$5.80Avg low bid / SQ FT
$5.35Avg of all bids
—Avg engineer's estimate
157Jobs · 150,871.2 SQ FT
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2022 | 1 | 576 | $6.00 | $6.00 |
| 2021 | 43 | 24,284.5 | $4.95 | $4.50 |
| 2020 | 56 | 59,762.2 | $5.70 | $5.22 |
| 2019 | 48 | 42,143.5 | $6.71 | $5.15 |
| 2018 | 9 | 24,105 | $5.30 | $6.37 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Jan 21, 2022 | 74456 | EffinghamDistrict 7 | 576 SQ FT | $6.00 | Howell Paving, Inc. |
| Nov 5, 2021 | 87782 | GrundyDistrict 3 | 676 SQ FT | $5.50 | D. Construction, Inc. |
| Sep 17, 2021 | 74752 | EffinghamDistrict 7 | 31 SQ FT | $12.00 | Howell Paving, Inc. |
| Sep 17, 2021 | 78503 | FranklinDistrict 9 | 103 SQ FT | $11.33 | E. T. Simonds Construction Company |
| Sep 17, 2021 | 64N63 | JodaviessDistrict 2 | 612 SQ FT | $3.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jul 30, 2021 | 64M90 | WhitesideDistrict 2 | 132 SQ FT | $5.00 | Valley Construction Co. |
| Jul 30, 2021 | 62D86 | LakeDistrict 1 | 38 SQ FT | $10.00 | Lorig Construction Company |
| Jun 11, 2021 | 66L86 | KankakeeDistrict 3 | 164 SQ FT | $5.85 | Kankakee Valley Construction Company, Inc. |
| Jun 11, 2021 | 64M18 | WinnebagoDistrict 2 | 137 SQ FT | $2.40 | William Charles Construction Company, LLC |
| Jun 11, 2021 | 78788 | SalineDistrict 9 | 846 SQ FT | $2.37 | Southern Illinois Asphalt Co., Inc. |
| Jun 11, 2021 | 68C45 | PeoriaDistrict 4 | 329 SQ FT | $10.00 | Advanced Asphalt Company |
| Jun 11, 2021 | 64N38 | WhitesideDistrict 2 | 235 SQ FT | $2.50 | Fischer Excavating, Inc. |
| Jun 11, 2021 | 70B02 | EdgarDistrict 5 | 123 SQ FT | $1.00 | Howell Paving, Inc. |
| Jun 11, 2021 | 66A96 | BureauDistrict 3 | 216 SQ FT | $4.00 | Advanced Asphalt Company |
| Jun 11, 2021 | 72823 | ScottDistrict 6 | 229 SQ FT | $3.30 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 11, 2021 | 66K40 | IroquoisDistrict 3 | 270.2 SQ FT | $6.85 | Iroquois Paving Corporation |
| Jun 11, 2021 | 74462 | MaconDistrict 7 | 645.6 SQ FT | $8.25 | Illinois Valley Paving, a div of UCM, Inc. |
| Jun 11, 2021 | 66L02 | LasalleDistrict 3 | 233 SQ FT | $16.50 | D. Construction, Inc. |
| Jun 11, 2021 | 46579 | VariousDistrict 5 | 1,933.8 SQ FT | $3.00 | Varsity Striping & Construction Co. |
| Jun 11, 2021 | 78612 | JacksonDistrict 9 | 92 SQ FT | $10.50 | E. T. Simonds Construction Company |
| Apr 23, 2021 | 70E18 | McleanDistrict 5 | 100 SQ FT | $5.17 | Rowe Construction, a div of UCM, Inc. |
| Apr 23, 2021 | 64P30 | LeeDistrict 2 | 720 SQ FT | $2.00 | Advanced Asphalt Company |
| Apr 23, 2021 | 70E81 | VermilionDistrict 5 | 156 SQ FT | $7.98 | Cross Construction, Inc. |
| Apr 23, 2021 | 66B52 | LasalleDistrict 3 | 154 SQ FT | $1.75 | R. W. Dunteman Company |
| Apr 23, 2021 | 46562 | WillDistrict 1 | 992 SQ FT | $15.00 | Maintenance Coatings Co. |
| Apr 23, 2021 | 74A37 | MaconDistrict 7 | 94 SQ FT | $7.15 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 23, 2021 | 66E14 | BureauDistrict 3 | 622 SQ FT | $7.00 | Advanced Asphalt Company |
