| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2020 | 62J32 | LakeDistrict 1 | (6.452 Mile) Standard overlay and new HMA shoulders on IL 60/83 from IL 120 (Belvidere Rd) to IL 176. Located within the Villages of Volo, Ivanhoe, Round Lake Park. | — | Executed | Peter Baker & Son Co. $3,563,637 · | ||
| Jul 31, 2020 | 62J50 | CookDistrict 1 | (3.1 mile) Standard overlay and ADA improvements on Narragansett Ave., from Cortland St. to Nagle Ave. in the City of Chicago, Jefferson Township. | — | Executed | Bigane Paving Company $1,669,141 · | ||
| Jul 31, 2020 | 62K84 | CookDistrict 1 | ADA improvement project located along various State routes located in the Villages of Tinley Park, Homewood, Hazel Crest and Cities of Country Club Hills, Oak Forest and Blue Island. | — | Executed | Davis Concrete Construction Co. $332,357 · | ||
| Jul 31, 2020 | 62K86 | CookDistrict 1 | ADA improvement project located along various State routes located in the Town of Cicero. | — | Executed | J. Nardulli Concrete, Inc. $450,427 · | ||
| Jul 31, 2020 | 62K87 | CookDistrict 1 | ADA improvement project located along various State routes located in the Villages of Homer Glen, Lemont and Orland Park. | — | Executed | Davis Concrete Construction Co. $368,767 · | ||
| Jul 31, 2020 | 62K90 | CookDistrict 1 | This is an ADA improvement project located along various State routes located in the City of Country Club Hills and Villages of Matteson, Olympia Fields, Homewood, Tinley Park and Flossmoor. | — | Executed | Davis Concrete Construction Co. $576,216 · | ||
| Jul 31, 2020 | 62K91 | CookDistrict 1 | This is an ADA improvement project located along various State routes located in the Villages of River Forest and Riverside. | — | Executed | Triggi Construction, Inc. $483,366 · | ||
| Jul 31, 2020 | 62M20 | CookDistrict 1 | (0.953 miles) SMART overlay project on 471h Street from east of County line Rd. to east of Wolf Road, includes PCC pavement overlay, ADA sidewalk located in Villages of Hinsdale and Western Springs. | — | Executed | J. A. Johnson Paving Company $996,700 · | ||
| Jul 31, 2020 | 62M21 | VariousDistrict 1 | Impact attenuators and sand barrels on various expressways throughout District One in various counties The improvement consists of impact attenuators and sand barrels on various expressways throughout District One in various counties. | — | Executed | Western Remac, Inc. $2,594,499 · | ||
| Jul 31, 2020 | 62M24 | VariousDistrict 1 | High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide. | — | Executed | Northern Contracting, Inc. $340,980 · | ||
| Jul 31, 2020 | 66K22 | KendallDistrict 3 | 5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47. | — | Executed | D. Construction, Inc. $1,043,916 · | ||
| Jul 31, 2020 | 66K93 | VariousDistrict 3 | One year contract to repair damaged high tension cable median barrier, guard rail, attenuators, etc., caused by motorists along various routes. | — | Executed | Northern Contracting, Inc. $918,117 · | ||
| Jul 31, 2020 | 66K96 | KendallDistrict 3 | Pavement patching and striping on FAP 311 (US 34) beginning at the intersection of US 34 and Boulder Hill Pass Rd and ending at the S intersection of US 30 in Kendall County. | — | Executed | Triggi Construction, Inc. $195,788 · | ||
