| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 18, 2020 | 64A08 | WinnebagoDistrict 2 | Bridge Replacement under 20th St 0. 7 Mi E of IL 251 in Rockford. | — | Executed | Sjostrom & Sons, Inc. $4,252,385 · | ||
| Sep 18, 2020 | 64L14 | WinnebagoDistrict 2 | Intersection Reconstruction, Standard Overlay, Traffic Signal Modernization and MUP from Mid America Dr to Buckley Dr in Rockford. | — | Executed | William Charles Construction Company, LLC $6,628,029 · | ||
| Sep 18, 2020 | 64P20 | VariousDistrict 2 | Washing six bridges over the Rock River at various locations. | — | Executed | All States Painting, Inc. $94,210 · | ||
| Sep 18, 2020 | 64P21 | Rock IslandDistrict 2 | Washing SN 081-0011 over the Mississippi. | — | Executed | Interstate Maintenance, Incorporated $185,114 · | ||
| Sep 18, 2020 | 64P22 | VariousDistrict 2 | Washing three bridges (SN-s 008-0052, 081-9905, 098-6003) over the Mississippi River. | — | Executed | Interstate Maintenance, Incorporated $138,897 · | ||
| Sep 18, 2020 | 64P23 | VariousDistrict 2 | Washing five bridges over the Rock River at various locations. | — | Executed | All States Painting, Inc. $64,310 · | ||
| Sep 18, 2020 | 66K51 | IroquoisDistrict 3 | 3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $4,263,411 · | ||
| Sep 18, 2020 | 66L09 | BureauDistrict 3 | Installing a 36" ERS concrete Pipe culvert adjacent to the box culvert This work is located on FAS Route 1279 (US 34) carrying US 34 adjacent to a concrete Box culvert, Structure No. 006-2569, Station 428+72 in Bureau County. This project consists of installing a 36" ERS concrete Pipe culvert adjacent to the box culvert. | — | Executed | Scanlon Excavating & Concrete, Inc. $54,859 · | ||
| Sep 18, 2020 | 66L11 | BureauDeKalbDistrict 3 | The removal and replacement of traffic signal "Controller Cabinets This work is located at various intersections on US 6 in Bureau County and IL 38 in DeKalb County. This work consists of the removal and replacement of traffic signal "Controller Cabinets." | — | Executed | H & H Electric Co. $429,688 · | ||
| Sep 18, 2020 | 66L27 | LaSalleDistrict 3 | Removing and replacing two wing walls of the structure This work is located at Structure No. 050-2539 carrying IL 170 over Armstrong Run. Approximately 3.86 miles south of US 6 in LaSalle County. This project consists of removing and replacing two wing walls of the structure. | — | Executed | D. Construction, Inc. $93,370 · | ||
| Sep 18, 2020 | 68741 | PutnamDistrict 4 | Superstructure replacement on S This project is 550 feet long and consists of superstructure replacement on S.N. 078-0032, which carries IL Route 71 over Coffee Creek, 5.1 miles west of IL Route 89 in Putnam County. | — | Executed | D. Construction, Inc. $962,942 · | ||
| Sep 18, 2020 | 68F57 | VariousDistrict 4 | Upgrade guardrail terminal end sections, Texas Turndowns, along various routes throughout the district in various counties. | — | Executed | COLLINS & HERMANN, INC. $1,165,296 · | ||
| Sep 18, 2020 | 70602 | ChampaignDistrict 5 | 0.1 miles, bridge superstructure, Copper Slough W of Duncan Rd. | — | Executed | Stark Excavating, Inc. $667,652 · | ||
| Sep 18, 2020 | 70E94 | McLeanDistrict 5 | Bridge Joint Repair of S.N. 057-0223 carrying Raab Rd. over 1-55. | — | Executed | Stark Excavating, Inc. $231,290 · | ||
