| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 25, 2025 | 72940 | VariousDistrict 6 | Bridge approach dip corrections on 11 structures on various routes in District 6. | — | Active | |||
| Apr 25, 2025 | 74759 | ColesDistrict 7 | Pavement patching, hot-mix asphalt surface removal and resurfacing, ADA improvements and Signal improvements on IL 16 from IL 121 to just east of Swords Drive in Mattoon. | — | Executed | Howell Paving, Inc. $10,508,360 · | ||
| Apr 25, 2025 | 74A01 | ClarkDistrict 7 | Bridge superstructure replacement on SN 012-0006 and SN 012-0007 carrying I-70 over East Little Creek, 2.5 miles east of IL 1. | — | Executed | |||
| Apr 25, 2025 | 74A26 | RichlandDistrict 7 | Patching, shoulder work, resurfacing, longitudinal joint sealant, bridge deck overlay, bridge joint replacement/repairs and flashing beacon on IL 130 from the Jasper County line to 0.4 miles north of Mack Avenue in Olney. | — | Executed | Howell Paving, Inc. $8,847,480 · | ||
| Apr 25, 2025 | 74B64 | EffinghamDistrict 7 | 6.1 miles of new shoulders and safety improvements on Dietrich Blacktop from north of Willow Avenue in Montrose to 1100the Avenue north of Dietrich. | — | Executed | Howell Paving, Inc. $1,731,256 · | ||
| Apr 25, 2025 | 74C44 | JasperDistrict 7 | 11.3 miles of resurfacing, shoulder work and patching on IL 33 from the Effingham County line to west of West End Avenue in Newton. | — | Executed | Howell Paving, Inc. $4,744,251 · | ||
| Apr 25, 2025 | 74C46 | LawrenceDistrict 7 | 2 miles of resurfacing, aggregate wedge shoulders and pavement patching on St. Francisville Spur from IL 1 to west of Hayes Road in St. Francisville. | — | Executed | Ambraw Asphalt Materials, Inc. $925,196 · | ||
| Apr 25, 2025 | 74C48 | EffinghamDistrict 7 | 20.9 miles of crack and joint sealing on southbound I-57 from the Clay County line to I-70 and on northbound I-57 from the Little Wabash River to I-70. | — | Executed | Complete Asphalt Service Co. $384,459 · | ||
| Apr 25, 2025 | 74C50 | CumberlandDistrict 7 | 7.5 miles of cape seal on US 45 from the Cumberland County line to 5th Street in Neoga and from 9th Street in Neoga to 0.3 miles south of IL 121. | — | Executed | Beniach Construction Co., Inc. $754,086 · | ||
| Apr 25, 2025 | 74D27 | FayetteDistrict 7 | Patching on I-70 from the Bond County line to 0.2 miles east of US 51 and from just east of TR 342 (Brownstown Road) to 1 mile east of TR 342 (Brownstown Road). | — | Executed | G. M. Sipes Construction, Inc. $498,479 · | ||
| Apr 25, 2025 | 74D28 | EffinghamDistrict 7 | 2 miles of patching on US 45 (South Banker Street) from Fayette Avenue to Jaycee Avenue in Effingham. | — | Executed | Feutz Contractors, Inc. $528,441 · | ||
| Apr 25, 2025 | 74D30 | JasperRichlandDistrict 7 | Tree removal and trimming on IL 130 from Ste. Marie Spur (600th Avenue) to Cove Lane in Olney. | — | Executed | Thor General Contracting LLC $290,712 · | ||
| Apr 25, 2025 | 74D44 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining electrical systems throughout District 7. | — | Executed | Bodine Electric of Decatur $508,030 · | ||
| Apr 25, 2025 | 76J62 | St. ClairDistrict 8 | 4.5 miles of resurfacing, patching and guardrail updates on IL 158/US 50 from US 50 in O-Fallon to IL 161. | — | Executed | Christ Bros. Asphalt, Inc. $14,154,479 · | ||
| Apr 25, 2025 | 76N05 | St. ClairDistrict 8 | 8.4 miles of resurfacing on IL 4 from IL 15 to IL 13. | — | Executed | Christ Bros. Asphalt, Inc. $7,874,830 · | ||
| Apr 25, 2025 | 76T07 | MadisonDistrict 8 | Bridge painting on I-55 under Goshen Road (SN 060-0178). | — | Executed | ERA-Valdivia Contractors, Inc. $278,460 · | ||
| Apr 25, 2025 | 76T79 | VariousDistrict 8 | Lighting and traffic signal modernization at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,923,315 · | ||
