| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 12, 2020 | 60Y69 | CookDistrict 1 | Landscaping within the following boundaries I-90/94: Roosevelt Rd to Washington Blvd and Peoria St to Clinton St and I-290: Roosevelt Rd to Van Buren St and Damen ve to Clinton St. | — | Executed | Nettle Creek Nursery, Inc. $275,916 · | ||
| Jun 12, 2020 | 61F82 | KaneDistrict 1 | Reconstruct the intersection of Anderson Road at Keslinger Road, and the extension of Anderson Road from Keslinger Road to Freedom Road in Elburn. | — | Executed | Geneva Construction Company $1,052,132 · | ||
| Jun 12, 2020 | 61G20 | CookDistrict 1 | Pavement reconstruction, storm sewers, curb and gutter, sidewalks, traffic signals, lighting, water main, landscaping and pavement markings on IL 62 in Schaumburg. | — | Executed | R. W. Dunteman Company $9,776,015 · | ||
| Jun 12, 2020 | 61G33 | CookDistrict 1 | Construct a pedestrian underpass from Burlington Avenue, through the BNSF Railway embankment, to Hillgrove Avenue at Prospect Avenue in Western Springs. | — | Executed | D. Construction, Inc. $1,373,593 · | ||
| Jun 12, 2020 | 61G35 | CookDistrict 1 | Reconstruction of 21st Avenue from 16th Street to 19th Street, and the reconstruction of 19th Street from 21st Avenue to 17th Avenue in Broadview. | — | Executed | A Lamp Concrete Contractors, Inc. $3,090,000 · | ||
| Jun 12, 2020 | 61G39 | CookDistrict 1 | Resurfacing Wentworth Avenue from Bernice Road to Ridge Road in Lansing. | — | Executed | D. Construction, Inc. $799,663 · | ||
| Jun 12, 2020 | 61G41 | CookDistrict 1 | Construction of a pedestrian path adjacent to IL 72/Higgins Road, from west of Plum Grove Road to east of Plum Grove Road in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $689,669 · | ||
| Jun 12, 2020 | 61G42 | CookDistrict 1 | Reconstruction of Central Avenue from the Union Pacific Railroad to Sheridan Road. Resurfacing of Wilmette Avenue from the Union Pacific Railroad to Lake Avenue, and traffic signal modernization at Central and Wilmette Avenues in Wilmette. | — | Executed | A Lamp Concrete Contractors, Inc. $9,504,079 · | ||
| Jun 12, 2020 | 61G47 | LakeDistrict 1 | Traffic Signal modifications, installation of fiber optic communication system, sidewalk replacement and pavment markings at various locations in Waukegan. | — | Executed | Home Towne Electric, Inc. $1,395,602 · | ||
| Jun 12, 2020 | 61G49 | LakeDistrict 1 | Installation of snow-proof lens cover for red signal indications. | — | Executed | Meade Inc. $627,708 · | ||
| Jun 12, 2020 | 61G50 | CookDistrict 1 | Resurface Vincennes Road from Us 6 to Armory Drive, Armory Drive from Westview Avenue to Vincennes Road, and Westview Avenue from 172nd Street to Armory Drive in South Holland. | — | Executed | Gallagher Asphalt Corporation $1,234,904 · | ||
| Jun 12, 2020 | 61G51 | CookDistrict 1 | Construction of a pedestrian bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont. | — | Executed | Copenhaver Construction, Inc. $1,253,143 · | ||
| Jun 12, 2020 | 61G52 | CookDistrict 1 | Buffalo Creek trail extension from Lake Cook Road to the existing trail in Arlington. | — | Executed | A Lamp Concrete Contractors, Inc. $265,753 · | ||
| Jun 12, 2020 | 61G55 | DuPageDistrict 1 | Construction of a multi-use path, pedestrian bridge and boardwalk adjacent to Hager Road from west of Salt Creek to Yorkshire Road in Oak Brook. | — | Executed | P. T. Ferro Construction Co. $1,692,755 · | ||
| Jun 12, 2020 | 61G61 | CookDistrict 1 | Construction of a multi-use path adjacent to Old Green Bay Road, from Maple Hill Road to Park Avenue in Glencoe. | — | Executed | A Lamp Concrete Contractors, Inc. $776,067 · | ||
