2019-198-RS&SW
- Let date
- Friday, June 12, 2020
- Contract
- 62K71 · job page
- District
- District 1
- County
- Kane
- Highway
- Limits
- 5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin. , 5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs West Rd to Strom Dr in the City of Elgin.
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Plote Construction, Inc. Low bidder | $4,041,087 | ||
| 2 | R. W. Dunteman Company | $4,173,976 | +3.3% | |
| 3 | Arrow Road Construction Co. | $4,285,231 | +6.0% | |
| 4 | Curran Contracting Company | $4,411,178 | +9.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Plote Construct… | #2 R. W. Dunteman … | #3 Arrow Road Cons… | #4 Curran Contract… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0320015 | MAINT TRAFF ILL TLWY | 1 | L SUM | $5,000.00 | $1,000.00 | $25,000.00 | $5,000.00 | |
| 2 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $10,000.00 | $8,100.00 | $8,100.00 | $16,000.00 | |
| 3 | X0323160 | VIDEO INSP OF SS | 200 | FOOT | $23.25 | $25.00 | $25.00 | $25.00 | |
| 4 | X0324599 | ROD AND CLEAN EX COND | 167 | FOOT | $1.00 | $2.82 | $1.00 | $1.00 | |
| 5 | X0327979 | PAVMT MRKG REM GRIND | 870 | SQ FT | $1.00 | $1.25 | $1.25 | $1.25 | |
| 6 | X0327980 | PAVMT MRKG REM WTR BL | 150 | SQ FT | $8.00 | $30.00 | $10.00 | $10.00 | |
| 7 | X0900027 | PROT SHLD PERM REM | 675 | SQ FT | $1.00 | $5.00 | $1.00 | $1.00 | |
| 8 | X2010350 | TREE REMOV ACRES SPL | 4.182 | ACRE | $7,500.00 | $5,800.00 | $7,500.00 | $7,500.00 | |
| 9 | X2700003 | GRV RCSD PVT MRKG 8 | 4,042 | FOOT | $1.89 | $1.89 | $1.89 | $1.90 | |
| 10 | X5537800 | SS CLEANED 12 | 150 | FOOT | $5.00 | $5.00 | $15.00 | $5.00 | |
| 11 | X5538000 | SS CLEANED 18 | 100 | FOOT | $7.75 | $7.75 | $15.00 | $7.75 | |
| 12 | X6030310 | FR & LIDS ADJUST SPL | 15 | EACH | $850.00 | $850.00 | $1,200.00 | $850.00 | |
| 13 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $165,000.00 | $53,526.49 | $56,500.00 | $175,000.00 | |
| 14 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $14,000.00 | $1,000.00 | $15,000.00 | $12,000.00 | |
| 15 | X7030005 | TEMP PAVT MKING REMOV | 767 | SQ FT | $0.7500 | $0.9500 | $0.0100 | $1.00 | |
| 16 | X8100105 | CONDUIT SPLICE | 2 | EACH | $241.60 | $362.06 | $241.60 | $242.00 | |
| 17 | Z0001800 | APPROACH SL REP (PD) | 17.7 | SQ YD | $2,500.00 | $1,950.00 | $1,500.00 | $2,500.00 | |
| 18 | Z0004562 | COMB C C&G REM & REPL | 8,766 | FOOT | $36.00 | $32.45 | $34.00 | $50.50 | |
