46-(3,4)RS-4 & I-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation Low bidder | $20,058,764 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Kankakee Valley… |
|---|---|---|---|---|---|---|
| 1 | X0322288 | MEDIAN CLOSURE | 1 | EACH | $7,000.00 | |
| 2 | X0323491 | SLOPE WALL CRACK SEAL | 585 | FOOT | $19.00 | |
| 3 | X0326351 | CONC APRN FOR MED INL | 1 | EACH | $3,475.00 | |
| 4 | X0326649 | LINEAR DELIN PANELS 6 | 4 | EACH | $150.00 | |
| 5 | X0327281 | REM REPL HT CBLE POST | 22 | EACH | $313.58 | |
| 6 | X0327809 | LINEAR DELIN PANELS 4 | 124 | EACH | $100.00 | |
| 7 | X0328004 | REAL-TIME TR CTRL SU | 200 | WEEK | $180.00 | |
| 8 | X0484300 | MEDIAN INLET BOX REM | 2 | EACH | $1,270.00 | |
| 9 | X0500002 | HMA MOW STRIP | 8,685 | SQ YD | $30.00 | |
| 10 | X2700001 | TEMP RUMBLE STRIPS SP | 6 | EACH | $850.00 | |
| 11 | X2700010 | PREF PL PM TD L 6 | 22,368 | FOOT | $5.40 | |
| 12 | X5010523 | REM CONC END SEC | 9 | EACH | $500.00 | |
| 13 | X5060601 | C&D N-LEAD PT C RS N1 | 1 | L SUM | $3,000.00 | |
| 14 | X5060602 | C&D N-LEAD PT C RS N2 | 1 | L SUM | $8,500.00 | |
| 15 | X5067501 | BR CLN & PT WAR #1 | 1 | L SUM | $750.00 | |
| 16 | X5067502 | BR CLN & PT WAR #2 | 1 | L SUM | $750.00 | |
| 17 | X5420618 | PIPE CULV CLEANED 18 | 63 | FOOT | $59.00 | |
| 18 | X5420624 | PIPE CULV CLEANED 24 | 512 | FOOT | $55.00 | |
| 19 | X6300135 | SPBGR TY B SPL | 50 | FOOT | $77.00 | |
| 20 | X6350120 | DELINEATOR REMOVAL | 419 | EACH | $12.23 | |
| 21 | X6431220 | REM REPL IMP ATTEN SM | 56 | EACH | $690.00 | |
| 22 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $30,200.00 | |
| 23 | X7010239 | CHANGEABLE MSG SN SPL | 750 | CAL WK | $160.00 | |
| 24 | X7040125 | PIN TEMP CONC BARRIER | 234 | EACH | $45.00 | |
| 25 | X7260100 | MILE POST MKR ASSY SP | 32 | EACH | $200.00 | |
| 26 | X7830060 | GRV RCSD PM LTR & SYM | 745 | SQ FT | $6.00 | |
| 27 | X7830070 | GRV RCSD PVT MRKG 5 | 189,212 | FOOT | $0.5000 | |
| 28 | X7830074 | GRV RCSD PVT MRKG 7 | 22,368 | FOOT | $0.7500 | |
| 29 | X7830076 | GRV RCSD PVT MRKG 9 | 3,257 | FOOT | $1.25 | |
| 30 | X7830078 | GRV RCSD PVT MRKG 13 | 3,306 | FOOT | $1.50 | |
| 31 | X7830090 | GRV RCSD PVT MRKG 25 | 3,113 | FOOT | $3.00 | |
| 32 | X8570002 | SMART TRAF MONIT SYS | 100 | CAL WK | $2,000.00 | |
| 33 | X8570004 | SMART TRAF MONIT DEV | 500 | CAL WK | $12.50 | |
| 34 | Z0001899 | JACK & REM EX BEARING | 19 | EACH | $1,845.00 | |
| 35 | Z0004552 | APPROACH SLAB REM | 181 | SQ YD | $48.00 | |
| 36 | Z0005216 | HMA STAB 6 AT SPBGR | 1,702 | SQ YD | $60.00 | |
| 37 | Z0006012 | BR DK LTX C OLY 2 1/4 | 1,298 | SQ YD | $220.00 | |
| 38 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $97,500.00 | |
| 39 | Z0010502 | CLEAN & PT STL BR N2 | 1 | L SUM | $132,500.00 | |
| 40 | Z0012130 | BR DECK SCAR 3/4 | 1,298 | SQ YD | $82.00 | |
| 41 | Z0012754 | STR REP CON DP = < 5 | 110 | SQ FT | $320.00 | |
| 42 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $52,000.00 | |
| 43 | Z0018002 | DRAINAGE SCUPPR DS-11 | 6 | EACH | $1,300.00 | |