| Apr 23, 2021 | 61G97 | DupageDistrict 1 | 763 SQ FT | $2.00 | K-Five Construction Corporation |
| Apr 23, 2021 | 66L01 | LasalleDistrict 3 | 233 SQ FT | $7.70 | D. Construction, Inc. |
| Apr 23, 2021 | 64M91 | LeeDistrict 2 | 3,134 SQ FT | $2.10 | Martin & Company Excavating |
| Apr 23, 2021 | 70990 | DewittDistrict 5 | 141 SQ FT | $6.30 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 23, 2021 | 64P29 | WinnebagoDistrict 2 | 1,240 SQ FT | $2.00 | Rock Road Companies, Inc. |
| Mar 5, 2021 | 70E99 | Dewitt, McleanDistrict 5 | 47 SQ FT | $60.00 | Path Construction Company, Inc. |
| Mar 5, 2021 | 74A11 | MoultrieDistrict 7 | 554.2 SQ FT | $13.00 | Kinney Contractors, Inc. |
| Mar 5, 2021 | 66F09 | KankakeeDistrict 3 | 745 SQ FT | $6.00 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation |
| Mar 5, 2021 | 66K61 | FordDistrict 3 | 123 SQ FT | $18.00 | Iroquois Paving Corporation |
| Mar 5, 2021 | 68F69 | TazewellDistrict 4 | 662.3 SQ FT | $6.61 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 15, 2021 | 74906 | ClayDistrict 7 | 62.4 SQ FT | $6.00 | Howell Paving, Inc. |
| Jan 15, 2021 | 74A14 | ColesDistrict 7 | 141 SQ FT | $6.00 | Howell Paving, Inc. |
| Jan 15, 2021 | 78606 | MassacDistrict 9 | 850 SQ FT | $1.29 | E. T. Simonds Construction Company |
| Jan 15, 2021 | 66L00 | LasalleDistrict 3 | 199 SQ FT | $1.65 | D. Construction, Inc. |
| Jan 15, 2021 | 95885 | ColesDistrict 7 | 83 SQ FT | $3.50 | Ne-Co Asphalt Co., Inc. |
| Jan 15, 2021 | 70A65 | McleanDistrict 5 | 4,061 SQ FT | $5.23 | Rowe Construction, a div of UCM, Inc. |
| Jan 15, 2021 | 74549 | Shelby, MaconDistrict 7 | 1,362 SQ FT | $2.63 | Illinois Valley Paving, a div of UCM, Inc. |
| Nov 6, 2020 | 66K54 | IroquoisDistrict 3 | 247 SQ FT | $6.50 | Iroquois Paving Corporation |
| Nov 6, 2020 | 74982 | WayneDistrict 7 | 111 SQ FT | $3.00 | Howell Paving, Inc. |
| Nov 6, 2020 | 89766 | PeoriaDistrict 4 | 3,806 SQ FT | $5.25 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Nov 6, 2020 | 66K20 | FordDistrict 3 | 811 SQ FT | $40.00 | Cross Construction, Inc. |
| Sep 18, 2020 | 70602 | ChampaignDistrict 5 | 62 SQ FT | $8.00 | Stark Excavating, Inc. |
| Sep 18, 2020 | 76H84 | MadisonDistrict 8 | 140 SQ FT | $57.75 | The Kilian Corporation |
| Jul 31, 2020 | 74710 | MaconDistrict 7 | 3,291 SQ FT | $3.58 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2020 | 76568 | JerseyDistrict 8 | 807 SQ FT | $0.0100 | Baxmeyer Construction, Inc. |
| Jul 31, 2020 | 78787 | WilliamsonDistrict 9 | 49 SQ FT | $9.48 | Southern Illinois Asphalt Co., Inc. |
| Jul 31, 2020 | 68F15 | PeoriaDistrict 4 | 627 SQ FT | $5.25 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2020 | 70D74 | Douglas, EdgarDistrict 5 | 216 SQ FT | $6.00 | Open Road Paving Company LLC |
| Jun 12, 2020 | 66B04 | FordDistrict 3 | 47 SQ FT | $35.00 | Iroquois Paving Corporation |
| Jun 12, 2020 | 70E16 | McleanDistrict 5 | 50 SQ FT | $5.78 | Rowe Construction, a div of UCM, Inc. |
| Jun 12, 2020 | 66K53 | KankakeeDistrict 3 | 414 SQ FT | $7.50 | Gallagher Asphalt Corporation |
