inc. $1,169,900 · | ||
| Jan 17, 2025 | 89854 | WoodfordDistrict 4 | Reconstruction of CH 13, including construction of a single span PPC deck beam bridge over the West Branch of Panther Creek. Work includes HMA pavement, PCC Pavement, roadway widening, storm sewer and sidewalks. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,250,597 · | ||
| Jan 17, 2025 | 89855 | WoodfordDistrict 4 | Resurfacing Santa Fe Trail from Lourdes Road to Douglas Street, and ADA Ramp improvements at the Douglas/Progress Street intersection. | — | Executed | Advanced Asphalt Company $754,206 · | ||
| Jan 17, 2025 | 89863 | TazewellDistrict 4 | Resurfacing Parkway Drive from IL 98 to the north city limits of Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $315,613 · | ||
| Jan 17, 2025 | 89865 | PeoriaDistrict 4 | Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe. | — | Executed | Advanced Asphalt Company $473,305 · | ||
| Jan 17, 2025 | 93773 | SangamonDistrict 6 | Construction of a two-span underpass structure to carry the Union Pacific Railroad over North Grand Avenue and construction of a two-span overpass structure to carry North Grand Avenue over the Illinois and Midland, and Norfolk Southern Railroads. This contract includes the reconstruction and re-alignment of North Grand Avenue from 9th Street to 19th Street in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $99,697,564 · | ||
| Jan 17, 2025 | 93803 | MontgomeryDistrict 6 | Intersection realignment and widening at Cofeen Road and Seven Sisters Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $512,832 · | ||
| Jan 17, 2025 | 93824 | HancockDistrict 6 | Constrution of a three-span, continuous steel beam bridge with concrete deck and approach slabs, HMA Pavement, aggregate shoulders, and guardrails on 4th Street over Spillman Creek in Pontoosuc. | — | Executed | Laverdiere Construction, Inc. $2,080,125 · | ||
| Jan 17, 2025 | 93825 | ScottDistrict 6 | Oil and Chip Resurfacing with aggregate base on Winchester-Glasgow Road. Work includes Aggregate shoulders, pipe culvert replacement and ditch improvements. | — | Executed | K. E. Vas Company $369,091 · | ||
| Jan 17, 2025 | 93827 | MenardDistrict 6 | Construction of a multi-use trail with trail head parking area between Irwin Bridge Road an Ethell Road. Work includes aggregate base course, shoulders, HMA surface course, pipe culverts, pavment markings, signage, erosion control, bicycle railing and so much more. | — | Executed | Laverdiere Construction, Inc. $1,454,080 · | ||
| Jan 17, 2025 | 95968 | EdwardsDistrict 7 | Replace the bridge carrying West Terminal Street over Butter Creek, east of Red Hill Road in Albion. | — | Executed | Samron Midwest Contracting, Inc. $425,523 · | ||
| Jan 17, 2025 | 95970 | LawrenceDistrict 7 | Replace the bridge carrying Birds Lane over Mad Creek, 1 mile east of Chauncey. | — | Executed | Samron Midwest Contracting, Inc. $837,511 · | ||
| Jan 17, 2025 | 97789 | MadisonDistrict 8 | Sidewalk construction along Pearl Street and a new pedestrian crossing at the Union Pacific and Kansas City Southern Railroads in Godfrey. | — | Executed | Stutz Excavating, Inc. $116,495 · | ||
| Jan 17, 2025 | 97843 | MadisonDistrict 8 | HMA resurfacing on Cougar Drive from Junction Drive tot Illini Drive, and HMA resurfacing and reconstruction on Junction Drive from Cougar to Troy Road in Glen Carbon. | — | Executed | Keller Construction, Inc. $949,494 · | ||
| Jan 17, 2025 | 97847 | MadisonDistrict 8 | Resurfacing Erwin Plegge Boulevard from Bethalto Road to Prairie Steet in Bethalto | — | Executed | Charles E. Mahoney Co. $670,202 · | ||
| Jan 17, 2025 | 97849 | MadisonDistrict 8 | Construct a single span 54" plate girder structure with concrete deck to carry Lee Road over Sugar Creek. | — | Executed | C-Hill Civil Contractors, Inc. $1,092,439 · | ||
| Jan 17, 2025 | 97850 | MonroeDistrict 8 | Construct a two-span 36" plate girder structure with concrete deck to carry Bluff Road over Carr Creek. | — | Executed | Keeley & Sons, Inc. $2,792,091 · | ||
| Jan 17, 2025 | 97853 | MadisonDistrict 8 | Construct a shared-use path along IL 157 from West Schwarz Street to Enclave Boulevard in Edwardsville. | — | Executed | Keller Construction, Inc. $531,755 · | ||
| Jan 17, 2025 | 99687 | WilliamsonDistrict 9 | Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . | — | Executed | Samron Midwest Contracting, Inc. $2,026,739 · | ||
| Jan 17, 2025 | 99712 | JeffersonDistrict 9 | Resurfacing Old Fairfield Road from Stinson Drive to 0.2 mile west of Campground Lane in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $387,947 · | ||
| Mar 7, 2025 | 46942 | JeffersonDistrict 9 | Oil and chip, drainage and other improvements to the roads and parking lots near and within Rend Lake State Fish and Wildlife Area. | — | Executed | Illini Asphalt Corporation $1,020,559 · | ||