| Jun 12, 2020 | 61G63 | McHenryDistrict 1 | Sidewalk and pedestrian crossing improvements on West Main Street from Cary-Algonquin Road to Wulff street in Cary | — | Executed | A Lamp Concrete Contractors, Inc. $162,319 · | ||
| Jun 12, 2020 | 62A38 | CookDistrict 1 | (0.27 mile) Intersection improvement consisting of HMA surface removal, pavement widening, earth excavation, ADA sidewalk repair, construction of a concrete barrier median and HMA resurfacing on IL 171 (1st Ave) at Roosevelt Rd. | — | Executed | K-Five Construction Corporation $1,462,098 · | ||
| Jun 12, 2020 | 62F20 | CookDuPageDistrict 1 | (18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates. | — | Executed | K-Five Construction Corp & Quality Seal & Saw, Inc & Midwest Fence Corp Tri-Venture $1,074,369 · | ||
| Jun 12, 2020 | 62F22 | WillDistrict 1 | Installation of new shoulders, milled rumble strips, and guardrail on Monee- , Installation of new shoulders, milled rumble strips, and guardrail on Monee- Manhattan Road from Brynn Drive to Center Road. The gross length of the project is 35 ,622 feet (6.75 miles) in the Village of Manhattan and unincorporated Green Garden and Manhattan Townships in Will County. | — | Executed | Iroquois Paving Corporation $1,692,651 · | ||
| Jun 12, 2020 | 62F90 | CookDistrict 1 | Traffic Signal Modernization, Channelization, Standard Overlay, ADA Improvements; FAP Route 348 (IL 43 / Harlem Ave) at Archer Ave in the City of Chicago and the Village of Summit in Cook County. | — | Executed | K-Five Construction Corporation $1,287,974 · | ||
| Jun 12, 2020 | 62G02 | CookDistrict 1 | Traffic Signal Modernization and left turn lane storage extension at the the intersection of Ogden Ave and Austin Blvd located in the Town of Cicero. | — | Executed | Lyons Electric Company, Inc. $758,758 · | ||
| Jun 12, 2020 | 62H60 | KaneDistrict 1 | Pavement removal, drainage structures, placement of subbase granular material, hot-mix asphalt pavement and installation of thermoplastic pavement markings at the St. Charles Maintenance Yard. , Pavement removal, drainage structures, placement of subbase, HMA asphalt pavement and pavement markings at the IDOT St. Charles Maintenance Yard at 38W 027 Illinois Route 38. | — | Executed | Plote Construction, Inc. $748,000 · | ||
| Jun 12, 2020 | 62H70 | CookDistrict 1 | This is a slope stabilization project on IL Rte 83 from north of Glenwood Dyer Road to south of Glenwood Lansing Road that includes guardrail replacement. It is located in Village of Lynwood in Cook county. The gross and net length of the project is 1.183 miles (6250 ft). , (6250 ft) Slope stabilization on IL Rte 83 from N. of Glenwood Dyer Rd. to S. of Glenwood Lansing Rd, includes guardrail replacement located in the Village of Lynwood. | — | Executed | D. Construction, Inc. $760,107 · | ||
| Jun 12, 2020 | 62J28 | CookDistrict 1 | Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel | — | Executed | Scanlon Excavating & Concrete, Inc. $334,356 · | ||
| Jun 12, 2020 | 62J62 | WillDistrict 1 | (3.69 Mile) Standard overlay, new shoulder and milled rumble strip in Wesley Wesley Township in Will County. | — | Executed | Iroquois Paving Corporation $2,130,977 · | ||
| Jun 12, 2020 | 62J68 | CookDistrict 1 | 8 miles of standard overlay, HMA and Class B patching, and pedestrian ramps on US 45 / IL 21 from just north of Columbus Parkway to North of Rand Road in the Villages of Wheeling, Mount Prospect and Cities of Prospect Heights and Des Plaines. , Standard Overlay, HMA, Class B patching and pedestrian ramp begins 500 ft north of Columbus Pkwy and proceeds 41323 ft (8.0 miles) southerly direction to North of Rand Rd. in the Villages of Wheeling, Mount Prospect and Cities of Prospect Height and Des·P | — | Executed | Arrow Road Construction Co. $4,381,945 · | ||