| Apr 25, 2025 | 76U16 | JerseyDistrict 8 | Bridge joint replacement and repairs, bridge deck overlay and repairs on SN 042-0014 carrying IL 100 over Elsah Creek. | — | Executed | Keeley & Sons, Inc. $1,685,988 · | ||
| Apr 25, 2025 | 76U18 | St. ClairDistrict 8 | Bridge joint replacements, deck repairs and deck overlay on SN 082-0271 carrying US 50 over Summerfield Road. | — | Executed | The Kilian Corporation $1,173,906 · | ||
| Apr 25, 2025 | 76U26 | MadisonDistrict 8 | 6.5 miles of resurfacing on IL 3 (Main Street) from Northgate Industrial Drive to the McKinley Bridge approach. | — | Executed | Charles E. Mahoney Co. $25,874,598 · | ||
| Apr 25, 2025 | 76U27 | MadisonDistrict 8 | 1.3 miles of resurfacing with guardrail upgrades on IL 143 from Kendall Drive to 0.1 miles west of Oasis Drive. | — | Executed | Charles E. Mahoney Co. $1,613,743 · | ||
| Apr 25, 2025 | 76U30 | St. ClairDistrict 8 | Bridge deck overlay and joint replacement on SN 082-0323 and 082-0325 carrying I-70 ramps over I-55/64 and the KCS Railroad in East St. Louis. | — | Executed | Keeley & Sons, Inc. $3,755,513 · | ||
| Apr 25, 2025 | 76U31 | St. ClairDistrict 8 | 7 miles of resurfacing on IL 4 from south of Cornmill Road to the northern city limits of Fayetteville. | — | Executed | The Kilian Corporation $9,334,223 · | ||
| Apr 25, 2025 | 78147 | GallatinDistrict 9 | Removal and replacement of SN 030-0019 carrying IL 1 over Crawford Creek, approximately 1 mile northwest of Ridgeway. | — | Executed | E. T. Simonds Construction Company $2,908,063 · | ||
| Apr 25, 2025 | 78373 | WilliamsonDistrict 9 | 3.6 miles of roadway reconstruction including adding lanes, reconstruction of 4 bridges and intersection reconstruction on IL 13 from Spillway Road to Shawnee Trail. | — | Executed | Samron Midwest Contracting, Inc. $40,895,392 · | ||
| Apr 25, 2025 | 78833 | WhiteDistrict 9 | Bridge replacement on US 45 over Lost Creek, approximately 9.3 miles south of the Wayne County line. (SN 097-0023) | — | Executed | E. T. Simonds Construction Company $1,609,107 · | ||
| Apr 25, 2025 | 78894 | SalineDistrict 9 | 3.4 miles of resurfacing on IL 145 from north of the Pope County line to IL 34. | — | Executed | Samron Midwest Contracting, Inc. $1,493,057 · | ||
| Apr 25, 2025 | 78973 | AlexanderDistrict 9 | Bridge painting on SN 002-0022 carrying IL 57 over the Mississippi River in Cairo. | — | Executed | Capital Industrial Services, LLC $33,351,843 · | ||
| Apr 25, 2025 | 78A56 | SalineDistrict 9 | Partial single box culvert replacement on US 45 just east of 4th Street in the City of Eldorado. | — | Executed | Samron Midwest Contracting, Inc. $584,789 · | ||
| Apr 25, 2025 | 78A80 | PulaskiDistrict 9 | 11.8 miles of resurfacing, patching, and cleanout and marking of existing pipe underdrains on I-57 / US 51 from Pulaski Road to Perks Road. Also includes bridge deck overlay and repair work on SN 077-0007 and SN 077-0008. | — | Executed | E. T. Simonds Construction Company $12,722,436 · | ||
| Apr 25, 2025 | 78A89 | GallatinDistrict 9 | 14 miles of resurfacing and ADA ramp upgrades on IL 1 and Old IL 13 in Omaha. | — | Executed | E. T. Simonds Construction Company $5,244,108 · | ||
| Apr 25, 2025 | 78A99 | SalineDistrict 9 | 5.5 miles of resurfacing on IL 13 from Lindale Road to the Gallatin County line. | — | Executed | E. T. Simonds Construction Company $2,299,898 · | ||
| Apr 25, 2025 | 78B07 | AlexanderDistrict 9 | 4.7 miles of resurfacing on IL 3 from Twente Crossing Road, 1.5 miles north of Olive Branch, to the UP Railroad in Thebes. | — | Executed | E. T. Simonds Construction Company $1,463,916 · | ||