| Jun 12, 2020 | 78709 | JacksonDistrict 9 | 329 SQ FT | $0.2600 | E. T. Simonds Construction Company |
| Jun 12, 2020 | 68894 | TazewellDistrict 4 | 421 SQ FT | $4.90 | Otto Baum Company, Inc. |
| Jun 12, 2020 | 70710 | DouglasDistrict 5 | 1,676 SQ FT | $7.30 | Ne-Co Asphalt Co., Inc. |
| Jun 12, 2020 | 60X94 | CookDistrict 1 | 136 SQ FT | $23.50 | Lorig Construction Company |
| Jun 12, 2020 | 70C25 | Champaign, PiattDistrict 5 | 49 SQ FT | $10.00 | Open Road Paving Company LLC |
| Jun 12, 2020 | 61G42 | CookDistrict 1 | 1,706 SQ FT | $2.20 | A Lamp Concrete Contractors, Inc. |
| Apr 24, 2020 | 70B38 | ChampaignDistrict 5 | 156 SQ FT | $64.13 | Stark Excavating, Inc. |
| Apr 24, 2020 | 64N59 | StephensonDistrict 2 | 145 SQ FT | $3.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Apr 24, 2020 | 64M07 | WinnebagoDistrict 2 | 1,697 SQ FT | $2.00 | Rock Road Companies, Inc. |
| Apr 24, 2020 | 74575 | ColesDistrict 7 | 1,498 SQ FT | $7.00 | Ne-Co Asphalt Co., Inc. |
| Apr 24, 2020 | 66968 | BureauDistrict 3 | 47 SQ FT | $52.00 | Advanced Asphalt Company |
| Apr 24, 2020 | 64M42 | WhitesideDistrict 2 | 333 SQ FT | $2.50 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Apr 24, 2020 | 74907 | EffinghamDistrict 7 | 2,251 SQ FT | $2.25 | Howell Paving, Inc. |
| Apr 24, 2020 | 68953 | FultonDistrict 4 | 130 SQ FT | $6.30 | Gunther Construction, a div of UCM, Inc. |
| Apr 24, 2020 | 64N35 | OgleDistrict 2 | 273 SQ FT | $2.40 | Martin & Company Excavating |
| Apr 24, 2020 | 74917 | MaconDistrict 7 | 385 SQ FT | $2.75 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 24, 2020 | 62A76 | CookDistrict 1 | 715 SQ FT | $4.50 | Lorig Construction Company |
| Apr 24, 2020 | 68A81 | PeoriaDistrict 4 | 1,966.4 SQ FT | $1.65 | Advanced Asphalt Company |
| Apr 24, 2020 | 64N36 | Boone, WinnebagoDistrict 2 | 1,787.5 SQ FT | $26.25 | Martam Construction Incorporated |
| Apr 24, 2020 | 74923 | EdwardsDistrict 7 | 62.4 SQ FT | $6.50 | Howell Paving, Inc. |
| Apr 24, 2020 | 62A77 | CookDistrict 1 | 4,561 SQ FT | $4.50 | Lorig Construction Company |
| Apr 24, 2020 | 68F42 | PeoriaDistrict 4 | 34.5 SQ FT | $33.60 | Laser Electric, Inc. |
| Apr 24, 2020 | 64N58 | StephensonDistrict 2 | 145 SQ FT | $2.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Apr 24, 2020 | 64J28 | Rock IslandDistrict 2 | 956 SQ FT | $2.00 | Valley Construction Co. |
| Mar 6, 2020 | 74924 | EffinghamDistrict 7 | 14.4 SQ FT | $9.00 | Howell Paving, Inc. |
| Mar 6, 2020 | 64N56 | WinnebagoDistrict 2 | 368 SQ FT | $2.00 | Rock Road Companies, Inc. |
| Mar 6, 2020 | 78750 | JacksonDistrict 9 | 314.8 SQ FT | $8.40 | Samron Midwest Contracting, Inc. |
| Mar 6, 2020 | 68C98 | PeoriaDistrict 4 | 375 SQ FT | $4.40 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Mar 6, 2020 | 89778 | PeoriaDistrict 4 | 693 SQ FT | $4.13 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Mar 6, 2020 | 68E58 | PeoriaDistrict 4 | 517 SQ FT | $8.80 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Mar 6, 2020 | 70D86 | McleanDistrict 5 | 46 SQ FT | $6.60 | Rowe Construction, a div of UCM, Inc. |