| Jun 12, 2020 | 62J89 | CookDistrict 1 | (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located within South Chicago and Hyde park Townships. , (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located | — | Executed | K-Five Construction Corporation $4,658,002 · | ||
| Jun 12, 2020 | 62J91 | WillDistrict 1 | (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West. in Village of Channahon in Will County. , (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West in | — | Executed | P. T. Ferro Construction Co. $361,155 · | ||
| Jun 12, 2020 | 62J92 | LakeDistrict 1 | (3.10 Mile) Overlay, pedestrian ramp new HMA Shoulders on IL- 173 Shoulders on IL- 173 from Green Bay Rd to Sheridan Rd . Drainage improvement between Hebron Ave. and Galilee Ave. in the City of Zion. | — | Executed | J. A. Johnson Paving Company $2,870,188 · | ||
| Jun 12, 2020 | 62J98 | CookDistrict 1 | Bridge beam replacement for SN 016-0825 carrying Church St over I-94. | — | Executed | ICC Group Inc. $676,200 · | ||
| Jun 12, 2020 | 62K10 | VariousDistrict 1 | Dead tree removal along expressway and arterial routes of District One. | — | Executed | Homer Tree Service, Inc. $482,800 · | ||
| Jun 12, 2020 | 62K19 | LakeDistrict 1 | (0.019MI) Bridge superstructure repair over Flint Creek Tributary. Located in the Village of Barrington on US 14. SN 049-0003. | — | Executed | Alliance Contractors, Inc. $264,114 · | ||
| Jun 12, 2020 | 62K20 | CookDistrict 1 | Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago. | — | Executed | D. Construction, Inc. $655,770 · | ||
| Jun 12, 2020 | 62K35 | CookDistrict 1 | Permanent protective shield installation on IL 53 bridges over IL 62, US 14 and RR, Palatine Rd, Kirchoff Rd, Anderson Dr, as well as Fulton Market St bridge over I-90/I-94. | — | Executed | Herlihy Mid-Continent Company $790,785 · | ||
| Jun 12, 2020 | 62K49 | CookDistrict 1 | Partial beam and deck replacement on the bridge carrying Sibley Blvd. over I- 94 located in the Village of Dolton, IL. LT= 1110 FT (0.21MI) | — | Executed | D. Construction, Inc. $682,072 · | ||
| Jun 12, 2020 | 62K55 | WillDistrict 1 | Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at 1-55 at I 113 (Coal City Rd) Interchange. | — | Executed | H & H Electric Co. $1,034,047 · | ||
| Jun 12, 2020 | 62K71 | KaneDistrict 1 | 5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin. , 5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs West Rd to Strom Dr in the City of Elgin. | — | Executed | Plote Construction, Inc. $4,041,087 · | ||
| Jun 12, 2020 | 62K72 | CookDistrict 1 | (593.9 FT.) Bridge repair project of the structure carrying Torrence Ave over IHB and BandOCT Railroads, in the Village of Burnham, in Thornton Township, in Cook County. SN 016-0935 | — | Executed | ERA-Valdivia Contractors, Inc. $479,948 · | ||
| Jun 12, 2020 | 62K76 | CookDistrict 1 | Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, in the South Chicago Township, and Roosevelt Road over IHB Rail Road. , Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, and Roosevelt Road Over IHB Railroad. | — | Executed | ERA-Valdivia Contractors, Inc. $428,200 · | ||
| Jun 12, 2020 | 62K92 | CookDistrict 1 | (12.6 miles) Patching on 1-57, Halsted St. to 1-80, located in the Villages of Calumet Park Dixmoor, Posen, Riverdale, Markham and Blue Island. | — | Executed | K-Five Construction Corporation $2,539,731 · | ||
| Jun 12, 2020 | 62K95 | WillDistrict 1 | (290 FT.) Bridge steel repair project on US 30 WB (Cass St.) at the Des Plaines River in the City of Joliet, in Joliet Township, Will County. | — | Executed | D. Construction, Inc. $149,592 · | ||