| Jul 31, 2020 | 66K99 | FordDistrict 3 | Crack and joint serling on FAI 57 (IL 57) from Champaign County line to Irroquois County line in Ford County for a total length of 6.35 mi. | — | Executed | Complete Asphalt Service Co. $101,312 · | ||
| Jul 31, 2020 | 66L04 | KankakeeDistrict 3 | Crack and Joint Sealing on FAP 41 (IL 17) from NS RR to 0.3 mi W of Roosevelt Ave in Kankakee and on FAP 330 (US 45/52) from Indian Oaks Rd (5000 N) to 0.1 mi N of Armour Rd in Bourbonnais for a total legnth of 5.32 miles. | — | Executed | Complete Asphalt Service Co. $63,926 · | ||
| Jul 31, 2020 | 66L05 | LaSalleDistrict 3 | Crack and Joint Sealing on FAP 623 (US 6) from 0.31 mi of 1-39 to IL 178 in Utica in LaSalle for a total length of 3.57 miles. | — | Executed | Complete Asphalt Service Co. $17,440 · | ||
| Jul 31, 2020 | 66L06 | DeKalbDistrict 3 | Crack and Joint Sealing on FAP 324 (IL 23) from Fox Ave in Sycamore to Davy St in Dekalb for a total length of 4.19 miles. | — | Executed | Complete Asphalt Service Co. $79,996 · | ||
| Jul 31, 2020 | 66L07 | LaSalleDistrict 3 | Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County. | — | Rejected | D. Construction, Inc. $32,407 · | ||
| Jul 31, 2020 | 66L08 | GrundyDistrict 3 | Placing an aggregate wedge shoulder adjacent to existing paved shoulders on FAP 326 (IL 47) beginning at the intersection of IL 47 and Rte 113 and ending at the intersection of IL 47 and Scully Rd in Grundy County. | — | Executed | Scanlon Excavating & Concrete, Inc. $91,591 · | ||
| Jul 31, 2020 | 66L16 | BureauDistrict 3 | Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County. | — | Executed | D. Construction, Inc. $40,542 · | ||
| Jul 31, 2020 | 68E18 | KnoxDistrict 4 | Culvert repair to culvert east side of IL Rte 41, approximately 0.57 mi S of IL 116 in Knox County. | — | Executed | Brandt Construction Co. $199,999 · | ||
| Jul 31, 2020 | 68F15 | PeoriaDistrict 4 | 5.75 miles of resurfacing on I-74 from W of Kickapoo/Edwards Rd to 0.7 mile E of I-474. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $10,969,411 · | ||
| Jul 31, 2020 | 68F21 | HendersonDistrict 4 | Resurface IL 164 from 8th St in Oquaka to the Warren County line in Henderson county. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,175,199 · | ||
| Jul 31, 2020 | 68F61 | PeoriaDistrict 4 | Substructure repair to SN 072-0138 carrying IL 6 over Charter Oak Rd in Peoria. | — | Executed | Halverson Construction Co., Inc. $190,984 · | ||
| Jul 31, 2020 | 68F66 | PeoriaDistrict 4 | Bridge beam replacement on SN 072-0056 at Dry Run Creek E of Sterling Ave in West Peoria. | — | Executed | Otto Baum Company, Inc. $132,756 · | ||
| Jul 31, 2020 | 68F93 | HenryDistrict 4 | Pavement patching on EB I-74 entrance and exit ramps at IL 17 near Woodull in Henry County. | — | Executed | G. M. Sipes Construction, Inc. $106,730 · | ||
| Jul 31, 2020 | 70A92 | VermilionDistrict 5 | Bridge superstructure replacements over Salt Fork Vermilion River. | — | Executed | ICC Group Inc. $17,683,000 · | ||
| Jul 31, 2020 | 72J51 | MasonDistrict 6 | Deck patching, joint repairs, superstructure repairs and bridge cleaning on SN SN 065-0501 carrying IL 29 over Salt Creek at the Mason / Menard County line. | — | Executed | Freesen, a div of UCM, Inc. $229,934 · | ||
| Jul 31, 2020 | 72L73 | LoganDistrict 6 | Patching on Lincoln Parkway in Lincoln. | — | Executed | Lion Construction 1, LLC $151,089 · | ||