| Apr 25, 2025 | 78B08 | JeffersonDistrict 9 | 3.5 miles of HMA resurfacing on IL 37 from County Road 1500N outside of Mt. Vernon to SN 041-0039 carrying IL 37 over the Norfolk Southern Railroad. | — | Executed | E. T. Simonds Construction Company $2,371,499 · | ||
| Apr 25, 2025 | 78B09 | GallatinSalineWhiteDistrict 9 | 2.4 miles of HMA removal, pavement overlay, shoulder work and guardrail improvements on US 45 beginning 0.7 miles southwest of the Saline/Gallatin County line and proceeding northeast 2.4 miles. | — | Executed | E. T. Simonds Construction Company $1,208,977 · | ||
| Apr 25, 2025 | 78B10 | WilliamsonDistrict 9 | 1.5 miles of resurfacing and patching on Moellers Road from IL 13 to Pittsburg Road. | — | Executed | Samron Midwest Contracting, Inc. $526,107 · | ||
| Apr 25, 2025 | 78B11 | JeffersonDistrict 9 | 0.8 miles of resurfacing on IL 15 in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $963,345 · | ||
| Apr 25, 2025 | 78B12 | WilliamsonDistrict 9 | 3.2 miles of HMA surface removal, HMA surfacing and patching on Old IL 13 from the east city limits of Carterville to IL 148. | — | Executed | E. T. Simonds Construction Company $974,757 · | ||
| Apr 25, 2025 | 78B14 | FranklinDistrict 9 | 5.7 miles of HMA surface removal, resurfacing, patching and shoulder work on IL 184 from IL 14 in Mulkeytown to IL 149 north of Royalton. | — | Executed | E. T. Simonds Construction Company $1,642,992 · | ||
| Apr 25, 2025 | 78B15 | HardinDistrict 9 | 15.1 miles of milling and resurfacing on IL 146 from the Pope County line to IL 1. | — | Executed | Samron Midwest Contracting, Inc. $2,988,051 · | ||
| Apr 25, 2025 | 78B17 | AlexanderPulaskiDistrict 9 | Patching on I-57 from the Mississippi River Bridge near Cairo to 1 mile north of Mounds Road interchange in both lanes (13.3 miles) and from 1 mile north of Mounds Road interchange to Pulaski Road. | — | Executed | Kinney Contractors, Inc. $1,168,552 · | ||
| Apr 25, 2025 | 78B25 | PerryDistrict 9 | 6.5 miles of patching on US 51 from IL 154 to 2.5 miles south of the Washington County line. | — | Executed | E. T. Simonds Construction Company $521,745 · | ||
| Apr 25, 2025 | 85773 | LeeDistrict 2 | Replace the bridge carrying Brooklyn Road over Willow Creek, 0.5 mile north of US 30. | — | Executed | Martin & Company Excavating $950,396 · | ||
| Apr 25, 2025 | 85774 | Rock IslandDistrict 2 | Pavement reconstruction, sidewalks, storm sewer, curb and gutter, traffic signals, lighting, and landscaping on 15 Avenue from 6th Street to 13th Street in East Moline. | — | Executed | Valley Construction Co. $12,185,222 · | ||
| Apr 25, 2025 | 85776 | StephensonDistrict 2 | Removal and replacement of guardrail and terminals on various routes in Stephenson County. | — | Executed | Northern Contracting, Inc. $947,223 · | ||
| Apr 25, 2025 | 85777 | WhitesideDistrict 2 | Resurfacing on Fenton Road 0.8 mile south of Garden Plain Road to Black Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,439,241 · | ||
| Apr 25, 2025 | 85778 | OgleDistrict 2 | Extension of two industrial rail spurs from east of Steward Street to south of Ritchie Road in Rochelle. Includes; concrete paving, precast concrete box culverts, storm sewers, and landscaping. | — | Executed | McCarthy Improvement Company $4,668,879 · | ||
| Apr 25, 2025 | 87862 | LivingstonDistrict 3 | HMA resurfacing with aggregate shoulders on various county highways in Livingston County. | — | Executed | H. J. Eppel & Co. $1,638,174 · | ||
| Apr 25, 2025 | 87880 | BureauDistrict 3 | Replace sidewalks and ADA ramp improvements along Cleveland street from Peru Avenue to Summit Avenue in Ladd. | — | Executed | Gillan Construction LLC $255,362 · | ||
