60-(10,11)RS-1, 60-(9,10)RS-3
- Let date
- Friday, September 18, 2020
- Contract
- 76H84 · job page
- District
- District 8
- County
- Madison
- Highway
- Limits
- 2.5 miles of standard overlay resurfacing along I-70/270 from I-55 to 2.5 miles east of the I-55/70/270 interchange and the ramps at the I-55/70/270 interchange and 4.7 miles of ultra-thin bonded wearing course from 0.4 miles east of IL 159 to 0.3 miles north of I-270.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | The Kilian Corporation Low bidder | $23,515,724 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 The Kilian Corp… |
|---|---|---|---|---|---|---|
| 1 | X0300028 | UT BON W CRS IL 12.5 UTB MIX E | 170,054 | SQ YD | $11.50 | |
| 2 | X0323388 | TRAFFIC COUNTER | 1 | EACH | $25,750.00 | |
| 3 | X0326808 | INTERST WKEND CLSR SP | 1 | L SUM | $42,000.00 | |
| 4 | X4405020 | LONG PAR DEP REM 2 | 253 | FOOT | $20.60 | |
| 5 | X4406020 | PART DEP REM T1 2 | 174.5 | SQ YD | $67.00 | |
| 6 | X4406220 | PART DEP REM T2 2 | 391.1 | SQ YD | $67.00 | |
| 7 | X4406420 | PART DEP REM T3 2 | 73.3 | SQ YD | $67.00 | |
| 8 | X4406620 | PART DEP REM T4 2 | 220 | SQ YD | $67.00 | |
| 9 | X4420900 | LONG PART DEPTH PATCH | 6.5 | TON | $485.00 | |
| 10 | X4421000 | PARTIAL DEPTH PATCH | 107.6 | TON | $485.00 | |
| 11 | X5420615 | PIPE CULV CLEANED 15 | 41 | FOOT | $25.00 | |
| 12 | X5420624 | PIPE CULV CLEANED 24 | 50 | FOOT | $42.50 | |
| 13 | X5420642 | PIPE CULV CLEANED 42 | 40 | FOOT | $70.00 | |
| 14 | X5870015 | BR DK CONCRETE SEALER | 54,745 | SQ FT | $0.7000 | |
| 15 | X6350120 | DELINEATOR REMOVAL | 372 | EACH | $10.00 | |
| 16 | X6430120 | REM IMP ATTEN NO SALV | 6 | EACH | $2,950.00 | |
| 17 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $1,610,000.00 | |
| 18 | X7010410 | SPEED DISPLAY TRAILER | 13 | CAL MO | $535.00 | |
| 19 | X7030005 | TEMP PAVT MKING REMOV | 110,010 | SQ FT | $0.00 | |
| 20 | X7830060 | GRV RCSD PM LTR & SYM | 140 | SQ FT | $57.75 | |
| 21 | X7830074 | GRV RCSD PVT MRKG 7 | 81,139 | FOOT | $0.5500 | |
| 22 | X7830076 | GRV RCSD PVT MRKG 9 | 8,019 | FOOT | $0.7500 | |
| 23 | X7830078 | GRV RCSD PVT MRKG 13 | 805 | FOOT | $6.05 | |
| 24 | X8570000 | SMART TRAF MONIT SYS | 1 | L SUM | $145,000.00 | |
| 25 | X8900100 | TEMP TR SIG INSTAL SP | 3 | EACH | $57,000.00 | |
| 26 | Z0007101 | C&D LEAD PT CL RS N1 | 1 | L SUM | $35,000.00 | |
| 27 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $198,500.00 | |
| 28 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $75,000.00 | |
| 29 | Z0015500 | DEBRIS REMOVAL | 1 | L SUM | $7,000.00 | |
| 30 | Z0016200 | DECK SLAB REP (PART) | 33.9 | SQ YD | $700.00 | |
| 31 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $69,000.00 | |
| 32 | Z0021906 | SILICONE JT SEAL 1.5 | 62 | FOOT | $69.00 | |
| 33 | Z0033700 | LONG JOINT SEALANT | 108,390 | FOOT | $3.30 | |
| 34 | Z0034105 | MATL TRANSFER DEVICE | 42,744 | TON | $0.0100 | |
| 35 | Z0034390 | MODULAR EXPAN JT 6 | 351.2 | FOOT | $2,250.00 | |