| 19 | Z0016002 | DECK SLAB REP (FD-T2) | 2.8 | SQ YD | $5,500.00 | $4,000.00 | $5,400.00 | $5,500.00 | |
| 20 | Z0016200 | DECK SLAB REP (PART) | 4.3 | SQ YD | $3,000.00 | $1,950.00 | $2,800.00 | $3,000.00 | |
| 21 | Z0018500 | DRAINAGE STR CLEANED | 50 | EACH | $405.00 | $405.00 | $500.00 | $405.00 | |
| 22 | Z0030850 | TEMP INFO SIGNING | 208 | SQ FT | $16.00 | $15.00 | $12.00 | $12.00 | |
| 23 | Z0033700 | LONG JOINT SEALANT | 70,570 | FOOT | $1.90 | $2.19 | $2.17 | $2.05 | |
| 24 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $8,000.00 | $5,000.00 | $4,200.00 | $5,500.00 | |
| 25 | Z0064800 | SELECTIVE CLEARING | 12 | UNIT | $300.00 | $220.00 | $300.00 | $300.00 | |
| 26 | Z0073510 | TEMP TR SIGNAL TIMING | 2 | EACH | $297.00 | $271.76 | $297.00 | $300.00 | |
| 27 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 28 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 29 | 20100110 | TREE REMOV 6-15 | 100 | UNIT | $29.00 | $16.00 | $29.00 | $29.00 | |
| 30 | 20100210 | TREE REMOV OVER 15 | 85 | UNIT | $39.00 | $19.00 | $39.00 | $39.00 | |
| 31 | 20101300 | TREE PRUN 1-10 | 8 | EACH | $30.00 | $50.00 | $30.00 | $30.00 | |
| 32 | 20101350 | TREE PRUN OVER 10 | 32 | EACH | $120.00 | $80.00 | $120.00 | $120.00 | |
| 33 | 20200100 | EARTH EXCAVATION | 122 | CU YD | $75.00 | $67.45 | $45.00 | $160.00 | |
| 34 | 21101615 | TOPSOIL F & P 4 | 597 | SQ YD | $7.00 | $18.16 | $5.50 | $5.50 | |
| 35 | 25000400 | NITROGEN FERT NUTR | 5 | POUND | $3.00 | $32.50 | $5.00 | $5.00 | |
| 36 | 25000500 | PHOSPHORUS FERT NUTR | 5 | POUND | $3.00 | $32.50 | $5.00 | $5.00 | |
| 37 | 25000600 | POTASSIUM FERT NUTR | 5 | POUND | $3.00 | $32.50 | $5.00 | $5.00 | |
| 38 | 25003210 | INTERSEED CL 2A | 4.2 | ACRE | $2,210.00 | $2,940.00 | $2,000.00 | $2,000.00 | |
| 39 | 25200110 | SODDING SALT TOLERANT | 597 | SQ YD | $16.75 | $31.60 | $7.50 | $7.50 | |
| 40 | 30300112 | AGG SUBGRADE IMPR 12 | 216 | SQ YD | $40.00 | $25.67 | $29.80 | $28.00 | |
| 41 | 35600716 | HMA BC WID 10 | 216 | SQ YD | $75.00 | $49.81 | $65.55 | $68.00 | |
| 42 | 40600290 | BIT MATLS TACK CT | 83,111 | POUND | $0.0100 | $0.6000 | $0.0100 | $0.8500 | |
| 43 | 40600400 | MIX CR JTS FLANGEWYS | 183 | TON | $45.00 | $579.02 | $100.00 | $200.00 | |
| 44 | 40600982 | HMA SURF REM BUTT JT | 1,761 | SQ YD | $5.00 | $13.92 | $0.5000 | $15.00 | |
| 45 | 40603200 | P HMA BC IL-4.75 N50 | 5,014 | TON | $81.00 | $87.35 | $50.00 | $83.00 | |
| 46 | 40605026 | P HMA SC SMA 9.5 F N80 | 11,912 | TON | $86.00 | $103.28 | $50.00 | $85.00 | |