| 44 | Z0018800 | DRAINAGE SYSTEM | 1 | L SUM | $17,500.00 | |
| 45 | Z0021904 | SILICONE JT SEAL 1 | 48 | FOOT | $51.00 | |
| 46 | Z0021906 | SILICONE JT SEAL 1.5 | 76 | FOOT | $56.00 | |
| 47 | Z0030850 | TEMP INFO SIGNING | 126 | SQ FT | $20.00 | |
| 48 | Z0033700 | LONG JOINT SEALANT | 177,063 | FOOT | $2.15 | |
| 49 | Z0034105 | MATL TRANSFER DEVICE | 60,406 | TON | $3.80 | |
| 50 | Z0040530 | PIPE UNDERDRAIN REMOV | 38 | FOOT | $9.00 | |
| 51 | Z0041895 | POLYMER CONCRETE | 12 | CU FT | $1,100.00 | |
| 52 | Z0046304 | P UNDR FOR STRUCT 4 | 152 | FOOT | $34.00 | |
| 53 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $10,800.00 | |
| 54 | Z0065700 | SLOPE WALL REPAIR | 103 | SQ YD | $328.00 | |
| 55 | Z0065730 | SLOPEWALL SLUR PUMPNG | 11 | CU YD | $270.00 | |
| 56 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 57 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 58 | 20101000 | TEMPORARY FENCE | 11,222 | FOOT | $4.00 | |
| 59 | 20200100 | EARTH EXCAVATION | 135 | CU YD | $126.00 | |
| 60 | 20400800 | FURNISHED EXCAVATION | 120 | CU YD | $138.00 | |
| 61 | 25000210 | SEEDING CL 2A | 0.6 | ACRE | $4,100.00 | |
| 62 | 25000400 | NITROGEN FERT NUTR | 54 | POUND | $4.00 | |
| 63 | 25000500 | PHOSPHORUS FERT NUTR | 54 | POUND | $4.00 | |
| 64 | 25000600 | POTASSIUM FERT NUTR | 54 | POUND | $4.00 | |
| 65 | 25100115 | MULCH METHOD 2 | 0.45 | ACRE | $4,000.00 | |
| 66 | 25100630 | EROSION CONTR BLANKET | 753 | SQ YD | $1.53 | |
| 67 | 28000250 | TEMP EROS CONTR SEED | 60 | POUND | $4.00 | |
| 68 | 28000400 | PERIMETER EROS BAR | 11,222 | FOOT | $3.00 | |
| 69 | 31100500 | SUB GRAN MAT A 6 | 146 | SQ YD | $39.00 | |
| 70 | 35600708 | HMA BC WID 8 | 148 | SQ YD | $142.00 | |
| 71 | 40600290 | BIT MATLS TACK CT | 105,356 | POUND | $1.10 | |
| 72 | 40600400 | MIX CR JTS FLANGEWYS | 69 | TON | $300.00 | |
| 73 | 40600982 | HMA SURF REM BUTT JT | 280 | SQ YD | $49.00 | |
| 74 | 40600990 | TEMPORARY RAMP | 109 | SQ YD | $56.00 | |
| 75 | 40603240 | P HMA BC IL19.0 N90 | 31,979 | TON | $95.00 | |
| 76 | 40604002 | HMA SC IL-9.5FG C N70 | 46 | TON | $334.00 | |
| 77 | 40604052 | HMA SC IL-9.5 C N70 | 80 | TON | $220.00 | |
| 78 | 40605034 | P SC SMA 12.5 E N80 | 28,427 | TON | $134.00 | |
| 79 | 42000060 | WELDED WIRE REINF | 143 | SQ YD | $11.00 | |
| 80 | 42000080 | PVT CON PCC BR APP SL | 143 | SQ YD | $285.00 | |
| 81 | 42001300 | PROTECTIVE COAT | 143 | SQ YD | $3.50 | |
| 82 | 44000100 | PAVEMENT REM | 155 | SQ YD | $46.00 | |
| 83 | 44000157 | HMA SURF REM 2 | 56,606 | SQ YD | $3.00 | |
| 84 | 44000166 | HMA SURF REM 4 1/4 | 253,806 | SQ YD | $4.25 | |
| 85 | 44000173 | HMA SURF REM 6 | 77,478 | SQ YD | $7.25 | |
| 86 | 44201843 | CL D PATCH T3 16 | 400 | SQ YD | $180.00 | |
| 87 | 48102100 | AGG WEDGE SHLD TYPE B | 7,131 | TON | $26.50 | |
| 88 | 48203100 | HMA SHOULDERS | 32,293 | TON | $84.00 | |
| 89 | 50102400 | CONC REM | 22.3 | CU YD | $3,860.00 | |
| 90 | 50104400 | CONC HDWL REM | 1 | EACH | $485.00 | |
| 91 | 50104701 | REM EX CONC DECK N1 | 1 | EACH | $36,000.00 | |
