| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 12, 2020 | 72L75 | ScottDistrict 6 | Deck patching and joint repair on SN 086-0013 carrying IL 106 over Little Sandy Creek, 1.5 miles north of Alsey. | — | Executed | Freesen, a div of UCM, Inc. $137,055 · | ||
| Jun 12, 2020 | 72L76 | ChristianDistrict 6 | Deck patching and joint repair on SN 011-0033 carrying Lincoln Trail over the Flat Branch River, 1.1 miles east of IL 48. | — | Executed | Otto Baum Company, Inc. $184,349 · | ||
| Jun 12, 2020 | 72L77 | ChristianDistrict 6 | Replacing bridge approach pavement on SN 011-0021 carrying IL 104 over Lake Sangchris, 1 mile west of Tovey. | — | Executed | Otto Baum Company, Inc. $184,691 · | ||
| Jun 12, 2020 | 72L83 | PikeDistrict 6 | Repairing and sealing parapets on SN 075-0123 carrying I-72 westbound over the Illinois River, | — | Executed | Freesen, a div of UCM, Inc. $496,936 · | ||
| Jun 12, 2020 | 72L87 | MorganDistrict 6 | Substructure and slope wall repairs on SN 069-0048 and 069-0049 carrying I-72 over North Fork Mauvaise Terre Creek, 1.1 miles east of Old US 36 near Jacksonville. | — | Executed | Freesen, a div of UCM, Inc. $391,307 · | ||
| Jun 12, 2020 | 72M00 | HancockDistrict 6 | Bituminous surface treatment and precast concrete parking blocks on scenic turnouts along IL 96 beginning at the Hoot Owl Rest Area at County Road 1550 and continuing north to the Stone Arch Bridge Scenic Turnout in Nauvoo. | — | Active | W. L. Miller Company $52,411 · | ||
| Jun 12, 2020 | 72M01 | SangamonDistrict 6 | Patching and profile diamond grinding concrete pavement on Old US 36 from Farmingdale Road to 0.2 miles south of International Parkway. | — | Rejected | Kinney Contractors, Inc. $79,916 · | ||
| Jun 12, 2020 | 72M02 | MorganDistrict 6 | Patching on IL 72 from US 67 to the Sangamon County line. | — | Executed | G. M. Sipes Construction, Inc. $165,015 · | ||
| Jun 12, 2020 | 72M03 | PikeDistrict 6 | Patching on I-72 from I-172 to IL 96. | — | Executed | G. M. Sipes Construction, Inc. $517,995 · | ||
| Jun 12, 2020 | 72M04 | VariousDistrict 6 | Weed spraying on various routes in various counties of District 6. | — | Executed | Endrizzi Contracting, Inc $102,085 · | ||
| Jun 12, 2020 | 72M05 | SangamonDistrict 6 | Tree removal, fence repair and seeding at multiple locations: I-72 (WB) from Riverton Interchange (Exit 108) to 2.5 miles east; at Taintor Road north of Browning Avenue; and at the Springfield west Maintenance Yard. | — | Executed | Homer Tree Service, Inc. $219,490 · | ||
| Jun 12, 2020 | 72M07 | SangamonDistrict 6 | Tree removal and seeding at the I-55 and East Lake Shore Drive Interchange (Exit 88) south of Springfield. | — | Executed | Homer Tree Service, Inc. $124,160 · | ||
| Jun 12, 2020 | 74464 | ClayEffinghamDistrict 7 | 5.1 miles of HMA pavement removal, HMA resurfacing, aggregate shoulders and pavement patching on Dietrich Blacktop from north of 200th Avenue in Effingham County to south of Zion Lane in Clay County. | — | Executed | Howell Paving, Inc. $1,880,149 · | ||
| Jun 12, 2020 | 74874 | ClayDistrict 7 | Base course widening, bridge joint replace/repair and bridge deck patching and overlay on US 50 over the Little Wabash River, 2 miles west of the Richland County line. (SN 013-0004) | — | Active | Samron Midwest Contracting, Inc. $649,389 · | ||
| Jun 12, 2020 | 74971 | EffinghamDistrict 7 | 4.9 miles of cape seal on US 45 from the Shelby County line to Rickelman Avenue in Effingham. | — | Executed | Beniach Construction Co., Inc. $434,411 · | ||