| Jun 12, 2020 | 62K97 | CookDuPageDistrict 1 | Entire concrete bridge deck, top of sidewalks, inside and top of parapets. Drai age system repairs and cleaning. Structures located at various locations within Cook and DuPage County. | — | Executed | Vixen Construction, Inc. $285,533 · | ||
| Jun 12, 2020 | 62K98 | VariousDistrict 1 | Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in Cook, various Counties. | — | Executed | D. Construction, Inc. $885,834 · | ||
| Jun 12, 2020 | 64L74 | WhitesideDistrict 2 | Removal and replacement of the reinforced concrete drop beam along the bridge centerline. A new concrete overlay and other miscellaneous bridge repairs on the structure carrying US 30 over Hennepin Feeder Canal in Rock Falls. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,192,662 · | ||
| Jun 12, 2020 | 64M32 | WinnebagoDistrict 2 | Traffic signal upgrades at the intersection of Alpine Rd and Florida Dr/ Cleveland Dr and removal of the signals at Louisiana Rd. | — | Executed | William Charles Construction Co, LLC $239,239 · | ||
| Jun 12, 2020 | 64N60 | CarrollDistrict 2 | 9.6 miles of micro-surfacing from Plum River E of Savanna to 0.4 miles E of Benton St in Mount Carroll. | — | Executed | Asphalt Stone Company and Pavement Maintenance Systems JV $1,044,554 · | ||
| Jun 12, 2020 | 64N70 | Rock IslandDistrict 2 | Replace highway lighting at IL 92 at 7th ave, 18th ave, and 31st ave interchanges. | — | Executed | Davenport Electric Contract Company $409,190 · | ||
| Jun 12, 2020 | 64N99 | OgleDistrict 2 | Painting and cleaning of SN's 071-0050 carrying Big Mound Rd over I-39 located 1.5 miles S of IL 72 and 071-0056 carrying Bethel Rd over I-39 located 1 mile S of IL 64. | — | Executed | Three Star Painting, Inc. $285,000 · | ||
| Jun 12, 2020 | 64P03 | WinnebagoDistrict 2 | Traffic signal upgrades at the intersection of IL 70 at Springfield Ave. Upgrades include cabinet replacement on existing foundation, video detection, and flashing yellow left turn signals. | — | Executed | William Charles Construction Co, LLC $72,606 · | ||
| Jun 12, 2020 | 64P25 | VariousDistrict 2 | Maintenance of signs along state maintained routes within District 2. | — | Executed | Western Remac, Inc. $353,000 · | ||
| Jun 12, 2020 | 64P31 | WhitesideDistrict 2 | Cold-In-Place recycling with HMA overlay on Garden Plain Rd from 0.1 mile E of IL 84 to 0.3 mile E of Fenton Rd. | — | Executed | Valley Construction Co. $1,367,500 · | ||
| Jun 12, 2020 | 64P33 | HenryDistrict 2 | Cleaning and painting beam ends on SN's 037-0001 and 037-0002 carrying I-74/280 over Mosquito Creek. | — | Executed | Three Star Painting, Inc. $95,000 · | ||
| Jun 12, 2020 | 64P35 | OgleDistrict 2 | Expansion joint replacement on SN 071-0085 carrying IL 251 over Kyte Creek 0.6 N of IL 38 in Rochelle. | — | Executed | ERA-Valdivia Contractors, Inc. $266,643 · | ||
| Jun 12, 2020 | 64P36 | Rock IslandDistrict 2 | Expansion joint replacement on SN 081-0074 carrying IL 92 over Hills Creek 0.1 mile E of 115th St in Andalusia. | — | Executed | ERA-Valdivia Contractors, Inc. $233,263 · | ||
| Jun 12, 2020 | 64P37 | WhitesideDistrict 2 | Removal and replacement of fabric reinforced elastomeric troughs for the finger joints on SN 098-0079 and SN 098-0080 carrying I-88 over the Rock River 3 miles west of Rock Falls. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $267,213 · | ||
| Jun 12, 2020 | 64P38 | BooneDistrict 2 | Expansion joint replacement, deck patching, and HMA wearing surface with waterproofing membrane system on SN 004-0004 and SN 004-9900 carrying US 20 over I-90 0.1 mile E of Wheeler Rd. | — | Executed | Sjostrom & Sons, Inc. $564,889 · | ||