| Mar 6, 2020 | 74411 | LawrenceDistrict 7 | 94 SQ FT | $2.00 | Ambraw Asphalt Materials, Inc. |
| Mar 6, 2020 | 61G29 | DupageDistrict 1 | 577 SQ FT | $1.60 | R. W. Dunteman Company |
| Jan 17, 2020 | 64L72 | WinnebagoDistrict 2 | 1,194 SQ FT | $13.85 | William Charles Construction Company, LLC |
| Jan 17, 2020 | 74694 | ColesDistrict 7 | 1,916 SQ FT | $1.50 | Howell Paving, Inc. |
| Jan 17, 2020 | 66A51 | GrundyDistrict 3 | 122 SQ FT | $7.54 | D. Construction, Inc. |
| Jan 17, 2020 | 68E34 | WoodfordDistrict 4 | 59 SQ FT | $22.45 | Advanced Asphalt Company |
| Jan 17, 2020 | 70912 | McleanDistrict 5 | 222 SQ FT | $26.40 | Rowe Construction, a div of UCM, Inc. |
| Jan 17, 2020 | 46534 | VariousDistrict 5 | 15,566.2 SQ FT | $4.50 | A. C. Pavement Striping Co. |
| Jan 17, 2020 | 72G57 | LoganDistrict 6 | 608 SQ FT | $2.20 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 17, 2020 | 64L57 | WinnebagoDistrict 2 | 4,719 SQ FT | $1.60 | Rock Road Companies, Inc. |
| Jan 17, 2020 | 74260 | Moultrie, ColesDistrict 7 | 219 SQ FT | $2.00 | Howell Paving, Inc. |
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | 568 SQ FT | $9.50 | ICC Group Inc. |
| Nov 8, 2019 | 70545 | DouglasDistrict 5 | 32 SQ FT | $33.90 | Sangamo Construction Company |
| Nov 8, 2019 | 76E13 | St.clairDistrict 8 | 1,086 SQ FT | $11.00 | The Kilian Corporation & Keeley & Sons, Inc. |
| Sep 20, 2019 | 61F25 | LakeDistrict 1 | 1,121 SQ FT | $3.50 | Berger Excavating Contractors, Inc. |
| Sep 20, 2019 | 62H74 | CookDistrict 1 | 1,414 SQ FT | $9.50 | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. |
| Sep 20, 2019 | 62J19 | CookDistrict 1 | 1,531 SQ FT | $9.50 | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. |
| Sep 20, 2019 | 70B53 | ChampaignDistrict 5 | 2,615 SQ FT | $12.00 | Champaign Asphalt Company, LLC |
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | 338 SQ FT | $13.46 | Otto Baum Company, Inc. |
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | 1,188 SQ FT | $2.00 | Plote Construction, Inc. |
| Jul 12, 2019 | 64C06 | HenryDistrict 2 | 25 SQ FT | $6.00 | Advanced Asphalt Company |
| Jul 12, 2019 | 70E04 | McleanDistrict 5 | 234 SQ FT | $6.30 | Rowe Construction, a div of UCM, Inc. |
| Jul 12, 2019 | 64J40 | HenryDistrict 2 | 127 SQ FT | $6.00 | Advanced Asphalt Company |
| Jul 12, 2019 | 74461 | CumberlandDistrict 7 | 56 SQ FT | $6.00 | Howell Paving, Inc. |
| Jul 12, 2019 | 64N55 | WhitesideDistrict 2 | 420 SQ FT | $3.50 | Martin & Company Excavating |
| Jul 12, 2019 | 74778 | ColesDistrict 7 | 1,794 SQ FT | $7.00 | Howell Paving, Inc. |
| Jul 12, 2019 | 68D88 | PeoriaDistrict 4 | 175 SQ FT | $10.80 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jul 12, 2019 | 70952 | ChampaignDistrict 5 | 123 SQ FT | $19.80 | Cross Construction, Inc. |
| Jul 12, 2019 | 70B09 | McleanDistrict 5 | 185 SQ FT | $10.30 | H. J. Eppel & Co. |
| Jun 14, 2019 | 91582 | PiattDistrict 5 | 797 SQ FT | $6.60 | Cross Construction, Inc. |