| Jun 12, 2020 | 74972 | CumberlandDistrict 7 | Constructing PCC base course, replacing expansion joints, bearings and wearing surface on SN 018-0042 and SN 018-0043 on I-70, 4.6 miles east of the Effingham County line. | — | Executed | Plocher Construction Company, Inc. $2,069,455 · | ||
| Jun 12, 2020 | 74A16 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems in Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties. | — | Executed | Bodine Electric of Decatur $148,879 · | ||
| Jun 12, 2020 | 74A17 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems in Macon, Moultrie, Shelby, Clark, Cumberland, Effingham and Coles Counties. | — | Executed | Bodine Electric of Decatur $148,879 · | ||
| Jun 12, 2020 | 74A18 | VariousDistrict 7 | Repair or replace steel plate beam guardrail damaged by motorists throughout District 7. | — | Executed | Kujo, Inc. $125,021 · | ||
| Jun 12, 2020 | 76H08 | BondDistrict 8 | Designed overlay resurfacing, patching and guardrail improvements on US 40 from Pokey Road to Overpass Road, Millersburg Road from US 40 to S Frontage Road, and N Frontage Road from US 40 to 0.1 miles east. | — | Executed | Christ Bros. Asphalt, Inc. $3,978,677 · | ||
| Jun 12, 2020 | 76H17 | JerseyDistrict 8 | 5.2 miles of patching, milling, and resurfacing along US 67 from 0.5 miles north of Fulkerson Drive to Crystal Lake Road in the City of Jerseyville. | — | Executed | Charles E. Mahoney Co. $5,284,270 · | ||
| Jun 12, 2020 | 76J71 | RandolphDistrict 8 | Milling and filling mainline, parking lanes, and shoulders, guardrail improvements, ADA upgrades, storm sewer, and scour mitigation under SN 079-0002; along IL 3 from 0.2 miles south of 1st Street in Ruma to the Monroe County line. | — | Executed | E. T. Simonds Construction Company $5,052,900 · | ||
| Jun 12, 2020 | 76K64 | ClintonDistrict 8 | 4 miles of designed overlay and bridge deck overlay on US 50 from 1 mile east of Crackerneck Road to 0.2 miles west of St. Rose Road. | — | Executed | The Kilian Corporation $8,502,200 · | ||
| Jun 12, 2020 | 76L17 | ClintonDistrict 8 | 3.3 miles of resurfacing along US 50 from Shattuc Road to the Marion County line. | — | Executed | Howell Paving, Inc. $1,912,983 · | ||
| Jun 12, 2020 | 76M22 | MadisonSt. ClairDistrict 8 | Mechanical plumbing work at the Bowman Pump Station and McCambridge Avenue Pump Station. | — | Executed | Haier Plumbing and Heating, Inc. $104,300 · | ||
| Jun 12, 2020 | 76M42 | St. ClairDistrict 8 | 0.8 miles of resurfacing on IL 13 (Freeburg Avenue) from S. Belt East to Nocturne Court in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $469,896 · | ||
| Jun 12, 2020 | 76M57 | VariousDistrict 8 | Guardrail and cable rail repair at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $1,852,899 · | ||
| Jun 12, 2020 | 76M59 | VariousDistrict 8 | Maintain and service all ITS equipment in District 8. | — | Rejected | |||
| Jun 12, 2020 | 76N29 | MadisonDistrict 8 | Resurfacing and patching along IL 111 from Edwardsville Road to 0.1 miles north of Wesley Drive. | — | Executed | Christ Bros. Asphalt, Inc. $448,106 · | ||
| Jun 12, 2020 | 76N49 | MadisonDistrict 8 | 1.4 miles of resurfacing along IL 140 from Terra Drive to Annex Street in Alton. | — | Executed | Charles E. Mahoney Co. $980,934 · | ||
| Jun 12, 2020 | 76N50 | BondMadisonDistrict 8 | 19.8 miles of patching on IL 140 from IL 4 to IL 127. | — | Executed | Christ Bros. Asphalt, Inc. $1,261,767 · | ||
| Jun 12, 2020 | 76N51 | ClintonDistrict 8 | 4.1 miles of patching on US 50 from St. Rose Road to Frogtown Road. | — | Executed | DMS Contracting, Inc. $392,923 · | ||