| Sep 18, 2020 | 72L22 | LoganMontgomeryDistrict 6 | Removal and replacement of high mast light towers on I-55 at the Litchfield and Elkhart interchanges. | — | Executed | Bodine Electric of Decatur $47,248 · | ||
| Sep 18, 2020 | 72M37 | ScottDistrict 6 | Bridge superstructure repairs on SN 086-0037 and SN 086-0038 carrying I-72 over IL 100. | — | Executed | Halverson Construction Co., Inc. $53,431 · | ||
| Sep 18, 2020 | 72M39 | ScottDistrict 6 | Patching on I-72 from the abandoned BandN Railroad to the Morgan County line. | — | Executed | G. M. Sipes Construction, Inc. $623,502 · | ||
| Sep 18, 2020 | 72M40 | MontgomeryDistrict 6 | Patching on I-55 at the Coalfield Rest Area. | — | Executed | Kinney Contractors, Inc. $181,367 · | ||
| Sep 18, 2020 | 74A29 | ClarkDistrict 7 | 7 miles of patching on I-70 from mile post 130 to 137. | — | Executed | Kinney Contractors, Inc. $362,259 · | ||
| Sep 18, 2020 | 76H84 | MadisonDistrict 8 | 2.5 miles of standard overlay resurfacing along I-70/270 from I-55 to 2.5 miles east of the I-55/70/270 interchange and the ramps at the I-55/70/270 interchange and 4.7 miles of ultra-thin bonded wearing course from 0.4 miles east of IL 159 to 0.3 miles north of I-270. | — | Executed | The Kilian Corporation $23,515,724 · | ||
| Sep 18, 2020 | 76L20 | GreeneJerseyDistrict 8 | 5.7 miles of standard overlay resurfacing on US 67 from 0.1 miles north of Township Road 285 to 0.6 miles south of Tolman Road. | — | Executed | Charles E. Mahoney Co. $4,475,169 · | ||
| Sep 18, 2020 | 76M61 | VariousDistrict 8 | Repair and maintenance of electrical equipment at pump stations in various locations within District 8. | — | Executed | Electrico, Inc. $49,533 · | ||
| Sep 18, 2020 | 76M62 | CalhounDistrict 8 | Repair and maintenance of electrical equipment on the Joe Page Bridge in Hardin (SN 031-0001). | — | Executed | Wissehr Electric, Inc. $55,211 · | ||
| Sep 18, 2020 | 76M78 | MadisonSt. ClairDistrict 8 | Chemical treatment of deep wells at various locations in East St. Louis. | — | Active | Davinroy Mechanical Contractor, Inc. $669,550 · | ||
| Sep 18, 2020 | 76N15 | MadisonDistrict 8 | Bridge joint repairs and HMA overlay with bridge repairs on SN 060-0278 and 060-0279 on IL 255 over the Cahokia Diversion Canal. | — | Executed | Stutz Excavating, Inc. $1,150,493 · | ||
| Sep 18, 2020 | 78799 | MassacPulaskiDistrict 9 | 9 miles of HMA surface removal, HMA surface course, pavement patching and ADA curb ramp improvements on IL 169 from IL 37 to US 45. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,284,417 · | ||
| Sep 18, 2020 | 78822 | WilliamsonDistrict 9 | High friction surface treatment on the northbound I-57 entrance Ramp A and Ramp A-R; Ramp A begins at IL 13 and continues to The Hill Avenue overpass; Ramp A-R begins at IL 13 and ends where it merges into Ramp A. | — | Executed | E. T. Simonds Construction Company $379,353 · | ||
| Sep 18, 2020 | 85684 | Rock IslandDistrict 2 | Construction of a shared-use path adjacent to Avenue of the Cities, from Hospital Road to Greenview Memorial Gardens in the City of Silvs. | — | Executed | Valley Construction Co. $867,531 · | ||
| Sep 18, 2020 | 93749 | SangamonDistrict 6 | Milling and resurfacing for a three lane section with bike lane and new traffic signals on Walnut Street from South Grand Avenue to Monroe Street in Springfield. | — | Executed | P. H. Broughton & Sons, Inc. and Perry Broughton Trucking and Excavating, Inc. $1,414,226 · | ||
