19-00050-00-BT
- Let date
- Friday, June 12, 2020
- Contract
- 61G55 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- Construction of a multi-use path, pedestrian bridge and boardwalk adjacent to Hager Road from west of Salt Creek to Yorkshire Road in Oak Brook.
Bidders 9
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | — | | |
| 1 |
P. T. Ferro Construction Co. Low bidder |
$1,692,755 |
|
|
| 2 |
Martam Construction Incorporated |
$1,694,075 |
|
+0.1% |
| 3 |
D. Construction, Inc. |
$1,695,260 |
|
+0.1% |
| 4 |
Alliance Contractors, Inc. |
$1,794,880 |
|
+6.0% |
| 5 |
Rausch Infrastructure, LLC |
$1,847,552 |
|
+9.1% |
| 6 |
MYS, Incorporated |
$1,890,281 |
|
+11.7% |
| 7 |
Herlihy Mid-Continent Company |
$2,143,543 |
|
+26.6% |
| 8 |
Copenhaver Construction, Inc. |
$2,172,736 |
|
+28.4% |
| 9 |
ICC Group Inc. |
$2,391,600 |
|
+41.3% |
Bid tab: unit prices 83 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 P. T. Ferro Con… | #2 Martam Construc… | #3 D. Construction… | #4 Alliance Contra… | #5 Rausch Infrastr… | #6 MYS, Incorporat… | #7 Herlihy Mid-Con… | #8 Copenhaver Cons… |
| 1 | A2007820 |
T-TILIA AMER 2-1/2 | 3 | EACH |
|
$450.00 |
$492.96 |
$550.00 |
$500.00 |
$587.00 |
$575.00 |
$474.00 |
$980.00 |
| 2 | A2008470 |
T-ULMUS AMER PRNC 2.5 | 2 | EACH |
|
$450.00 |
$534.56 |
$550.00 |
$500.00 |
$587.00 |
$575.00 |
$514.00 |
$980.00 |
| 3 | C2C020G3 |
S-CORNUS STOLO CG 3G | 10 | EACH |
|
$85.00 |
$81.12 |
$99.00 |
$90.00 |
$105.00 |
$100.00 |
$78.00 |
$120.00 |
| 4 | C2C100G5 |
S-VIBURN LENTAG CG 5G | 9 | EACH |
|
$90.00 |
$111.28 |
$71.50 |
$65.00 |
$76.00 |
$72.00 |
$107.00 |
$210.00 |
| 5 | XX007762 |
SHUT DOWN CONNECTION | 2 | EACH |
|
$2,000.00 |
$2,071.05 |
$2,500.00 |
$5,000.00 |
$3,384.00 |
$4,750.00 |
$5,000.00 |
$5,000.00 |
| 6 | XX008287 |
BOARDWALK STRUCTURE | 5,785 | SQ FT |
|
$150.00 |
$115.00 |
$142.00 |
$150.00 |
$140.00 |
$136.50 |
$179.00 |
$178.00 |
| 7 | X0100003 |
CLEARING & GRUBBING | 1,572 | SQ YD |
|
$2.78 |
$3.64 |
$3.07 |
$2.78 |
$3.27 |
$9.00 |
$2.10 |
$5.00 |
| 8 | X0322508 |
PED TRUSS SUPERSTR | 2,090 | SQ FT |
|
$130.00 |
$150.26 |
$160.15 |
$125.00 |
$123.00 |
$142.00 |
$194.25 |
$184.00 |
| 9 | X1200136 |
WATER MAIN INSULATION | 170 | FOOT |
|
$80.00 |
$82.00 |
$0.0100 |
$135.00 |
$69.00 |
$95.00 |
$135.00 |
$15.00 |
| 10 | X2200004 |
CH LNK FNCE, 6' SP | 671 | FOOT |
|
$22.37 |