| Mar 7, 2025 | 46946 | SalineDistrict 9 | Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area. | — | Executed | Illini Asphalt Corporation $883,314 · | ||
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. | — | Executed | R. W. Dunteman Company $30,162,688 · | ||
| Mar 7, 2025 | 61K89 | CookDistrict 1 | Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements. | — | Executed | D. Construction, Inc. $9,722,683 · | ||
| Mar 7, 2025 | 61L01 | CookDistrict 1 | Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest. | — | Executed | D. Construction, Inc. $341,757 · | ||
| Mar 7, 2025 | 61L02 | WillDistrict 1 | Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. | — | Executed | D. Construction, Inc. $398,891 · | ||
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. | — | Executed | D'Land Construction, LLC $2,990,057 · | ||
| Mar 7, 2025 | 61L09 | CookDistrict 1 | Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake. | — | Executed | Home Towne Electric, Inc. $674,695 · | ||
| Mar 7, 2025 | 61L10 | DuPageDistrict 1 | PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. | — | Executed | D'Land Construction, LLC $225,598 · | ||
| Mar 7, 2025 | 61L12 | CookDistrict 1 | Resurface Main Street from US 30 to 216th Street in Matteson. | — | Executed | Gallagher Asphalt Corporation $824,771 · | ||
| Mar 7, 2025 | 61L13 | WillDistrict 1 | HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. | — | Executed | P. T. Ferro Construction Co. $392,397 · | ||
| Mar 7, 2025 | 61L14 | CookDistrict 1 | HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings. | — | Executed | D. Construction, Inc. $927,996 · | ||
| Mar 7, 2025 | 61L15 | CookDistrict 1 | Resurface 207th Street from IL 50 to Crawford Avenue in Matteson. | — | Executed | P. T. Ferro Construction Co. $899,917 · | ||
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | Sidewalk improvements at various intersections in Lake Forest. | — | Executed | D'Land Construction, LLC $246,136 · | ||
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake | — | Executed | Peter Baker & Son Co. $388,288 · | ||
| Mar 7, 2025 | 61L20 | CookDistrict 1 | Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland. | — | Executed | D. Construction, Inc. $413,449 · | ||
| Mar 7, 2025 | 61L23 | CookDistrict 1 | HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage. | — | Executed | A Lamp Concrete Contractors, Inc. $1,163,964 · | ||
| Mar 7, 2025 | 61L25 | CookDistrict 1 | Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor. | — | Executed | D. Construction, Inc. $1,920,303 · | ||
| Mar 7, 2025 | 61L26 | KaneDistrict 1 | Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. | — | Rejected | |||
| Mar 7, 2025 | 61L27 | CookDistrict 1 | HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage. | — | Executed | Gallagher Asphalt Corporation $592,913 · | ||
| Mar 7, 2025 | 62G55 | WillDistrict 1 | Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. | — | Executed | Gallagher Asphalt Corporation $1,427,655 · | ||
| Mar 7, 2025 | 62L58 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County. | — | Rejected | Builders Paving, LLC $4,247,496 · | ||
| Mar 7, 2025 | 62N33 | DuPageDistrict 1 | (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. | — | Rejected | John Burns Construction Company $25,464,000 · | ||
| Mar 7, 2025 | 62N91 | CookDistrict 1 | (3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County. | — | Executed | Dunnet Bay Construction Company & K-Five Construction Corporation $105,964,527 · | ||
| Mar 7, 2025 | 62P43 | CookDistrict 1 | (533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street. | — | Executed | Lorig Construction Company $13,975,161 · | ||
| Mar 7, 2025 | 62R58 | CookDuPageDistrict 1 | This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. | — | Executed | R. W. Dunteman Company $4,792,444 · | ||
| Mar 7, 2025 | 62R73 | CookDistrict 1 | Culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile) | — | Executed | Martam Construction Incorporated $2,946,729 · | ||
| Mar 7, 2025 | 62R96 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. | — | Executed | Peter Baker & Son Co. $1,270,720 · | ||
| Mar 7, 2025 | 62T31 | DuPageDistrict 1 | Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. | — | Executed | D. Construction, Inc. $1,159,146 · | ||
| Mar 7, 2025 | 62T48 | CookDistrict 1 | (1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest. | — | Executed | D. Construction, Inc. $589,859 · | ||
| Mar 7, 2025 | 62T50 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County (292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County. | — | Executed | D. Construction, Inc. $1,094,671 · | ||
