(10-7,8;92-8,9)RS-2(92-10)RS-3

Let date
Friday, April 26, 2019
Contract
70790 · job page
District
District 5
County
Champaign, Vermilion
Highway
Limits
5.4 miles of resurfacing on I-74 from 2 miles east of St. Joseph interchange to IL 49 N.

Bidders 1

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Open Road Paving Company LLC Low bidder $11,754,738

Bid tab: unit prices 157 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Open Road Pavin…
1XZ193300 SURVEY MARKER T1 SPL9EACH $600.00
2X0320157 CLEAN UNDERDR OUTLET145EACH $85.00
3X0325110 BIAXIAL GEOGRID6,934SQ YD $1.95
4X0325379 DIRECTIONAL BORING842FOOT $150.00
5X0325667 WD CTRL MWNG STRP SP2,032SQ YD $30.25
6X0326677 REM HT CBL MEDIAN BAR4,571FOOT $2.50
7X0327640 REAL-TIME TR CONT CBU9CAL MO $4,280.04
8X0327641 REAL-TIME TR CONT SU117CAL MO $1,859.78
9X0327980 PAVMT MRKG REM WTR BL55,347SQ FT $0.9400
10X0795800 COARSE AGGREGATE1,363TON $33.00
11X1400267 REMVL LMNAIR NO SALVG24EACH $420.00
12X2700001 TEMP RUMBLE STRIPS SP32EACH $1,100.00
13X4400196 HMA SURF REM SPL204SQ YD $23.50
14X4403300 CONC MEDIAN REMOV176SQ FT $7.00
15X6015000 REM CONC HDWL P DRNS3EACH $345.00
16X6061702 CONC MED TSM DOW181SQ FT $33.50
17X7040125 PIN TEMP CONC BARRIER1,554EACH $13.50
18X7200201 WIDTH RESTRICT SIGN1L SUM $6,980.54
19X7830060 GRV RCSD PM LTR & SYM172SQ FT $5.50
20X7830070 GRV RCSD PVT MRKG 5140,803FOOT $0.3500
21X7830074 GRV RCSD PVT MRKG 7748FOOT $0.5000
22X7830076 GRV RCSD PVT MRKG 93,198FOOT $0.7000
23X7830078 GRV RCSD PVT MRKG 13592FOOT $2.50
24X7830090 GRV RCSD PVT MRKG 25144FOOT $5.00
25Z0008758 AERIAL SPEED CHK MK144FOOT $50.00
26Z0013798 CONSTRUCTION LAYOUT1L SUM $21,600.00
27Z0023600 FILL EXIST CULVERTS1EACH $2,000.00
28Z0025615 F & I METAL SCREEN20EACH $235.00
29Z0033700 LONG JOINT SEALANT64,136FOOT $2.15
30Z0034105 MATL TRANSFER DEVICE37,129TON $1.25
31Z0040530 PIPE UNDERDRAIN REMOV6,112FOOT $2.50
32Z0076600 TRAINEES2,000HOUR $0.8000
33Z0076604 TRAINEES TPG2,000HOUR $15.00
34Z0076870 UNDR CONNECT TO STR39EACH $425.00
3520100110 TREE REMOV 6-15146UNIT $75.00
3620100210 TREE REMOV OVER 15332UNIT $110.00
3720200100 EARTH EXCAVATION10,864CU YD $29.00
3820400800 FURNISHED EXCAVATION1,153CU YD $45.75
3920700110 POROUS GRAN EMBANK2,764TON $36.50
4020800150 TRENCH BACKFILL16CU YD $30.00
4125000210 SEEDING CL 2A3ACRE $1,175.00
4225000312 SEEDING CL 4A5ACRE $1,125.00
4325000314 SEEDING CL 4B3.5ACRE $4,925.00
4425000400 NITROGEN FERT NUTR990POUND $1.15
4525000500 PHOSPHORUS FERT NUTR990POUND $1.15
4625000600 POTASSIUM FERT NUTR990POUND $1.15