$33.28 |
$26.19 |
$23.81 |
$27.00 |
$27.00 |
$23.81 |
$27.00 |
| 11 | X2800500 |
INLET PROTECTION SPL | 4 | EACH |
|
$150.00 |
$65.52 |
$550.00 |
$25.00 |
$587.00 |
$550.00 |
$63.00 |
$220.00 |
| 12 | X4022000 |
TEMP ACCESS- COM ENT | 2 | EACH |
|
$1.00 |
$1,201.21 |
$1,000.00 |
$1.00 |
$1,175.00 |
$1,500.00 |
$1,800.00 |
$200.00 |
| 13 | X5610900 |
DIWM 8 DIAM REST JT | 170 | FOOT |
|
$190.00 |
$91.74 |
$0.0100 |
$210.00 |
$292.00 |
$175.00 |
$210.00 |
$95.00 |
| 14 | X7010216 |
TRAF CONT & PROT SPL | 1 | L SUM |
|
$5,950.00 |
$57,000.00 |
$26,100.00 |
$6,500.00 |
$6,991.00 |
$10,000.00 |
$5,950.00 |
$90,000.00 |
| 15 | Z0013797 |
STAB CONSTR ENTRANCE | 38 | SQ YD |
|
$50.00 |
$36.64 |
$25.00 |
$10.00 |
$113.00 |
$100.00 |
$150.00 |
$30.00 |
| 16 | Z0013798 |
CONSTRUCTION LAYOUT | 1 | L SUM |
|
$8,000.00 |
$8,320.00 |
$10,000.00 |
$6,450.00 |
$11,750.00 |
$15,000.00 |
$21,000.00 |
$14,000.00 |
| 17 | Z0022800 |
FENCE REMOVAL | 357 | FOOT |
|
$5.00 |
$7.28 |
$5.50 |
$7.21 |
$5.00 |
$8.00 |
$7.21 |
$8.00 |
| 18 | Z0046304 |
P UNDR FOR STRUCT 4 | 230 | FOOT |
|
$25.00 |
$21.39 |
$42.72 |
$5.00 |
$2.35 |
$50.00 |
$30.00 |
$20.00 |
| 19 | Z0056646 |
SS 1 WAT MN 10 | 19 | FOOT |
|
$157.55 |
$127.98 |
$173.26 |
$110.00 |
$185.00 |
$150.00 |
$110.00 |
$130.00 |
| 20 | Z0076600 |
TRAINEES | 500 | HOUR |
|
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
| 21 | Z0076604 |
TRAINEES TPG | 500 | HOUR |
|
$15.00 |
$15.00 |
$15.00 |
$15.00 |
$15.00 |
$15.00 |
$15.00 |
$15.00 |
| 22 | Z0077900 |
WD POST & RAIL FENCE | 170 | FOOT |
|
$44.57 |
$62.40 |
$67.41 |
$61.28 |
$72.00 |
$70.00 |
$61.28 |
$66.00 |
| 23 | 20100110 |
TREE REMOV 6-15 | 53 | UNIT |
|
$40.00 |
$41.60 |
$44.00 |
$40.00 |
$47.00 |
$32.00 |
$16.00 |
$35.00 |
| 24 | 20200100 |
EARTH EXCAVATION | 111 | CU YD |
|
$75.00 |
$42.00 |
$42.50 |
$40.00 |
$85.00 |
$75.00 |
$49.00 |
$35.00 |
| 25 | 20201200 |
REM & DISP UNS MATL | 482 | CU YD |
|
$55.00 |
$48.00 |
$32.50 |
$40.00 |
$66.00 |
$55.00 |
$57.24 |
$35.00 |
| 26 | 20400800 |
FURNISHED EXCAVATION | 167 | CU YD |
|
$0.0100 |
$22.00 |
$30.00 |
$1.00 |
$76.00 |
$75.00 |
$20.00 |
$15.00 |
| 27 | 20800150 |
TRENCH BACKFILL | 305 | CU YD |
|
$44.68 |
$54.00 |
$49.15 |
$50.00 |
$52.00 |
$46.20 |
$50.00 |
$35.00 |
| 28 | 20900110 |
POROUS GRAN BACKFILL | 250 | CU YD |
|
$70.00 |
$54.00 |
$50.00 |
$20.00 |
$50.00 |
$55.00 |
$1.00 |
$40.00 |