| Jun 14, 2019 | 66E21 | BureauDistrict 3 | 125 SQ FT | $8.00 | Advanced Asphalt Company |
| Jun 14, 2019 | 66H03 | DekalbDistrict 3 | 296 SQ FT | $8.00 | Curran Contracting Company |
| Jun 14, 2019 | 70D33 | Edgar, VermilionDistrict 5 | 130 SQ FT | $12.00 | Illiana Construction Co., Inc., A Div. of Champaign Asphalt Company |
| Jun 14, 2019 | 74754 | JasperDistrict 7 | 123 SQ FT | $8.76 | Howell Paving, Inc. |
| Jun 14, 2019 | 46515 | VermilionDistrict 5 | 12,314 SQ FT | $4.00 | Varsity Striping & Construction Co. |
| Jun 14, 2019 | 87715 | KankakeeDistrict 3 | 210 SQ FT | $6.00 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation |
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | 146 SQ FT | $3.15 | Campanella and Sons, Inc. |
| Apr 26, 2019 | 74419 | ClarkDistrict 7 | 825 SQ FT | $6.00 | Ne-Co Asphalt Co., Inc. |
| Apr 26, 2019 | 61E24 | LakeDistrict 1 | 704 SQ FT | $21.00 | Lake County Grading Company, LLC |
| Apr 26, 2019 | 61F64 | WillDistrict 1 | 148 SQ FT | $1.55 | K-Five Construction Corporation |
| Apr 26, 2019 | 64M39 | JodaviessDistrict 2 | 265 SQ FT | $19.65 | Civil Constructors, Inc. |
| Apr 26, 2019 | 68D77 | TazewellDistrict 4 | 305 SQ FT | $18.00 | Phoenix Corporation of the Quad Cities |
| Apr 26, 2019 | 70790 | Champaign, VermilionDistrict 5 | 172 SQ FT | $5.50 | Open Road Paving Company LLC |
| Mar 8, 2019 | 76L67 | St. ClairDistrict 8 | 187 SQ FT | $1.20 | DMS Contracting, Inc. |
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | 479 SQ FT | $8.40 | Illinois Civil Contractors, Inc. |
| Mar 8, 2019 | 68B78 | WarrenDistrict 4 | 1,419.5 SQ FT | $8.40 | Gunther Construction, a div of UCM, Inc. |
| Mar 8, 2019 | 97680 | MadisonDistrict 8 | 96 SQ FT | $0.3000 | Stutz Excavating, Inc. |
| Mar 8, 2019 | 70D15 | ChampaignDistrict 5 | 125 SQ FT | $12.00 | Stark Excavating, Inc. |
| Mar 8, 2019 | 74835 | MaconDistrict 7 | 2,928 SQ FT | $9.45 | Illinois Valley Paving, a div of UCM, Inc. |
| Mar 8, 2019 | 74879 | ShelbyDistrict 7 | 1,008 SQ FT | $8.50 | Howell Paving, Inc. |
| Jan 18, 2019 | 61F42 | MchenryDistrict 1 | 1,040 SQ FT | $2.00 | Curran Contracting Company |
| Jan 18, 2019 | 89712 | PeoriaDistrict 4 | 580 SQ FT | $6.18 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 18, 2019 | 66E75 | LasalleDistrict 3 | 551 SQ FT | $7.75 | Advanced Asphalt Company |
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | 170 SQ FT | $7.49 | Rowe Construction, a div of UCM, Inc. |
| Jan 18, 2019 | 70997 | ChampaignDistrict 5 | 1,041 SQ FT | $4.40 | Cross Construction, Inc. |
| Jan 18, 2019 | 61E97 | KaneDistrict 1 | 1,293 SQ FT | $1.76 | D. Construction, Inc. |
| Jan 18, 2019 | 70A61 | ChampaignDistrict 5 | 397 SQ FT | $8.00 | Stark Excavating, Inc. |
| Jan 18, 2019 | 61F33 | LakeDistrict 1 | 1,159 SQ FT | $1.60 | Berger Excavating Contractors, Inc. |
| Jan 18, 2019 | 74261 | ColesDistrict 7 | 78 SQ FT | $3.99 | Howell Paving, Inc. |
| Nov 9, 2018 | 61E06 | DupageDistrict 1 | 37 SQ FT | $5.00 | R. W. Dunteman Company |
| Jun 15, 2018 | 66D24 | KendallDistrict 3 | 753 SQ FT | $7.75 | D. Construction, Inc. |