| Sep 18, 2020 | 93750 | ChristianDistrict 6 | Replace the existing pedestrian bridge with a prefabricated pedestrian superstructure located on Lincoln Prairie Trail over Flat Branch, adjacent to IL 29 between Pana and Taylorville. | — | Rejected | Sangamo Construction Company $910,055 · | ||
| Nov 6, 2020 | 60W34 | WillDistrict 1 | (1.27-miles) Pavement reconstruction along 1-80 EB from Gardner St to Rowell Ave. replacement and widening of the bridges carrying EB Hickory Creek, Rowell Ave and 1-80 EB and WB over Richards St., and lighting in the City of Joliet. | — | Executed | D. Construction, Inc. and P. T. Ferro Construction Company JV $41,618,429 · | ||
| Nov 6, 2020 | 61G12 | DuPageDistrict 1 | Intersection Widening, milling and resurfacing, and the upgrade of existing signalized intersection on 31st Street from Meyers Road to York Road in Oak Brook. | — | Executed | K-Five Construction Corporation $6,239,378 · | ||
| Nov 6, 2020 | 61G28 | WillDistrict 1 | Construction of a multi-use path along the ComEd right-of-way in Romeoville. | — | Executed | Pan-Oceanic Engineering Co., Inc. $974,364 · | ||
| Nov 6, 2020 | 61G36 | WillDistrict 1 | Traffic Signal modernization and construction of a fiber optic communication system on Black Road from US 30 to IL 59 in Joliet. | — | Executed | H & H Electric Co. $1,061,567 · | ||
| Nov 6, 2020 | 61G45 | CookDistrict 1 | Construction of a HMA multi-use path, sidewalks, curb and gutter, retaining wall, and pavement markings along Cicero Avenue from Meadow Lake Court (Poplar Ave) to Gateway Drive in Richton Park. | — | Executed | D. Construction, Inc. $692,219 · | ||
| Nov 6, 2020 | 61G46 | LakeDistrict 1 | Reconstruction of Nippersink Boulevard from Oak Street to Grand Avenue in Fox Lake. | — | Executed | Copenhaver Construction, Inc. $2,722,349 · | ||
| Nov 6, 2020 | 61G54 | DuPageDistrict 1 | Replace a pedestrian bridge at the intersection of Eastern Avenue and Harris Avenue over Flagg Creek in Clarendon Hills. | — | Executed | Alliance Contractors, Inc. $136,011 · | ||
| Nov 6, 2020 | 61G69 | LakeDistrict 1 | Traffic signal replacement and installation of adaptive signal control with flashing yellow arrows on Butterfield Road from IL 137 to Allanson Road. | — | Executed | H & H Electric Co. $2,711,130 · | ||
| Nov 6, 2020 | 61G70 | LakeDistrict 1 | Reconstruction of Brandywyn Lane from Aptakisic Road to Prairie Road; and the reconstruction of Thompson Boulevard from Buffalo Grove Road to Welland Road in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $4,849,825 · | ||
| Nov 6, 2020 | 61G72 | McHenryDistrict 1 | Sidewalk improvements including ADA ramp installation along Chapel Hill Road from Reed Avenue to Fairview Avenue in Johnsburg. | — | Executed | A Lamp Concrete Contractors, Inc. $149,541 · | ||
| Nov 6, 2020 | 61G75 | KaneDistrict 1 | Replace the bridge superstructure carrying Montgomery Road over Waubonsie Creek, o.3 mile nortwest of US 34 in Aurora. | — | Executed | D. Construction, Inc. $1,057,794 · | ||
| Nov 6, 2020 | 61G77 | CookDistrict 1 | Intersection improvements including curb "bump outs", bus shelters, covered bicycle parking, pavement markings, signage and a pedestrian activated cross- walk warning system on Broadway Avenue from Rice Street to Main Street in Melrose Park. | — | Executed | R. W. Dunteman Company $356,565 · | ||