| Jun 12, 2020 | 76N52 | MadisonSt. ClairDistrict 8 | Railroad interconnect repair at IL 3 and Monsanto Road; IL 3 and Poag Road; IL 159 and Douglas; Main Street and Carondolet/Dieroff Steet in Dupo; and Pontoon Road and Missouri Avenue in Granite City. | — | Executed | Wissehr Electric, Inc. $282,286 · | ||
| Jun 12, 2020 | 76N54 | St. ClairDistrict 8 | Repairs at the Bowman Pump Station. | — | Executed | Davinroy Mechanical Contractor, Inc. $352,980 · | ||
| Jun 12, 2020 | 76N56 | ClintonDistrict 8 | 2 miles of pavement patching on IL 161 from Church Steeple Road to Slant Road near Bartelso. | — | Executed | G. M. Sipes Construction, Inc. $496,782 · | ||
| Jun 12, 2020 | 76N57 | JerseyMadisonDistrict 8 | 5.9 miles of guardrail replacement on IL 100 from 0.1 miles south of Piasa Bird Monument to Lockhaven Road. | — | Executed | Lovewell Fencing, Inc. $2,236,681 · | ||
| Jun 12, 2020 | 76N79 | MadisonDistrict 8 | Removal and replacement of the pumps at Collinsville #2 Pump Station in Collinsville and Grey-s Farm Pump Station in Pontoon Beach. | — | Executed | Korte and Luitjohan Contractors, Inc. $309,790 · | ||
| Jun 12, 2020 | 76N81 | ClintonDistrict 8 | 7.2 miles of ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. | — | Executed | The Kilian Corporation $3,387,825 · | ||
| Jun 12, 2020 | 78709 | JacksonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from just east of Veterans Parkway to the Williamson County line. | — | Executed | E. T. Simonds Construction Company $4,691,711 · | ||
| Jun 12, 2020 | 78717 | SalineDistrict 9 | Reconstruction of ADA ramps at 7 locations along IL 34 (Main Street) and along Old IL 13 (Polar Steet) in Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $161,701 · | ||
| Jun 12, 2020 | 78730 | JohnsonDistrict 9 | Combination of joint reconstruction, partial depth patching, structure repair, HMA overlay and substructure repairs on 4 structures in Johnson County (SN 044-0011, 044-0025, 044-0027 and 044-0054). | — | Executed | Samron Midwest Contracting, Inc. $634,655 · | ||
| Jun 12, 2020 | 78733 | JeffersonPerryDistrict 9 | Bridge repairs including deck/approach patching, shallow strip seals, substructure repairs, waterproofing and bituminous overlay on SN 041-0046 carrying IL 142 over ICRR in Jefferson County and SN 073-0023 carrying IL 152 over Beaucoup Creek in Perry County. | — | Executed | Samron Midwest Contracting, Inc. $408,447 · | ||
| Jun 12, 2020 | 78746 | VariousDistrict 9 | Electrical repair and/or replacement on various routes in various counties of District 9. | — | Executed | F. W. Electric, Inc. $51,261 · | ||
| Jun 12, 2020 | 78747 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $874,519 · | ||
| Jun 12, 2020 | 78753 | JeffersonDistrict 9 | Bridge deck microsilica concrete overlay, approach slab replacements, joint reconstruction, bearing replacements, backwall replacements, slope wall repairs and floor drain extensions on SN 041-0060 carrying I-64 westbound (2nd level structure) over I-57 southbound at the north tri-level, north of Vernon. | — | Executed | E. T. Simonds Construction Company $648,215 · | ||
| Jun 12, 2020 | 78758 | PulaskiWilliamsonDistrict 9 | Bearing removal and replacement, joint reconstruction, plating beam ends, diaphragm removal and replacement, concrete overlay and deck patching on SN SN 100-0057 over I-57 in Williamson County and bearing removal and replacement on SN 077-0028(31) over I-57 in Pulaski County. | — | Executed | Samron Midwest Contracting, Inc. $498,769 · | ||
| Jun 12, 2020 | 78794 | AlexanderDistrict 9 | Major bridge preventative maintenance on SN 002-0002 carrying I-57 over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line. | — | Executed | Samron Midwest Contracting, Inc. $695,276 · | ||
