2020-193-DM
- Let date
- Friday, September 18, 2020
- Contract
- 62M66 · job page
- District
- District 1
- County
- Mchenry
- Highway
- Limits
- Building Demolition at 3 locations. Location No. 1: 2103 N. Woodlawn Parkway; Location No. 2 2107 N. Woodlawn Parkway; Locaton No. 3 W. side of IL 31, approximately 2,250-ft N. of McCullom Lake.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | MYS, Incorporated Low bidder | $360,168 | ||
| 2 | Scanlon Excavating & Concrete, Inc. | $399,835 | +11.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 MYS, Incorporat… | #2 Scanlon Excavat… |
|---|---|---|---|---|---|---|---|
| 1 | X0327547 | ABANDON EXIST UTLS | 1 | L SUM | $16,800.00 | $5,500.00 | |
| 2 | X0488100 | REM EX SEPTIC TANK | 2 | EACH | $3,000.00 | $4,000.00 | |
| 3 | X2010400 | STUMP REMOVAL ONLY | 60 | UNIT | $50.00 | $10.00 | |
| 4 | X3400006 | BLDG RMVLC4 NOASBSTOS | 1 | L SUM | $38,500.00 | $18,000.00 | |
| 5 | Z0007601 | BLDG REMOV NO 1 | 1 | L SUM | $33,600.00 | $55,000.00 | |
| 6 | Z0007602 | BLDG REMOV NO 2 | 1 | L SUM | $31,200.00 | $55,000.00 | |
| 7 | Z0007603 | BLDG REMOV NO 3 | 1 | L SUM | $38,500.00 | $40,000.00 | |
| 8 | Z0015500 | DEBRIS REMOVAL | 1 | L SUM | $5,000.00 | $4,800.00 | |
| 9 | Z0022800 | FENCE REMOVAL | 89 | FOOT | $15.00 | $4.00 | |
| 10 | Z0030850 | TEMP INFO SIGNING | 102.8 | SQ FT | $25.00 | $25.00 | |
| 11 | Z0049901 | R&D NON-FR ASB BLD 1 | 1 | L SUM | $4,500.00 | $10,000.00 | |
| 12 | Z0049902 | R&D NON-FR ASB BLD 2 | 1 | L SUM | $15,600.00 | $10,000.00 | |
| 13 | Z0055905 | TEMP CONSTR FENCE | 956 | FOOT | $12.00 | $8.00 | |
| 14 | Z0064800 | SELECTIVE CLEARING | 4 | UNIT | $100.00 | $1,000.00 | |
| 15 | 20100110 | TREE REMOV 6-15 | 78 | UNIT | $15.00 | $25.00 | |
| 16 | 20100210 | TREE REMOV OVER 15 | 300 | UNIT | $20.00 | $25.00 | |
| 17 | 20101000 | TEMPORARY FENCE | 468 | FOOT | $6.00 | $8.00 | |
| 18 | 21101625 | TOPSOIL F & P 6 | 8,677 | SQ YD | $7.00 | $8.00 | |
| 19 | 25000110 | SEEDING CL 1A | 1.75 | ACRE | $4,560.00 | $5,500.00 | |
| 20 | 25000400 | NITROGEN FERT NUTR | 140 | POUND | $3.50 | $4.00 | |
| 21 | 25000600 | POTASSIUM FERT NUTR | 140 | POUND | $3.50 | $4.00 | |
| 22 | 25100115 | MULCH METHOD 2 | 1.75 | ACRE | $2,400.00 | $5,000.00 | |
| 23 | 25100630 | EROSION CONTR BLANKET | 8,677 | SQ YD | $1.20 | $3.00 | |
| 24 | 28000400 | PERIMETER EROS BAR | 1,182 | FOOT | $4.50 | $5.00 | |
| 25 | 44000200 | DRIVE PAVEMENT REM | 209 | SQ YD | $25.00 | $15.00 | |
| 26 | 44000600 | SIDEWALK REM | 436 | SQ FT | $3.00 | $5.00 | |
| 27 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $1,800.00 | $1,000.00 | |
| 28 | 67100100 | MOBILIZATION | 1 | L SUM | $32,500.00 | $30,000.00 | |
| 29 | 70100310 | TRAF CONT-PROT 701421 | 1 | L SUM | $2,000.00 | $1,500.00 | |
| 30 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $250.00 | $1,500.00 |