| Jul 31, 2020 | 72L81 | LoganDistrict 6 | 0.2 miles of design overlay on US 136 from 0.1 miles west of Illinois Central Railroad to 0.1 miles west of Emden Road (600th Avenue). | — | Executed | Truman L. Flatt & Sons Co., Inc. $178,687 · | ||
| Jul 31, 2020 | 72M06 | AdamsDistrict 6 | Parking improvements at the Quincy Maintenance Yard / Sign Shop parking lot. | — | Rejected | Lee Hood d/b/a Hood Demolition & Excavation $117,306 · | ||
| Jul 31, 2020 | 72M09 | VariousDistrict 6 | On-call repair of guardrail, cable median barrier, impact attenuators and fence at locations throughout District 6. | — | Executed | COLLINS & HERMANN, INC. $1,091,354 · | ||
| Jul 31, 2020 | 72M10 | SangamonDistrict 6 | Bridge superstructure, substructure, and joint repairs on SN 084-0116 carrying East Lakeshore Drive over I-55, 0.7 miles south of Lake Springfield. | — | Executed | Freesen, a div of UCM, Inc. $277,026 · | ||
| Jul 31, 2020 | 72M11 | LoganDistrict 6 | Replacing bridge bearings and expansion joint seals on SN 054-0059 carrying County Highway 2 over I-55, 3.1 miles east of I-155. | — | Executed | Stark Excavating, Inc. $67,972 · | ||
| Jul 31, 2020 | 72M12 | AdamsDistrict 6 | Deck patching and miscellaneous repairs on SN 001-0073 carrying IL 96 over Pigeon Creek, 1.7 miles southeast of Payson. | — | Executed | County Contractors, Inc. $148,698 · | ||
| Jul 31, 2020 | 72M14 | CassDistrict 6 | Culvert replacements on IL 125 from 5.3 miles west of IL 78 to 3.9 miles west of IL 78. | — | Executed | K. E. Vas Company $129,397 · | ||
| Jul 31, 2020 | 72M15 | CassDistrict 6 | HMA surface removal and replacement on IL 78, 0.1 miles north of the Morgan County line and at the IL 78/IL 125 intersection in Virginia. | — | Executed | P. H. Broughton & Sons, Inc. $218,562 · | ||
| Jul 31, 2020 | 72M16 | SangamonDistrict 6 | Seal coat and pavement markings at the District 6 parking lot, 126 East Ash Street in Springfield. | — | Executed | Complete Asphalt Service Co. $38,807 · | ||
| Jul 31, 2020 | 76568 | JerseyDistrict 8 | 2.4 miles of grading, drainage and paving on new alignment on US 67 for the New Delhi Bypass. | — | Executed | Baxmeyer Construction, Inc. $18,624,678 · | ||
| Jul 31, 2020 | 76K91 | CalhounDistrict 8 | Extending the sea wall, dredging and constructing a collision cell at the Kampsville Ferry on IL 108, on the Greene County side. | — | Executed | Keeley & Sons, Inc. $3,247,740 · | ||
| Jul 31, 2020 | 76N53 | JerseyDistrict 8 | Demolition of 2 houses and five buildings on 3 parcels and debris removal from 2 parcels along the proposed US 67 corridor. | — | Executed | Stutz Excavating, Inc. $64,276 · | ||
| Jul 31, 2020 | 76N74 | RandolphDistrict 8 | 1.9 miles of crack and joint sealing on IL 4 from 0.1 miles north of VFW Drive to IL 154. | — | Executed | HSC Pavement Maintenance $42,066 · | ||
| Jul 31, 2020 | 76N75 | WashingtonDistrict 8 | Crack and joint sealing on IL 127 from 0.1 miles south of Holzhauer Drive to 0.7 miles south of I-64. | — | Executed | Complete Asphalt Service Co. $52,962 · | ||
| Jul 31, 2020 | 76N76 | MadisonDistrict 8 | 1.4 miles of crack and joint sealing on IL 159 from Clay Street to Kinloch Avenue. | — | Executed | Kinney Contractors, Inc. $123,923 · | ||