| Jun 12, 2020 | 78795 | AlexanderDistrict 9 | Pier repairs on SN 002-0005 carrying US 60/62 over the Mississippi River. | — | Executed | Samron Midwest Contracting, Inc. $73,736 · | ||
| Jun 12, 2020 | 78800 | JeffersonDistrict 9 | 3000' of pavement, shoulder, curb and gutter removal; PCC pavement (jointed); PCC shoulders; combination concrete curb and gutter; and pavement striping. | — | Executed | Samron Midwest Contracting, Inc. $608,452 · | ||
| Jun 12, 2020 | 85696 | Rock IslandDistrict 2 | Remove and replace guardrail and terminals at various locations in Rock Island County. | — | Rejected | Lovewell Fencing, Inc. $1,125,972 · | ||
| Jun 12, 2020 | 87692 | LaSalleDistrict 3 | Replace the bridge carrying FAS 263 (CH 5) over the Vermilion River, 4.0 miles east of Leonore. | — | Executed | ICC Group Inc. $8,028,500 · | ||
| Jun 12, 2020 | 87716 | IroquoisDistrict 3 | Resurfacing CH 23 from CH 4 to IL 116. | — | Executed | Iroquois Paving Corporation $1,295,043 · | ||
| Jun 12, 2020 | 87717 | LaSalleDistrict 3 | Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting along IL 18 from the Vermilion River to Wasson Street, on Vemilion Street from Hickory St. to Bridge St. and on Monroe St. from Hickory St. to Bridge St. in Streator. | — | Rejected | H. J. Eppel & Co. $926,471 · | ||
| Jun 12, 2020 | 87720 | BureauDistrict 3 | Replace the bridge carrying Jefferson Street over Rocky run Creek in Tiskilwa. | — | Executed | D. Construction, Inc. $331,165 · | ||
| Jun 12, 2020 | 87721 | BureauDistrict 3 | Resurface Ladd Road from US 6 to Dakota Street in Spring Valley. | — | Executed | Advanced Asphalt Company $226,431 · | ||
| Jun 12, 2020 | 87723 | DeKalbDistrict 3 | Replace the bridge carrying TR 160 (Motel Road) over the east branch of the Kishwaukee River, 0.5 mile north of IL route 64. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,463,053 · | ||
| Jun 12, 2020 | 87724 | FordDistrict 3 | Replace the bridge carrying CH 2 over Wall Town Drainage Ditch, 5 miles west of Loda. | — | Executed | Iroquois Paving Corporation $495,240 · | ||
| Jun 12, 2020 | 87732 | DeKalbDistrict 3 | Sidewalk improvements at various locations in Somonauk. | — | Executed | Copenhaver Construction, Inc. $147,919 · | ||
| Jun 12, 2020 | 87758 | IroquoisDistrict 3 | Remove existing guardrail and terminals, install new guardrail and terminals, pipe culverts and shaping ditches at various locations in Iroquois County. | — | Executed | Lovewell Fencing, Inc. $1,490,938 · | ||
| Jun 12, 2020 | 89738 | KnoxDistrict 4 | Reconstruct South Seminary Street from East Berrien Street to Fifth Steet in Galesburg. | — | Executed | Brandt Construction Co. $3,385,000 · | ||
| Jun 12, 2020 | 89782 | MercerDistrict 4 | Full-depth pavement reclamation followed by an A-3 bituminous surface treatment and aggregate wedge shoulders on CH 9 from 0.36 mile south of 155th Avenue to 110th Street. | — | Executed | Tri-City Blacktop, Inc. $600,700 · | ||
| Jun 12, 2020 | 91585 | McLeanDistrict 5 | Resurfacing CH 14 from IL 165 to CH 29 in Towanda | — | Executed | Rowe Construction, a div of UCM, Inc. $1,992,414 · | ||
| Jun 12, 2020 | 91589 | McLeanDistrict 5 | Sidewalk construction at various locations within 2 miles of the Sheridan Elementary Shcool in Bloomington. | — | Executed | Stark Excavating, Inc. $207,192 · | ||
| Jun 12, 2020 | 93714 | SangamonDistrict 6 | Construction of the Heritage Route 66 Trail located between Williamsville and Sherman, along the Ameren Illinois Right-of-Way. | — | Executed | Otto Baum Company, Inc. $2,793,598 · | ||