| Apr 25, 2025 | 87881 | LaSalleDistrict 3 | Sidewalk removal and replacement at various locations in Mendota. | — | Executed | D. Construction, Inc. $247,455 · | ||
| Apr 25, 2025 | 89780 | WarrenDistrict 4 | Pavement reconstruction on West Harlem Avenue from US 34 to North Main Street in Monmouth. | — | Executed | Brandt Construction Co. $2,855,658 · | ||
| Apr 25, 2025 | 89802 | TazewellDistrict 4 | HMA resurfacing and construction of a Multi-use path along Detroit Avenue in Morton. Includes; sidewalks, pedestrian signals, ADA ramps, and curb and gutter. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,452,499 · | ||
| Apr 25, 2025 | 89852 | TazewellDistrict 4 | Sidewalk construction at various locations in the City of Washington. | — | Executed | Stark Excavating, Inc. $791,727 · | ||
| Apr 25, 2025 | 89868 | MercerDistrict 4 | Construct a shared-use path along 9th Avenue from 6th Street to 4th Street in Aledo. Includes; Curb and gutter, storm sewer, HMA Patching, and PCC entrances. | — | Executed | Phoenix Corporation of the Quad Cities $918,761 · | ||
| Apr 25, 2025 | 91650 | VermilionDistrict 5 | HMA shoulders with rumble strips on Perrysville Road from Brewer Road to the Indiana State Line. | — | Executed | Cross Construction, Inc. $1,720,330 · | ||
| Apr 25, 2025 | 91654 | VermilionDistrict 5 | Sidewalk replacement along Jefferson Street and Walnut Street in Westville. | — | Executed | SNC Construction, Inc. $273,470 · | ||
| Apr 25, 2025 | 93829 | PikeDistrict 6 | Construct a single-span PPC deck beam bridge to carry TR 424B over Blue Creek in Pike County. Includes; Aggregate roadway reconstruction and channel excavation. | — | Executed | County Contractors, Inc. $391,972 · | ||
| Apr 25, 2025 | 93830 | AdamsDistrict 6 | HMA resurfacing on South 18th Street from Harrison Street to Ohio Street in Quincy. Includes; sidewalks and ADA improvements. | — | Executed | Diamond Construction Company $1,576,416 · | ||
| Apr 25, 2025 | 95940 | ShelbyDistrict 7 | Construct a PCC Bike path with a single-span prefabricated pedestrian structure along IL 16 in Shelbyville. Includes; ADA ramps, drainage improvements, signage, and traffic signal improvements. | — | Executed | Kinney Contractors, Inc. $2,495,777 · | ||
| Apr 25, 2025 | 95969 | ClarkDistrict 7 | Sidewalk replacement on 7th Street from Oak Street to Mulberry Street, and on Mulberry Street from 6th St. to Michigan Avenue in Marshall. | — | Executed | Feutz Contractors, Inc. $394,399 · | ||
| Apr 25, 2025 | 95972 | EffinghamDistrict 7 | HMA resurfacing on N 300 Street from 475 N to the Effingham/Fayetteville county line. Includes; aggregate shoulders, and pavement markings. | — | Executed | Howell Paving, Inc. $2,411,360 · | ||
| Apr 25, 2025 | 95975 | ColesDistrict 7 | Resurfacing on Madison Avenue from 7th Street to 18th Street in Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $356,482 · | ||
| Apr 25, 2025 | 95976 | ShelbyDistrict 7 | Cold-in-place recycling with HMA surface and binder on CH 3 from Findlay to the Moultrie County line. Includes aggregate shoulders and pavement markings. | — | Executed | Howell Paving, Inc. $2,057,823 · | ||
| Apr 25, 2025 | 95977 | MaconDistrict 7 | Construct a shared-use path along Harryland Road from Sundance Drive to North Baltimore Avenue in Mt. Zion. | — | Executed | Kinney Contractors, Inc. $247,095 · | ||
| Apr 25, 2025 | 95978 | MaconDistrict 7 | Construct multi-use paths at various locations in Forsyth. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $536,307 · | ||
| Apr 25, 2025 | 97839 | MadisonDistrict 8 | HMA resurfacing on Esic Drive from University Drive to IL 157 in Edwardsville. Includes; ADA improvements, storm sewer, and signage. | — | Executed | Charles E. Mahoney Co. $615,086 · | ||