4725100115 MULCH METHOD 211ACRE $875.00
4825100630 EROSION CONTR BLANKET8,256SQ YD $1.45
4928000250 TEMP EROS CONTR SEED4,450POUND $1.00
5028000305 TEMP DITCH CHECKS3,435FOOT $7.75
5128000400 PERIMETER EROS BAR2,726FOOT $1.85
5228000500 INLET & PIPE PROTECT5EACH $195.00
5328001000 AGGREGATE - EROS CONT8TON $200.00
5428100105 STONE RIPRAP CL A38SQ YD $568.88
5531100100 SUB GRAN MAT A2,370TON $45.00
5635400510 PCC BASE CSE W 111SQ YD $885.25
5740600275 BIT MATLS PR CT18,042POUND $1.00
5840600290 BIT MATLS TACK CT194,581POUND $1.15
5940600847 P LB MM IL-9.5FG N90636TON $140.00
6040600982 HMA SURF REM BUTT JT2,973SQ YD $2.75
6140600990 TEMPORARY RAMP1,124SQ YD $29.75
6240603153 P HMA SC SMA N8021,223TON $133.00
6340603240 P HMA BC IL19.0 N9019,330TON $97.00
6440800025 BIT MATLS PR CT98POUND $1.15
6540800050 INCIDENTAL HMA SURF18TON $680.00
6644000100 PAVEMENT REM6,419SQ YD $19.00
6744000154 HMA SURF REM 1 1/46,609SQ YD $4.75
6844000156 HMA SURF REM 1 3/41,269SQ YD $7.25
6944000157 HMA SURF REM 2148,049SQ YD $2.35
7044000159 HMA SURF REM 2 1/27,387SQ YD $3.05
7144000169 HMA SURF REM 564,671SQ YD $3.89
7244000500 COMB CURB GUTTER REM7FOOT $125.00
7344004250 PAVED SHLD REMOVAL3,677SQ YD $6.15
7444200050 WELDED WIRE REINF359SQ YD $6.85
7544201031 CL B PATCH T2 15399SQ YD $229.15
7644201035 CL B PATCH T3 15232SQ YD $180.50
7744201037 CL B PATCH T4 15127SQ YD $190.00
7844201299 DOWEL BARS 1 1/21,080EACH $17.50
7944213200 SAW CUTS2,464FOOT $2.80
8044213204 TIE BARS 3/438EACH $18.95
8148102100 AGG WEDGE SHLD TYPE B3,847TON $50.00
8248203029 HMA SHOULDERS 83,143SQ YD $52.00
8348203100 HMA SHOULDERS14,045TON $82.00
8450900200 STEEL RAIL TYPE 2399746FOOT $177.00
85542A0217 P CUL CL A 1 1236FOOT $275.00
86542A0223 P CUL CL A 1 1848FOOT $290.00
87542D0241 P CUL CL D 1 3650FOOT $100.00
88542JA018 P CUL CL A 18 JKD175FOOT $455.00
8954213657 PRC FLAR END SEC 122EACH $1,250.00
9054213663 PRC FLAR END SEC 184EACH $1,450.00
9154248510 CONCRETE COLLAR1.7CU YD $2,100.00
9254262712 METAL FL END SEC 12"7EACH $240.00
9354262736 METAL FL END SEC 36"2EACH $835.00
9455200900 STORM SEWERS JKD 24220FOOT $540.00
9560100060 CONC HDWL FOR P DRAIN29EACH $475.00
9660100070 SHOULDER REM & REPL5,097FOOT $8.30
9760100915 PIPE DRAINS 6848FOOT $27.00
9860100945 PIPE DRAINS 12108FOOT $97.50
9960107600 PIPE UNDERDRAINS 44,800FOOT $11.25
10060108100 PIPE UNDERDRAIN 4 SP1,875FOOT $20.75
10160108206 PIPE UNDERDR T 2 68,975FOOT $10.75
10260218400 MAN TA 4 DIA T1F CL1EACH $4,375.00
10360223800 MAN TA 6 DIA T1F CL2EACH $7,350.00
10460236200 INLETS TA T8G12EACH $1,050.00