| Jul 31, 2020 | 78600 | JeffersonDistrict 9 | 4.2 miles of patching, milling, HMA surface, HMA shoulders and guardrail on I-57 from north of the northern tri-level in Jefferson County to 2 miles south of the Dix interchange. | — | Executed | Southern Illinois Asphalt Co., Inc. $5,210,684 · | ||
| Jul 31, 2020 | 78701 | UnionDistrict 9 | Construction of additional truck parking lot adjacent to the existing lots at both the northbound and southbound Trail of Tears Rest Area on I-57, north of IL 146. | — | Executed | E. T. Simonds Construction Company $1,625,206 · | ||
| Jul 31, 2020 | 78731 | JeffersonDistrict 9 | 1.3 miles of ADA ramp modifications, flashing left turn arrows, mast arm improvements to properly locate signal heads, controller upgrades and interconnect upgrades due to signal spacing on IL 15 from east of 44th Street to west of 25th Street in Mt. Vernon. | — | Executed | Brown Electric, Inc. $1,546,370 · | ||
| Jul 31, 2020 | 78735 | VariousDistrict 9 | Crack sealing on various routes throughout various counties of District 9. | — | Executed | Complete Asphalt Service Co. $131,653 · | ||
| Jul 31, 2020 | 78763 | WhiteDistrict 9 | 8.2 miles of patching and resurfacing on US 45 from IL 14 to IL 1; including sidewalk ramps in Norris City. | — | Executed | E. T. Simonds Construction Company $2,326,867 · | ||
| Jul 31, 2020 | 78769 | FranklinDistrict 9 | 1.8 miles of HMA surface removal, HMA resurfacing, patching and ADA ramp h reconstruction on IL 149 in West Frankfort, from IL 37 to the east corp limits near Horrell Street. | — | Executed | E. T. Simonds Construction Company $1,443,396 · | ||
| Jul 31, 2020 | 78782 | GallatinDistrict 9 | 1.2 miles of pavement patching, milling, HMA binder and surface, HMA shoulders and curb ramp / sidewalk modifications on Main Street from IL 1 to Murphy Murphy Street in Ridgway. | — | Executed | E. T. Simonds Construction Company $518,040 · | ||
| Jul 31, 2020 | 78783 | JacksonDistrict 9 | 4 miles of patching, milling, HMA binder and surfacing, HMA shoulders and spot drainage improvements on Old IL 13 from just west of Tower Road in Carbondale to just east of IL 127 in Murphysboro. | — | Executed | E. T. Simonds Construction Company $1,137,153 · | ||
| Jul 31, 2020 | 78784 | JacksonDistrict 9 | 0.52 miles of resurfacing and patching on IL 13 westbound in Carbondale, sidewalk ramp update at Lewis Lane and the addition of a new bike lane. | — | Executed | Samron Midwest Contracting, Inc. $443,394 · | ||
| Jul 31, 2020 | 78787 | WilliamsonDistrict 9 | 5.8 miles of resurfacing on I-57 from Herrin Road to Old IL 13 in Marion. | — | Executed | Southern Illinois Asphalt Co., Inc. $4,925,290 · | ||
| Jul 31, 2020 | 78796 | MassacDistrict 9 | Removal and replacement of HMA overlay at various locations, partial depth patching, cleaning of deck drains and removal of debris from the shoulders on I-24 at SN 064-0035 over the Ohio River. | — | Executed | E. T. Simonds Construction Company $614,135 · | ||
| Jul 31, 2020 | 78797 | VariousDistrict 9 | Bridge deck concrete sealing at various structures in Gallatin, Hardin, Pope, Saline and Williamson Counties. | — | Executed | All States Painting, Inc. $194,376 · | ||
| Jul 31, 2020 | 78807 | JeffersonDistrict 9 | 11 miles of patching, partial depth removal and partial depth patching on I-64 from the Washington County line to I-57 / I-64 Tri-level north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $450,914 · | ||