| Jun 12, 2020 | 64P39 | WhitesideDistrict 2 | Removal and replacement of exterior precast prestressed concrete deck beam on SN 098-0054 carrying IL 172 over the Hennepin Canal 3.2 miles W of IL 40. | — | Executed | Brandt Construction Co. $105,517 · | ||
| Jun 12, 2020 | 66A86 | KankakeeDistrict 3 | Milling and resurfacing the existing pavement 3.75", guardrail updates, and various types of drainage work on IL 115 from S13000W Rd in Herscher to S600W Rd N of Irwin. | — | Executed | Kankakee Valley Construction Company, Inc. $3,406,011 · | ||
| Jun 12, 2020 | 66B04 | FordDistrict 3 | 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. , 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. | — | Executed | Iroquois Paving Corporation $7,095,506 · | ||
| Jun 12, 2020 | 66B78 | FordKankakeeDistrict 3 | 9.26 miles of milling and resurfacing existing pavement 3.75- on IL 115 from CH 18 to 0.3 mile S of Main St in Cabery and Cabery to west corporate limits of Herscher. Work includes guardrail updates, various types of drainage work, and ADA ramp construction in Cabery. | — | Executed | Kankakee Valley Construction Company, Inc. $4,595,011 · | ||
| Jun 12, 2020 | 66D81 | FordDistrict 3 | 8.999 miles of milling and resurfacing from US 24 to IL 54 (N) in Roberts. | — | Executed | Iroquois Paving Corporation $3,941,216 · | ||
| Jun 12, 2020 | 66J34 | LaSalleDistrict 3 | Class B patching on IL 18 and IL 71 and Class A and B patching on the entrance and exit ramps, at the interchanges of I-39 and IL 18 and IL 71. | — | Executed | G. M. Sipes Construction, Inc. $396,409 · | ||
| Jun 12, 2020 | 66J96 | LaSalleDistrict 3 | HMA milling and resurfacing, PCC pavement replacement, storm sewer replacement, gutter removal, guardrail, and striping on FAP Rte 68 (IL 23) from the N intersection of IL 23 and US 34 to 400' N of SN 050-0042 (BNSF Railway). | — | Executed | Scanlon Excavating & Concrete, Inc. $485,332 · | ||
| Jun 12, 2020 | 66K08 | IroquoisDistrict 3 | Class B pavement patching from N 2950 East Rd to US 24. | — | Executed | G. M. Sipes Construction, Inc. $145,923 · | ||
| Jun 12, 2020 | 66K14 | LaSalleDistrict 3 | Cleaning and painting all structural steel components, including beams/girders, diaphragms, cross and lateral framing, bearings, drains, angle brackets, steel handrails when present, and other related steel components of SN 050-0129 carrying E. 14th Rd (TR 244) over FAI 80 (I-80) 6 miles E of IL 178. | — | Executed | ERA-Valdivia Contractors, Inc. $249,708 · | ||
| Jun 12, 2020 | 66K21 | KankakeeDistrict 3 | 4.96 miles of shoulder widening and rumble strip installation on US 45/52 from 0.37 mile N of 6000N Rd to 0.40 mile S of the Will County line. | — | Executed | Gallagher Asphalt Corporation $1,350,428 · | ||
| Jun 12, 2020 | 66K28 | BureauDistrict 3 | 3P milling and resurfacing (designed overlay) and ADA from US 6/34 to BSNF RR S of Buda. | — | Executed | Advanced Asphalt Company $1,374,338 · | ||
| Jun 12, 2020 | 66K44 | KankakeeDistrict 3 | This contract is for 2 permanent crossovers in Kankakee. The North crossover is located approximately 1500' N of SN 046-0010/11 over Grinnell Rd, the South crossover is located 2300' S of SN 046-0008/0009 over railroad tracks. | — | Executed | Kankakee Valley Construction Company, Inc. $1,630,706 · | ||
| Jun 12, 2020 | 66K52 | LivingstonDistrict 3 | Milling and resurfacing 2.75- HMA from the mainline as part of the 3P standard overlay. Areas on Culverts SN 053-2003 and SN 053-2029 will have additional HMA lifts so the new HMA overlay equals 2.75-. In addition, the project includes guardrail upgrades, grading and shaping ditches, and ADA improvements in Forrest. | — | Executed | Iroquois Paving Corporation $2,599,878 · | ||