| 29 | 21001000 |
GEOTECH FAB F/GR STAB | 100 | SQ YD |
|
$2.00 |
$4.26 |
$3.00 |
$1.00 |
$2.93 |
$5.00 |
$2.50 |
$3.00 |
| 30 | 21101615 |
TOPSOIL F & P 4 | 2,633 | SQ YD |
|
$4.00 |
$9.02 |
$6.60 |
$6.00 |
$7.00 |
$6.75 |
$7.00 |
$8.00 |
| 31 | 21301072 |
EXPLOR TRENCH 72 | 150 | FOOT |
|
$40.00 |
$44.72 |
$55.00 |
$1.00 |
$30.00 |
$38.50 |
$66.28 |
$15.00 |
| 32 | 25000100 |
SEEDING CL 1 | 0.55 | ACRE |
|
$1,400.00 |
$2,494.96 |
$4,400.00 |
$4,000.00 |
$4,700.00 |
$5,000.00 |
$2,399.00 |
$5,500.00 |
| 33 | 25000400 |
NITROGEN FERT NUTR | 50 | POUND |
|
$3.00 |
$2.08 |
$3.30 |
$3.00 |
$3.52 |
$3.50 |
$2.00 |
$3.00 |
| 34 | 25000600 |
POTASSIUM FERT NUTR | 50 | POUND |
|
$3.00 |
$2.08 |
$3.30 |
$3.00 |
$3.52 |
$3.50 |
$2.00 |
$3.00 |
| 35 | 25100630 |
EROSION CONTR BLANKET | 2,633 | SQ YD |
|
$1.40 |
$0.9400 |
$2.20 |
$2.00 |
$2.35 |
$2.30 |
$0.9000 |
$2.40 |
| 36 | 28000250 |
TEMP EROS CONTR SEED | 55 | POUND |
|
$6.00 |
$5.20 |
$1.10 |
$1.00 |
$1.17 |
$1.15 |
$5.00 |
$3.00 |
| 37 | 28000400 |
PERIMETER EROS BAR | 455 | FOOT |
|
$2.50 |
$2.08 |
$3.30 |
$3.00 |
$3.52 |
$3.50 |
$2.00 |
$6.60 |
| 38 | 28000510 |
INLET FILTERS | 2 | EACH |
|
$170.00 |
$157.04 |
$330.00 |
$25.00 |
$352.00 |
$350.00 |
$151.00 |
$50.00 |
| 39 | 28001100 |
TEMP EROS CONTR BLANK | 2,633 | SQ YD |
|
$1.30 |
$0.8300 |
$1.10 |
$1.00 |
$1.17 |
$1.15 |
$0.8000 |
$0.0100 |
| 40 | 30300001 |
AGG SUBGRADE IMPROVE | 80 | CU YD |
|
$50.00 |
$66.21 |
$50.00 |
$40.00 |
$101.00 |
$65.00 |
$55.00 |
$40.00 |
| 41 | 31101200 |
SUB GRAN MAT B 4 | 42 | SQ YD |
|
$8.00 |
$21.45 |
$10.00 |
$4.00 |
$32.00 |
$6.00 |
$15.00 |
$10.00 |
| 42 | 35101800 |
AGG BASE CSE B 6 | 565 | SQ YD |
|
$15.00 |
$15.00 |
$13.00 |
$6.00 |
$13.00 |
$8.00 |
$10.00 |
$12.00 |
| 43 | 40600275 |
BIT MATLS PR CT | 1,339 | POUND |
|
$0.0100 |
$0.0100 |
$0.0100 |
$0.0100 |
$0.0100 |
$2.25 |
$0.0100 |
$0.1000 |
| 44 | 40602978 |
HMA BC IL-9.5 N50 | 50 | TON |
|
$95.00 |
$415.69 |
$100.00 |
$210.00 |
$469.00 |
$170.00 |
$399.70 |
$440.00 |
| 45 | 40604060 |
HMA SC IL-9.5 D N50 | 50 | TON |
|
$100.00 |
$421.93 |
$150.00 |
$215.00 |
$476.00 |
$190.00 |
$405.70 |
$440.00 |
| 46 | 40700100 |
BIT MATLS TACK CT | 134 | POUND |
|
$0.0100 |
$0.0100 |
$0.0100 |
$0.0100 |
$0.0100 |
$2.50 |
$0.0100 |
$0.1000 |
| 47 | 42300400 |
PCC DRIVEWAY PAVT 8 | 164 | SQ YD |
|
$70.00 |
$88.40 |
$65.00 |
$80.00 |
$99.00 |
$75.00 |