10560605000 COMB CC&G TB6.247FOOT $512.38
10663000001 SPBGR TY A 6FT POSTS3,950FOOT $21.00
10763100087 TRAF BAR TERM T6A8EACH $3,300.00
10863100167 TR BAR TRM T1 SPL TAN10EACH $2,750.00
10963200310 GUARDRAIL REMOV4,837.5FOOT $4.00
11063301210 REM RE-E SPBGR TY A950FOOT $16.00
11163301990 REM RE-E T B TERM T14EACH $1,675.00
11263302720 REM RE-E T B TERM T6B4EACH $2,200.00
11364200116 SHOULDER RUM STRIP 16141,381FOOT $0.2000
11464401100 HT CBL MEDIAN BARRIER5,891FOOT $15.00
11564401300 HT CBL MED BAR TERM3EACH $4,800.00
11667000500 ENGR FIELD OFFICE B9CAL MO $2,000.00
11767100100 MOBILIZATION1L SUM $650,000.00
11870100207 TRAF CONT-PROT 7014024EACH $5,000.00
11970100420 TRAF CONT-PROT 7014118EACH $2,000.00
12070100450 TRAF CONT-PROT 7012011L SUM $5,075.00
12170100700 TRAF CONT-PROT 7014061L SUM $15,000.00
12270100800 TRAF CONT-PROT 7014011L SUM $225,000.00
12370100825 TRAF CONT-PROT 7014561L SUM $5,000.00
12470103815 TR CONT SURVEILLANCE275CAL DA $100.00
12570107025 CHANGEABLE MESSAGE SN60CAL DA $65.00
12670300100 SHORT TERM PAVT MKING11,635FOOT $1.00
12770300150 SHRT TRM PAVT MK REM3,879SQ FT $3.50
12870300210 TEMP PVT MK LTR & SYM172SQ FT $2.50
12970300220 TEMP PVT MK LINE 4155,809FOOT $0.1000
13070300240 TEMP PVT MK LINE 6748FOOT $0.1700
13170300250 TEMP PVT MK LINE 83,198FOOT $0.2300
13270300260 TEMP PVT MK LINE 12592FOOT $0.3500
13370300280 TEMP PVT MK LINE 24144FOOT $2.00
13470400100 TEMP CONC BARRIER3,362.5FOOT $22.00
13570400200 REL TEMP CONC BARRIER3,112.5FOOT $5.15
13670600260 IMP ATTN TEMP FRN TL34EACH $4,175.00
13770600332 IMP ATTN REL FRN TL34EACH $1,475.00
13872501000 TERMINAL MARKER - DA10EACH $25.00
13978000100 THPL PVT MK LTR & SYM172SQ FT $4.00
14078000200 THPL PVT MK LINE 4140,803FOOT $0.5600
14178000400 THPL PVT MK LINE 6748FOOT $0.7800
14278000500 THPL PVT MK LINE 83,198FOOT $1.04
14378000600 THPL PVT MK LINE 12592FOOT $1.57
14478000650 THPL PVT MK LINE 24144FOOT $3.50
14578004210 PREF PL PM TB INL L415,006FOOT $2.96
14678100100 RAISED REFL PAVT MKR1,706EACH $26.00
14778200005 GRDRAIL REF TYPE A54EACH $8.00
14878300200 RAISED REF PVT MK REM1,706EACH $8.65
14980400100 ELECT SERV INSTALL2EACH $6,000.00
15081028350 UNDRGRD C PVC 2325FOOT $15.00
15181603035 UD 2#6 #6G XLPUSE 11,940FOOT $13.00
15282110008 LUM LED RDWY H24EACH $1,700.00
15382500330 LT CONT PEDM 240V 602EACH $8,000.00
15484500110 REMOV LIGHTING CONTR2EACH $600.00
15584500120 REMOV ELECT SERV INST2EACH $1,100.00
15684500130 REMOV LTG CONTR FDN2EACH $850.00
15789502300 REM ELCBL FR CON5,820FOOT $0.5000