| Jul 31, 2020 | 78808 | AlexanderPulaskiDistrict 9 | Pavement patching on I-57 from mile marker 1 to mile marker 8. | — | Executed | Kinney Contractors, Inc. $399,525 · | ||
| Jul 31, 2020 | 87727 | LaSalleDistrict 3 | Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23. | — | Executed | Riber Construction, Inc. $922,301 · | ||
| Jul 31, 2020 | 89719 | MercerDistrict 4 | Replace the bridge carrying _CH 16 over Snake Creek, at the western edge of Seaton | — | Executed | Brandt Construction Co. $747,127 · | ||
| Jul 31, 2020 | 89735 | TazewellDistrict 4 | Reconstruct the intersection of Camp Street and River Road in East Peoria. | — | Executed | Otto Baum Company, Inc. $1,295,159 · | ||
| Jul 31, 2020 | 89768 | TazewellDistrict 4 | Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington. | — | Executed | Gensini Excavating, Inc. $240,310 · | ||
| Jul 31, 2020 | 89770 | TazewellDistrict 4 | Construction of sidewalks and ADA Ramps at various locations in Pekin. | — | Executed | Otto Baum Company, Inc. $203,635 · | ||
| Jul 31, 2020 | 91593 | VermilionDistrict 5 | Replace the bridge carrying TR 186 over Windfall Creek, 3 miles southeast of Jamesburg. | — | Executed | Big O Services, LLC $333,547 · | ||
| Jul 31, 2020 | 91595 | VermilionDistrict 5 | Replace the bridge carrying TR 15 over Whiskey Creek, 2.5 miles southeast of Rankin. | — | Executed | Big O Services, LLC $269,637 · | ||
| Jul 31, 2020 | 93748 | SangamonDistrict 6 | Cold-in-place recycling with HMA overlay, HMA shoulders and aggregate shoulders on CH 12 from south of the I-72 Interchange to west of the Sangamon River bridge. | — | Executed | P. H. Broughton & Sons, Inc. $2,080,789 · | ||
| Jul 31, 2020 | 95856 | WabashDistrict 7 | Resurfacing CH 4 from the Lawrence County line to CH 11. | — | Executed | Howell Paving, Inc. $936,042 · | ||
| Jul 31, 2020 | 95872 | EffinghamDistrict 7 | Sidewalk, lighting, curb and gutter, and resurfacing at various locations in Dieterich. | — | Rejected | Kieffer Bros. Construction Co., Inc. $1,284,012 · | ||
| Jul 31, 2020 | 95878 | ColesDistrict 7 | Construction of HMA shoulders with rumbnle strips, aggregate shoulds and pavement markings on CH 18 from IL 121 to CH 20. | — | Executed | Howell Paving, Inc. $354,954 · | ||
| Jul 31, 2020 | 97733 | St. ClairDistrict 8 | Resurfacing, curb and gutter, sidewalks and ADA ramps on Centreville Avenue from Dintelman Avenue to 0.02 mile south of West Lincoln Street in Belleville. | — | Executed | Fournie Contracting Co. Inc. $922,944 · | ||
| Jul 31, 2020 | 97740 | St. ClairDistrict 8 | Reconstruction of West Morris Street from 2nd Street to North Main Street in Caseyville. | — | Executed | Baxmeyer Construction, Inc. $678,772 · | ||
| Jul 31, 2020 | 97743 | MarionDistrict 8 | Resurfacing South Locust Street from East 3rd Street to East 17th Street in Centralia. | — | Executed | Howell Paving, Inc. $601,856 · | ||
| Jul 31, 2020 | 97745 | MadisonDistrict 8 | Resurfacing Johnson Road from Nameoki Road to Terrace Lane in Granite City. | — | Executed | Stutz Excavating, Inc. $579,214 · | ||
| Jul 31, 2020 | 99639 | JacksonDistrict 9 | Reconstruct the intersection of Chautaugua Street at McLafferty Road/Briarwood Drive in Carbondale to a roundabout with multi-use path and pavement markings. | — | Executed | Samron Midwest Contracting, Inc. $736,354 · | ||