| Mar 7, 2025 | 62T83 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. | — | Executed | Peter Baker & Son Co. $622,485 · | ||
| Mar 7, 2025 | 62U89 | WillDistrict 1 | The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. | — | Executed | Scanlon Excavating & Concrete, Inc. $498,400 · | ||
| Mar 7, 2025 | 62U91 | LakeDistrict 1 | (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. | — | Executed | Payne & Dolan, Inc. $2,424,972 · | ||
| Mar 7, 2025 | 62W55 | VariousDistrict 1 | Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will. | — | Executed | Central Sweeping of Illinois, LLC $11,515,816 · | ||
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62W61 | VariousDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1. | — | Executed | H & H Electric Co. $2,125,601 · | ||
| Mar 7, 2025 | 62W63 | CookDistrict 1 | This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL. | — | Executed | A Lamp Concrete Contractors, Inc. $794,968 · | ||
| Mar 7, 2025 | 62W73 | CookDistrict 1 | Standard and Design Overlay and ADA Improvements and all incidental and collateral work (2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County. | — | Rejected | Peter Baker & Son Co. $4,682,472 · | ||
| Mar 7, 2025 | 62W87 | CookDistrict 1 | (9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton. | — | Active | Lorig Construction Company $81,370,819 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X36 | McHenryDistrict 1 | This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. | — | Executed | Payne & Dolan, Inc. $348,412 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Mar 7, 2025 | 62X90 | LakeDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. | — | Executed | Central Sweeping of Illinois, LLC $2,728,800 · | ||
| Mar 7, 2025 | 62X91 | VariousDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties. | — | Executed | Central Sweeping of Illinois, LLC $1,982,600 · | ||
| Mar 7, 2025 | 62X95 | VariousDistrict 1 | Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook. | — | Executed | ALLEN CHASE ENTERPRISES INC. $338,044 · | ||
| Mar 7, 2025 | 64N01 | WhitesideDistrict 2 | 8.25 miles of patching, milling and resurfacing on I-88 from Elkhorn Creek to US 30. Expansion joint replacement, deck patching, concrete overlay, and miscellaneous other bridge repairs to SN's: 098-0073, 098-0074, 098-0075, 098-0076, 098-0087, and 098-0088. Demolition and removal of SN's 098-0089 and 098-0090. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $26,883,771 · | ||
| Mar 7, 2025 | 64R02 | LeeDistrict 2 | Reconstruction of sidewalk ramps for those with disabilities at ramps deemed uncompliant, patching, milling, and resurfacing along various state routes in Dixon, Illinois. Gross Length 4,163 ft. | — | Executed | Martin & Company Excavating $4,036,696 · | ||
| Mar 7, 2025 | 64S33 | StephensonDistrict 2 | Bridge repairs and joint replacement on SN 089-0030, carrying IL 73 over Indian Creek in Winslow. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $447,987 · | ||
| Mar 7, 2025 | 64S87 | Rock IslandDistrict 2 | Traffic signals upgrade at Barstow Rd 0.6 mile northeast of IL 92 interchange in Carbon Cliff. | — | Executed | Davenport Electric Contract Company $321,496 · | ||
| Mar 7, 2025 | 64T20 | HenryDistrict 2 | Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280. | — | Executed | Martin & Company Excavating $263,536 · | ||
| Mar 7, 2025 | 64T81 | WhitesideDistrict 2 | 0.5 miles of resurfacing on US 30 from IL 78 to Garden Plain Rd in Morrison | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $218,027 · | ||
| Mar 7, 2025 | 64T82 | Rock IslandDistrict 2 | Standard overlay on Airport Rd from 0.56 mile to 0.86 mile east of Rock Island - Milan Parkway. 0.6 mile gross length. | — | Executed | Brandt Construction Co. $266,278 · | ||
| Mar 7, 2025 | 64T91 | WhitesideDistrict 2 | Full bridge cleaning and painting at SN 098-0033 carrying US 30 over Elkhorn Creek 0.6 mile west of Como Rd. | — | Executed | ERA-Valdivia Contractors, Inc. $289,059 · | ||
| Mar 7, 2025 | 64U07 | Rock IslandDistrict 2 | Bridge washing of 11 structures along I-74 in Rock Island County. | — | Executed | Pressure Washing Unlimited Inc. $68,100 · | ||
| Mar 7, 2025 | 64U08 | WinnebagoDistrict 2 | Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebago County. | — | Executed | Pressure Washing Unlimited Inc. $20,900 · | ||
| Mar 7, 2025 | 64U09 | BooneWinnebagoDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | Pressure Washing Unlimited Inc. $58,850 · | ||
| Mar 7, 2025 | 64U10 | VariousDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | Pressure Washing Unlimited Inc. $92,050 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.