| 47 | 42001300 | PROTECTIVE COAT | 980 | SQ YD | $2.00 | $0.7000 | $2.00 | $0.1000 | |
| 48 | 42400200 | PC CONC SIDEWALK 5 | 6,846 | SQ FT | $9.00 | $6.00 | $8.00 | $8.00 | |
| 49 | 42400800 | DETECTABLE WARNINGS | 600 | SQ FT | $32.00 | $25.00 | $28.00 | $32.00 | |
| 50 | 44000159 | HMA SURF REM 2 1/2 | 121,366 | SQ YD | $3.75 | $3.55 | $9.45 | $4.00 | |
| 51 | 44000600 | SIDEWALK REM | 6,705 | SQ FT | $2.50 | $1.68 | $2.00 | $4.00 | |
| 52 | 44003100 | MEDIAN REMOVAL | 4,110 | SQ FT | $6.00 | $2.48 | $3.65 | $6.05 | |
| 53 | 44200050 | WELDED WIRE REINF | 20 | SQ YD | $32.00 | $15.00 | $16.00 | $37.00 | |
| 54 | 44200970 | CL B PATCH T2 10 | 110 | SQ YD | $100.00 | $111.00 | $175.00 | $177.00 | |
| 55 | 44200974 | CL B PATCH T3 10 | 200 | SQ YD | $100.00 | $110.00 | $168.00 | $177.00 | |
| 56 | 44200976 | CL B PATCH T4 10 | 120 | SQ YD | $100.00 | $109.00 | $168.00 | $177.00 | |
| 57 | 44201299 | DOWEL BARS 1 1/2 | 400 | EACH | $15.00 | $16.00 | $11.00 | $31.00 | |
| 58 | 44201815 | CL D PATCH T2 14 | 516 | SQ YD | $175.00 | $99.06 | $138.00 | $160.00 | |
| 59 | 44201819 | CL D PATCH T3 14 | 96 | SQ YD | $170.00 | $87.87 | $131.00 | $145.00 | |
| 60 | 44201821 | CL D PATCH T4 14 | 167 | SQ YD | $165.00 | $78.89 | $118.00 | $140.00 | |
| 61 | 44213200 | SAW CUTS | 1,200 | FOOT | $4.00 | $2.50 | $6.00 | $6.00 | |
| 62 | 44213204 | TIE BARS 3/4 | 30 | EACH | $7.00 | $11.00 | $8.00 | $28.00 | |
| 63 | 45100100 | CRACK ROUTING (PAVT) | 9,046 | FOOT | $0.0500 | $1.45 | $0.0500 | $0.7000 | |
| 64 | 45100200 | CRACK FILLING | 2,380 | POUND | $3.10 | $1.45 | $3.10 | $9.10 | |
| 65 | 50157300 | PROTECTIVE SHIELD | 55 | SQ YD | $900.00 | $85.00 | $585.00 | $900.00 | |
| 66 | 59300100 | CONTR LOW-STRENG MATL | 6.5 | CU YD | $525.00 | $525.00 | $290.00 | $525.00 | |
| 67 | 60221100 | MAN TA 5 DIA T1F CL | 1 | EACH | $23,585.00 | $23,585.00 | $28,100.00 | $24,000.00 | |
| 68 | 60250200 | CB ADJUST | 41 | EACH | $400.00 | $400.00 | $390.00 | $435.00 | |
| 69 | 60252800 | CB RECONST | 3 | EACH | $1,250.00 | $1,250.00 | $1,100.00 | $1,350.00 | |
| 70 | 60255500 | MAN ADJUST | 10 | EACH | $495.00 | $495.00 | $500.00 | $535.00 | |
| 71 | 60255800 | MAN ADJ NEW T1F CL | 2 | EACH | $1,000.00 | $1,000.00 | $850.00 | $1,075.00 | |
| 72 | 60266600 | VALVE BOX ADJ | 2 | EACH | $395.00 | $395.00 | $250.00 | $425.00 | |
| 73 | 60300105 | FR & GRATES ADJUST | 16 | EACH | $400.00 | $400.00 | $390.00 | $435.00 | |
| 74 | 60300305 | FR & LIDS ADJUST | 10 | EACH | $525.00 | $525.00 | $450.00 | $575.00 | |