| Jun 12, 2020 | 93746 | HancockDistrict 6 | Replace the bridge carrying CH 6 over La Moine River, 1 mile east of St. Mary. | — | Executed | County Contractors, Inc. $1,536,091 · | ||
| Jun 12, 2020 | 95524 | EffinghamDistrict 7 | Replace the superstructure and rehabilitate the abutments to the structure carrying CH 6 over Lake Sara, 3.0 miles southeast of Shumway. | — | Executed | Depew and Owen Builders, Inc. $362,188 · | ||
| Jun 12, 2020 | 95862 | CumberlandDistrict 7 | Replace the bridge carrying CH 19 over Lake Mattoon, 1.5 miles north of Neoga. | — | Executed | Depew and Owen Builders, Inc. $798,988 · | ||
| Jun 12, 2020 | 95865 | ShelbyDistrict 7 | Replace the bridge carrying TR 367 over Brush Creek, 3.7 miles northwest of Stewardson. | — | Executed | Depew and Owen Builders, Inc. $326,288 · | ||
| Jun 12, 2020 | 95873 | FayetteDistrict 7 | Replace the bridge carrying CH 28 over Dismal Creek, 4.5 miles north of Farina. | — | Executed | Plocher Construction Company, Inc. $445,100 · | ||
| Jun 12, 2020 | 95874 | MaconDistrict 7 | Replace the bridge carrying CH 27 over Spring Creek and the construction of a box culvert over a drainage ditch, 3.1 miles northeast of Blue Mound. | — | Executed | County Contractors, Inc. $639,781 · | ||
| Jun 12, 2020 | 95875 | CrawfordDistrict 7 | Replace the bridge carrying TR 68 over Little Creek, 2.0 miles east of Pierceburg. | — | Executed | Allendale Gravel Co., Inc. $420,596 · | ||
| Jun 12, 2020 | 95876 | LawrenceDistrict 7 | Resurfacing Sand Barrens Lane from 250E Road to Bridgeport Road. | — | Executed | Ambraw Asphalt Materials, Inc. $2,137,594 · | ||
| Jun 12, 2020 | 97699 | CalhounDistrict 8 | Resurfacing CH 6 from 0.2 mile east of Park Street to West of Hill Top Road. | — | Executed | Stutz Excavating, Inc. $1,215,620 · | ||
| Jun 12, 2020 | 97723 | ClintonDistrict 8 | Resurfacing Bartelso Road from Old US 50 in Beckemeyer to IL 161 in Bartelso. | — | Executed | Howell Paving, Inc. $1,139,992 · | ||
| Jun 12, 2020 | 97730 | St. ClairDistrict 8 | Rehabilitate the bridge carrying CH 39 over Prairie Creek, just south of IL 157 | — | Executed | DMS Contracting, Inc. $167,883 · | ||
| Jun 12, 2020 | 97731 | WashingtonDistrict 8 | Replace the bridge carrying CH 5 over Rayse Creek, one half mile east of Richview. | — | Executed | Samron Midwest Contracting, Inc. $383,251 · | ||
| Jun 12, 2020 | 97732 | RandolphDistrict 8 | replace the bridge carrying CH 5 over Little Mill Creek, 3 miles north of Rockwood. | — | Executed | Samron Midwest Contracting, Inc. $396,167 · | ||
| Jun 12, 2020 | 97734 | MadisonDistrict 8 | Replace the bridge carrying Ch 32 over Mill Creek, 2 miles east of Troy-O'Fallon Road. | — | Executed | Keller Construction, Inc. $400,000 · | ||
| Jun 12, 2020 | 97735 | MadisonDistrict 8 | Sidewalk replacement, new sidewalk, brick paver sidewalk, curb and gutter replacement, street lighting, landscaping and pavement markings on Broadway Street/IL 160 from Polar Street to Laural Street in the City of Highland. | — | Executed | Stutz Excavating, Inc. $1,906,366 · | ||
| Jun 12, 2020 | 97736 | MarionDistrict 8 | Resurface Ch 37 from Green Street to IL 161. | — | Executed | Howell Paving, Inc. $1,224,790 · | ||
| Jun 12, 2020 | 97737 | MonroeDistrict 8 | Resurfacing, curb and gutter, sidewalks, HMA multi-use path, storm sewers and pavement markings on Quarry Road from Ghent Road to Palmer Creek Drive in Columbia. | — | Rejected | Hank's Excavating & Landscaping, Inc. $947,941 · | ||
| Jun 12, 2020 | 97739 | BondDistrict 8 | Hot-in-place surface recycling on CH 8 from IL 185 to the Mongomery County line. | — | Executed | Howell Paving, Inc. $2,120,601 · | ||