| Jun 12, 2020 | 66K53 | KankakeeDistrict 3 | 1.91 miles of 3P milling and resurfacing on FAU 6194 (IL 113) from Indian Trail to IL 17 in Kankakee. | — | Executed | Gallagher Asphalt Corporation $1,679,008 · | ||
| Jun 12, 2020 | 66K59 | BureauDistrict 3 | 8.532 miles of milling and resurfacing 3-3/4" of mainline from the eastern city limit of Dover to IL 89 in Lamoille. This project includes pavement markings. | — | Executed | Advanced Asphalt Company $3,113,802 · | ||
| Jun 12, 2020 | 66K79 | LivingstonDistrict 3 | Bridge expansion joint removal and replacement, bridge approach shoulder removal and replacement, deck slab repairs, guardrail and terminal sections sections removal and replacement, pavement striping removal and replacement, traffic control, and other related construction items on SN 053-0158 carrying FAP 649 (IL 17) over the west fork of the Mazon River 1.33 miles west of I-55 near Dwight. | — | Executed | P. T. Ferro Construction Co. $249,319 · | ||
| Jun 12, 2020 | 66K89 | GrundyLaSalleDistrict 3 | Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles). | — | Executed | ERA-Valdivia Contractors, Inc. $407,093 · | ||
| Jun 12, 2020 | 66K90 | IroquoisDistrict 3 | Class A pavement patching and pavement marking on I-57 from the Ford/Iroquois county line to the Iroquois/Kankakee county line. | — | Executed | G. M. Sipes Construction, Inc. $396,436 · | ||
| Jun 12, 2020 | 66K91 | FordDistrict 3 | Class A pavement patching and pavement marking on I-57 from the Champaign/Ford county line to the Ford/Iroquois county line. | — | Executed | Lion Construction 1, LLC $88,128 · | ||
| Jun 12, 2020 | 66K97 | LaSalleDistrict 3 | Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). , Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). | — | Executed | G. M. Sipes Construction, Inc. $1,483,376 · | ||
| Jun 12, 2020 | 68894 | TazewellDistrict 4 | Replacement of SN 090-0091 carrying Pinecrest Dr over I-74, 2 miles E of the IL 8 interchange. | — | Executed | Otto Baum Company, Inc. $9,626,406 · | ||
| Jun 12, 2020 | 68A83 | PeoriaDistrict 4 | Resurfacing on I-74 from E of Il 78 to W of Kickapoo/Edwards Rd including joint replacement and slope wall repair to SN-s 072-0077 and 072-0078 over Schlink Rd and joint replacement to SN-s 072-0078 and 072-0080 on I-74 over Kickapoo Creek. | — | Executed | Advanced Asphalt Company $16,030,666 · | ||
| Jun 12, 2020 | 68F24 | WoodfordDistrict 4 | 9 miles of surface maintenance on IL 26 from the Marshall County line to the north city limits of Spring Bay (Zimmerman Rd). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,995,170 · | ||
| Jun 12, 2020 | 68F40 | VariousDistrict 4 | Replace river clearance gauge signage on the Illinois River Bridges in District 4. SN-s 062-0003, 090-0001, 090-0122, 090-0108, and 090-0109. | — | Executed | Western Remac, Inc. $217,000 · | ||
| Jun 12, 2020 | 68F52 | MarshallWoodfordDistrict 4 | 10 miles of pavement patching on I-39 from N of IL 116 to S of IL 17.. | — | Executed | Kinney Contractors, Inc. $434,438 · | ||
| Jun 12, 2020 | 68F53 | KnoxDistrict 4 | Beam straightening and strengthening on SN 048-0022 carrying US 34/IL 110 over US 150. | — | Executed | Halverson Construction Co., Inc. $49,336 · | ||
| Jun 12, 2020 | 68F55 | HenryDistrict 4 | Culvert repair to SN 037-2010 on I-74/IL 110, 0.1 mile N of the Knox County line. | — | Executed | Phoenix Corporation of the Quad Cities $79,729 · | ||
| Jun 12, 2020 | 68F58 | PeoriaDistrict 4 | 2.42 miles of longitudinal joint repair and pavement marking maintenance along US 150 (War Memorial Dr) from N Frostwood Pkwy to W Northbound Ave. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $591,671 · | ||