$85.00 |
$70.00 |
| 48 | 42400200 |
PC CONC SIDEWALK 5 | 103 | SQ FT |
|
$7.50 |
$15.60 |
$7.00 |
$8.00 |
$17.00 |
$15.00 |
$15.00 |
$10.00 |
| 49 | 42400300 |
PC CONC SIDEWALK 6 | 268 | SQ FT |
|
$9.00 |
$20.80 |
$7.50 |
$14.00 |
$23.00 |
$15.00 |
$20.00 |
$10.00 |
| 50 | 42400800 |
DETECTABLE WARNINGS | 32 | SQ FT |
|
$19.00 |
$41.60 |
$30.00 |
$25.00 |
$47.00 |
$35.00 |
$40.00 |
$30.00 |
| 51 | 44000100 |
PAVEMENT REM | 112 | SQ YD |
|
$18.00 |
$27.30 |
$15.00 |
$30.00 |
$26.00 |
$30.00 |
$20.00 |
$17.00 |
| 52 | 44000200 |
DRIVE PAVEMENT REM | 164 | SQ YD |
|
$18.00 |
$12.00 |
$10.00 |
$30.00 |
$21.00 |
$25.00 |
$18.00 |
$15.00 |
| 53 | 44000300 |
CURB REM | 95 | FOOT |
|
$12.00 |
$10.00 |
$10.00 |
$20.00 |
$10.00 |
$15.00 |
$12.00 |
$10.00 |
| 54 | 44000400 |
GUTTER REM | 90 | FOOT |
|
$12.00 |
$10.00 |
$10.00 |
$20.00 |
$10.00 |
$15.00 |
$23.73 |
$10.00 |
| 55 | 48101498 |
AGGREGATE SHLDS B 4 | 191 | SQ YD |
|
$9.00 |
$10.00 |
$10.00 |
$20.00 |
$11.00 |
$10.00 |
$17.00 |
$15.00 |
| 56 | 50200100 |
STRUCTURE EXCAVATION | 270 | CU YD |
|
$32.00 |
$42.00 |
$30.00 |
$10.00 |
$55.00 |
$75.00 |
$46.00 |
$40.00 |
| 57 | 50300225 |
CONC STRUCT | 29 | CU YD |
|
$925.00 |
$960.00 |
$950.00 |
$1,300.00 |
$1,691.00 |
$1,800.00 |
$1,481.79 |
$1,400.00 |
| 58 | 50800105 |
REINFORCEMENT BARS | 2,390 | POUND |
|
$2.00 |
$1.97 |
$3.00 |
$1.00 |
$2.11 |
$6.00 |
$2.28 |
$2.00 |
| 59 | 50800205 |
REINF BARS, EPOXY CTD | 4,080 | POUND |
|
$2.00 |
$1.97 |
$3.00 |
$1.00 |
$2.35 |
$6.00 |
$2.23 |
$2.00 |
| 60 | 51603000 |
DRILLED SHAFT IN SOIL | 6.2 | CU YD |
|
$1,800.00 |
$1,872.00 |
$1,974.00 |
$4,700.00 |
$2,467.00 |
$4,250.00 |
$2,200.00 |
$1,600.00 |
| 61 | 51604000 |
DRILLED SHAFT IN ROCK | 1.4 | CU YD |
|
$7,000.00 |
$7,280.00 |
$1,974.00 |
$10,000.00 |
$8,577.00 |
$8,000.00 |
$490.00 |
$6,000.00 |
| 62 | 52200010 |
TEMP SHT PILING | 710 | SQ FT |
|
$25.00 |
$36.00 |
$25.00 |
$5.75 |
$47.00 |
$65.00 |
$0.0100 |
$37.00 |
| 63 | 52200800 |
SEG CONC BLOCK WALL | 780 | SQ FT |
|
$44.00 |
$46.80 |
$45.10 |
$41.00 |
$48.00 |
$45.00 |
$27.92 |
$77.00 |
| 64 | 55100400 |
STORM SEWER REM 10 | 19 | FOOT |
|
$36.00 |
$10.00 |
$39.60 |
$25.00 |
$42.00 |
$38.50 |
$25.00 |
$20.00 |
| 65 | 56100700 |
WATER MAIN 8 | 967 | FOOT |
|
$61.59 |
$81.00 |
$67.75 |
$90.00 |
$72.00 |
$112.50 |
$90.00 |
$83.00 |
| 66 | 56105000 |
WATER VALVES 8 | 4 | EACH |
|
$2,137.37 |