| Nov 6, 2020 | 62A80 | McHenryDistrict 1 | (0.45 miles) the type of work is Bridge Replacement in McHenry County, over Kishwaukee River: SN 056-0025. | — | Executed | Plote Construction, Inc. $7,441,279 · | ||
| Nov 6, 2020 | 62J35 | McHenryDistrict 1 | Bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary (0.09-Mile) Improvement of US 14 over Fox River consists of bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary. | — | Executed | Martam Construction Incorporated $813,564 · | ||
| Nov 6, 2020 | 62K81 | CookDistrict 1 | ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township. | — | Executed | Triggi Construction, Inc. $1,116,609 · | ||
| Nov 6, 2020 | 62K82 | CookDistrict 1 | ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township. | — | Executed | Triggi Construction, Inc. $697,210 · | ||
| Nov 6, 2020 | 62K83 | CookDistrict 1 | ADA improvement project located along various State maintained routes within Bloom Township. Located in the City of Chicago Heights and Villages of Glenwood, Homewood, Lansing and Lynwood. | — | Executed | Triggi Construction, Inc. $788,016 · | ||
| Nov 6, 2020 | 62K85 | CookDistrict 1 | ADA Improvements to sidewalk curb ramps to compliant with PROWAG. Located at Vermont St, Vincennes St, Ashland Ave and 1271th St. in the Villages of Calumet Park, Blue Island and Riverdale, all in Calumet Township. | — | Executed | Acura Inc. $708,708 · | ||
| Nov 6, 2020 | 62K89 | CookDistrict 1 | ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 131st St, Kean Ave, US 12/20 (95th St), IL 7 (Southwest Hwy), IL 43 (Harlem Ave) in Bridgeview, Chicago Ridge, Hickory Hills, Palos Heights, Palos Hills, Palos Park and Worth, all in Palos Twp. | — | Executed | Acura Inc. $839,950 · | ||
| Nov 6, 2020 | 62L17 | CookDistrict 1 | (3.07 Mile) Resurfacing (Smart Overlay), milled rumble strips; Location: FAP 332: IL 394 from North of 186th Street to South of Joe Orr Road in the Villages of Lansing, Glenwood, Lynwood and Ford Heights. | — | Executed | D. Construction, Inc. $2,825,421 · | ||
| Nov 6, 2020 | 62L22 | KaneDistrict 1 | (4.0-Mile) SMART overlay, ADA improvements and milled rumble strips on IL. 31 from 1-88 to Rathbone Ave. located in the City of Aurora in Kane County. | — | Executed | D. Construction, Inc. $2,783,507 · | ||
| Nov 6, 2020 | 62L24 | LakeDistrict 1 | (4.12-Mile) SMART overlay and ADA improvements on US 12 from north of Old Rand Rd. to south of IL 22 located in the Villages of Lake Zurich and North Barrington. | — | Executed | Peter Baker & Son Co. $3,247,000 · | ||
| Nov 6, 2020 | 62L40 | CookDistrict 1 | (2788 Ft.) Crack and Joint Sealing project from Western Ave to Carrol Ave. in the Village of Harvey, in Thornton Township. | — | Rejected | Freehill Asphalt, Inc. $130,312 · | ||
| Nov 6, 2020 | 62L41 | CookDistrict 1 | (6.2-Mile) Cleaning and Sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping pavement marking from Balbo Dr to 57th Dr in City of Chicago. | — | Rejected | Freehill Asphalt, Inc. $540,128 · | ||
| Nov 6, 2020 | 62L43 | CookDistrict 1 | Cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villa (1.74-Mile) Improvement on IL 38 from Harrison St to Manheim Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages Hillside and Westchester, Proviso Township. | — | Rejected | Freehill Asphalt, Inc. $108,423 · | ||