| Jul 31, 2020 | 99646 | UnionDistrict 9 | Replace the bridge carrying TR 164 over a tributary to Big Creek, 4 miles southeast of Anna. | — | Executed | Samron Midwest Contracting, Inc. $238,472 · | ||
| Jul 31, 2020 | 99648 | MassacDistrict 9 | Resurfacing New Columbia Road from the Johnson County line to Teague Hill Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $326,340 · | ||
| Jul 31, 2020 | 99652 | WhiteDistrict 9 | Resurfacing Epworth Road from E 1100 N Road to E 650 N Road. | — | Executed | E. T. Simonds Construction Company $1,625,901 · | ||
| Jul 31, 2020 | 99653 | JeffersonDistrict 9 | Resurfacing CH 8 from IL 15 to 5th Street in Bluford. | — | Executed | Southern Illinois Asphalt Co., Inc. $351,312 · | ||
| Sep 18, 2020 | 46454 | JeffersonJohnsonDistrict 9 | Repairing or replacing damaged or deteriorated overhead sign structures, overhead sign structure components and supports at various locations in Jefferson and Johnson Counties. | — | Executed | COLLINS & HERMANN, INC. $733,275 · | ||
| Sep 18, 2020 | 46547 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified o This work shall consist of removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $126,518 · | ||
| Sep 18, 2020 | 46551 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols with This work shall consist of placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,237,600 · | ||
| Sep 18, 2020 | 46559 | VariousDistrict 7 | Various types of pavement marking rehabilitation throughout District 7. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,220,863 · | ||
| Sep 18, 2020 | 46922 | MassacDistrict 9 | HMA resurfacing of roadway and parking areas, striping of parking areas, sign replacement, aggregate resurfacing of camp sites, HMA paving of existing camp sites, parking lot and sidewalk construction and site lighting at Fort Massac State Park (IDNR) in Metropolis. | — | Executed | E. T. Simonds Construction Company $470,696 · | ||
| Sep 18, 2020 | 60P14 | CookDistrict 1 | (1.22 miles) The 3 signalized intersections include: IL 72 at Oakton St. (W Jct), IL 72 at IL 83 Busse Rd and IL 72 east of IL 83 (E Jct). IL 72 and IL 83 intersection is approx. 1000 FT south of I-90. | — | Executed | Alliance Contractors, Inc. $5,751,620 · | ||
| Sep 18, 2020 | 60V06 | LakeDistrict 1 | Precast concrete pavement and class B concrete patches along IL 83, approximately 419 ft E of the center line of N Buffalo Grove Rd and approximately 29833 ft NE to US 45. | — | Executed | R. W. Dunteman Company $1,738,700 · | ||
| Sep 18, 2020 | 60Y21 | CookDistrict 1 | (0.30-miles) Intersection Reconstruction (traffic signal modernization, addition of turn lanes) at the intersection of IL 19 (Irving Park Road) and Scott Street and at Judd Avenue. | — | Executed | A Lamp Concrete Contractors, Inc. $2,498,941 · | ||
| Sep 18, 2020 | 60Y23 | CookDistrict 1 | (0.32- mile) Right turn lane, traffic signal modernization, and ADA improvement. Location: Willow Road, from 646-ft west of the centerline of the centerline of Pfingsten Road to 524- ft east of the centerline of Pfingsten Road in the Villages of Glenview and Northbrook, Northfield Township. | — | Executed | Alliance Contractors, Inc. $1,473,789 · | ||