| 75 | 60500105 | FILL MANHOLES | 1 | EACH | $685.00 | $685.00 | $400.00 | $700.00 | |
| 76 | 60618740 | CONC MED TM2.12 | 1,200 | SQ FT | $26.00 | $14.95 | $22.00 | $20.00 | |
| 77 | 60619200 | CONC MED TSB6.06 | 970 | SQ FT | $28.00 | $15.25 | $22.00 | $15.00 | |
| 78 | 66900200 | NON SPL WASTE DISPOSL | 122 | CU YD | $100.00 | $96.21 | $140.00 | $54.00 | |
| 79 | 66900530 | SOIL DISPOSAL ANALY | 7 | EACH | $800.00 | $1,400.00 | $1,300.00 | $1,300.00 | |
| 80 | 66901001 | REG SUB P-CONST PLAN | 1 | LSUM | $2,000.00 | $2,900.00 | $4,900.00 | $3,000.00 | |
| 81 | 66901003 | REG SUB F CON REPORT | 1 | LSUM | $3,500.00 | $2,500.00 | $1,700.00 | $2,500.00 | |
| 82 | 66901006 | REG SUB MON | 24 | CAL DA | $850.00 | $900.00 | $600.00 | $810.00 | |
| 83 | 67000400 | ENGR FIELD OFFICE A | 18 | CAL MO | $3,300.00 | $3,100.00 | $2,500.00 | $2,400.00 | |
| 84 | 67100100 | MOBILIZATION | 1 | L SUM | $244,000.00 | $248,831.21 | $300,000.00 | $280,000.00 | |
| 85 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $500.00 | $26,915.00 | $308,000.00 | $1,000.00 | |
| 86 | 70106800 | CHANGEABLE MESSAGE SN | 30 | CAL MO | $60.00 | $32.00 | $30.00 | $30.00 | |
| 87 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $3,000.00 | $5,500.00 | $10,000.00 | $1,800.00 | |
| 88 | 70300100 | SHORT TERM PAVT MKING | 34,269 | FOOT | $1.00 | $1.00 | $0.0100 | $0.5000 | |
| 89 | 70300150 | SHRT TRM PAVT MK REM | 11,423 | SQ FT | $0.0100 | $1.46 | $0.0100 | $0.5000 | |
| 90 | 70300210 | TEMP PVT MK LTR & SYM | 821 | SQ FT | $0.0100 | $1.50 | $0.0100 | $1.00 | |
| 91 | 70300220 | TEMP PVT MK LINE 4 | 72,997 | FOOT | $0.0100 | $0.2200 | $0.0100 | $0.2200 | |
| 92 | 70300240 | TEMP PVT MK LINE 6 | 11,028 | FOOT | $0.0100 | $0.5000 | $0.0100 | $0.2600 | |
| 93 | 70300250 | TEMP PVT MK LINE 8 | 4,677 | FOOT | $0.0100 | $0.6500 | $0.0100 | $0.4500 | |
| 94 | 70300260 | TEMP PVT MK LINE 12 | 2,640 | FOOT | $0.0100 | $0.8000 | $0.0100 | $0.7500 | |
| 95 | 70300280 | TEMP PVT MK LINE 24 | 1,023 | FOOT | $0.0100 | $1.50 | $0.0100 | $1.00 | |
| 96 | 70300510 | PAVT MARK TAPE T3 L&S | 943 | SQ FT | $3.50 | $2.20 | $3.00 | $3.00 | |
| 97 | 70300520 | PAVT MARK TAPE T3 4 | 600 | FOOT | $1.05 | $1.10 | $0.9000 | $0.9000 | |
| 98 | 70300540 | PAVT MARK TAPE T3 6 | 1,134 | FOOT | $1.29 | $1.50 | $1.00 | $1.00 | |
| 99 | 70400100 | TEMP CONC BARRIER | 300 | FOOT | $50.00 | $28.66 | $18.00 | $80.00 | |
| 100 | 70400200 | REL TEMP CONC BARRIER | 300 | FOOT | $15.00 | $9.41 | $10.00 | $25.00 | |