| Jun 12, 2020 | 97741 | BondDistrict 8 | Resurface CH 10 from US 40 to Trapper Avenue. | — | Executed | The Kilian Corporation $706,897 · | ||
| Jun 12, 2020 | 99600 | SalineDistrict 9 | Removal of a three-span precast prestressed concrete deck beam bridge, construction of 148 feet of reinforced concrete culvert pipe, construction of 300 feet of roadway embankment (using 22,392 cu. yd. of furnished excavation) and hot-mix asphalt pavement with aggregate base, placing riprap for erosion control, seeding all distrubed areas and miscellaneous items necessary to complete the improvement. | — | Executed | E. T. Simonds Construction Company $403,665 · | ||
| Jun 12, 2020 | 99615 | JeffersonDistrict 9 | Replace the bridge carrying TR 1A over East Creek, 1.5 miles east of Boyd. | — | Executed | Dees, Inc. $210,784 · | ||
| Jun 12, 2020 | 99627 | AlexanderDistrict 9 | Replace the bridge carrying TR 89A over Miller Creek, 3.7 miles southeast of Thebes. | — | Executed | E. T. Simonds Construction Company $171,025 · | ||
| Jun 12, 2020 | 99638 | JohnsonDistrict 9 | Resurfacing Goreville Road from I-57 southbound ramp to IL 37. | — | Executed | E. T. Simonds Construction Company $850,071 · | ||
| Jun 12, 2020 | 99644 | WhiteDistrict 9 | Replace the bridge carrying TR 380 over Crooked Creek, one half mile north of Garnerville. | — | Executed | Samron Midwest Contracting, Inc. $211,296 · | ||
| Jun 12, 2020 | 99645 | HamiltonDistrict 9 | Construct a 20'- 22' wide bituminous service treatment on various county highways. | — | Executed | Illini Asphalt Corporation $267,972 · | ||
| Jun 12, 2020 | 99647 | PerryDistrict 9 | Resufacing South Walnut Street from Randolph Street to Kaskaskia Street in Pinckneyville. | — | Executed | Samron Midwest Contracting, Inc. $138,420 · | ||
| Jun 12, 2020 | 99649 | SalineDistrict 9 | Resurfacing Mill Street from Town Park Road to Oak Street. | — | Executed | E. T. Simonds Construction Company $412,963 · | ||
| Jul 31, 2020 | 46552 | McHenryDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $308,371 · | ||
| Jul 31, 2020 | 46553 | KaneDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $449,399 · | ||
| Jul 31, 2020 | 46554 | CookDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $482,391 · | ||
| Jul 31, 2020 | 46555 | CookDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $2,952,962 · | ||
| Jul 31, 2020 | 61F92 | CookDistrict 1 | Replace the bridge carrying Central Street over the North Shore Channel in Evanston. | — | Executed | Copenhaver Construction, Inc. $6,169,456 · | ||
| Jul 31, 2020 | 61G62 | DuPageDistrict 1 | Resurfacing, sidewalks, landscaping and contruction of a train platform shelter on Prospect Avenue, from Burlington Avenue to Ann Street in Clarendon Hills. | — | Executed | John Burns Construction Company $1,216,667 · | ||
| Jul 31, 2020 | 61G64 | WillDistrict 1 | Construction of a multi-use path along the natural gas pipeline right of way, from Taylor Road to Normantown Road in Romeoville | — | Executed | R. W. Dunteman Company $773,338 · | ||
| Jul 31, 2020 | 61G65 | LakeDistrict 1 | Construction of a shared-use path from the Raven Glen Forest Preserve to the Ethel's Woods Forest Preserve, and construction of a US 45 pedestrian underpass in Antioch. | — | Executed | Campanella and Sons, Inc. $3,315,373 · | ||
| Jul 31, 2020 | 62J06 | LakeDistrict 1 | Traffic Signal Modernization at the intersection of IL 131 (Green Bay Rd) and Audrey Nixon Blvd / Casimir Pulaski Dr in North Chicago, Lake County. | — | Executed | Home Towne Electric, Inc. $259,097 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.