2017-024I
- Let date
- Friday, June 12, 2020
- Contract
- 62F20 · job page
- District
- District 1
- County
- Cook, Dupage
- Highway
- Limits
- (18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | K-Five Construction Corp & Quality Seal & Saw, Inc & Midwest Fence Corp Tri-Venture Low bidder | $1,074,369 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 K-Five Construc… |
|---|---|---|---|---|---|---|
| 1 | X0325134 | WIRELESS INTERCON COM | 1 | EACH | $26,892.00 | |
| 2 | X0327980 | PAVMT MRKG REM WTR BL | 7,438 | SQ FT | $1.15 | |
| 3 | X6330900 | VERT ADJ OF GUARDRAIL | 1,350 | FOOT | $18.00 | |
| 4 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $21,500.00 | |
| 5 | X7030005 | TEMP PAVT MKING REMOV | 7,438 | SQ FT | $0.3500 | |
| 6 | Z0030850 | TEMP INFO SIGNING | 154.2 | SQ FT | $15.00 | |
| 7 | Z0033046 | RE-OPTIMIZE SIG SYS 2 | 1 | EACH | $1,050.00 | |
| 8 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | |
| 9 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | |
| 10 | 20200100 | EARTH EXCAVATION | 119 | CU YD | $85.89 | |
| 11 | 48101202 | AGGREGATE SHLDS B | 119 | CU YD | $107.52 | |
| 12 | 63000001 | SPBGR TY A 6FT POSTS | 600 | FOOT | $40.00 | |
| 13 | 63100045 | TRAF BAR TERM T2 | 5 | EACH | $1,500.00 | |
| 14 | 63100085 | TRAF BAR TERM T6 | 6 | EACH | $4,000.00 | |
| 15 | 63100089 | TRAF BAR TERM T6B | 9 | EACH | $4,400.00 | |
| 16 | 63100105 | TRAF BAR TERM T10 | 3 | EACH | $600.00 | |
| 17 | 63100167 | TR BAR TRM T1 SPL TAN | 41 | EACH | $4,500.00 | |
| 18 | 63200310 | GUARDRAIL REMOV | 2,400 | FOOT | $10.00 | |
| 19 | 63500105 | DELINEATORS | 1,078 | EACH | $76.00 | |
| 20 | 64200116 | SHOULDER RUM STRIP 16 | 26,760 | FOOT | $0.7800 | |
| 21 | 66900200 | NON SPL WASTE DISPOSL | 119 | CU YD | $75.00 | |
| 22 | 66900530 | SOIL DISPOSAL ANALY | 5 | EACH | $750.00 | |
| 23 | 66901001 | REG SUB P-CONST PLAN | 1 | LSUM | $3,000.00 | |
| 24 | 66901003 | REG SUB F CON REPORT | 1 | LSUM | $2,000.00 | |
| 25 | 66901006 | REG SUB MON | 5 | CAL DA | $870.00 | |
| 26 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $3,300.00 | |
| 27 | 67100100 | MOBILIZATION | 1 | L SUM | $64,406.00 | |
| 28 | 70100310 | TRAF CONT-PROT 701421 | 1 | L SUM | $198,500.00 | |
| 29 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $1.00 | |
| 30 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $20,000.00 | |
| 31 | 70107025 | CHANGEABLE MESSAGE SN | 150 | CAL DA | $30.00 | |
| 32 | 70300100 | SHORT TERM PAVT MKING | 7,500 | FOOT | $2.00 | |
| 33 | 70300150 | SHRT TRM PAVT MK REM | 2,500 | SQ FT | $5.00 | |
| 34 | 70300904 | PAVT MARK TAPE T4 4 | 15,050 | FOOT | $1.00 | |
| 35 | 72501000 | TERMINAL MARKER - DA | 37 | EACH | $40.00 | |
| 36 | 78000200 | THPL PVT MK LINE 4 | 7,190 | FOOT | $0.9400 | |
| 37 | 78000300 | THPL PVT MK LINE 5 | 1,340 | FOOT | $1.18 | |
| 38 | 78000500 | THPL PVT MK LINE 8 | 3,520 | FOOT | $1.94 | |
| 39 | 78000600 | THPL PVT MK LINE 12 | 1,120 | FOOT | $2.91 | |
| 40 | 78008310 | POLYUREA PM T2 LN 4 | 870 | FOOT | $2.34 | |
| 41 | 78008320 | POLYUREA PM T2 LN 5 | 240 | FOOT | $1.18 | |
| 42 | 78008340 | POLYUREA PM T2 LN 8 | 430 | FOOT | $1.94 | |
| 43 | 78008350 | POLYUREA PM T2 LN 12 | 340 | FOOT | $5.91 | |
| 44 | 78100100 | RAISED REFL PAVT MKR | 187 | EACH | $49.25 | |
| 45 | 78200006 | GRDRAIL REF TYPE B | 112 | EACH | $10.00 | |
| 46 | 78300200 | RAISED REF PVT MK REM | 187 | EACH | $25.33 | |
| 47 | 85000200 | MAIN EX TR SIG INSTAL | 25 | EACH | $154.00 | |
| 48 | 88200510 | TS BACKPLATE RET-REFL | 223 | EACH | $489.56 | |
| 49 | 89502375 | REMOV EX TS EQUIP | 25 | EACH | $924.00 |