2019-051-T
- Let date
- Friday, June 12, 2020
- Contract
- 62J28 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Scanlon Excavating & Concrete, Inc. Low bidder | $334,356 | ||
| 2 | Plainfield Construction Company | $385,296 | +15.2% | |
| 3 | Meru Corporation | $489,633 | +46.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Scanlon Excavat… | #2 Plainfield Cons… | #3 Meru Corporation |
|---|---|---|---|---|---|---|---|---|
| 1 | A2C022G3 | T-CARYA ILLINOI CG 3G | 10 | EACH | $175.00 | $240.00 | $200.00 | |
| 2 | A2C026G3 | T-CELTIS OCCID CG 3G | 10 | EACH | $200.00 | $130.00 | $175.00 | |
| 3 | A2C040G3 | T-PLAT OCCID CG 3G | 10 | EACH | $200.00 | $75.00 | $175.00 | |
| 4 | A2C056G3 | T-QUERC MACR CG 3G | 10 | EACH | $200.00 | $75.00 | $202.00 | |
| 5 | A2C060G3 | T-QUERC PALUS CG 3G | 10 | EACH | $175.00 | $70.00 | $202.00 | |
| 6 | A2000216 | T-ACERX FREM MM 2 | 3 | EACH | $600.00 | $515.00 | $550.00 | |
| 7 | A2002916 | T-CELTIS OCCID 2 | 4 | EACH | $600.00 | $530.00 | $530.00 | |
| 8 | B2000564 | T-AMELAN CAN SF 5' | 15 | EACH | $350.00 | $335.00 | $265.00 | |
| 9 | B2001064 | T-BETUL NIG LK CL 5' | 15 | EACH | $450.00 | $535.00 | $300.00 | |
| 10 | C2002736 | S-EUONY ATROPUR 3' | 10 | EACH | $350.00 | $70.00 | $145.00 | |
| 11 | K0029614 | WEED CONT AQUATIC | 1 | GALLON | $4,500.00 | $2,500.00 | $1,000.00 | |
| 12 | K0029634 | WEED CONTR PRE-EM GRN | 5 | POUND | $50.00 | $50.00 | $401.00 | |
| 13 | X0326806 | WASHOUT BASIN | 1 | L SUM | $2,500.00 | $1,000.00 | $1,100.00 | |
| 14 | X0900064 | MEMBR WTRPR SYS B STR | 51 | SQ YD | $60.00 | $60.00 | $83.00 | |
| 15 | X0900075 | COFFERDAM TYP 1 IS WW | 1 | EACH | $11,500.00 | $11,000.00 | $35,520.00 | |
| 16 | X2503110 | MOWING SPL | 0.5 | ACRE | $5,000.00 | $5,000.00 | $1,440.00 | |
| 17 | X2511630 | EROS CONT BLANKET SPL | 3,615 | SQ YD | $5.00 | $1.55 | $3.00 | |
| 18 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $25,000.00 | $37,000.00 | $23,200.00 | |
| 19 | Z0005300 | BOX CUL TO BE CLEANED | 1 | EACH | $2,000.00 | $4,500.00 | $3,600.00 | |
| 20 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $7,500.00 | $5,000.00 | $6,200.00 | |
| 21 | Z0030850 | TEMP INFO SIGNING | 51.4 | SQ FT | $25.00 | $12.00 | $19.20 | |
| 22 | Z0064800 | SELECTIVE CLEARING | 20 | UNIT | $150.00 | $140.00 | $168.00 | |
| 23 | Z0073510 | TEMP TR SIGNAL TIMING | 4 | EACH | $500.00 | $230.00 | $276.00 | |
| 24 | 20100110 | TREE REMOV 6-15 | 486 | UNIT | $20.00 | $17.00 | $18.00 | |
| 25 | 20100210 | TREE REMOV OVER 15 | 124 | UNIT | $21.00 | $19.00 | $20.00 | |
| 26 | 20101000 | TEMPORARY FENCE | 458 | FOOT | $6.00 | $5.50 | $4.00 | |
| 27 | 20200100 | EARTH EXCAVATION | 455 | CU YD | $25.00 | $80.00 | $35.00 | |
| 28 | 20201200 | REM & DISP UNS MATL | 235 | CU YD | $75.00 | $41.00 | $30.00 | |
| 29 | 20700220 | POROUS GRAN EMBANK | 44 | CU YD | $65.00 | $100.00 | $60.00 | |
| 30 | 21101615 | TOPSOIL F & P 4 | 1,118 | SQ YD | $10.00 | $7.75 | $8.00 | |
| 31 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $5,000.00 | $4,000.00 | $5,500.00 | |
| 32 | 25000314 | SEEDING CL 4B | 0.25 | ACRE | $7,500.00 | $4,600.00 | $4,700.00 | |