| Apr 25, 2025 | 97852 | JerseyDistrict 8 | Pavement reconstruction and widening on Hollow Avenue from 0.1 mile west of Waggoner Avenue to 0.1 mile west of North Hickory Street in Jerseyville. | — | Executed | Baxmeyer Construction, Inc. $2,063,878 · | ||
| Apr 25, 2025 | 97857 | WashingtonDistrict 8 | Resurface CH 12 from CH 10 to New Marigold Road. | — | Executed | E. T. Simonds Construction Company $773,798 · | ||
| Apr 25, 2025 | 97858 | BondDistrict 8 | Construct PCC sidewalk with ADA improvements in the East Wood Subdivision in Greenville. Includes; Utility relocations, driveways, and curb and gutter. | — | Executed | Keller Construction, Inc. $449,364 · | ||
| Apr 25, 2025 | 97861 | ClintonDistrict 8 | Resurfacing on Aviston Road from Old US Highway 50 to IL 161. | — | Executed | Christ Bros. Asphalt, Inc. $2,147,938 · | ||
| Apr 25, 2025 | 97862 | MadisonDistrict 8 | Pavement reconstruction, sidewalk, curb and gutter on Pierce Lane from north of Stamper Lane to Stamper lane in Godfrey. | — | Executed | Keller Construction, Inc. $1,917,545 · | ||
| Apr 25, 2025 | 99727 | JacksonDistrict 9 | HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,596,208 · | ||
| Jun 13, 2025 | 46658 | VariousDistrict 7 | Replacing guardrail reflectors and linear delineation panels on various routes throughout District 7. | — | Executed | Done Rite Construction Co., Inc. $227,213 · | ||
| Jun 13, 2025 | 46661 | VariousDistrict 2 | Removing existing guardrail delineators and barrier wall delineators and installing new guardrail delineators and barrier wall delineators within the limits of each individual work order. | — | Executed | O'Brien Civil Works, Inc. $167,625 · | ||
| Jun 13, 2025 | 46664 | VariousDistrict 4 | Repairing various widths of preformed plastic, epoxy, modified urethane pavement marking lines, letters and symbols and removal of existing pavement markings within the limits specified on each individual Work Order, and related collateral work necessary to complete the project on various routes throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,978,061 · | ||
| Jun 13, 2025 | 46937 | LaSalleDistrict 3 | Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length. | — | Executed | D. Construction, Inc. $1,632,707 · | ||
| Jun 13, 2025 | 46941 | LaSalleDistrict 3 | PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL. | — | Executed | Advanced Asphalt Company $513,534 · | ||
| Jun 13, 2025 | 60R76 | WillDistrict 1 | Construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert e (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County. | — | Executed | D. Construction, Inc. $4,142,053 · | ||
| Jun 13, 2025 | 61J86 | LakeDistrict 1 | Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit. | — | Executed | Lake County Grading Company, LLC $4,391,124 · | ||
| Jun 13, 2025 | 61K96 | LakeDistrict 1 | HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods. | — | Executed | |||
| Jun 13, 2025 | 61L34 | CookDistrict 1 | Add bike lanes on Church Street from Linder Avenue to McCormick Boulevard in Skokie. Includes PCC base course widening, curb and gutter, sidewalks, and traffic signal modifications. | — | Executed | Alliance Contractors, Inc. $2,111,750 · | ||
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. | — | Executed | Schroeder Asphalt Services, Inc. $1,348,856 · | ||
| Jun 13, 2025 | 61L49 | McHenryDistrict 1 | Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments. | — | Executed | Alliance Contractors, Inc. $1,194,482 · | ||
| Jun 13, 2025 | 61L50 | McHenryDistrict 1 | HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders. | — | Executed | Geske and Sons, Inc. $1,758,088 · | ||
| Jun 13, 2025 | 61L51 | McHenryDistrict 1 | Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove. | — | Executed | Geske and Sons, Inc. $588,609 · | ||