| 92 | 50104702 | REM EX CONC DECK N2 | 1 | EACH | $178,000.00 | |
| 93 | 50105220 | PIPE CULVERT REMOV | 1,173 | FOOT | $16.00 | |
| 94 | 50157300 | PROTECTIVE SHIELD | 1,431 | SQ YD | $165.00 | |
| 95 | 50200100 | STRUCTURE EXCAVATION | 164 | CU YD | $36.00 | |
| 96 | 50300100 | FLOOR DRAINS | 8 | EACH | $550.00 | |
| 97 | 50300225 | CONC STRUCT | 40.1 | CU YD | $1,400.00 | |
| 98 | 50300255 | CONC SUP-STR | 642 | CU YD | $1,375.00 | |
| 99 | 50300260 | BR DECK GROOVING | 3,151 | SQ YD | $12.50 | |
| 100 | 50300300 | PROTECTIVE COAT | 3,733 | SQ YD | $2.50 | |
| 101 | 50301350 | CONC SUPSTR APP SLAB | 122.5 | CU YD | $580.00 | |
| 102 | 50500405 | F & E STRUCT STEEL | 1,280 | POUND | $20.00 | |
| 103 | 50500505 | STUD SHEAR CONNECTORS | 6,936 | EACH | $3.80 | |
| 104 | 50800205 | REINF BARS, EPOXY CTD | 195,160 | POUND | $1.50 | |
| 105 | 50800515 | BAR SPLICERS | 483 | EACH | $53.00 | |
| 106 | 51500100 | NAME PLATES | 2 | EACH | $560.00 | |
| 107 | 52000110 | PREF JT STRIP SEAL | 95 | FOOT | $237.00 | |
| 108 | 52100020 | ELAST BEARING ASSY T2 | 5 | EACH | $2,160.00 | |
| 109 | 52100520 | ANCHOR BOLTS 1 | 38 | EACH | $105.00 | |
| 110 | 52200010 | TEMP SHT PILING | 241 | SQ FT | $45.00 | |
| 111 | 542A1069 | P CUL CL A 2 24 | 796 | FOOT | $109.00 | |
| 112 | 542A1075 | P CUL CL A 2 30 | 131 | FOOT | $152.00 | |
| 113 | 542A1093 | P CUL CL A 2 48 | 143 | FOOT | $222.00 | |
| 114 | 54213669 | PRC FLAR END SEC 24 | 15 | EACH | $1,015.00 | |
| 115 | 54213675 | PRC FLAR END SEC 30 | 2 | EACH | $1,325.00 | |
| 116 | 54213681 | PRC FLAR END SEC 36 | 2 | EACH | $1,600.00 | |
| 117 | 54213693 | PRC FLAR END SEC 48 | 2 | EACH | $2,560.00 | |
| 118 | 54217680 | R C PIPE TEE 24P 24R | 2 | EACH | $1,040.00 | |
| 119 | 54244405 | FL INLT BX MED 542546 | 1 | EACH | $2,850.00 | |
| 120 | 54244805 | INLET BOX 542501 | 5 | EACH | $3,550.00 | |
| 121 | 54246405 | INLET BOX 542531 | 2 | EACH | $11,000.00 | |
| 122 | 54248510 | CONCRETE COLLAR | 0.4 | CU YD | $4,110.00 | |
| 123 | 58600101 | GRANULAR BACKFILL STR | 128 | CU YD | $78.00 | |
| 124 | 59000200 | EPOXY CRACK INJECTION | 140 | FOOT | $53.00 | |
| 125 | 59100100 | GEOCOMPOSITE WALL DR | 73 | SQ YD | $34.00 | |
| 126 | 59300100 | CONTR LOW-STRENG MATL | 417 | CU YD | $144.00 | |
| 127 | 60100060 | CONC HDWL FOR P DRAIN | 2 | EACH | $234.00 | |
| 128 | 60100070 | SHOULDER REM & REPL | 20 | FOOT | $53.00 | |
| 129 | 60108100 | PIPE UNDERDRAIN 4 SP | 38 | FOOT | $20.00 | |
| 130 | 60246605 | MED INLET (604101) | 2 | EACH | $1,885.00 | |
| 131 | 60300105 | FR & GRATES ADJUST | 8 | EACH | $560.00 | |
| 132 | 60600605 | CONC CURB TB | 60 | FOOT | $39.00 | |
| 133 | 63000003 | SPBGR TY A 9FT POSTS | 3,750 | FOOT | $32.00 | |
| 134 | 63100045 | TRAF BAR TERM T2 | 8 | EACH | $1,545.00 | |
| 135 | 63100070 | TRAF BAR TERM T5 | 1 | EACH | $1,460.00 | |
| 136 | 63100085 | TRAF BAR TERM T6 | 12 | EACH | $3,780.00 | |
| 137 | 63100089 | TRAF BAR TERM T6B | 1 | EACH | $3,685.00 | |