| Nov 6, 2020 | 62L70 | WillDistrict 1 | (2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill. | — | Rejected | Denler, Inc. $141,906 · | ||
| Nov 6, 2020 | 62L71 | CookDistrict 1 | 1.69 miles of cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter on IL 43 from IL 72 to south of Collum Ave. in Norridge and the City of Chicago. | — | Rejected | SKC Construction, Inc. $206,985 · | ||
| Nov 6, 2020 | 62L72 | CookDistrict 1 | (3.49-Mile) Crack and Joint sealing on PCC pavement. Location: IL 62 (Algonquin Rd) from Penny Rd to Center Port Dr. in the Village of South Barrington, Palatine and Hoffman Estates. | — | Rejected | Freehill Asphalt, Inc. $131,471 · | ||
| Nov 6, 2020 | 62M00 | WillDistrict 1 | (6.395-Mile) Crack and Joint Sealing of PCC Pavement; Location: FAP 338: IL 59 from DuPage County Line to North of Pheasant Chase Drive in the City of Naperville and Village of Plainfield in Will County. | — | Rejected | SKC Construction, Inc. $452,962 · | ||
| Nov 6, 2020 | 62M23 | CookDistrict 1 | Traffic Signal Modernization and ADA curb ramp improvements at the intersection of IL Route 58 at Shady Oaks Drive in Elgin, Cook County. | — | Executed | H & H Electric Co. $313,863 · | ||
| Nov 6, 2020 | 62M63 | WillDistrict 1 | New bridge structure carrying the future north bound traffic IL 59 over 1-55 at the interchange of IL 59 and 1-55 located in the City of Joliet, Village of Shorewood, and Troy Township. SN 21029B | — | Executed | D. Construction, Inc. $8,700,000 · | ||
| Nov 6, 2020 | 62M67 | CookDuPageDistrict 1 | Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties. | — | Executed | Western Remac, Inc. $144,928 · | ||
| Nov 6, 2020 | 62M74 | CookDistrict 1 | Cleaning and painting the steel structure carrying IL 43 (Harlem Ave) over Calumet Sag Channel in the Village of Worth and the City of Palos Heights, SN 016-0323 | — | Executed | Capital Industrial Services $930,033 · | ||
| Nov 6, 2020 | 62M75 | CookDistrict 1 | Bridge pier repair on pier 2 of SN 016-1100, located on 1-90 at Foster Avenue in the City of Chicago, Cook Cou This improvement consists of bridge pier repair on pier 2 of SN 016-1100, located on 1-90 at Foster Avenue in the City of Chicago, Cook County. | — | Executed | Sumit Construction Co., Inc. $161,951 · | ||
| Nov 6, 2020 | 62M78 | CookDistrict 1 | Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties. | — | Executed | Sumit Construction Co., Inc. $537,335 · | ||
| Nov 6, 2020 | 62M88 | CookDistrict 1 | Cleaning and painting designated existing steel on the structures carrying Lake-Cook Road and Sheridan Road over various ravines, In the Village of Glencoe, in Moraine and New Trier Townships. | — | Executed | Capital Industrial Services $453,300 · | ||
| Nov 6, 2020 | 62M89 | CookDistrict 1 | Bridge Painting project in Calumet City and Country Club Hills, in Thornton and Bremen Township. Location 1 (SN-016-0956): Il-83 Sibley Blvd. over 1-94 (Bishop Ford Expy.). Location 2 (SN-016-2125): 167th Street over 1-57; | — | Executed | Capital Industrial Services $983,300 · | ||
| Nov 6, 2020 | 62M97 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout (North) Cook county. | — | Active | Illinois Central Sweeping LLC $1,215,520 · | ||
| Nov 6, 2020 | 62M98 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout (South) Cook county. | — | Active | Illinois Central Sweeping LLC $1,025,240 · | ||