| 101 | 70600255 | IMP ATTN TEMP FRN TL2 | 4 | EACH | $4,500.00 | $4,440.00 | $2,900.00 | $3,000.00 | |
| 102 | 70600322 | IMP ATTN REL FRN TL2 | 4 | EACH | $2,000.00 | $1,929.00 | $500.00 | $500.00 | |
| 103 | 78000100 | THPL PVT MK LTR & SYM | 821 | SQ FT | $3.75 | $3.75 | $3.75 | $3.75 | |
| 104 | 78000200 | THPL PVT MK LINE 4 | 124,598 | FOOT | $0.5000 | $0.5000 | $0.5000 | $0.5000 | |
| 105 | 78000400 | THPL PVT MK LINE 6 | 11,028 | FOOT | $0.7000 | $0.7000 | $0.7000 | $0.7000 | |
| 106 | 78000500 | THPL PVT MK LINE 8 | 4,677 | FOOT | $1.00 | $1.00 | $1.00 | $1.00 | |
| 107 | 78000600 | THPL PVT MK LINE 12 | 2,640 | FOOT | $1.40 | $1.40 | $1.40 | $1.40 | |
| 108 | 78000650 | THPL PVT MK LINE 24 | 1,023 | FOOT | $3.75 | $3.75 | $3.75 | $3.75 | |
| 109 | 78009000 | MOD URETH PM LTR-SYM | 565 | SQ FT | $4.00 | $4.00 | $4.00 | $4.00 | |
| 110 | 78009004 | MOD URETH PM LINE 4 | 18,645 | FOOT | $0.5000 | $0.5000 | $0.5000 | $0.5000 | |
| 111 | 78009006 | MOD URETH PM LINE 6 | 2,757 | FOOT | $0.7500 | $0.7500 | $0.7500 | $0.7500 | |
| 112 | 78009008 | MOD URETH PM LINE 8 | 158 | FOOT | $1.00 | $1.00 | $1.00 | $1.00 | |
| 113 | 78009012 | MOD URETH PM LINE 12 | 20 | FOOT | $1.50 | $1.50 | $1.50 | $1.50 | |
| 114 | 78100100 | RAISED REFL PAVT MKR | 2,551 | EACH | $22.00 | $22.00 | $22.00 | $22.00 | |
| 115 | 78200011 | BARR WALL REF TYPE C | 8 | EACH | $25.00 | $25.00 | $10.00 | $10.00 | |
| 116 | 78300200 | RAISED REF PVT MK REM | 1,276 | EACH | $5.00 | $9.54 | $3.60 | $12.50 | |
| 117 | 81028200 | UNDRGRD C GALVS 2 | 56 | FOOT | $37.40 | $47.89 | $37.40 | $37.50 | |
| 118 | 81400200 | HD HANDHOLE | 4 | EACH | $2,680.00 | $3,234.58 | $2,680.10 | $3,000.00 | |
| 119 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $1,661.50 | $1,406.02 | $1,661.50 | $2,000.00 | |
| 120 | 87301305 | ELCBL C LEAD 14 1PR | 877 | FOOT | $2.00 | $3.75 | $2.00 | $2.00 | |
| 121 | 87900200 | DRILL EX HANDHOLE | 1 | EACH | $362.20 | $399.88 | $362.20 | $400.00 | |
| 122 | 88600100 | DET LOOP T1 | 862 | FOOT | $17.20 | $22.80 | $17.20 | $17.25 | |
| 123 | 88600600 | DET LOOP REPL | 4,760 | FOOT | $17.20 | $18.78 | $17.20 | $17.25 | |
| 124 | 89500400 | RELOC EX PED PUSH-BUT | 13 | EACH | $402.90 | $221.01 | $402.90 | $450.00 | |
| 125 | 89502300 | REM ELCBL FR CON | 877 | FOOT | $0.6000 | $0.3600 | $0.6000 | $0.6000 | |
| 126 | 89502376 | REBUILD EX HANDHOLE | 14 | EACH | $2,101.90 | $1,501.83 | $2,101.90 | $2,400.00 | |
| 127 | 89502380 | REMOV EX HANDHOLE | 4 | EACH | $356.00 | $563.24 | $356.00 | $400.00 |