$1,865.83 |
$2,351.11 |
$2,000.00 |
$2,511.00 |
$2,800.00 |
$2,000.00 |
$1,900.00 |
| 67 | 56400500 |
FIRE HYDNTS TO BE REM | 1 | EACH |
|
$1,017.60 |
$600.00 |
$1,119.36 |
$1,500.00 |
$1,195.00 |
$825.00 |
$1,500.00 |
$1,200.00 |
| 68 | 56400820 |
FIRE HYD W/AUX V & VB | 1 | EACH |
|
$4,482.60 |
$5,400.00 |
$4,930.86 |
$8,000.00 |
$5,267.00 |
$6,200.00 |
$8,000.00 |
$6,900.00 |
| 69 | 59100100 |
GEOCOMPOSITE WALL DR | 40 | SQ YD |
|
$28.00 |
$35.00 |
$30.00 |
$20.00 |
$3.52 |
$40.00 |
$16.00 |
$30.00 |
| 70 | 60234200 |
INLETS TA T1F OL | 1 | EACH |
|
$1,106.25 |
$1,123.94 |
$1,216.88 |
$1,300.00 |
$1,299.00 |
$1,750.00 |
$1,300.00 |
$1,700.00 |
| 71 | 60248700 |
VV TA 4 DIA T1F CL | 4 | EACH |
|
$2,301.17 |
$2,353.03 |
$2,531.29 |
$2,900.00 |
$2,703.00 |
$3,000.00 |
$2,900.00 |
$2,900.00 |
| 72 | 60250200 |
CB ADJUST | 2 | EACH |
|
$586.10 |
$600.00 |
$644.71 |
$550.00 |
$688.00 |
$415.00 |
$550.00 |
$600.00 |
| 73 | 60252800 |
CB RECONST | 1 | EACH |
|
$2,262.50 |
$1,400.00 |
$2,488.75 |
$1,200.00 |
$2,658.00 |
$1,700.00 |
$1,200.00 |
$900.00 |
| 74 | 60500060 |
REMOV INLETS | 1 | EACH |
|
$476.25 |
$200.00 |
$523.88 |
$250.00 |
$559.00 |
$350.00 |
$250.00 |
$400.00 |
| 75 | 60600605 |
CONC CURB TB | 95 | FOOT |
|
$33.00 |
$52.00 |
$25.00 |
$57.00 |
$58.00 |
$40.00 |
$50.00 |
$30.00 |
| 76 | 63000003 |
SPBGR TY A 9FT POSTS | 113 | FOOT |
|
$31.99 |
$31.20 |
$38.72 |
$35.20 |
$41.00 |
$40.00 |
$35.20 |
$40.00 |
| 77 | 63100105 |
TRAF BAR TERM T10 | 1 | EACH |
|
$544.13 |
$624.00 |
$404.80 |
$368.00 |
$432.00 |
$400.00 |
$368.00 |
$660.00 |
| 78 | 63100167 |
TR BAR TRM T1 SPL TAN | 1 | EACH |
|
$3,690.24 |
$3,120.00 |
$3,094.30 |
$2,813.00 |
$3,305.00 |
$3,500.00 |
$2,813.00 |
$3,300.00 |
| 79 | 63200310 |
GUARDRAIL REMOV | 13 | FOOT |
|
$24.37 |
$20.80 |
$11.00 |
$10.00 |
$11.00 |
$12.00 |
$10.00 |
$20.00 |
| 80 | 67100100 |
MOBILIZATION | 1 | L SUM |
|
$70,000.00 |
$101,284.92 |
$53,500.00 |
$135,629.00 |
$109,500.00 |
$70,000.00 |
$127,000.75 |
$100,000.00 |
| 81 | 70107025 |
CHANGEABLE MESSAGE SN | 42 | CAL DA |
|
$35.00 |
$36.40 |
$75.00 |
$30.00 |
$41.00 |
$40.00 |
$35.00 |
$44.00 |
| 82 | 72000100 |
SIGN PANEL T1 | 23 | SQ FT |
|
$45.00 |
$46.80 |
$49.50 |
$17.50 |
$52.00 |
$50.00 |
$45.00 |
$33.00 |
| 83 | 72900100 |
METAL POST TY A | 98 | FOOT |
|
$12.50 |
$13.00 |
$13.75 |
$15.50 |
$14.00 |
$15.00 |
$12.50 |
$17.00 |