| Nov 6, 2020 | 62M99 | WillDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout (South) Will county. | — | Rejected | Illinois Central Sweeping LLC $388,960 · | ||
| Nov 6, 2020 | 62N00 | DuPageDistrict 1 | Cleaning (sweeping) various arterial highways in District One throughout DuPage County. | — | Rejected | Illinois Central Sweeping LLC $599,170 · | ||
| Nov 6, 2020 | 62N01 | LakeDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Lake County. | — | Active | Illinois Central Sweeping LLC $697,950 · | ||
| Nov 6, 2020 | 62N02 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Active | Illinois Central Sweeping LLC $495,000 · | ||
| Nov 6, 2020 | 64F78 | Rock IslandDistrict 2 | 2.3 miles of removal and replacement of concrete bridge deck on SN 081-0106 carrying I-280 over the Mississippi River. Cold milling, pavement patching, and HMA resurfacing on I-280 from the Mississippi River Bridge to E of the IL 92 interchange. | — | Executed | Kraemer North America, LLC $49,728,568 · | ||
| Nov 6, 2020 | 64P04 | OgleDistrict 2 | Deck patching, expansion joint replacement, concrete overlay, substructure and other miscellaneous repairs on SN's 071-0052 and 071-0053 over Kilbuck Creek. | — | Executed | Martam Construction Incorporated $1,754,249 · | ||
| Nov 6, 2020 | 64P17 | VariousDistrict 2 | Washing twelve (12) bridges at various locations within District 2. | — | Executed | Interstate Maintenance, Incorporated $126,272 · | ||
| Nov 6, 2020 | 64P18 | WinnebagoDistrict 2 | Washing eight (8) bridges at various locations. | — | Executed | M & M Concrete, Inc. $79,100 · | ||
| Nov 6, 2020 | 64P19 | VariousDistrict 2 | Washing nineteen (19) bridges at various locations within District 2. | — | Executed | All States Painting, Inc. $158,000 · | ||
| Nov 6, 2020 | 64P24 | VariousDistrict 2 | Washing eight (8) bridges at various locations. | — | Executed | All States Painting, Inc. $79,000 · | ||
| Nov 6, 2020 | 64P50 | HenryDistrict 2 | Concrete overlays on the structures (037-0009 and 037-0010) carrying 1-74 over the Osco-Orion Road (FAS 2224A). | — | Executed | General Constructors Inc. of the Quad Cities $627,394 · | ||
| Nov 6, 2020 | 66959 | IroquoisDistrict 3 | The removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA mil This project is located on FAP 332 (IL 1) 0.15 mile north of US 52 in lroquois County. The work consists of the removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA milling and resurfacing, pavement marking, and reflectors. | — | Executed | Iroquois Paving Corporation $1,546,600 · | ||
| Nov 6, 2020 | 66K20 | FordDistrict 3 | The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City. | — | Executed | Cross Construction, Inc. $8,756,556 · | ||
| Nov 6, 2020 | 66K54 | IroquoisDistrict 3 | 3P Milling and Resurfancing (Designed overlay) and ADA improvements on FAP 332 (IL 1) from 0.1 miles North of US 52 to US 24 in Watseka for a total length of 8.2 miles. | — | Executed | Iroquois Paving Corporation $5,298,767 · | ||
| Nov 6, 2020 | 68897 | StarkDistrict 4 | Replacement of structure carrying IL 78 over Walnut Creek (S.N. 088-0012 existing, S.N. 088-2503 proposed) 0.8 miles North of West Jersey in Stark County. | — | Executed | Stark Excavating, Inc. $1,632,505 · | ||