| Jun 12, 2020 | 68F59 | HendersonDistrict 4 | Placement of riprap and grout around piers of SN 036-0037 carrying IL 164 over Henderson Creek 1.5 miles E of Oquawka. | — | Executed | Brandt Construction Co. $108,000 · | ||
| Jun 12, 2020 | 68F60 | HendersonDistrict 4 | Repair to North abutment with structural fa«ade to SN 036-0010 over Honey Creek, 1.5 miles S of Stronghurst. | — | Executed | Brandt Construction Co. $100,853 · | ||
| Jun 12, 2020 | 68F62 | PeoriaDistrict 4 | Shoulder repair along IL 6 from the IL 29 interchange to E of IL 40 (Knoxville Ave) in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $629,048 · | ||
| Jun 12, 2020 | 70710 | DouglasDistrict 5 | 2.011 miles of standard resurfacing/ADA improvements on ILL 133 from US 45 in Arcola to 0.5 miles E of I-57 and US 45 from ILL 133 to Madison St. | — | Executed | Ne-Co Asphalt Co., Inc. $1,915,428 · | ||
| Jun 12, 2020 | 70C25 | ChampaignPiattDistrict 5 | 11.033 miles of resurfacing of I-72 from White Heath Rd NE of White Heath to I-57 W of Champaign. Work includes Fiber-Mod Asphalt Crack Sealing and Micro-Surfacing 2 Pass in Piatt County and IL 10 ramps, HMA surface removal 2" and 2" Polymer HMA resurfacing in Champaign County and IL 47 ramps. | — | Executed | Open Road Paving Company LLC $8,357,789 · | ||
| Jun 12, 2020 | 70D74 | DouglasEdgarDistrict 5 | 10.387 miles of resurfacing (3P policy standard overlay), new shoulders, milled rumble overlay, and culvert replacement from Vermilion/Edgar Co. line to 1800th Rd N of Brocton. | — | Executed | Open Road Paving Company LLC $7,391,354 · | ||
| Jun 12, 2020 | 70D82 | VermilionDistrict 5 | 2.887 miles 3P Designed Overlay: 3- Cold Central Plant Recycle (CCPR) mixture, 1.5- HMA surface course, and Aggregate Type B from ECL of Indianola to Georgetown/Indianola Rd. | — | Executed | Cross Construction, Inc. $1,694,875 · | ||
| Jun 12, 2020 | 70E16 | McLeanDistrict 5 | 2.989 miles of Standard overlay on Old Rte 66 from Shirley to I-74. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,476,692 · | ||
| Jun 12, 2020 | 70E31 | McLeanDistrict 5 | Resurfacing (SMART) 0.3 mile W of I-55 to Old Route 66 W of Chenoa. | — | Executed | Rowe Construction, a div of UCM, Inc. $96,406 · | ||
| Jun 12, 2020 | 70E39 | ChampaignVermilionDistrict 5 | 0.226 mile of patching on I-74 at US 150, and 9.015 miles of patching on I-57 from MM 244 to Ford County line. | — | Executed | Beniach Construction Co., Inc. $244,755 · | ||
| Jun 12, 2020 | 70E45 | McLeanDistrict 5 | 0.833 mile of patching at Carlock Weigh Station. | — | Executed | Beniach Construction Co., Inc. $135,953 · | ||
| Jun 12, 2020 | 70E69 | ChampaignDistrict 5 | 2020 National Highway Preservation Project to install new traffic signals at the I-57 NB and SB ramps with FAP 807 (Curtis Rd). | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $448,301 · | ||
| Jun 12, 2020 | 70E71 | ChampaignDeWittDouglasDistrict 5 | 13.8 miles of Pollinator Habitat signs along US 45 from Douglas/Coles County line to Windsor Rd in Champaign. Tree removal, weed control, and seeding are included. | — | Executed | CSD Environmental Services, Inc. $405,276 · | ||
| Jun 12, 2020 | 72L56 | PikeDistrict 6 | Painting SN 075-0036 carrying IL 96 over Hadley Creek, 0.5 miles south of Kinderhook. | — | Executed | ERA-Valdivia Contractors, Inc. $129,250 · | ||
| Jun 12, 2020 | 72L57 | SchuylerDistrict 6 | Painting SN 085-0001 carrying US 67 over Crane Creek, 2.5 miles southeast of Rushville. | — | Executed | ERA-Valdivia Contractors, Inc. $128,505 · | ||
| Jun 12, 2020 | 72L74 | LoganDistrict 6 | Deck patching on SN 054-0105 carrying IL 10 over the Kickapoo Creek Overflow, 0.5 miles west of I-55. | — | Executed | Freesen, a div of UCM, Inc. $105,857 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.