| 36 | Z0040530 | PIPE UNDERDRAIN REMOV | 54,025 | FOOT | $0.0100 | |
| 37 | Z0064800 | SELECTIVE CLEARING | 413 | UNIT | $21.00 | |
| 38 | Z0065730 | SLOPEWALL SLUR PUMPNG | 24 | CU YD | $200.00 | |
| 39 | Z0076600 | TRAINEES | 2,500 | HOUR | $0.8000 | |
| 40 | Z0076604 | TRAINEES TPG | 2,500 | HOUR | $15.00 | |
| 41 | 20100500 | TREE REMOV ACRES | 9.5 | ACRE | $13,200.00 | |
| 42 | 20200100 | EARTH EXCAVATION | 5,337 | CU YD | $22.00 | |
| 43 | 20400800 | FURNISHED EXCAVATION | 3,021 | CU YD | $25.00 | |
| 44 | 20700110 | POROUS GRAN EMBANK | 107 | TON | $77.00 | |
| 45 | 21400100 | GRADING & SHAP DITCH | 1,155 | FOOT | $10.00 | |
| 46 | 25000210 | SEEDING CL 2A | 12.75 | ACRE | $1,375.00 | |
| 47 | 25000400 | NITROGEN FERT NUTR | 1,146 | POUND | $1.60 | |
| 48 | 25000500 | PHOSPHORUS FERT NUTR | 1,146 | POUND | $1.60 | |
| 49 | 25000600 | POTASSIUM FERT NUTR | 1,146 | POUND | $1.60 | |
| 50 | 25000700 | AGR GROUND LIMESTONE | 22.5 | TON | $155.00 | |
| 51 | 25100630 | EROSION CONTR BLANKET | 61,614 | SQ YD | $1.25 | |
| 52 | 28000250 | TEMP EROS CONTR SEED | 3,819 | POUND | $1.00 | |
| 53 | 28000305 | TEMP DITCH CHECKS | 936 | FOOT | $7.00 | |
| 54 | 28000500 | INLET & PIPE PROTECT | 5 | EACH | $95.00 | |
| 55 | 28100207 | STONE RIPRAP CL A4 | 952.1 | TON | $81.00 | |
| 56 | 28100225 | STONE RIPRAP CL B3 | 21 | TON | $50.00 | |
| 57 | 28200200 | FILTER FABRIC | 942 | SQ YD | $2.00 | |
| 58 | 28400100 | GABIONS | 55 | CU YD | $310.00 | |
| 59 | 31101810 | SUB GRAN MAT B 12 | 6,553.5 | SQ YD | $31.50 | |
| 60 | 40600250 | RAP SET POLY MOD EMUL | 290,792 | POUND | $0.0100 | |
| 61 | 40600285 | P BIT MATLS PR CT | 14,378 | POUND | $0.5000 | |
| 62 | 40600290 | BIT MATLS TACK CT | 40,844 | POUND | $1.25 | |
| 63 | 40600295 | P BIT MATLS TACK CT | 88,971 | POUND | $1.25 | |
| 64 | 40600990 | TEMPORARY RAMP | 1,599 | SQ YD | $0.0100 | |
| 65 | 40603240 | P HMA BC IL19.0 N90 | 10,633.2 | TON | $112.00 | |
| 66 | 40605034 | P SC SMA 12.5 E N80 | 23,539.5 | TON | $130.00 | |
| 67 | 42000511 | PCC PVT 10 1/2 JOINTD | 4,835.3 | SQ YD | $112.00 | |
| 68 | 44000100 | PAVEMENT REM | 341.1 | SQ YD | $25.00 | |
| 69 | 44000152 | HMA SURF REM 3/4 | 170,054 | SQ YD | $2.20 | |
| 70 | 44000166 | HMA SURF REM 4 1/4 | 38,075 | SQ YD | $7.00 | |
| 71 | 44000174 | HMA SURF REM 6 1/4 | 122,039 | SQ YD | $7.25 | |
| 72 | 44004000 | PAVED DITCH REMOVAL | 679.2 | FOOT | $7.50 | |
| 73 | 44004250 | PAVED SHLD REMOVAL | 4,868 | SQ YD | $21.00 | |
| 74 | 44200050 | WELDED WIRE REINF | 760.7 | SQ YD | $16.50 | |
| 75 | 44200559 | CL A PATCH T4 10 | 4,942.3 | SQ YD | $220.00 | |
| 76 | 44201007 | CL B PATCH T2 13 | 393.5 | SQ YD | $262.00 | |
| 77 | 44201011 | CL B PATCH T3 13 | 202.7 | SQ YD | $261.00 | |
| 78 | 44201013 | CL B PATCH T4 13 | 66.7 | SQ YD | $260.00 | |
| 79 | 44201053 | CL B PATCH T4 17 | 98 | SQ YD | $291.00 | |
| 80 | 44201055 | CL B PATCH T2 17 | 9 | SQ YD | $302.00 | |
| 81 | 44201299 | DOWEL BARS 1 1/2 | 1,275 | EACH | $27.50 | |
| 82 | 44213000 | PATCH REINFORCEMENT | 3,759.9 | SQ YD | $67.50 | |