| 33 | 25000324 | SEEDING CL 5B | 0.25 | ACRE | $3,500.00 | $4,000.00 | $3,000.00 | |
| 34 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $3.00 | $3.00 | $4.00 | |
| 35 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $3.00 | $3.00 | $4.00 | |
| 36 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $3.00 | $3.00 | $4.00 | |
| 37 | 25003310 | INTERSEED CL 4 | 0.5 | ACRE | $2,000.00 | $3,200.00 | $2,000.00 | |
| 38 | 28000250 | TEMP EROS CONTR SEED | 113 | POUND | $5.00 | $6.00 | $7.00 | |
| 39 | 28000305 | TEMP DITCH CHECKS | 240 | FOOT | $12.00 | $5.00 | $6.50 | |
| 40 | 28000400 | PERIMETER EROS BAR | 110 | FOOT | $5.00 | $5.00 | $4.00 | |
| 41 | 28000510 | INLET FILTERS | 1 | EACH | $150.00 | $300.00 | $300.00 | |
| 42 | 30300112 | AGG SUBGRADE IMPR 12 | 64 | SQ YD | $25.00 | $65.00 | $100.00 | |
| 43 | 40600275 | BIT MATLS PR CT | 144 | POUND | $1.00 | $5.00 | $0.0200 | |
| 44 | 40600290 | BIT MATLS TACK CT | 86 | POUND | $1.00 | $5.00 | $0.0200 | |
| 45 | 40603085 | HMA BC IL-19.0 N70 | 65 | TON | $185.00 | $180.00 | $252.00 | |
| 46 | 40604062 | HMA SC IL-9.5 D N70 | 9 | TON | $325.00 | $185.00 | $440.00 | |
| 47 | 44000100 | PAVEMENT REM | 80 | SQ YD | $70.00 | $50.00 | $25.00 | |
| 48 | 48101600 | AGGREGATE SHLDS B 8 | 302 | SQ YD | $30.00 | $28.00 | $40.00 | |
| 49 | 50100100 | REM EXIST STRUCT | 1 | EACH | $5,500.00 | $5,000.00 | $25,000.00 | |
| 50 | 50104400 | CONC HDWL REM | 1 | EACH | $1,550.00 | $750.00 | $500.00 | |
| 51 | 50800105 | REINFORCEMENT BARS | 4,140 | POUND | $1.20 | $3.00 | $3.00 | |
| 52 | 51500100 | NAME PLATES | 1 | EACH | $1,000.00 | $750.00 | $720.00 | |
| 53 | 54003000 | CONC BOX CUL | 20.4 | CU YD | $650.00 | $2,600.00 | $2,770.00 | |
| 54 | 54010603 | PCBC 6X3 | 36 | FOOT | $655.00 | $575.00 | $2,600.00 | |
| 55 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $1,015.00 | $900.00 | $1,100.00 | |
| 56 | 550A0360 | STORM SEW CL A 2 15 | 108 | FOOT | $52.00 | $72.00 | $75.00 | |
| 57 | 55100700 | STORM SEWER REM 15 | 117 | FOOT | $15.00 | $30.00 | $15.00 | |
| 58 | 59100100 | GEOCOMPOSITE WALL DR | 51 | SQ YD | $40.00 | $65.00 | $37.00 | |
| 59 | 63200310 | GUARDRAIL REMOV | 383 | FOOT | $6.00 | $9.00 | $8.00 | |
| 60 | 66900200 | NON SPL WASTE DISPOSL | 160 | CU YD | $80.00 | $82.00 | $75.00 | |
| 61 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,500.00 | $1,360.00 | $2,000.00 | |
| 62 | 66901001 | REG SUB P-CONST PLAN | 1 | LSUM | $15,500.00 | $2,100.00 | $2,400.00 | |
| 63 | 66901003 | REG SUB F CON REPORT | 1 | LSUM | $3,000.00 | $2,100.00 | $2,400.00 | |
| 64 | 66901006 | REG SUB MON | 10 | CAL DA | $100.00 | $1.00 | $670.00 | |
| 65 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $500.00 | $3,000.00 | $1,400.00 | |
| 66 | 67100100 | MOBILIZATION | 1 | L SUM | $20,000.00 | $20,000.00 | $28,000.00 | |
| 67 | 78000200 | THPL PVT MK LINE 4 | 100 | FOOT | $12.00 | $40.00 | $38.40 | |
| 68 | 78100100 | RAISED REFL PAVT MKR | 4 | EACH | $150.00 | $100.00 | $885.00 | |
| 69 | 78300200 | RAISED REF PVT MK REM | 4 | EACH | $100.00 | $30.00 | $120.00 |