| Nov 6, 2020 | 68D95 | WarrenDistrict 4 | Replacement of Structure Nos. 094-0025 (New S.N. 094-0053) and 094-0026 (New Structure No. 094-0054) carrying US 34/1 L 110 over 120 Street (TR 162) in Warren County. | — | Executed | White Construction LLC $5,194,500 · | ||
| Nov 6, 2020 | 68E60 | PeoriaDistrict 4 | Building Demo at 1229 Kickapoo Creek Road in Peoria. | — | Executed | Illinois Civil Contractors, Inc. $45,885 · | ||
| Nov 6, 2020 | 68F98 | TazewellWoodfordDistrict 4 | Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. | — | Executed | Phoenix Corporation of the Quad Cities $217,465 · | ||
| Nov 6, 2020 | 68G04 | VariousDistrict 4 | Replacement of existing CCTV cameras with high definition CCTV cameras at various locations in District Four. | — | Executed | H & H Electric Co. $258,043 · | ||
| Nov 6, 2020 | 68G05 | PeoriaTazewellDistrict 4 | Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. | — | Executed | Oberlander Electric Co. $406,250 · | ||
| Nov 6, 2020 | 70616 | ChampaignDistrict 5 | Bridge replacement, 0.16 miles road reconstruction and widening over the Salt Fork Vermilion River 0.50 miles NE of Sidney. | — | Executed | Stark Excavating, Inc. $2,539,782 · | ||
| Nov 6, 2020 | 70D87 | McLeanDistrict 5 | Bridge Painting at 5 Structure Locations on 1-39 and 1-55 in Mclean County. | — | Executed | Venus Painting Co. $1,738,976 · | ||
| Nov 6, 2020 | 70F16 | VariousDistrict 5 | Maintenance and Lighting Repair at District 5 Facilities. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $352,058 · | ||
| Nov 6, 2020 | 72F27 | SangamonDistrict 6 | Culvert replacement and resurfacing on IL 123 just east of IL 29 and Old IL 29 just south of IL 123. | — | Executed | Truman L. Flatt & Sons Co., Inc. $1,414,607 · | ||
| Nov 6, 2020 | 72H82 | MenardDistrict 6 | 5.9 miles of resurfacing on IL 97 from 0.3 miles north of Boy Scout Road to the Sangamon County line. | — | Executed | Truman L. Flatt & Sons Co., Inc. $2,915,813 · | ||
| Nov 6, 2020 | 72L58 | AdamsDistrict 6 | 2.172 miles Bridge Deck Overlay, Bridge Joint Replace/Repair, Bridge Painting, Lighting, and Navigational Lighting on the Quincy Memorial Bridge over the Mississippi River in Quincy. | — | Executed | ERA-Valdivia Contractors, Inc. $7,257,807 · | ||
| Nov 6, 2020 | 72L85 | SangamonDistrict 6 | Painting three bridges on I-72 near the I-72/6th Street interchange south of Springfield. (SN 084-0076, 084-0077, 084-0104) | — | Executed | Civil Coatings and Construction Inc. $632,720 · | ||
| Nov 6, 2020 | 72L86 | LoganSangamonDistrict 6 | Painting three bridges on I-55 between Sherman and Williamsville and painting portions of one bridge on IL 121, 4 miles east of Mt. Pulaski. (SN 084-0171, 084-0022, 084-0023, 054-0022) | — | Executed | Venus Painting Co. $671,416 · | ||
| Nov 6, 2020 | 72L97 | SchuylerDistrict 6 | Microsilica overlay of SN 085-0025 carrying IL 101 over Williams Creek, 0.4 miles east of the Hancock County line. | — | Executed | Freesen, a div of UCM, Inc. $597,124 · | ||
| Nov 6, 2020 | 72M43 | AdamsDistrict 6 | Patching on IL 104 from east of I-172 to just east of the airport. | — | Executed | G. M. Sipes Construction, Inc. $644,794 · | ||
| Nov 6, 2020 | 72M44 | PikeDistrict 6 | Patching on I-72 from east of the Trumpet Interchange to west of Hull. | — | Executed | G. M. Sipes Construction, Inc. $348,629 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.