| Sep 18, 2020 | 61F90 | LakeDistrict 1 | Sidewalk construction at various locations in Lake Villa. | — | Executed | Electric Conduit Construction $388,937 · | ||
| Sep 18, 2020 | 61G15 | CookDistrict 1 | Streetscape improvements on IL 21 from Jonquil Terrace to Howard Street, in the Village of Niles. | — | Executed | A Lamp Concrete Contractors, Inc. $574,435 · | ||
| Sep 18, 2020 | 61G48 | CookDistrict 1 | Remove and replace sidewalks, curb and gutter, and driveways on 13th Street, from 23rd Avenue to 17th Avenue, and on 15th Street from 21st Avenue to 19th Avenue in Broadview. | — | Executed | J. Nardulli Concrete, Inc. $134,011 · | ||
| Sep 18, 2020 | 62B65 | LakeDistrict 1 | US 41 @ Deerpath Rd-PS#38. New pump station 38 in the SW quadrant of Deerpath Rd. @ Ahwahnee Ln., decommissioning existing pump station at bridge abutement (SN 049-0033). 2 detention ponds in Lake Forest golf course, 2 new ret. walls, resurfacing, drainage repairs (0.49 miles) | — | Executed | Berger Excavating Contractors, Inc. $12,127,335 · | ||
| Sep 18, 2020 | 62K28 | WillDistrict 1 | (0.53 Mile) Traffic signal installation, median reconstruction, new sidewalk installation, and ADA and drainage improvement at the intersection of IL 59 and Champion Road. | — | Executed | Alliance Contractors, Inc. $839,622 · | ||
| Sep 18, 2020 | 62K94 | LakeDistrict 1 | Weigh Station Repairs (remove and replace scales, steel beam support and deck platform, repairs to the pit walls and replacement of approach pavements. Location: Northbound Wasdworth Weigh Station in Wadsworth, Lake County. | — | Executed | Alliance Contractors, Inc. $328,144 · | ||
| Sep 18, 2020 | 62L01 | CookDistrict 1 | (0.528 Mile) standard overlay with ADA ramp improvement from 26th St to 31st St in the Village of Riverside, in Riverside Township. | — | Executed | K-Five Construction Corporation $496,965 · | ||
| Sep 18, 2020 | 62L13 | LakeDistrict 1 | (0.5 Mile) Designed Overlay, ADA Improvements, Located on Barrington Road from ILL 176 (Liberty St) to US 12 (Rand Rd) in the Village of Wauconda in Lake County. | — | Executed | Arrow Road Construction Co. $305,686 · | ||
| Sep 18, 2020 | 62L14 | CookDistrict 1 | (0.92 Mile) Standard Overlay, ADA Improvement, Located on Meacham Road from south of Emerson Ave to ILL 62 (Algonquin Road). | — | Executed | Arrow Road Construction Co. $755,906 · | ||
| Sep 18, 2020 | 62L96 | CookDistrict 1 | (3.05 Miles) Crack and Joint Sealing Improvements, Location: FAP 350; IL 50/US 41 (Skokie Blvd.) from North of Golf Rd to Touhy Ave. | — | Executed | Denler, Inc. $125,087 · | ||
| Sep 18, 2020 | 62L97 | CookDistrict 1 | (2.60 Miles) Crack and joint sealing, includes pavement marking re-striping. Located from Will-Cook Road to Southwest Highway. | — | Executed | Denler, Inc. $60,652 · | ||
| Sep 18, 2020 | 62M66 | McHenryDistrict 1 | Building Demolition at 3 locations. Location No. 1: 2103 N. Woodlawn Parkway; Location No. 2 2107 N. Woodlawn Parkway; Locaton No. 3 W. side of IL 31, approximately 2,250-ft N. of McCullom Lake. | — | Executed | MYS, Incorporated $360,168 · | ||
| Sep 18, 2020 | 62M72 | WillDistrict 1 | Traffic Signal Modernization and Traffic Signal Retroreflective Backplate Installation at various locations in the City of Joliet. | — | Executed | John Burns Construction Company $2,353,333 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.