| 138 | 63100167 | TR BAR TRM T1 SPL TAN | 12 | EACH | $3,500.00 | |
| 139 | 63200310 | GUARDRAIL REMOV | 5,300 | FOOT | $6.00 | |
| 140 | 63500105 | DELINEATORS | 419 | EACH | $61.05 | |
| 141 | 64200116 | SHOULDER RUM STRIP 16 | 174,948 | FOOT | $0.2500 | |
| 142 | 64401100 | HT CBL MEDIAN BARRIER | 19,540 | FOOT | $13.13 | |
| 143 | 64401300 | HT CBL MED BAR TERM | 4 | EACH | $4,577.20 | |
| 144 | 66900200 | NON SPL WASTE DISPOSL | 661 | CU YD | $100.00 | |
| 145 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,950.00 | |
| 146 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,950.00 | |
| 147 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $900.00 | |
| 148 | 66901006 | REG SUB MON | 8 | CAL DA | $760.00 | |
| 149 | 67000400 | ENGR FIELD OFFICE A | 18 | CAL MO | $4,000.00 | |
| 150 | 67100100 | MOBILIZATION | 1 | L SUM | $734,640.00 | |
| 151 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $6,000.00 | |
| 152 | 70100420 | TRAF CONT-PROT 701411 | 4 | EACH | $4,000.00 | |
| 153 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $395,000.00 | |
| 154 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $4,000.00 | |
| 155 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $4,000.00 | |
| 156 | 70103815 | TR CONT SURVEILLANCE | 270 | CAL DA | $950.00 | |
| 157 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $25,000.00 | |
| 158 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $36,000.00 | |
| 159 | 70300100 | SHORT TERM PAVT MKING | 5,684 | FOOT | $2.50 | |
| 160 | 70300150 | SHRT TRM PAVT MK REM | 1,891 | SQ FT | $0.0100 | |
| 161 | 70300220 | TEMP PVT MK LINE 4 | 229,031 | FOOT | $0.2600 | |
| 162 | 70300240 | TEMP PVT MK LINE 6 | 22,368 | FOOT | $0.7600 | |
| 163 | 70300250 | TEMP PVT MK LINE 8 | 3,029 | FOOT | $2.10 | |
| 164 | 70400100 | TEMP CONC BARRIER | 5,663 | FOOT | $30.00 | |
| 165 | 70400200 | REL TEMP CONC BARRIER | 3,951 | FOOT | $8.00 | |
| 166 | 70600250 | IMP ATTN TEMP NRD TL3 | 16 | EACH | $3,800.00 | |
| 167 | 70600350 | IMP ATTN REL NRD TL3 | 16 | EACH | $1,250.00 | |
| 168 | 72400100 | REMOV SIN PAN ASSY TA | 16 | EACH | $50.00 | |
| 169 | 72501000 | TERMINAL MARKER - DA | 12 | EACH | $23.30 | |
| 170 | 72501100 | TERMINAL MARKER - PM | 4 | EACH | $157.26 | |
| 171 | 72800100 | TELES STL SIN SUPPORT | 320 | FOOT | $15.00 | |
| 172 | 78003100 | PREF PL PM TB LTR-SYM | 196 | SQ FT | $100.00 | |
| 173 | 78008310 | POLYUREA PM T2 LN 4 | 192,744 | FOOT | $0.9600 | |
| 174 | 78008340 | POLYUREA PM T2 LN 8 | 3,579 | FOOT | $2.90 | |
| 175 | 78008350 | POLYUREA PM T2 LN 12 | 3,306 | FOOT | $3.55 | |
| 176 | 78008370 | POLYUREA PM T2 LN 24 | 3,113 | FOOT | $7.10 | |
| 177 | 78100100 | RAISED REFL PAVT MKR | 2,458 | EACH | $45.00 | |
| 178 | 78200005 | GRDRAIL REF TYPE A | 124 | EACH | $3.50 | |
| 179 | 78200011 | BARR WALL REF TYPE C | 256 | EACH | $8.00 | |
| 180 | 78200021 | HT CBL MED BAR REF | 435 | EACH | $3.45 | |
| 181 | 78300200 | RAISED REF PVT MK REM | 2,458 | EACH | $7.00 | |
| 182 | 78300202 | PAVMT MRKG REM WTR BL | 16,124 | SQ FT | $2.00 |