| 83 | 44213200 | SAW CUTS | 5,627 | FOOT | $7.75 | |
| 84 | 44213204 | TIE BARS 3/4 | 750 | EACH | $19.50 | |
| 85 | 48101200 | AGGREGATE SHLDS B | 3,013 | TON | $40.00 | |
| 86 | 48203037 | HMA SHOULDERS 10 | 8,861 | SQ YD | $64.00 | |
| 87 | 48203100 | HMA SHOULDERS | 17,828 | TON | $85.00 | |
| 88 | 50102400 | CONC REM | 53 | CU YD | $2,950.00 | |
| 89 | 50104400 | CONC HDWL REM | 9 | EACH | $450.00 | |
| 90 | 50104650 | SLOPE WALL REMOV | 28 | SQ YD | $100.00 | |
| 91 | 50105220 | PIPE CULVERT REMOV | 20 | FOOT | $45.00 | |
| 92 | 50300225 | CONC STRUCT | 37.4 | CU YD | $1,225.00 | |
| 93 | 50300255 | CONC SUP-STR | 49.3 | CU YD | $4,000.00 | |
| 94 | 50800105 | REINFORCEMENT BARS | 123 | POUND | $0.0100 | |
| 95 | 50800205 | REINF BARS, EPOXY CTD | 10,060 | POUND | $3.00 | |
| 96 | 51100100 | SLOPE WALL 4 | 28 | SQ YD | $225.00 | |
| 97 | 542A0220 | P CUL CL A 1 15 | 32 | FOOT | $65.00 | |
| 98 | 542A0223 | P CUL CL A 1 18 | 42 | FOOT | $70.00 | |
| 99 | 542A0229 | P CUL CL A 1 24 | 16 | FOOT | $80.00 | |
| 100 | 542A1921 | P CUL CL A 3 36 | 54 | FOOT | $110.00 | |
| 101 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $675.00 | |
| 102 | 54213669 | PRC FLAR END SEC 24 | 3 | EACH | $875.00 | |
| 103 | 54213681 | PRC FLAR END SEC 36 | 5 | EACH | $1,275.00 | |
| 104 | 54244405 | FL INLT BX MED 542546 | 2 | EACH | $3,900.00 | |
| 105 | 54246405 | INLET BOX 542531 | 1 | EACH | $8,500.00 | |
| 106 | 54248510 | CONCRETE COLLAR | 1.8 | CU YD | $600.00 | |
| 107 | 54261418 | CONC ES 542001 18 1:4 | 2 | EACH | $4,500.00 | |
| 108 | 60100060 | CONC HDWL FOR P DRAIN | 81 | EACH | $460.00 | |
| 109 | 60100070 | SHOULDER REM & REPL | 52,354 | FOOT | $5.15 | |
| 110 | 60108106 | PIPE UNDERDR T 1 6 | 52,354 | FOOT | $8.50 | |
| 111 | 60108200 | PIPE UNDERDRAIN 6 SP | 1,716 | FOOT | $11.50 | |
| 112 | 60240215 | INLETS TB T1F CL | 2 | EACH | $1,850.00 | |
| 113 | 60500060 | REMOV INLETS | 2 | EACH | $500.00 | |
| 114 | 63000003 | SPBGR TY A 9FT POSTS | 12,239 | FOOT | $33.40 | |
| 115 | 63000009 | SPBGR TY B 9FT POSTS | 100 | FOOT | $64.50 | |
| 116 | 63000017 | SPBGR TY D 6FT POSTS | 296 | FOOT | $43.00 | |
| 117 | 63100045 | TRAF BAR TERM T2 | 15 | EACH | $1,620.00 | |
| 118 | 63100085 | TRAF BAR TERM T6 | 19 | EACH | $4,200.00 | |
| 119 | 63100087 | TRAF BAR TERM T6A | 8 | EACH | $4,750.00 | |
| 120 | 63100167 | TR BAR TRM T1 SPL TAN | 31 | EACH | $3,345.00 | |
| 121 | 63200310 | GUARDRAIL REMOV | 9,727 | FOOT | $4.70 | |
| 122 | 63500105 | DELINEATORS | 372 | EACH | $57.00 | |
| 123 | 64200116 | SHOULDER RUM STRIP 16 | 50,141 | FOOT | $0.4000 | |
| 124 | 64300260 | IMP ATTEN FRD NAR TL3 | 4 | EACH | $34,250.00 | |
| 125 | 64300450 | IMP ATTEN NRD TL3 | 2 | EACH | $6,285.00 | |
| 126 | 64301090 | ATTENUATOR BASE | 55 | SQ YD | $125.00 | |
| 127 | 67000400 | ENGR FIELD OFFICE A | 13 | CAL MO | $1,900.00 | |
| 128 | 67100100 | MOBILIZATION | 1 | L SUM | $1,960,410.00 | |
| 129 | 70100420 | TRAF CONT-PROT 701411 | 14 | EACH | $2,750.00 | |