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration. | — | Executed | Alliance Contractors, Inc. $521,885 · | ||
| Jun 13, 2025 | 61L53 | CookDistrict 1 | Resurfacing Glenview Road from Milwaukee Avenue to Shermer Road in Glenview. | — | Executed | Peter Baker & Son Co. $2,007,772 · | ||
| Jun 13, 2025 | 61L59 | KaneDistrict 1 | HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments. | — | Executed | Curran Contracting Company $308,598 · | ||
| Jun 13, 2025 | 61L60 | KaneDistrict 1 | HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration. | — | Executed | Plote Construction, Inc. $1,197,423 · | ||
| Jun 13, 2025 | 61L62 | CookDistrict 1 | Resurfacing Beckwith Road from Shermer Road to Austin Avenue in Morton Grove. | — | Executed | Peter Baker & Son Co. $1,660,324 · | ||
| Jun 13, 2025 | 61L63 | CookDistrict 1 | Resurfacing Gross Point Road from Main Street to Oakton Street in Morton Grove. | — | Executed | Peter Baker & Son Co. $929,683 · | ||
| Jun 13, 2025 | 61L64 | CookDistrict 1 | Resurfacing Central Avenue from Golf Road to Dempster Street in Morton Grove. | — | Executed | Peter Baker & Son Co. $1,669,904 · | ||
| Jun 13, 2025 | 61L65 | CookDistrict 1 | Resurfacing Shermer Road from Gold Road to Harlem Avenue in Morton Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $939,244 · | ||
| Jun 13, 2025 | 62G52 | WillDistrict 1 | (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville. | — | Executed | K-Five Construction Corporation $3,382,064 · | ||
| Jun 13, 2025 | 62L61 | McHenryDistrict 1 | (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock. | — | Executed | Curran Contracting Company $2,693,463 · | ||
| Jun 13, 2025 | 62N39 | CookDuPageDistrict 1 | (9.38-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization, and ADA Improvements. Located along 22nd St / Cermak Rd from York Rd to IL 50 (Cicero Ave.) in the Village of Oak Brook in DuPage County, and in the Villages of Hillside, Westchester, Broadview North Riverside, Forest Park, the City of Berwyn, and the Town of Cicero,in Cook County. | — | Executed | Meade Inc. $20,875,047 · | ||
| Jun 13, 2025 | 62P73 | LakeDistrict 1 | US RTE 12 (10 The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein | — | Executed | Curran Contracting Company $16,944,587 · | ||
| Jun 13, 2025 | 62T22 | CookDistrict 1 | Bridge and approach slab scarification, replacement of joints at abutments and piers with strip seals, cleanin (405-Ft) Bridge Deck Overlay on SN 016-1005 and SN 016-1006 and associated bridge rehabilitation consists of bridge and approach slab scarification, replacement of joints at abutments and piers with strip seals, cleaning/ adjusting shoulder drains, concrete sealer of deck and parapets, HMA overlay on bridge approaches, slope wall repair and replacement, maintenance of traffic control, pavement marking. Located along IL-171 at Joliet Road and BNSF Railroad Spur in the Village of McCook, Cook Coun | — | Executed | Martam Construction Incorporated $1,747,368 · | ||
| Jun 13, 2025 | 62T95 | CookDistrict 1 | (1,082.40-Ft) The improvement includes earth excavation, non-special waste disposal, erosion control and protection, temporary drainage, traffic control and protection. The project is located along the east side of the NB Mannheim Ramp between Mannheim Road and the CN Railroad tracks and I-190 and Willow Creek. | — | Executed | Lindahl Brothers, Inc. $8,580,778 · | ||
| Jun 13, 2025 | 62U39 | WillDistrict 1 | Removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavemen Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL. | — | Executed | D. Construction, Inc. $5,328,033 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.