12(W-1 RS-6)
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $547,924 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X7830060 | GRV RCSD PM LTR & SYM | 1,008 | SQ FT | $8.50 | |
| 2 | X7830070 | GRV RCSD PVT MRKG 5 | 8,591 | FOOT | $0.6400 | |
| 3 | X7830074 | GRV RCSD PVT MRKG 7 | 297 | FOOT | $1.25 | |
| 4 | X7830078 | GRV RCSD PVT MRKG 13 | 122 | FOOT | $2.50 | |
| 5 | X7830090 | GRV RCSD PVT MRKG 25 | 68 | FOOT | $8.00 | |
| 6 | Z0033700 | LONG JOINT SEALANT | 6,876 | FOOT | $3.03 | |
| 7 | Z0049799 | PROT RESET SURVEY MRK | 3 | EACH | $929.21 | |
| 8 | 40600290 | BIT MATLS TACK CT | 9,290.9 | POUND | $2.60 | |
| 9 | 40600847 | P LB MM IL-9.5FG N90 | 578 | TON | $128.18 | |
| 10 | 40600990 | TEMPORARY RAMP | 3,515.8 | SQ YD | $11.08 | |
| 11 | 40603545 | P HMA SC "D" N90 | 1,156.2 | TON | $118.42 | |
| 12 | 40800050 | INCIDENTAL HMA SURF | 51 | TON | $210.13 | |
| 13 | 42400300 | PC CONC SIDEWALK 6 | 361.5 | SQ FT | $30.32 | |
| 14 | 42400800 | DETECTABLE WARNINGS | 22 | SQ FT | $29.70 | |
| 15 | 44000100 | PAVEMENT REM | 13 | SQ YD | $103.37 | |
| 16 | 44000155 | HMA SURF REM 1 1/2 | 605 | SQ YD | $5.80 | |
| 17 | 44000158 | HMA SURF REM 2 1/4 | 13,751 | SQ YD | $2.95 | |
| 18 | 44000300 | CURB REM | 133 | FOOT | $7.54 | |
| 19 | 44000500 | COMB CURB GUTTER REM | 59 | FOOT | $37.18 | |
| 20 | 44000600 | SIDEWALK REM | 452 | SQ FT | $7.96 | |
| 21 | 44201815 | CL D PATCH T2 14 | 43 | SQ YD | $241.88 | |
| 22 | 44201851 | CL D PATCH T2 17 | 96 | SQ YD | $250.49 | |
| 23 | 60300105 | FR & GRATES ADJUST | 3 | EACH | $1,483.98 | |
| 24 | 60600605 | CONC CURB TB | 48.4 | FOOT | $101.36 | |
| 25 | 60605000 | COMB CC&G TB6.24 | 61.5 | FOOT | $94.94 | |
| 26 | 67000500 | ENGR FIELD OFFICE B | 3 | CAL MO | $2,369.76 | |
| 27 | 67100100 | MOBILIZATION | 1 | L SUM | $32,963.08 | |
| 28 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $33,839.01 | |
| 29 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $0.00 | |
| 30 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $7,808.34 | |
| 31 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $395.07 | |
| 32 | 70107025 | CHANGEABLE MESSAGE SN | 42 | CAL DA | $107.24 | |
| 33 | 70300100 | SHORT TERM PAVT MKING | 2,844 | FOOT | $0.9100 | |
| 34 | 70300150 | SHRT TRM PAVT MK REM | 948 | SQ FT | $2.75 | |
| 35 | 78000100 | THPL PVT MK LTR & SYM | 328 | SQ FT | $4.50 | |
| 36 | 78000200 | THPL PVT MK LINE 4 | 8,591 | FOOT | $0.7300 | |
| 37 | 78000400 | THPL PVT MK LINE 6 | 297 | FOOT | $1.08 | |
| 38 | 78000600 | THPL PVT MK LINE 12 | 122 | FOOT | $2.17 | |
| 39 | 78000650 | THPL PVT MK LINE 24 | 68 | FOOT | $4.40 | |
| 40 | 78100100 | RAISED REFL PAVT MKR | 163 | EACH | $27.64 | |
| 41 | 88600100 | DET LOOP T1 | 384 | FOOT | $15.00 |