| 130 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $260,000.00 | |
| 131 | 70100815 | TRAF CONT-PROT 701446 | 1 | L SUM | $0.0100 | |
| 132 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $29,500.00 | |
| 133 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $0.0100 | |
| 134 | 70103815 | TR CONT SURVEILLANCE | 90 | CAL DA | $0.0100 | |
| 135 | 70107025 | CHANGEABLE MESSAGE SN | 2,216 | CAL DA | $39.25 | |
| 136 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $125,000.00 | |
| 137 | 70300100 | SHORT TERM PAVT MKING | 43,400 | FOOT | $0.0100 | |
| 138 | 70300150 | SHRT TRM PAVT MK REM | 14,467 | SQ FT | $0.0100 | |
| 139 | 70300220 | TEMP PVT MK LINE 4 | 20,362 | FOOT | $0.00 | |
| 140 | 70300240 | TEMP PVT MK LINE 6 | 182,230 | FOOT | $0.00 | |
| 141 | 70300250 | TEMP PVT MK LINE 8 | 18,163 | FOOT | $0.00 | |
| 142 | 70400100 | TEMP CONC BARRIER | 7,201.5 | FOOT | $30.00 | |
| 143 | 70400200 | REL TEMP CONC BARRIER | 4,378 | FOOT | $0.0100 | |
| 144 | 70600250 | IMP ATTN TEMP NRD TL3 | 6 | EACH | $3,500.00 | |
| 145 | 70600350 | IMP ATTN REL NRD TL3 | 5 | EACH | $1,200.00 | |
| 146 | 72000200 | SIGN PANEL T2 | 48 | SQ FT | $27.50 | |
| 147 | 72000300 | SIGN PANEL T3 | 4,569 | SQ FT | $30.20 | |
| 148 | 72400320 | REMOV SIGN PANEL T2 | 48 | SQ FT | $11.30 | |
| 149 | 72400330 | REMOV SIGN PANEL T3 | 4,773 | SQ FT | $8.60 | |
| 150 | 72501000 | TERMINAL MARKER - DA | 35 | EACH | $32.00 | |
| 151 | 73300100 | OVHD SIN STR-SPAN T1A | 82 | FOOT | $890.00 | |
| 152 | 73301810 | OSS WALKWAY TY A | 28.8 | FOOT | $285.00 | |
| 153 | 73301840 | OSS WALKWAY CANT TA | 60.5 | FOOT | $315.00 | |
| 154 | 73302210 | OSS CANT 3CA 3-0X7-0 | 109 | FOOT | $1,300.00 | |
| 155 | 73400200 | DRILL SHAFT CONC FDN | 55.4 | CU YD | $3,000.00 | |
| 156 | 73500005 | REM OH SIN STR SPAN | 1 | EACH | $6,000.00 | |
| 157 | 73500010 | REM OH SIN STR CANTI | 3 | EACH | $4,600.00 | |
| 158 | 73800005 | REM SS S OV S ST SPAN | 2 | EACH | $2,400.00 | |
| 159 | 73800205 | STR ST S OV S ST SPAN | 2 | EACH | $12,000.00 | |
| 160 | 73800405 | REM RE OH SN STR SPAN | 1 | EACH | $12,500.00 | |
| 161 | 78003100 | PREF PL PM TB LTR-SYM | 140 | SQ FT | $55.50 | |
| 162 | 78003130 | PREF PL PM TB LINE 6 | 81,139 | FOOT | $3.70 | |
| 163 | 78003140 | PREF PL PM TB LINE 8 | 8,019 | FOOT | $5.55 | |
| 164 | 78003150 | PREF PL PM TB LINE 12 | 805 | FOOT | $11.10 | |
| 165 | 78004210 | PREF PL PM TB INL L4 | 20,362 | FOOT | $2.70 | |
| 166 | 78004230 | PREF PL PM TB INL L6 | 99,361 | FOOT | $3.20 | |
| 167 | 78004240 | PREF PL PM TB INL L8 | 10,144 | FOOT | $5.00 | |
| 168 | 78009006 | MOD URETH PM LINE 6 | 1,730 | FOOT | $3.70 | |
| 169 | 78100100 | RAISED REFL PAVT MKR | 2,982 | EACH | $25.50 | |
| 170 | 78200005 | GRDRAIL REF TYPE A | 188 | EACH | $10.50 | |
| 171 | 78200011 | BARR WALL REF TYPE C | 54 | EACH | $12.00 | |
| 172 | 78300200 | RAISED REF PVT MK REM | 2,871 | EACH | $0.0100 | |
| 173 | 80300100 | LOCATE UNDERGR CABLE | 500 | FOOT | $10.50 |